City Commission
Regular MeetingDelray Beach, FL · January 29, 2018
Minutes
City of Delray Beach
100 NW 1st Avenue - Delray Beach, Florida 33444
Phone: (561) 243-7000 - Fax: (561) 243-3774
www.mydelraybeach.com
Minutes - Final
Monday, January 29, 2018
5:30 PM
City Commission/CRA Joint Workshop at 5:30 PM
Fairfield Inn & Suites, 910 West Atlantic Avenue, Delray Beach, FL
33444
City Commission
City Commission Minutes - Final January 29, 2018
Pursuant to Section 3.12 of the Charter of the City of Delray Beach the Mayor has instructed me to
announce a Workshop Meeting of the City Commission to be held for the following purposes:
WS.1. 18-077 Joint Session with Community Redevelopment Agency (CRA) to discuss
the following:
1. Status of proposed legislation pertaining to CRAs - House Bill 17 &
Senate Bill 432
2. Update - Agreement with Pasadena Capital (Publix) & Letters of
Interest - SW 600-800 Blocks W. Atlantic Avenue
3. Status of FY 17/18 Capital Improvement Program - CRA Funded
Projects - 1st Quarter Report
Sponsors: Community Redevelopment Agency
Attachments: 1-22-18 -MLJC - CRA-City Commission Joint Workshop Memo
Memo from David Tolces re Update-HB 17 & SB432 - 1-22-18
9A LOI W Atlantic 600-800 Blocks
Workshop 1-29 FINAL
Item 1 Status of proposed legislation pertaining to CRAs- House
Bill 17 and Senate Bill 432
Mayor Glickstein called the meeting with the Delray Beach Community
Redevelopment Agency to order at 5:31 p.m. He noted that there were a
total of three items on this evening's agenda.
David Tolces, CRA Board Attorney, noted that the proposed legislation
regarding CRAs were still being considered in the House chamber of the
legislature. He also noted that Senate Bill 432 still had to be considered by
three additional committees, with all three committees yet to be scheduled.
Mr. Tolces said that he would keep all interested parties apprised about
the status of all applicable bills pertaining to Community Redevelopment
Agencies. Mr. Tolces also said that he would be pleased to answer any
questions.
CRA Board Member Sandy Zeller inquired whether there any successful
efforts by lobbying groups to change any components of the bills which
were opposed by Community Redevelopment Agencies. Mr. Tolces said
that he was not aware of any such efforts. He noted, however, that bills in
the legislature were very fluid.
Mayor Glickstein said that none of the lobbying efforts had effected the
House bill. He also said it was unfortunate that none of the lobbying efforts
had effected the House bill. Mayor Glickstein stated that it was also
City of Delray Beach Page 1 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
unfortunate that there was a video which had been circulated which
demeaned the Delray Beach CRA relative to the use of funds for the tennis
tournament. He said that much of the information contained in the video
was wrong. Mayor Glickstein said that running the tennis tournament was
never a responsibility of the Delray Beach CRA. He noted that it had been
an expectation of City Commissions for several years to forcefully ask the
CRA to fund something it was never really their obligation to fund. Mayor
Glickstein stated that both the CRA Board and City Commission had
struggled every year with the nexus of the tournament's expenditure.
Mayor Glickstein also said he thought that the CRA, on balance, had been
run very well through a tumultuous time in the City's history. He noted that it
was unfortunate that such a terrible contract, signed so long ago, obligated
this City Commission for decades for doing something that it never should
have been doing.
Item 2 Update- Agreement with Pasadena Capital (Publix) and
Letters of Interest - SW 600- 800 Blocks West Atlantic Avenue
Following introductory remarks by Delray Beach CRA Director Jeff
Costello, CRA Board Attorney David Tolces outlined the update regarding
the submittal of RFPs and RFQs. Discussion then ensued between the
City Commission and the CRA Board, regarding Pasadena Capital
(Publix) and related matters. Delray Beach CRA Attorney David Tolces
said he was in the process of drafting a contract for Pasadena Capital
(Publix) by the February 8th CRA Board meeting. Deputy Vice Mayor
Ervin Johnson said that the Delray Beach CRA was created approximately
forty years ago to eliminate slum and blight. She noted that areas east of
Swinton had been either developed or overdeveloped. Deputy Vice
Mayor Ervin Johnson said that Pasadena Capital (Publix) appeared to be
adamant not to put a shovel in the ground until December 2022. Deputy
Vice Mayor Ervin Johnson requested an update on this matter. Mr.
Straghn said that the CRA Board had been very clear on what messages
should be sent to Pasadena Capital. He stated that Pasadena Capital
had until February 8th to come back with a proposal to put something in the
ground before 2022. Mr. Straghn also said if this did not occur there would
be no Publix as far as he was concerned.
Commissioner Katz said he echoed the remarks of Deputy Vice Mayor
Johnson one hundred percent . He expressed frustration that it was one
year later with very little progress other than some negotiations in process.
Commissioner Katz stated that it was one year later and there were only
negotiations for one of the three blocks on West Atlantic. He expressed
frustration about the shortsightedness of stopping everything because
Pasadena (Publix) said that they were interested in one block.
Commissioner Katz suggested being creative and entertaining an offer
City of Delray Beach Page 2 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
and get some some options on the table. Commissioner Katz said it was
possible that perhaps ten developers would submit plans giving the chance
to go with the best one.
CRA Commissioner Balestriere said that the Board felt that it would have
taken a tremendous amount of staff time to do negotiations with Publix as
well as three other LOIs that we did not want to disrupt what they were
doing in order to get the Publix deal negotiated. She stated that
negotiations continued and the CRA Board hoped that the contract would
come back at the February 8th meeting.
Vice Mayor Chard said he was very concerned about potentially waiting
five years only to have Publix give us our money back. He noted that West
Atlantic Avenue was the gateway into Delray Beach. Vice Mayor Chard
said that only negotiating with Pasadena (Publix) and not with the other
three proposals was not equitable at all. He also noted that some of the
proposals referred to putting a shovel in the ground within two years. He
said letters had been submitted by two or three local developers. Mayor
Glickstein said that he generally agreed with Vice Mayor Chard about the
frustration at the pace of both execution on something that actually is
successful but in the current context but being tethered with uncertainty is
what has been outlined with Publix and Pasadena. Mayor Glickstein
noted that it was the CRA Board which recommended using something
other than equity, through the board's financial adviser. Mayor Glickstein
said he hoped that the CRA Board would pay a lot more attention to the
data throughout the process.
CRA Commissioner Balestriere said that the CRA Board had decided
collectively to go through the community driven study process.
Commissioner Balestriere also said that the CRA Board now had a solid
plan in front of them that will work. She noted that she did not support any
agreement which would take five years to make Publix a reality. Vice
Mayor Chard said he did not mean to criticize the efforts of the CRA Board
last week. He said that the CRA Board had done a yeoman's job trying to
move the process forward. He expressed concern that an equitable
chance was not being given to others. Commissioner Petrolia said that
she totally agreed with CRA Commissioner Balestriere. She said that the
City Commission did not know exactly what the CRA Board was going
through. Commissioner Petrolia noted that a lot more might be known
about the West Atlantic corridor after February 8th.
Mr. Costello said that there were timeframes in the agreement so far as
submitting site plans for approval. He noted that the contract commencing
constructing meant that would be footers in the ground and building the
foundation by December 31, 2022. Mayor Glickstein said that were two
CRA Board members not in attendance this evening that there was no
City of Delray Beach Page 3 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
direction given in terms of what the linchpin issue was in terms of timing.
Mayor Glickstein inquired whether the CRA got guidance on what the
outside date would be. He inquired whether the CRA Board was possibly
negotiating against itself. Mr. Tolces said the CRA Board knew that
Pasadena had heard the Board as far as their concerns with respect to the
outside date. He also said that the CRA Board and staff was impressing
upon Pasadena the board's concerns regarding the commencement of
construction. Mr. Tolces noted that it was anticipated that the agreement
would come before the CRA Board on February 8th. He said that
Pasadena (Publix) either needed to, or not, sign the agreement by
February 8th.
Commissioner Balestriere said she knew that the City Commission had
some concerns and items that they would like to see in an agreement. She
also said she would recommend that any such concerns should be given to
the City Manager to pass on to the CRA Director and the CRA Board
Attorney. Vice Mayor Chard said that negotiations were in process and the
clear direction this evening was to address the concerns of the City
commissioners as the negotiation process continued. Mr. Tolces said that
the CRA Board would have the opportunity to review the proposed
agreement prior to the February 8th meeting. Vice Mayor Chard said he
hoped that the City, if applicable, would receive our $2 million back with
interest. Mayor Glickstein said if it was the Board's position not to proceed
with Publix, it would be a huge missed opportunity. Mayor Glickstein said
he agreed with Vice Mayor Chard that an RFP was not the right way to go.
CRA Commissioner Balestriere said that the CRA Board would normally
put out a RFP or RFQ for sixty days or perhaps a sorter timeframe if the
Board knew that there was interest in the project. Vice Mayor Chard said
he thought that Commissioner Carstephen had talked about reallly
advertising this along with a press release and a meeting with the press
and other interested parties to let them know that the City and CRA Board
were open for business. Mayor Glicksten said he would recommend
putting this out using the services of national firms, rather than limiting it to
Florida firms. Commissioner Katz suggested that the CRA Board vote to
seek a RFQ at their February 8th meeting. He said if the CRA Board
decided not to proceed with Publix, there could be an already scheduled
press conference on February 9th to discuss either two (with Publix) or
three blocks to consider.
Mayor Glickstein said that unfortunately the CRA Board and the City
Commission would be judged by future development on West Atlantic
Avenue . He noted that the catalyst for the transformation plan would be
West Atlantic and scale up from there. Vice Mayor Chard suggested that
City of Delray Beach Page 4 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
the transformation plan be attached to the RFQ. Mayor Glickstein said that
any firm responding to this request would have to be familiar with the
community and the community's needs.
Item 3 CIP Projects
Mr. Costello commended Begona Krane and Kevin Matthews for their
efforts in managing the Delray Beach CRA's capital projects. Mr. Costello
provided a brief overview of existing alley, sidewalk, cross walk and other
capital projects.
Missie Barletto, Deputy Director, Program and Project Management, said
the Pompey Park Master Plan which was technically funded last year, had
only commenced this year. She noted that one of the first steps was to hold
a community meeting.
She also noted that another project moving forward in the near term was
the replacement of three HVAC units at Old School Square. Ms. Barletto
stated that the bids for this project would be opened in two days. She
estimated that the HVAC units would be installed by May at the latest. Ms.
Barletto said that the City had some unfortunate news when the operator for
the downtown roundabout trolley went of business. She noted that
applicable City staff would attempt to find a new operator in the next week.
Ms. Barletto said that funding was available for this year a level by level
parking garage accounting system at the Old School Square parking deck.
She noted that the software would make it possible for drivers to know the
number of available spaces on each floor of the garage. She also noted
that a license plate recognition project was underway at the same location.
She also said that City staff was in the process of designing a new building
to store the 100-foot Christmas tree. Ms. Barletto said that some of the
larger projects in process included the railway construction in the southwest
neighborhood on Southwest 3rd, 4th, 6th and 7th Avenue. Ms. Barletto
also said that City staff had met with neighborhood residents who had
requested nice low-level landscaping that will not affect sightlines over the
years and be easy for the City to maintain. She also said a consultant was
working with City staff to develop traffic calming measures for the residents
of this neighborhood.
Ms. Barletto said that the largest project in progress was in the
neighborhood improvement projects. She said that the Osceola Park
project included everything from underground pipes to street lights to traffic
calming, such as a temporary roundabout at Fourth Street and Fourth
Avenue. Ms. Barletto stated that the Katherine Strong Park Master Plan
was a Parks and Recreation project, following completion of the overall
City of Delray Beach Page 5 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
parks master plan.
Commissioner Petrolia said that there had been outreach about the
cut-through traffic from Lake Ida over to the City Hall area, with a school
close by. She inquired what City staff had found out about this matter. Ms.
Barletto said that City staff was examining potential traffic calming tools
similar to the SW 4th, 6th and 7th area, with roadway reconstruction being
considered. Commissioner Petrolia requested that Ms. Barletto speak to
the City Manager about the various cut-throughs from the City Hall area to
Lake Ida Road.
Commissioner Petrolia inquired about the possible installation of
sunshades on the playground at Veteran's Park because children were
unable to slide down the slides because it was so hot. Ms. Barletto said
she believed that the Parks and Recreation staff was looking into the
installation of sunshades.
Commissioner Petrolia inquired about the condition of lighting at Katherine
Strong Park, noting that it was very, very dark at the park during evening
hours. She also inquired whether it would cost the estimated $463,000 to
replace the three HVAC units. Ms. Bartello said the engineer's opinion
was in the neighborhood of $380,000.00. Commissioner Petrolia inquired
about the beautification for the interchange at I-95. Ms. Barletto said that
this was for street lighting. Mr. Costello said this also related to the design
due to the relocations of street lights at NW 12th Avenue and Atlantic
Avenue. Finally, Commissioner Petrolia asked whether the $200,000 for
the Old School Square parking garage was for the new parking space
system or for the design of the system. Ms. Barletto said the funds were for
the actual system. Ms. Barletto said it was osceolaparkproject.com.
Commissioner Katz said he had been told that there was money in last
year's budget to fund the sunshades for the playground at Veteran's Park.
Commissioner Katz asked whether the $200,000 for the parking space
system was for both garages. Ms. Barletto said that the $200,000 only
funded the system for the Old School Square parking space project. Ms.
Barletto said that the new system would let visitors know how many spaces
were available on each floor of the parking garage. Commissioner Katz
said he wanted to ensure that the City has expended funds on the right type
of technology. Ms. Barletto said staff had enlisted the aid of City of
Hollywood staff, who already had a similar parking system, to move forward
with the City's new system at Old School Square. Commissioner Katz
commended City staff for doing a great job on the Osceola Park project to
date. Ms. Barletto noted that some drivers did not know what to do at
roundabouts.
City of Delray Beach Page 6 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
Vice Mayor Chard said he had seen a huge truck attempting to get around
the roundabout. Ms. Barletto said that the City had actually installed
cameras at certain intersections in order to get a handle on problems and
to get a handle on pedestrian and bicycle traffic.
Vice Mayor Chard noted that when the City did NW 12th Avenue, it was
one week before Irma came through and the trees were impacted. He
asked whether there was a two-year maintenance agreement for
replacement of the trees on NW 12th Street. Ms. Barletto said that the City
had a one year warranty on dead plants whereby the contractor came out
and replaced the dead plants.
Vice Mayor Chard noted that Ms. Barletto had said that there would be
lighting on alleyways. He commended staff for moving forward in this
direction. Vice Mayor Chard inquired whether staff had investigated
permable alleyways. Ms. Barletto said this approach was being gradually
implemented by staff. Vice Mayor Chard said that the pilot for the trolley
was being moved up in terms of timeframe. Ms. Barletto said City staff
was working to expand service of the trolley service in the future.
Deputy Vice Mayor Johnson said she was concerned about the Pompey
Park master plan, said the consultant for this project was soliciting
community input and was certain that the best ideas would move forward.
Deputy Vice Mayor Johnson said that trolleys blocked traffic and polluted.
She said that Mr. deJesus had told her that there was a place to store the
Christmas tree. Ms. Barletto said that the tree was currently stored at the
train station facility. She also noted that a new facility would be constructed
at the Swwinton Operations Center to accommodate the christmas trees,
santa houses and other seasonal items. Mayor Glickstein inquired whether
the CIP execution was being driven by City staff. Mr. Lauzier said he was
ensuring that the execution was moving forward, with a new monthly update
being produced for the City Commission's information, including a monthly
update from CRA staff. Mayor Glickstein said that no one knew where the
CRA legislation may go. He asked whether the City would be able to move
quicker in terms of planned programs.
CRA Board Member Comments
CRA Commissioner Zeller requested that Mr. Costello provide a summary
of the recent joint meeting of the CRA Board with the WARC Board. Mr.
Costello said that there was a joint meeting with the WARC Board last
week, based on the Board's direction to have joint partnership agreement
with the WARC Board. Mr. Costello said that the CRA Board's attorney
was drafting an update agreement for review by both the WARC Board and
CRA Board.
City of Delray Beach Page 7 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
CRA Commissioner Cox said one of the strengths of the Delray Beach
CRA Board was the independence of the board members. Mr. Cox stated
that there were experts on the boards, who's expertise should be used for
the betterment of the community.
Mayor Glickstein said that the Delray Beach CRA had been held up as a
positive example of a CRA. Mayor Glickstein said that politics creeped
into a lot of decision-making. Mayor Glickstein also said he thought that
this evening's joint meeting were very productive.
Commissioner Cathy Balestriere said that the CRA's Board joint meeting
with the WARC (West Atlantic Redevelopment Coalition) Board was
difficult but very productive. She expressed hope that a draft of the
agreement with the WARC Board would come back to the CRA Board for
consideration at their next meeting. Ms. Balestiere said there was a need
to come together as partners.
Commissioner Straghn stated that he did not have a problem with criticism
of the CRA Board, so long as there was an opportunity to get things right.
He urged the CRA Board, City Commission, and community leaders to
work together in moving ahead with the development of West Atlantic and
other proposed developments within the CRA Board's boundaries to get
things right. Commissioner Straghn said he was not okay having a
contract with Publix holding land hostage for a period of five years, or with
any other developer.
CRA Board Chairperson Annette Gray, requested that the CRA Board's
monthly report be included on the City Commission's consent agenda. Ms.
Gray said that this would give Mr. Costello and his staff some lead time to
prepare to answer questions from members of the City Commission. She
suggested that the City Commissioners put their concerns about property
negotiations in writing to the City Manager to share with the CRA Executive
Director and CRA Board Attorney. Ms. Gray said that Publix had deep
pockets and the time to make changes to the logistics of any contract in
their favor. Ms. Gray emphasized the importance of the CRA Board and
City Commission understand the triggers of agreements and not give
Publix an out to the contract. She said that an RFP stated what was
wanted and how it was wanted. She suggested that a combination of an
RFP and RFQ might be the best be fine and get us where we need to be.
Ms. Gray inquired where things were in terms of the quiet zone for the
Brightline. Mr. Lauzier said a full report about the Brightline guiet zone
would be presented at the February 6th City Commission meeting.
There being no further business, Mayor Glickstein declared the workshop
meeting to be adjourned at 7:28 p.m.
City of Delray Beach Page 8 Printed on 5/16/2018
City Commission Minutes - Final January 29, 2018
City of Delray Beach Page 9 Printed on 5/16/2018
Agenda
CITY COMMISSION
CITY OF DELRAY BEACH, FLORIDA
WORKSHOP MEETING - MONDAY, JANUARY 29, 2018
5:30 PM FAIRFIELD INN & SUITES, 910 WEST ATLANTIC AVENUE, DELR
Mayor Cary Glickstein
Vice Mayor Jim Chard
Deputy Vice Mayor Shirley Ervin Johnson
Commissioner Shelly Petrolia
Commissioner Mitchell Katz
City Commission/CRA Joint Workshop at 5:30 PM
Pursuant to Section 3.12 of the Charter of the City of Delray Beach the Mayor has instructed me to
announce a Workshop Meeting of the City Commission to be held for the following purposes:
WS.1. Joint Session with Community Redevelopment Agency (CRA) to discuss the following:
1. Status of proposed legislation pertaining to CRAs - House Bill 17 & Senate Bill 432
2. Update - Agreement with Pasadena Capital (Publix) & Letters of Interest - SW 600-800
Blocks W. Atlantic Avenue
3. Status of FY 17/18 Capital Improvement Program - CRA Funded Projects - 1st Quarter
Report
Sponsors: Community Redevelopment Agency
Attachments: 1-22-18 -MLJC - CRA-City Commission Joint Workshop Memo
Memo from David Tolces re Update-HB 17 & SB432 - 1-22-18
9A LOI W Atlantic 600-800 Blocks
Workshop 1-29 FINAL
Please be advised that if a person decides to appeal any decision made by the City Commission with respect to
any matter considered at this meeting, such person will need to ensure that a verbatim record includes the
testimony and evidence upon which the appeal is based. The City neither provides nor prepares such record.
City of Delray Beach Page 1 Printed on 1/24/2018
Get email alerts for Delray Beach
A daily email when new agendas and minutes are posted.