Planning Board - Planning Technical Review Committee
Regular MeetingDover, NH · July 30, 2026
Agenda
PLANNING TECHNICAL REVIEW COMMITTEE –AGENDA
Meeting Type: Regular Meeting
Meeting Location: Council Conference Room, City Hall, 288 Central Ave, Dover NH 03820
Meeting Date: Thursday, July 30, 2026
CITY OF DOVER
Meeting Time: 10:30 AM
1. Site Plan for 6 Brick Road, LLC, Assessor’s Map 28, Lot 9-C, zoned Office and Gateway,
located at 1-24 Jefferson Drive. (Proposal is to construct 6 townhouse style residential units in
two (2) buildings.) (SITE-2026-0011)
Document Created by: Planning Department 2026.07.30_PlanningTechnicalReviewCommittee.Agenda
Document Posted on: July 16, 2026 Page 1 of 1
Packet
PLANNING TECHNICAL REVIEW COMMITTEE –AGENDA
Meeting Type: Regular Meeting
Meeting Location: Council Conference Room, City Hall, 288 Central Ave, Dover NH 03820
Meeting Date: Thursday, July 30, 2026
CITY OF DOVER
Meeting Time: 10:30 AM
1. Site Plan for 6 Brick Road, LLC, Assessor’s Map 28, Lot 9-C, zoned Office and Gateway,
located at 1-24 Jefferson Drive. (Proposal is to construct 6 townhouse style residential units in
two (2) buildings.) (SITE-2026-0011)
Document Created by: Planning Department 2026.07.30_PlanningTechnicalReviewCommittee.Agenda
Document Posted on: July 20, 2026 Page 1 of
1
PLAN SNAPSHOT REPORT SITE-2026-0011
FOR CITY OF DOVER, N.H.
Plan Type: Site Plan - Major Project: App Date: 07/09/2026
Work Class: New Construction District: None Exp Date: 09/12/2026
Status: In Review Square Feet: 0.00 Completed: NOT COMPLETED
Valuation: $0.00 Assigned To: Blonigen, Rachel Approval
Expire Date:
Description: Construction of 6 townhouse style residential units in 2 buildings.
Parcel: 28009-C00000 Main Address: 1-24 Jefferson Dr Main Zone: O(Office)
Dover, NH
Applicant Owner
Tritech Engineering Corp. 6 Brick Road, LLC
755 Central Avenue 3 Quill Lane Suite 107
Dover, NH 03820 Barrington, NH 03825
Business: (603) 742-8107 Home: (978) 375-3153
Plan Custom Fields
Total2 0 Total3 0 Total 0
Total5 0 Total4 0 Total6 0
Total7 0 Total9 0 Total8 0
Street Classification Private Recording Number Net Change in # Parking16
Type Spaces (+/-)
Water Service Municipal Sewer Service Municipal Deed Book 3986
and
5140
Total Acres (GIS) 2.891 Deed Page 60 Total SQFT 125932
and
135
Deed Date 01-08-2012 Proposed Property Use 6 new townhouse style Area of Parcel to be 24000
and residential units in 2 Developed (SQFT)
09-27-2023 buildings.
Number of Parking 51 Number of Parking 67 Distance to City Water 0
Spaces Existing Spaces Proposed
Distance to City Sewer 0 Type of Building to be 2 wood frame townhouse Estimated Construction 1500000.00
Built style with internal parking Value
Refuse Removal Private Is there an existing No Existing Conservation
Conservation Easement Details
Easement?
Total of Impact Fees to 0.00 TotalImpactFeeSDTOD 0.00 Sub Total Residential 0.00
be Assessed
TotalImpactFeeTHTOD 0.00 TotalImpactFee23FTOD0.00 TotalImpactFeeA4TOD 0.00
TotalImpactFeeMHTOD0.00 TotalImpactFeeADUTO 0.00 TotalImpactFeeAONRT 0.00
D OD
TotalImpactFeeAR55TO0.00 TotalImpactFeeAR62TO0.00 TotalImpactFeeRIRCTO0.00
D D D
Sub Total 0.00 TotalImpactFeeOCSTO 0.00 TotalImpactFeeITWCTO0.00
Non-Residential D D
TotalImpactFeeNHALTO0.00 TotalImpactFeeOIUTOD0.00 TotalImpactFeeAFAOT 0.00
D OD
Attachment File Name Added On Added By Attachment Group Notes
Signature_Robert_Stowell_7/9/2026.jpg 07/09/2026 13:49 Stowell, Robert Uploaded via CSS
2026.07.30_PlanningTechnicalReviewC 07/21/2026 9:58 Blonigen, Rachel TRC Agenda
ommittee.Agenda.pdf
July 21, 2026 City of Dover Page 1 of 3
PLAN SNAPSHOT REPORT (SITE-2026-0011)
Invoice No. Fee Fee Amount Amount Paid
INV-2026002595 Planning General Application Fee $250.00 $250.00
Total for Invoice INV-2026002595 $250.00 $250.00
Grand Total for Plan $250.00 $250.00
Meeting Type Location Scheduled Date Subject
Technical Review Committee Meeting City Hall, Second Floor Conference 07/30/2026 Technical Review Committee Meeting
v.1 Room
Submittal Name Status Received Date Due Date Complete Date Resubmit Completed
Land Use Plan Technical Review v.1 In Review 07/21/2026 08/18/2026 No No
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
Business Development Business Development Burdin, James In Review 07/21/2026 08/18/2026
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
City Engineer Community Services - Semprini, Jillian In Review 07/21/2026 08/18/2026
Engineering
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
Planning Planning Crouser, Paul In Review 07/21/2026 08/18/2026
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
Zoning Administrator Planning Crouser, Paul In Review 07/21/2026 08/18/2026
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
IS Building Official Planning / Inspection Maxfield, Jim In Review 07/21/2026 08/18/2026
Services
Assigned Due Completed
Item Review Name Department Assigned User Status
Date Date Date
Traffic Police Mitrushi, Alex In Review 07/21/2026 08/18/2026
Workflow Step / Action Name Action Type Start Date End Date
Review v.1 07/21/2026 9:54
Confirm application complete v.1 Generic Action 07/21/2026 9:57
Technical Review Committee Meeting Agenda v.1 Task 07/21/2026 9:54 07/21/2026 9:57
Land Use Plan Technical Review v.1 Receive Submittal 07/21/2026 0:00
Technical Review Committee Meeting v.1 Hold Meeting 07/21/2026 9:55
Planning Board v.1
Planning Board Agenda v.1 Task
Invoice for Notices v.1 Task
Send Notices v.1 Task
Planner Creates Staff Recommendations v.1 Plan Activity
Distribute Planning Board Materials v.1 Task
Planning Board Hearing v.1 Hold Hearing
Planning Board Decision v.1 Plan Activity
NOD Sent to Applicant v.1 Create Report
Final Plan v.1
Land Use Plan Stamped and Signed v.1 Generic Action
Recording v.1 Task
Document Archival v.1 Generic Action
July 21, 2026 City of Dover Page 2 of 3
PLAN SNAPSHOT REPORT (SITE-2026-0011)
Internal Notification of Plan Completion v.1 Generic Action
Building Official Notifies Address v.1 Generic Action
Pre-Con Meeting v.1 Hold Meeting
Create/Link to Records v.1
Create / Link to Permit - Building Major v.1 Create Sub Permit
Create / Link to Permit - Site Work, Construction v.1 Create Sub Permit
July 21, 2026 City of Dover Page 3 of 3
City of Dover, New Hampshire
SITE REVIEW APPLICATION
[Revision Date: July 1, 2021]
Office Use Only Project #: ________________ Date Received: __________________
Amount Paid: ________________ Time Received: __________________
APPLICANT AND OWNER INFORMATION
6 Brick Road, LLC
Name of Applicant: ________________________________________ 978-375-3153
Telephone #_________________
3 Quill Lane Suite 107, Barrington NH 03825
Address of Applicant: _________________________________________________________________
johnoneill.nh@gmail.com
E-Mail Address: _______________________________________________________________________
Name of Property Owner (if different from applicant): __________________ Telephone #___________
Address of Property Owner: _____________________________________________________________
PROPERTY INFORMATION
Jefferson Drive
Address of Property: __________________________________________________________________
28
Assessor's Map # _______________ 9C
Lot(s) # ______________________________________________
Office & Gateway
Zoning District(s) ________________________ Conservation District
Overlay District(s) _____________________________
Size of Parcel: 125,944 2.891
__________sq. ft. ________ac. Property Deed: Book 3986 60
_________ Page: ____________
5140 135
Multi-family residential
Existing Use of Property: _______________________________________________________________
SITE PLAN INFORMATION
6 new townhouse style units (2 buildings total).
Describe Proposed Use: ________________________________________________________________
24,000
Area of Parcel to be Developed: ____________________________________________________ sq. ft.
If Multi-family Residential: 6
Number of Units _________& Buildings Proposed __________________
2
If lodging: Number of Units ________ & number of Buildings __________________
Number of Parking Spaces: Existing 51
____________________ Proposed 67
________________________
X City Street ____ State Highway
Highway Access (check where applicable): ____
Number of Employees Total: ______________________ In Maximum Shift: ______________________
Disposition of Parcel: Building Setbacks:
4,350
Building Footprint _________________ sq. ft. Front Yard ________________________ ft.
N/A
4,350
Total Building Area ________________ sq. ft. Rear Yard ________________________ ft.
22
13,050
Paved Area ______________________ sq. ft. Side Yard: Right____
34.1 ft. Left_____
15 ft.
City of Dover, New Hampshire Site Review Application__ Page 2
X
City Water? ___Yes ___ No How far is city water from the property? ____________________
On site
City Sewer? ___Yes
X ___ No On site
How far is city sewer from the property? ____________________
TRANSFER OF DEVELOPMENT RIGHTS INFORMATION
Type of TRANSFER OF DEVELOPMENT RIGHT REQUEST (Check All That Apply):
□
X Residential □ Residential (reduced size) □ Industrial | X
□ Purchase □ Land Preservation
Relief sought (Check All That Apply):
□ Lot Size □ Frontage □ Setback □ 30’ Buffer □ Increase by ________
X 4 units
Describe Proposed Use or Activity that requires TDR; describe any impacts and document mitigation:
Jefferson Drive currently has 24 townhouse style units. The applicant proposes to develop an additional 6 units
____________________________________________________________________________________
4 of these units will be non-restricted and purchased through TDR.
____________________________________________________________________________________
____________________________________________________________________________________
BUILDING INFORMATION
Type of Building to be Built: Wood frame
____________________________________________________________
Varies Varies
Height of Building: _______________________ Finished Floor Elevation: ________________________
N/A
Number of Seats (where applicable) ______________________________________________________
$1.5 M
Estimated value of construction: _____________Refuse removal: Public/Private (circle one)
WAIVER REQUESTS
Site Review Regulations section(s) to be waived: ___________________________________________
Justification for waiver request(s) (attach additional sheets as needed):
___________________________________________________________________________________________
_____________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
________________________________________________________
City of Dover, New Hampshire Site Review Application__ Page 3
SURVEYOR INFORMATION
Robert Stowell; Tritech Engineering Corp.
Name of Surveyor and Company (Licensed in N.H.) __________________________________________
Address 755 Central Ave. Dover, NH
__________________________________________________Telephone #: 603 742 8107
______________
____________________________ E-mail address: rjs@tritecheng.com
Professional License #: 884 _______________________
ENGINEER INFORMATION
Name of Engineer and Company (Licensed in N.H.) Robert Stowell; Tritech Engineering Corp.
__________________________________________
755 Central Ave. Dover, NH
Address __________________________________________________Telephone #: 603 742 8107
______________
____________________________ E-mail address: rjs@tritecheng.com
Professional License #: 9903 _______________________
ARCHITECT INFORMATION
Name of Architect and Company (Licensed in N.H.) _________________________________________
Address __________________________________________________Telephone #: ______________
Professional License #: ____________________________ E-mail address: _______________________
LANDSCAPE ARCHITECT INFORMATION
Name of Landscape Architect and Company (Licensed in N.H.) Romy N. Maurer; Terrain Planning & Design
_________________________________
Address 311 Kost Hill Rd. Hopkinton, NH 03229
__________________________________________________Telephone #: 603 746 3512
______________
Professional License #: 086 romy@terrainplanning.com
____________________________ E-mail address: _______________________
SOIL SCIENTIST INFORMATION
Michael Mariano; Highland Soil Services
Name of Soil Scientist and Company (Licensed in N.H.) _________________________________
Address 75 Prospect St. Somersworth, NH
__________________________________________________Telephone #: 609 692 4457
______________
Professional License #: 76 highlandsoilservices@comcast.net
____________________________ E-mail address: _______________________
CONSERVATION EASEMENT HOLDER
Name of Easement Holder: __________________ Telephone #________
Address Easement Holder: __________________________________________________________
CITY OF DOVER SITE REVIEW
LIST OF ABUTTERS
Pursuant to RSA 676:4, the State Law of New Hampshire, the City of Dover is required to notify the applicant,
abutters (including holders of conservation easements), and any professional whose seal is on the plan, of the
public hearing by certified mail, return receipt requested. Staff will provide the abutter information, while the
applicant must provide accurate contact information for the owner, applicant and professional agents
representing the project.
Owner:
TAX MAP LOT # PROPERTY OWNER MAILING ADDRESS
28 9C 6 Brick Road, LLC 3 Quill Lane Suite 107, Barrington NH 03825
Applicant (if different from owner):
APPLICANT NAME APPLICANT COMPANY MAILING ADDRESS
Surveyor and/or Engineer/Professional Agent:
NAME COMPANY MAILING ADDRESS
Robert J. Stowell Tritech Engineering Corp. 755 Central Ave. Dover, NH 03820
Michael Mariano Highland Soil Services 75 Prospect St. Somersworth, NH 03878
Romy N. Maurer Terrain Planning & Design 311 Kost Hill Rd. Hopkinton, NH 03229
Conservation Easement Holder:
TAX MAP LOT # NAME OF EASEMENT HOLDER MAILING ADDRESS
PLANNING BOARD FEE SCHEDULE/INVOICE
(Revised July 24, 2023)
Below are the fees associated with plan review and are subject to a nonrefundable application fee to cover
administrative expenses. Please complete the information below and provide payment with your application
submittal. Plan review fees shall be paid prior to technical review committee (TRC) being scheduled.
For plans not requiring TRC review, fees are due 21 days prior to the Planning Board meeting. Staff will
coordinate abutter/notice fees, which will be invoiced and must be paid 28 hours before the Planning Board
meeting for an application to be heard. Fees shall be paid by cash or check made payable to “City of Dover”.
A. Plan Review Fees
1. Application fee for the following (SELECT ALL THAT APPLY):
SUBDIVISION Application fee $200.00 + $150.00 x # _____ new lots created = $________
LOT LINE ADJUSTMENT Application fee $200.00 + $100.00 X # ___ of lots involved = $________
TRANSFER OF DEVELOPMENT RIGHTS Application fee $200.00 = $________
SITE REVIEW – RESIDENTIAL Application fee $200.00+ $100.00 x # __ per dwelling unit =$________
6 800.00
SITE REVIEW – NON-RESIDENTIAL Application fee $200.00 + (not to exceed $10,000)
o New construction $.15 sq. ft. x # ______ sq. ft.= $________
o Additions (new floor space) $.10 per sq. ft. x # _____sq. ft.= $________
MOTEL/HOTEL $35.00 x # ___ per lodging unit= $________
CHANGE OF USE Application fee $200.00 + (not to exceed $5,000)
o Existing floor spaces $.10 per sq. ft. x # _______ sq. ft. = $________
CONDITIONAL USE PERMIT Application fee $200.00 x # _____ per Application = $________
GRAVEL PIT/ EXCAVATIONS
o Application fee $50.00= $________
o Permit fee $75.00= $________
EXTENSIONS/AMENDMENTS/WAIVERS FOR AN APPROVED PLAN Application fee $200.00 = $________
REQUEST FOR REZONING Application fee $200.00 = $________
DRIVEWAY WAIVER Application fee $200.00 = $________
TOTAL IMPERVIOUS PAVED AREA (for new development, roadways or additions to
existing parking lots, (not to exceed $10,000)) Application fee of $200.00 is N/A if it is part
of a Site Review or Subdivision Plan. $200.00 + $.07 per sq. ft. x # _________ sq. ft. = $_________
SUBTOTAL PLAN REVIEW FEE = $_________
800.00
AND
B. Abutter Notification/Mailing Labels - this office will create and print the abutter list and provide
labels in triplicate for each abutter. The applicant/owner will review the list for accuracy and provide to us
the engineer, architect, licensed land surveyor (LLS), licensed landscape architect (LLA) and/or soil scientist
whose professional seal appears on the plan with names and addresses for notices.
Applicant & Owner, engineer, architect, LLS, LLA and/or soil scientist
o Certified letters fee # ________ of x $10.00= $________
Certified letters fee: # of abutters __________ X $10.00= $________
First Class Mail fee (for individual owner of units within a condominium
or other collective form of ownership): # of abutters ________ X $1.00= $________
Creating/Printing Abutter Labels in triplicate per sheet _____ x $10.00= $________
C. Foster’s newspaper public notice fee $120.00 x # _____ applications = $________
SUBTOTAL = $_________
TOTAL INVOICE AMOUNT = $_________
PLAN REVIEW FEE COLLECTED/PAID = $ _________
BALANCE DUE = $ _________
800.00
The amount due must be paid 28 hours prior to the Planning Board Meeting, to be heard.
TEPP LLC TRANSPORTATION ENGINEERING, PLANNING, AND POLICY
MEMORANDUM 93 Stiles Road, Suite 201, Salem, New Hampshire 03079 USA
800 Turnpike Street, Suite 300, North Andover, Massachusetts 01845 USA
Phone (603) 212-9133 and Fax (603) 226-4108
Email tepp@teppllc.com and Web www.teppllc.com
Ref: 1168
Subject: Traffic Assessment
Jefferson Drive
Dover, New Hampshire
From: Kim Eric Hazarvartian, Ph.D., P.E., PTOE
Principal
keh@teppllc.com
Date: July 8, 2026
INTRODUCTION
Tritech Engineering Corporation has retained TEPP LLC to prepare this traffic assessment mem-
orandum (TAM) regarding the proposed residential expansion on Jefferson Drive in the City of
Dover, New Hampshire. The existing site has 24 townhouse dwelling units. The project will
add six townhouse dwelling units.
This TAM concludes that the proposed residential expansion will:
• generate a small number of peak-hour vehicle-trips
• have no significant impact to area traffic operations and safety
This TAM includes:
• existing site description
• proposed project description
• road description
• public transit
• sight distances
• trip generation
• trip distribution/assignment
• potential traffic impacts
This TAM concludes that the proposed residential expansion will:
• generate a small number of peak-hour vehicle-trips
• have no significant impact to area traffic operations and safety
TEPP
EXISTING SITE DESCRIPTION
The existing site:
• is north of Brick Road
• has an area of about 2.891 acres
• includes 24 townhouse dwelling units and wooded land
• to the south has residential development, to the west and north has a mix of commercial
and residential development, and to the east has wooded land
• includes one driveway (Jefferson Drive) that intersects the north side of Brick Road about
150 feet (ft) east of Central Avenue
PROPOSED PROJECT DESCRIPTION
The project will:
• add six townhouse dwelling units
• retain the existing driveway
ROAD DESCRIPTION
Brick Road:
• functions as a local street under the jurisdiction of the City
• to/from the west, terminates at an unsignalized intersection with Central Avenue
• to/from the east, continues as Floral Avenue
• includes minor grades
• has a minor horizontal curve for most of its length, with the outside of the curve to the
south
• connects with Floral Avenue at a horizontal turn, with the outside of the turn to the north
and east
• has a paved travelway about 22-to-24-ft wide
• has no pavement markings
• has asphalt cement concrete pavement in variable condition
• has some sloped granite curb on the south side
• has utility poles along the either side, some with luminaires
• has no posted speed limit
1168 20260708 M Traffic Assessment 2
TEPP
• is lined with residential development
PUBLIC TRANSIT
Cooperative Alliance for Seacoast Transportation bus-transit system Route 12
(Rochester/Somersworth/Dover) runs along Central Avenue near the site.
The route connects with:
• to the south, central Dover and the Dover Transportation Center
• to the north, the Cities of Somersworth and Rochester, New Hampshire
SIGHT DISTANCES
The project retains the existing driveway.
TRIP GENERATION
The Institute of Transportation Engineers (ITE) publishes trip-generation information in the au-
thoritative Trip Generation Manual. 1 This information is based on empirical data for a variety of
land uses, including land use 215, single-family-attached housing, based on dwelling units. 2
Table 1 shows changes in vehicle-trips due to the project as:
• weekday daily, 39 (total of in and out)
• weekday AM-street-peak hour, 3 (1 in and 2 out)
• weekday PM-street-peak hour, 3 (2 in and 1 out)
• Saturday daily, 39 (total of in and out)
• Saturday site-peak hour, 3 (2 in and 1 out)
TRIP DISTRIBUTION/ASSIGNMENT
Calculated trip generation is so low that area traffic operations will not be sensitive to trip distri-
bution/assignment. Trips will split along Brick Road to/from the east and west and will further
split beyond the immediate project area.
1
ITE, Trip Generation Manual, 12th edition (Washington DC, August 2025).
2
ITE, Trip Generation Manual, Volume 3, pages 249 to 260.
1168 20260708 M Traffic Assessment 3
TEPP
Vehicle-Trips
Existing Totala Proposed Totalb Differences
Weekday Daily 158 197 39
Weekday AM-Street-Peak Hour
In 3 4 1
Out 8 10 2
Total 11 14 3
Weekday PM-Street-Peak Hour
Enter 7 9 2
Exit 5 6 1
Total 12 15 3
Saturday Daily 158 197 39
Saturday Site-Peak Hour
Enter 5 7 2
Exit 6 7 1
Total 11 14 3
a Based on ITE, Trip Generation Manual, land use 215, single-family-attached housing,
24 dwelling units. Weekday daily used for Saturday daily.
b Based on ITE, Trip Generation Manual, land use 215, single-family-attached housing,
30 dwelling units. Weekday daily used for Saturday daily.
POTENTIAL TRAFFIC IMPACTS
ITE suggests that land developments generating at least 100 peak-hour vehicle trips, in the busier
direction, are candidates for consideration of traffic impact analysis. 3 Tabulated peak-hour trip
generation of the project is well below this national ITE threshold. The project will not add sig-
nificant new traffic to the area.
CONCLUSION
This TAM concludes that the proposed residential expansion will:
• generate a small number of peak-hour vehicle-trips
• have no significant impact to area traffic operations and safety
3
ITE, Manual of Transportation Engineering Studies (Prentice Hall: Englewood Cliffs, New Jersey, 2000), page
144.
1168 20260708 M Traffic Assessment 4
LANDSCAPE
OPERATION & MAINTENANCE PLAN
for
6 BRICK ROAD, LLC
Jefferson Drive
Dover, New Hampshire
June 2026
Weekly Tasks
1. Mow and edge lawns if needed. Lawns to be cut to 3.5” height.
2. Prune back any shrubs overhanging curbs or sidewalks.
3. Prune back any groundcover overhanging curbs or sidewalks.
4. Remove litter and leaves from plants, planters, and parking lots.
5. Remove any broken or fallen branches from trees. Remove sucker growth from
tree trunks.
6. Remove any weeds larger than 2 inches (5 cm) high or wide from planters. Weeds
2 inches (5 cm) and larger must be removed, not just killed.
7. Replace bark mulch which has been knocked or washed out of planters. Smooth
mulch layer if it has been disturbed.
8. Replace decorative rock which has been knocked or washed out of drip strips.
Smooth decorative rock surface if it has been disturbed.
9. Check plants for signs of stress, pests or disease. Request authorization to replace other
dead or missing plants. Note: Maintenance contractor must request authorization to
make replacements within one week of the damage becoming evident.
10. Sweep or blow clean all walkways, curbs, and gutters.
11. Treat for any signs of disease or pest infestation.
12. Complete any items required on the Monthly Checklist.
13. Hand water any plants that are dry and stressed.
14. Check the irrigation system (if there is a system). Make emergency repairs as needed or
request authorization to make major repairs. Note: Maintenance contractor must request
authorization for repairs within one week of the damage becoming evident.
15. Adjust the irrigation controllers for current water needs of plants.
16. Gently prune shrubs at appropriate time of year based on species, for shape
and form. DO NOT shear.
Yearly Tasks
Early Spring
1. Prune any tree branches that interfere with public safety. Prune all parking lot and
street trees yearly to encourage strong growth.
2. Apply granular fertilizer to shrubs beds and lawns. Be sure to make application prior to
a moderate rainfall in drip-irrigated planters so the rain will wash the fertilizer in.
3. Submit receipts to owner's authorized representative as proof of fertilizer purchase.
4. Trim any perennial foliage left in the fall for winter interest to within six inches of
the ground.
Tritech Engineering Corporation Page 1 of 2
LANDSCAPE
OPERATION & MAINTENANCE PLAN
for
6 BRICK ROAD, LLC
Jefferson Drive
Dover, New Hampshire
June 2026
5. Add new mulch to planters where the mulch depth has been reduced to less than 2
inches (5 cm) thick. Mulch depth shall not exceed 2”. Additional mulch not required
where shrubs or groundcover completely hide the soil surface from view.
6. Where there is irrigation and after threat of frost is gone, flush out irrigation systems
as needed and check for proper operation of each valve zone. Clean or replace
plugged sprinkler nozzles. Replace plugged drip emitters.
7. Replace irrigation controller program back-up batteries.
June:
No additional items
July:
No additional items
August:
No additional items
September:
1. Inventory all plant materials. Inventory shall include an exact count of all shrubs and
trees, itemized by planter. Replace any dead or missing plants.
October:
1. Prepare irrigation system for winter. Make sure backflow preventer is well insulated or
drained prior to first freeze. Blow out pipes using compressed air in areas where
freezing could result in breakage.
2. Mow field areas.
November:
1. “WILT-PRUF” broadleaf evergreens when temperature permits.
December:
1. Prune any tree branches that interfere with public safety. Prune all parking lot and street
trees yearly to encourage strong growth.
Tritech Engineering Corporation Page 2 of 2
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
ISSUED FOR TRC REVIEW
July 9, 2026
terrain
planning & design llc
311 kast hill road
(2) SJ hopkinton nh 03229
603. 491. 2322
(1) CS (6) AM terrainplanning.com
(2) HP
(1) IG
(1) CS (1) CA
(1) KL
(2) SJ (1) CA
(2) HP
(1) SR
ISSUED FOR TRC REVIEW
(2) AR
July 9, 2026
(1) SR
(9) AM
(2) SJ
NO SCALE
(1) CS
(1) IG (2) HP
(1) CS (1) (1) AR
CA
(1) KL
(2) SJ
(1) CA
(2) HP
PLANTING NOTES
1. CONTRACTOR SHALL OBTAIN APPROVAL FROM LANDSCAPE ARCHITECT PRIOR TO PURCHASING AND/OR
INSTALLING SUBSTITUTE PLANT MATERIAL PRIOR TO PURCHASE OF ANY SUBSTITUTE MATERIALS.
2. CONSTRUCTION ACCESS WILL BE AS DIRECTED BY LANDSCAPE ARCHITECT. CONTRACTOR IS RESPONSIBLE
FOR RESTORATION OF ACCESS ROUTE AND ALL AREAS DISTURBED BY PLANTING OPERATIONS UPON
COMPLETION OF CONSTRUCTION OPERATIONS, AT NO ADDITIONAL COST TO THE OWNER.
3. LAYOUT OF ALL PLANTING BEDS AND LOCATION OF PLANTS TO BE APPROVED BY LANDSCAPE ARCHITECT
ON SITE PRIOR TO CONSTRUCTION AND INSTALLATION.
4. CONTRACTOR TO REMOVE ALL DEBRIS GENERATED BY PLANT INSTALLATION. DEBRIS TO BE DISPOSED OF
IN A LEGAL MANNER.
5. ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN GOOD, HEALTHY AND FLOURISHING CONDITION FOR
ONE YEAR FROM THE DATE OF FINAL INSTALLATION APPROVAL BY LANDSCAPE ARCHITECT. CONTRACTOR
SHALL REPLACE, WITHOUT COST TO OWNER, AND AS SOON AS WEATHER CONDITIONS PERMIT, ALL DEAD
AND NON-FLOURISHING PLANTS AS DETERMINED BY THE LANDSCAPE ARCHITECT. REPLACEMENT PLANTS
SHALL BE BE GUARANTEED IDENTICALLY TO ORIGINAL PLANTS, TIME PERIOD COMMENCING FROM DATE OF
REPLACEMENT PLANTING APPROVAL BY LANDSCAPE ARCHITECT.
6. ALL BEDS TO BE MULCHED WITH 4" DEPTH SHREDDED BARK MULCH UNLESS NOTED OTHERWISE.
7. CONTRACTOR TO PROVIDE NECESSARY TEMPORARY IRRIGATION IF NEEDED BASED ON TIME OF YEAR THE
PROJECT IS IMPLEMENTED.
ISSUED FOR TRC REVIEW
July 9, 2026
Get email alerts for Dover
A daily email when new agendas and minutes are posted.