Water & Light Commission Agendas & Packets
Regular MeetingEast Grand Forks, MN · May 7, 2025
Minutes
Minutes of the regular meeting of the Water, Light, Power and Building Commission of the City of
East Grand Forks, Minnesota held on May 7, 2025, at 8:00 am in the City Council Chambers.
Present: Quirk, Grinde, Rapacz, Riopelle
Absent: None
Also present: Ron Galstad, Keith Mykleseth, Brian Johnson, Todd Grabanski, Steve Emery, Todd
Forster, Corey Thompson, Tyler Tretter, Jeremy King
It was moved by Commissioner Grinde supported by Commissioner Rapacz to approve the minutes
of the previous regular meeting held on April 16, 2025.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Rapacz supported by Commissioner Grinde to authorize the
Secretary to issue payment of the recommended bills and payroll in the amount of $1,759,725.90.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
Check # Vendor Name Check Date Amount
520694 Acme Electric Companies 5/7/2025 $235.62
520695 Advanced Business Methods 5/7/2025 $38.64
520696 Amundson, Roger 5/7/2025 $50.00
520697 ARIN 5/7/2025 $262.50
520698 Bert's Truck Equipment Inc 5/7/2025 $75.35
520699 Border States Electric Supply 5/7/2025 $1,011.80
520700 Cannon Technologies Inc 5/7/2025 $4,020.12
520701 Central McGowan Inc 5/7/2025 $1,743.75
520702 CenturyLink 5/7/2025 $110.24
520703 Commissioner of Revenue 5/7/2025 $52,334.00
520704 Conner, Shataya 5/7/2025 $134.86
520705 Dakota Supply Group 5/7/2025 $2,619.43
520706 Derouin, Bethany 5/7/2025 $249.38
520707 Diamond Cleaning Supply 5/7/2025 $601.65
520708 DitchWitch 5/7/2025 $382.13
520709 Docu Shred Inc 5/7/2025 $54.00
520710 East Grand Inn 5/7/2025 $4,425.00
520711 EGF City 5/7/2025 $748,504.62
520712 Electro Watchman, Inc 5/7/2025 $8,011.15
520713 Emerson, Malia 5/7/2025 $123.11
520714 Exponent 5/7/2025 $658.75
520715 GF Fire Equipment 5/7/2025 $27.00
520716 GF Thur-O-Clean 5/7/2025 $962.69
520717 Graymont (WI) LLC 5/7/2025 $9,928.92
520718 Halstad Telephone Company 5/7/2025 $1,531.62
520719 Halvorson Jr., Robert 5/7/2025 $59.38
520720 Hanson, Santana 5/7/2025 $36.13
520721 Hawkins Inc 5/7/2025 $2,940.00
520722 Hugo's #5 5/7/2025 $19.98
520723 Interstate Power Systems, Inc. 5/7/2025 $262.50
520724 Jadeke, Darlene 5/7/2025 $100.00
520725 Local Ace 5/7/2025 $110.00
520726 MMPA c/o Avant Energy 5/7/2025 $655,833.79
520727 MN Dept of Health 5/7/2025 $23.00
520728 Northdale Oil 5/7/2025 $937.97
520729 Nur, Imran 5/7/2025 $3.30
520730 O'Reilly Auto Parts 5/7/2025 $236.82
520731 RMB Environmental Laboratories, Inc 5/7/2025 $334.40
520732 Sacred Heart Church & School 5/7/2025 $11,600.00
520733 Smith, Roger 5/7/2025 $500.00
520734 Stuart C Irby Co 5/7/2025 $1,215.36
520735 T-Mobile 5/7/2025 $101.95
520736 Toshiba America Business Solutions 5/7/2025 $431.39
520737 True Temp Inc 5/7/2025 $966.60
520738 US Bank Corporate Payment Systems 5/7/2025 $9,740.20
520739 Verizon Wireless 5/7/2025 $362.85
520740 Vestis Services, LLC 5/7/2025 $235.77
520741 VWR International LLC 5/7/2025 $1,708.39
520742 Water & Light 5/7/2025 $160.14
520743 Water and Light Department 5/7/2025 $18,239.26
520744 Weikel, Robert 5/7/2025 $232.87
520745 Western Area Power Administration 5/7/2025 $188,093.70
520746 Widseth Smith Nolting & Assoc Inc 5/7/2025 $24,984.40
520747 Xcel Energy 5/7/2025 $2,159.42
$1,759,725.90
It was moved by Commissioner Grinde supported by Commissioner Rapacz to approve providing
326,500 gallons of water to fill the pool for the 2025 opening in the amount of $3,239.15.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Grinde supported by Commissioner Rapacz to authorize Widseth
to begin assembly of the 2026-2030 Electrical Distribution System Planning Study for the not-to-
exceed price of $74,300.00 and to begin assembly of the 2025 Arc Flash System Analysis for the not-
to-exceed price of $6,300.00
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Grinde supported by Commissioner Rapacz to approve and award
the 2025 Miscellaneous Electrical Distribution Construction bid to Parsons Electric, LLC in the
amount of $60,034.18 as recommended by Widseth.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Rapacz supported by Commissioner Grinde to accept Seth Baune’s
resignation as Water Treatment Plant Operator effective May 9, 2025.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Grinde supported by Commissioner Rapacz to grant permission to
begin the hiring process with Civil Service for the position of Water Treatment Plant Operator.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Rapacz supported by Commissioner Grinde to approve Widseth to
prepare Plans & Specifications for the IMG reservoir located at the Water Treatment Plant and
authorize permission to perform repairs.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Grinde supported by Commissioner Rapacz to approve the
proposal from Don’s ABC Seamless Inc. for the Sugar Hills Substation roof replacement.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Grinde supported by Commissioner Rapacz to adjourn at 8:43 am
to the next regular meeting on May 21, 2025, at 8:00 am to be held in the City Council Chambers.
Voting Aye: Quirk, Grinde, Rapacz, Riopelle
Voting Nay: None
Kristen Shipes
Commission Secretary
Agenda
WATER & LIGHT COMMISSION MEETING AGENDA
May 7, 2025
8:00 a.m., City Hall Council Chambers
1. Call meeting to order
2. Approve minutes from previous meeting – April 16, 2025
3. Bills and payroll
4. Comments from the public
5. Reports
a. Widseth
i. Todd
ii. Steve
b. City Attorney
6. Old Business
7. Request to Donate Water to EGF Pool
8. Authorization to begin Electrical System Planning Study and System Analysis
9. Recommendation for 2025 Miscellaneous Electrical Distribution Projects
10. Water Treatment Plant Operator Resignation
11. Plant Reservoir Repairs
12. Sugar Hills Substation Roofing Project Bids
13. Department Heads
14. Commissioner’s reports
15. Adjourn to May 21, 2025 at 8:00 a.m.
Individuals with disabilities, language barriers or other needs who plan to attend the meeting and will need special accommodations
should contact Nancy Ellis, ADA Coordinator at (218)-773-2208. Please contact us at least 48 hours before the meeting to give our
staff adequate time to make arrangements. Also, materials can be provided in alternative formats for people with disabilities or
with limited English proficiency (LEP) by contacting the ADA Coordinator (218)-773-2208 five (5) days prior to the meeting.
Minutes of the regular meeting of the Water, Light, Power and Building Commission of the City of
East Grand Forks, Minnesota held on April 16, 2025, at 8:00 am in the City Council Chambers.
Present: Grinde, Quirk (Interactive Technology), Rapacz, Riopelle
Absent: None
Also present: Ron Galstad, Keith Mykleseth, Brian Johnson, Tyler Tretter, Steve Emery, Todd
Forster, Brianna Feil, Jordan Midgarden, Corey Thompson, Karla Anderson, Tom Schneiderman
It was moved by Commissioner Rapacz supported by Commissioner Quirk to approve the minutes
of the previous regular meeting held on April 2, 2025.
Voting Aye: Grinde, Quirk, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Quirk supported by Commissioner Rapacz to authorize the
Secretary to issue payment of the recommended bills and payroll in the amount of $1,413,448.94.
Voting Aye: Grinde, Quirk, Rapacz, Riopelle
Voting Nay: None
It was moved by Commissioner Quirk supported by Commissioner Rapacz to allow staff to
advertise a Request for Proposal for new software and solicit proposals from vendors.
Voting Aye: Grinde, Quirk, Rapacz, Riopelle
Voting Nay: None
Commissioner Grinde presented Tom Schneiderman with a plaque and recognized him for almost
17 years of service as a Water Distribution Maintenance Operator.
It was moved by Commissioner Rapacz supported by Commissioner Quirk to adjourn at 8:15 am to
the next regular meeting on May 7, 2025, at 8:00 am to be held in the City Council Chambers.
Voting Aye: Grinde, Quirk, Rapacz, Riopelle
Voting Nay: None
Kristen Shipes
Commission Secretary
Rebates 5/7/2025
Rebate Name Amount
Commercial Lighting Replacement Sacred Heart $11,600.00
Commercial Weatherization -
Window Replacement East Grand Inn $4,425.00
ECM Anderson $150.00
Electric Water Heater Malone $50.00
Refrigerator Burton $75.00
Refrigerator - Recycle Deitz $50.00
Refrigerator - Recycle Larson $50.00
Washing Machine-Top Load Fitzpatrick $75.00
Weatherization - Residential Smith $500.00
Total $16,975.00
>
6%4> 0$>+)*6>1//+55+10>
%4%/=>+0)>> 56>4!0$>14,5>!4-5>0$>%#4% 6+10>82%4+06%0$%06>
%38%56>61>10 6%> 6%4>61>+..>>9".+#><+//+0)>11.>
!SºWEºAREºCURRENTLYºPREPARINGºFORºSUMMER ºTHEº%'&º0UBLICº3WIMMINGº0OOLºSERVESºASºAºVITALº
RECREATIONALºHUBºFORºRESIDENTSºANDºVISITORSº4HEºPOOLºREQUIRESºAºSUBSTANTIALºAMOUNTºOFºWATERº
TOºBEºFILLEDºBEFOREºITºCANºBEºOPERATIONALºFORºTHEºSEASONº7EºKINDLYºREQUESTºYOURºCONSIDERATIONº
INºDONATINGºWATERºTOºFILLºTHEºPOOLº4HEº7º,ºHASºDONATEDºWATERºINºTHEºPASTºYEARSºANDºHASºSETº
AºCAPºOFº ºGALºFORºTHEºDONATIONº0LEASEºSEEºTHEºINFORMATIONºBELOWºTHATºSHOWSºTHEº
ºººDONATIONºANDºTHEººDONATIONºREQUESTº
%38%56> &14> >
%4*185 0$> ..105>
56>6%2> > > > 0$>
6%2> > > >
> >
%38%56>(4> >
%4*185 0$> ..105>
56>6%2> > > >
0$>6%2> > > >
> >
ºº2EQUESTºFORºº
ººº0ERº4HOUSANDº'ALLONSº
ººSTº3TEPº ºººººººº
ººNDº3TEPº ººº º
ºººº ºººº º
.% 5%>#105+$%4>$10 6+0)>< 6%4>(4>'..+0)>6*%>*%4.1#,>11.>
Request for W&L Commission Action
Date: April 30, 2025
To: East Grand Forks Water & Light Commissioners; Keith Mykleseth, General
Manager
From: Todd Forster, Widseth, Inc.
RE: Authorization for engineering services to begin assembly of 2026-2030 Electrical
Distribution System Planning Study and 2025 Arc Flash System Analysis
Background:
Water & Light’s current 5-year study was completed in 2017 and covered the years of
2018 thru 2022. The system model we developed for that study along with the customer
loading and fault data we currently use to analyze the system is now almost 8 years old and
needs updating. In addition to updating the utility’s electronic system model to reflect
present conditions, this study will allow us to make system loading projections out to 2030
which will allow us to be proactive in planning and budgeting for future system
construction needs. Widseth is proposing to complete this 5-year study for the not-to-
exceed price of $74,300.00. Anticipated completion date would be prior to December 1,
2025.
Water & Light’s current arc flash analysis was completed in February of 2016 and is now
over 9 years old. Rule 410.A.3 of the 2023 National Electric Safety Code states that “The
employer shall ensure that an assessment is performed to determine potential exposure to
an electric arc for employees who work on or near energized lines, parts, or equipment.”
This assessment will determine the potential electric arc value at each point on the system.
With this information, employees will know what level of personal protective equipment
(PPE) is required to be used when working on energized equipment in a particular area.
Widseth is proposing to complete this arc flash analysis for the not-to-exceed price of
$6,300.00. The new electronic system model detailed in the 5-year study would need to be
completed prior to performing this arc flash analysis. Anticipated completion date would
follow approximately 4 weeks after the completion of the 5-year study.
Refer to the attached Widseth proposal letter for additional information regarding the
completion of each study.
Recommendation:
1. Authorize Widseth to begin assembly of 2026-2030 Electrical Distribution System
Planning Study for the not-to-exceed price of $74,300.00.
2. Authorize Widseth to begin assembly of 2025 Arc Flash System Analysis for the not-to-
exceed price of $6,300.00.
Request for W&L Commission Action
Date: May 1, 2025
To: East Grand Forks Water & Light Commissioners; Keith Mykleseth, General
Manager
From: Todd Forster, Widseth, Inc.
RE: Construction contract recommendation for the 2025 Miscellaneous Electrical
Distribution Construction projects
Background:
Bids for the 2025 Miscellaneous Electrical Distribution Construction projects were opened
on April 24, 2025, at 2:00 pm CDT. Four bids were received: Parsons Electric; North-Holt
Electric; Fusion Automation; and AEI Construction. The engineering estimate for this
work was $45,583.26. Low bidder was Parsons Electric at $60,034.18. The low bid was
approximately 32% higher than the engineer’s estimate. Parsons previously completed the
2022 Miscellaneous Electrical Distribution Construction contract, and their work was
satisfactory.
Refer to attached bid tabulation for a construction unit breakdown of each bid received.
Recommendation:
Approval and award of the 2025 Miscellaneous Electrical Distribution Construction bid to
Parsons Electric, LLC in the amount of $60,034.18 as recommended by the Engineer,
Widseth, Inc.
BID TABULATION
2025 MISCELLANEOUS ELECTRICAL DISTRIBUTION CONSTRUCTION
FOR
WATER, LIGHT, POWER & BUILDING COMMISSION
EAST GRAND FORKS, MINNESOTA
BID DATE: APRIL 24, 2025
WIDSETH PROJECT NO. 2024-12204
REVISED: 5/1/2025
Parsons Electric, LLC North-Holt Electric, Inc. Fusion Automation, Inc. Widseth, Inc. (ESTIMATE)
3451 South University Drive 20914 430th Ave SW 622 South 15th Street 3535 South 31st Street, Suite 202
Fargo, ND 58104 East Grand Forks, MN 56721 Grand Forks, ND 58201 Grand Forks, ND 58201
Labor & Extended Labor & Extended Labor & Extended Labor & Extended
Unit UOM Qty Labor Material Material Price Labor Material Material Price Labor Material Material Price Labor Material Material Price
W50U /FT 492 $5.85 $0.85 $6.70 $3,296.40 $4.00 $2.00 $6.00 $2,952.00 $3.75 $0.25 $4.00 $1,968.00 $1.68 $0.00 $1.68 $826.56
W10U /FT 720 $1.85 $0.85 $2.70 $1,944.00 $4.00 $1.00 $5.00 $3,600.00 $2.75 $0.25 $3.00 $2,160.00 $0.81 $0.00 $0.81 $583.20
TRACER /FT 404 $0.25 $0.15 $0.40 $161.60 $1.25 $0.25 $1.50 $606.00 $0.50 $0.25 $0.75 $303.00 $0.21 $0.00 $0.21 $84.84
FIBER-12 /FT 5,036 $1.55 $0.20 $1.75 $8,813.00 $2.00 $0.80 $2.80 $14,100.80 $3.00 $0.25 $3.25 $16,367.00 $0.79 $0.00 $0.79 $3,978.44
DMT /FT 4,285 $0.25 $0.11 $0.36 $1,542.60 $1.00 $0.38 $1.38 $5,913.30 $0.50 $0.25 $0.75 $3,213.75 $0.21 $0.00 $0.21 $899.85
X-PRI /FT 492 $3.95 $0.32 $4.27 $2,100.84 $1.00 $0.00 $1.00 $492.00 $3.25 $0.50 $3.75 $1,845.00 $1.68 $0.00 $1.68 $826.56
X-TRACER /FT 164 $0.25 $0.15 $0.40 $65.60 $1.00 $0.00 $1.00 $164.00 $0.25 $0.25 $0.50 $82.00 $0.21 $0.00 $0.21 $34.44
TBH1 /FT 197 $19.50 $0.32 $19.82 $3,904.54 $26.00 $4.00 $30.00 $5,910.00 $15.00 $4.00 $19.00 $3,743.00 $8.65 $0.00 $8.65 $1,704.05
BOR-2F /FT 1,284 $9.00 $0.75 $9.75 $12,519.00 $10.00 $4.00 $14.00 $17,976.00 $14.00 $1.00 $15.00 $19,260.00 $8.11 $0.00 $8.11 $10,413.24
BOR-4 /FT 86 $12.20 $1.10 $13.30 $1,143.80 $20.00 $4.00 $24.00 $2,064.00 $15.00 $1.00 $16.00 $1,376.00 $10.00 $0.00 $10.00 $860.00
CONC-R SQ FT 32 $58.00 $12.50 $70.50 $2,256.00 $80.00 $13.75 $93.75 $3,000.00 $325.00 $50.00 $375.00 $12,000.00 $36.52 $36.52 $73.04 $2,337.28
EXC EA 4 $330.00 $15.00 $345.00 $1,380.00 $650.00 $150.00 $800.00 $3,200.00 $500.00 $50.00 $550.00 $2,200.00 $351.49 $0.00 $351.49 $1,405.96
HY-SEED SQ FT 452 $1.25 $0.90 $2.15 $971.80 $5.00 $3.00 $8.00 $3,616.00 $5.00 $1.50 $6.50 $2,938.00 $6.06 $9.84 $15.90 $7,186.80
WTAPE /FT 252 $0.25 $0.05 $0.30 $75.60 $2.00 $0.00 $2.00 $504.00 $1.25 $0.00 $1.25 $315.00 $0.17 $0.00 $0.17 $42.84
CND2 /FT 1,452 $0.90 $0.10 $1.00 $1,452.00 $3.00 $1.00 $4.00 $5,808.00 $4.00 $0.50 $4.50 $6,534.00 $1.03 $0.00 $1.03 $1,495.56
CND4 /FT 212 $1.10 $0.10 $1.20 $254.40 $4.00 $2.00 $6.00 $1,272.00 $8.00 $1.00 $9.00 $1,908.00 $3.24 $0.00 $3.24 $686.88
BELL2 EA 10 $20.00 $0.50 $20.50 $205.00 $20.00 $5.00 $25.00 $250.00 $45.00 $5.00 $50.00 $500.00 $5.41 $0.00 $5.41 $54.10
BELL4 EA 4 $22.00 $0.50 $22.50 $90.00 $20.00 $5.00 $25.00 $100.00 $50.00 $6.00 $56.00 $224.00 $5.41 $0.00 $5.41 $21.64
BELL6 EA 6 $25.00 $0.50 $25.50 $153.00 $20.00 $5.00 $25.00 $150.00 $60.00 $7.00 $67.00 $402.00 $5.41 $0.00 $5.41 $32.46
PT3-GS EA 1 $480.00 $15.00 $495.00 $495.00 $500.00 $250.00 $750.00 $750.00 $750.00 $100.00 $850.00 $850.00 $334.74 $0.00 $334.74 $334.74
PLB1730F EA 4 $430.00 $15.00 $445.00 $1,780.00 $250.00 $250.00 $500.00 $2,000.00 $500.00 $125.00 $625.00 $2,500.00 $389.88 $0.00 $389.88 $1,559.52
GP EA 2 $900.00 $1,200.00 $2,100.00 $4,200.00 $300.00 $200.00 $500.00 $1,000.00 $825.00 $50.00 $875.00 $1,750.00 $243.45 $222.79 $466.24 $932.48
BLDG LOT 2 $480.00 $235.00 $715.00 $1,430.00 $1,200.00 $1,645.00 $2,845.00 $5,690.00 $2,500.00 $250.00 $2,750.00 $5,500.00 $616.46 $547.76 $1,164.22 $2,328.44
B&M LOT 1 $9,800.00 $0.00 $9,800.00 $9,800.00 $2,460.00 $5,000.00 $7,460.00 $7,460.00 $4,000.00 $0.00 $4,000.00 $4,000.00 $5,665.04 $1,288.34 $6,953.38 $6,953.38
TOTAL BID PRICE: $60,034.18 TOTAL BID PRICE: $88,578.10 TOTAL BID PRICE: $91,938.75 TOTAL BID PRICE: $45,583.26
Extended Price value shown in Proposal Schedule does not equal Labor & Material value times estimated quantity. As stated in Specification Section 00100 Article 14.01.C, "Discrepancies between the multiplication
of units of Work and unit prices will be resolved in favor of the unit prices."
Total Base Bid value on Proposal Schedule was shown as $59,999.74
Total Base Bid value on Proposal Schedule was shown as $88,828.10
BID TABULATION
2025 MISCELLANEOUS ELECTRICAL DISTRIBUTION CONSTRUCTION
FOR
WATER, LIGHT, POWER & BUILDING COMMISSION
EAST GRAND FORKS, MINNESOTA
BID DATE: APRIL 24, 2025
WIDSETH PROJECT NO. 2024-12204
REVISED: 5/1/2025
AEI Construction, Inc. Widseth, Inc. (ESTIMATE)
150 Second Street SW 3535 South 31st Street, Suite 202 NOT USED NOT USED
Perham, MN 56573 Grand Forks, ND 58201
Labor & Extended Labor & Extended Labor & Extended Labor & Extended
Unit UOM Qty Labor Material Material Price Labor Material Material Price Labor Material Material Price Labor Material Material Price
W50U /FT 492 $5.00 $0.00 $5.00 $2,460.00 $1.68 $0.00 $1.68 $826.56
W10U /FT 720 $3.00 $0.00 $3.00 $2,160.00 $0.81 $0.00 $0.81 $583.20
TRACER /FT 404 $2.00 $0.00 $2.00 $808.00 $0.21 $0.00 $0.21 $84.84
FIBER-12 /FT 5,036 $3.00 $0.00 $3.00 $15,108.00 $0.79 $0.00 $0.79 $3,978.44
DMT /FT 4,285 $3.00 $0.00 $3.00 $12,855.00 $0.21 $0.00 $0.21 $899.85
X-PRI /FT 492 $2.00 $0.00 $2.00 $984.00 $1.68 $0.00 $1.68 $826.56
X-TRACER /FT 164 $1.00 $0.00 $1.00 $164.00 $0.21 $0.00 $0.21 $34.44
TBH1 /FT 197 $25.00 $0.00 $25.00 $4,925.00 $8.65 $0.00 $8.65 $1,704.05
BOR-2F /FT 1,284 $18.00 $0.00 $18.00 $23,112.00 $8.11 $0.00 $8.11 $10,413.24
BOR-4 /FT 86 $27.00 $0.00 $27.00 $2,322.00 $10.00 $0.00 $10.00 $860.00
CONC-R SQ FT 32 $1,000.00 $17.82 $1,017.82 $32,570.24 $36.52 $36.52 $73.04 $2,337.28
EXC EA 4 $6,000.00 $0.00 $6,000.00 $24,000.00 $351.49 $0.00 $351.49 $1,405.96
HY-SEED SQ FT 452 $4.00 $0.00 $4.00 $1,808.00 $6.06 $9.84 $15.90 $7,186.80
WTAPE /FT 252 $1.00 $0.00 $1.00 $252.00 $0.17 $0.00 $0.17 $42.84
CND2 /FT 1,452 $4.00 $0.00 $4.00 $5,808.00 $1.03 $0.00 $1.03 $1,495.56
CND4 /FT 212 $10.00 $0.00 $10.00 $2,120.00 $3.24 $0.00 $3.24 $686.88
BELL2 EA 10 $150.00 $0.00 $150.00 $1,500.00 $5.41 $0.00 $5.41 $54.10
BELL4 EA 4 $175.00 $0.00 $175.00 $700.00 $5.41 $0.00 $5.41 $21.64
BELL6 EA 6 $200.00 $0.00 $200.00 $1,200.00 $5.41 $0.00 $5.41 $32.46
PT3-GS EA 1 $1,000.00 $0.00 $1,000.00 $1,000.00 $334.74 $0.00 $334.74 $334.74
PLB1730F EA 4 $600.00 $0.00 $600.00 $2,400.00 $389.88 $0.00 $389.88 $1,559.52
GP EA 2 $1,000.00 $255.42 $1,255.42 $2,510.84 $243.45 $222.79 $466.24 $932.48
BLDG LOT 2 $750.00 $207.90 $957.90 $1,915.80 $616.46 $547.76 $1,164.22 $2,328.44
B&M LOT 1 $10,000.00 $0.00 $10,000.00 $10,000.00 $5,665.04 $1,288.34 $6,953.38 $6,953.38
TOTAL BID PRICE: $152,682.88 TOTAL BID PRICE: $45,583.26 TOTAL BID PRICE: $0.00 TOTAL BID PRICE: $0.00
BID TABULATION
2025 MISCELLANEOUS ELECTRICAL DISTRIBUTION CONSTRUCTION
FOR
WATER, LIGHT, POWER & BUILDING COMMISSION
EAST GRAND FORKS, MINNESOTA
BID DATE: APRIL 24, 2025
WIDSETH PROJECT NO. 2024-12204
REVISED: 5/1/2025
PARSONS NORTH HOLT FUSION AEI WSN
Diff vs Diff vs Diff vs Diff vs Diff vs
Unit UOM Qty Low Bid Low Bid Low Bid Low Bid Low Bid
W50U /FT 492 $0.00 -$344.40 -$1,328.40 -$836.40 -$2,469.84
W10U /FT 720 $0.00 $1,656.00 $216.00 $216.00 -$1,360.80
TRACER /FT 404 $0.00 $444.40 $141.40 $646.40 -$76.76
FIBER-12 /FT 5,036 $0.00 $5,287.80 $7,554.00 $6,295.00 -$4,834.56
DMT /FT 4,285 $0.00 $4,370.70 $1,671.15 $11,312.40 -$642.75
X-PRI /FT 492 $0.00 -$1,608.84 -$255.84 -$1,116.84 -$1,274.28
X-TRACER /FT 164 $0.00 $98.40 $16.40 $98.40 -$31.16
TBH1 /FT 197 $0.00 $2,005.46 -$161.54 $1,020.46 -$2,200.49
BOR-2F /FT 1,284 $0.00 $5,457.00 $6,741.00 $10,593.00 -$2,105.76
BOR-4 /FT 86 $0.00 $920.20 $232.20 $1,178.20 -$283.80
CONC-R SQ FT 32 $0.00 $744.00 $9,744.00 $30,314.24 $81.28
EXC EA 4 $0.00 $1,820.00 $820.00 $22,620.00 $25.96
HY-SEED SQ FT 452 $0.00 $2,644.20 $1,966.20 $836.20 $6,215.00
WTAPE /FT 252 $0.00 $428.40 $239.40 $176.40 -$32.76
CND2 /FT 1,452 $0.00 $4,356.00 $5,082.00 $4,356.00 $43.56
CND4 /FT 212 $0.00 $1,017.60 $1,653.60 $1,865.60 $432.48
BELL2 EA 10 $0.00 $45.00 $295.00 $1,295.00 -$150.90
BELL4 EA 4 $0.00 $10.00 $134.00 $610.00 -$68.36
BELL6 EA 6 $0.00 -$3.00 $249.00 $1,047.00 -$120.54
PT3-GS EA 1 $0.00 $255.00 $355.00 $505.00 -$160.26
PLB1730F EA 4 $0.00 $220.00 $720.00 $620.00 -$220.48
GP EA 2 $0.00 -$3,200.00 -$2,450.00 -$1,689.16 -$3,267.52
BLDG LOT 2 $0.00 $4,260.00 $4,070.00 $485.80 $898.44
B&M LOT 1 $0.00 -$2,340.00 -$5,800.00 $200.00 -$2,846.62
TOTAL BID AMOUNT: $60,034.18 $88,578.10 $91,938.75 $152,682.88 $45,583.26
TOTAL DIFFERENCE: $0.00 $28,543.92 $31,904.57 $92,648.70 -$14,450.92
Dollar difference ABOVE low bidder's Extended Price value
Dollar difference BELOW low bidder's Extended Price value
CONFIRMATION OF REQUEST
FOR
ENGINEERING SERVICES
CLIENT: EGF Water & Light LOCATION: East Grand Forks, Mn
SERVICE REQUESTED BY: Brian Johnson, Water Plant Supt DATE: April 28, 2025
PROJECT: I MG Concrete Reservoir Rehabilitation
DESCRIPTION OF WORK INVOLVED: Prepare plans/ specifications for Rehabilitation of I MG Concrete
Ground Storage Reservoir located adjacent to Water Plant. Scope of work as identified in inspection report
completed by KL M Engineering dated June 2019. Widseth to provide a complete set of plans/ specifications
and submit to Minnesota Department of Health (MOH) for plan review approval. Widseth to further assist with
obtaining bids/ quotes as necessary along with providing a bid tabulation and recommendation of award.
During construction Widseth to provide construction observation & all necessary project management duties
through project closeout.
ESTIMATED ENGINEERING COSTS:
DESCRIPTION: WIDSETH LABOR & EXPENSES:
Prepare Plans & Specifications - Hourly (Estimated Fee) $8,000.00
Project Management/ Inspection - Hourly (Estimated Fee) $12,000.00
Total Estimated Fee $20,000.00
TIME SCHEDULE FOR SERVICES: Complete and submit plans to MOH by May 30, 2025. Construction
anticipated to be completed summer I fall 2025.
BILLING METHOD: BILLING SCHEDULE:
(X) Hourly (X) Monthly
() Percentage () Phased
U Lump Sum () Upon Completion
() Other
REMARKS: Billing to be on an hourly basis. Client responsible for all fees associated with plan reviews/
permitting.
WIDSETH agrees to perform the described work as set forth above. The CLIENT agrees to make payment for
work performed within thirty (30) days after receipt of billing.
SUBMI//idp APPROVED: EGF Water & Light
BY: � /, BY:
DAT E: _____ ______
4/30/2025
Water
and Light Commission
Todd
Grabanski
Sugar
Hills Substation Roofing Project Bids
The Sugar Hills Substation is in need of roof replacement. We have received two bids to move
forward with the capital project.
See attached proposals.
Recommend approving the proposal from Don's ABC Seamless Inc. for Sugar Hills Substation
roof replacement.
Get email alerts for East Grand Forks
A daily email when new agendas and minutes are posted.