Muyni
← Back to Elverson

City Council

Regular Meeting

Elverson, PA · March 26, 2019

Minutes

Minutes

MABE Meeting Minutes March 26, 2019 In Attendance: Absent: Others in Attendance: Lori Sifford Floyd Jennelle Joe Boldaz, Hydraterra Darrell Gibble Stephen Kalis, Fox Rothschild Dave Friedman, EEMA Jose Colon Bob Preston, Hydraterra Charlotte Gehman Meeting called to order at 7:05p Meeting Minutes Motion by Darrell to Approve Minutes of February 26, 2019 and the March 19, 2016 Workshop Board Meeting. Second by Steve. Motion approved. Public Comment None Correspondence/Communication Operator’s Report Dave shared photos of the plant during a rainstorm event. The average for March has been 105,000 gallons per day. Normal flow is typically 70,000 gallons per day. Ammonia and BOD have been good. Polymer Feed System – The polymer system is now operational. Inks hauled several loads of sludge in anticipation of adding the polymer. They are monitoring daily to balance the amount needed for the biology. Dave believes the new blower panel will help control the air and that will help the process as well. Tertiary Filters – 4 new filters were ordered and received. One as a replacement and 3 as spares. Hour Meters – The Brick Lane hour meter is recording correctly, but it does have an electrical problem that Brad is tracking down. HVAC – Cleaning the filters and flushing the system daily. The polymer is improving this also. Filter on backwash pump needs to be cleaned daily. With the water line restored, Brad plans to clean and backflush the system. Both sludge tanks have had blower issues. Brad is suggesting pulling the aerator up to inspect it. Dave suggests cleaning the aeration and clarifier tanks as he believes they have rags in them as he sees them when the air is off. Engineer’s Report Blower Panel Project - Eastern will provide shop drawings and a schedule next week. The change order request for the air conditioning was only received by the Board today. Board will need to review. Blue Rock Project – No escrow has been received to date. Chapter 94 – Final draft received Monday. Lori will review and Bob will put it in the mail. Must be postmarked by March 31st. Televising Results – Bob reviewed the results of the televising. A few sags in the pipe were found. The one leak that was found should be repaired, but it will be more cost effective to wait until more repairs are identified. The leak was estimated to be at a flow of 2 gallons a minute. Solicitor’s Report No report Old Business Water Line Project – The water line project has been completed and the plant has running water again. Project costs did increase based on necessary modifications when the concrete floor was determined to be more than 8 inches thick as per the plans. New pressure tank is installed and heat tape which will need to be plugged in if the temperature is below 20 degrees. Insurance has been covering the costs at 50%. Motion by Darrell to approve payment for the WWTP Water Line work by Tim McEwen. Second by Jose. Motion approved. Sewer Standards – Lori requested the missing Appendix H for the sample standards which Bob had available. Board will need to review the standards. Page 1 of 2 MABE Meeting Minutes March 26, 2019 New Business Landscaping Quote/Mowing Guidelines – to be reviewed at the April meeting. Treasurer’s Report Sign Checks - Motion by Steve to approve the March payables as presented. Second by Darrell. Motion approved. Audit Reports – 2018 audit is complete. Admin Update Sewer Plumbing Inspections – Plumbers have been notified and have been sent a supply of forms. Title companies and Homeowners will be notified next and the project is still on track to begin April 1, 2019. Executive Session – Board entered executive session at 8:09p Adjournment 8:25p Next Scheduled MABE Meeting is Tuesday, April 30, 2019 at 7:00p. Page 2 of 2

Get email alerts for Elverson

A daily email when new agendas and minutes are posted.

Report an issue with this meeting