Englewood Transportation Advisory Committee
Regular MeetingEnglewood, CO · July 16, 2026
Agenda
AGENDA
1000 Englewood Pkwy Englewood Transportation Advisory Committee
Community Rm. 2nd Floor Meeting
Englewood, CO 80110 Thursday, July 16, 2026 ♦ 6:00 p.m.
1. Call to Order
2. Recognition of Public Comment
3. Approval of Minutes
a. Transportation Advisory Committee - 11 Jun 2026 - Minutes - Pdf
4. New Business
a. Rail Trail Overview and Costs
b. Englewood Transportation Advisory Committee 07-16-2026
c. Update on Walk and Wheel Projects
d. Update on Traffic Calming
e. Overview and discussion on new legislation on school zones
f. Update on E Dartmouth Roundabouts
g. University and Floyd Intersection
5. Director's Choice
6. Chairperson's Choice
7. Committee Member's Choice
8. Adjournment
Please note: If you have a disability and need auxiliary aids or services, please notify the City of Englewood (303-
762-2405) at least 48 hours in advance of when services are needed.
MINUTES
Englewood Transportation Advisory Committee Meeting
Thursday, June 11, 2026
PRESENT: Neil Sarno
Catherine Smith
Jake Gilbert
Jacob Somerson
William Todis
Brittany Rivera
Daniel Strackeljahn
Patrick Lewis
Chris Diedrich
Joe Anderson
Victor Rachael
Madeleine Pike
ABSENT:
STAFF PRESENT: Ladd Vostry, Traffic Engineer
Julie Bailey, Staff Liaison
Page
1. Call to Order
a. PRESENT:
Chair Diedrich
Vice-chair Lewis
Member Sarno
Member Gilbert
Member Somerson
Member Pike
Member Strackeljahn
ALTERNATE (VACANT)
Director Rachael
Deputy Director Crum
City Engineer Branham
Sergeant Todis
Executive Assistant Rivera
2. Recognition of Public Comment
3. Approval of Minutes
Page 2 of 39
Draft
Englewood Transportation Advisory Committee
June 11, 2026
a. Meeting held on 03/12/2026
ETAC Minutes from 03.12.26
b. Moved By: Chair Diedrich
Second By: Vice Chair Lewis
4. New Business
b. 2027 PIF (Public Improvement Fund) review and project recommendations (20
min)
1. Detailed discussion on Walk and Wheel projects
2. ETAC Recommendations
3. Presenter: Public Works
c. Update to ETAC By-laws regarding meeting schedule and members (15min)
1. Presenter: Public Works
2. Vote needed
Moved by Member Madeleine Pike
VOTE ON PIF FUNDING:
Moved By: Member Pike
Second By: Vice Chair Lewis
Motion MOTION CARRIED.
Moved by Member Jacob Somerson
VOTE ON UPDATE TO BYLAWS:
Moved By:Member Somerson
Second By: Member Sarno
Motion MOTION CARRIED.
d. Overview of current projects & status (30min)
1. Update on Neighborhood Traffic Calming Program
2. HAWK on Broadway
3. HAWK on Oxford
4. S. Broadway Complete Streets Status
5. Union Ave Paving
6. Presenter: Public Works
5. Director's Choice
a. New Staff: Business Operations Manager Julie Miller starts 6/15/26
6. Chairperson's Choice
Page 2 of 3
Page 3 of 39
Draft
Englewood Transportation Advisory Committee
June 11, 2026
a. Next Meeting: July 16
b. Review of deisgn quotes
c. Review of by-laws edits to include Committee recommendation
7. Committee Member's Choice
8. Adjournment
a. Adjorn Time: 8:03pm
Michelle Chavez, Staff Liaison
Page 3 of 3
Page 4 of 39
Englewood Transportation
Advisory Committee meeting
July 16, 2026
Page 5 of 39
Agenda – New Business
4. New Business
a. Rail Trail Overview and Costs
b. Update of Walk and Wheel Projects
c. Update on Traffic Calming
d. Overview of New Legislation on School Zones
e. Update on E Dartmouth Roundabouts
f. University and Floyd Intersection
Page 6 of 39
New Business
Page 7 of 39
Rail Trail
Overview & Costs
Presented by
Ryan Crum, Deputy Director of Public Works
Page 8 of 39
Rail Trail – Oxford Ped Bridge to Kenyon
Quote from Otak – Consultant that
completed 30% design plans:
- $508,597 for 100% design plans
- Includes $25,000 for ROW acquisition from
railroads for design only
- Estimated construction cost: $7.09M
- Design costs 7.2 percent of construction.
- ROW acquisitions approximately $1.8M
- Construction includes:
- 10-foot-wide trail
- Buffer zone between roadway and trail
including water quality structures, trees and
vegetation
- Areas for parking
Page 9 of 39
QuestionsQuestionsQuestionsQ
Page 10 of 39
Update on Walk & Wheel Projects
Presented by
Victor Rachael, Director of Public Works
Page 11 of 39
Walk and Wheel Projects
• First walk and wheel plan completed in
November 2015
• Updated in April 2022
• Prioritization Criteria (higher score = high priority)
1. Connectivity
2. Cost
3. Demand
4. Ease of Implementation
5. Equity
6. Safety & Comfort
Page 12 of 39
Walk and Wheel Projects
Page 13 of 39
Walk and Wheel Projects
Page 14 of 39
Walk and Wheel Projects
Page 15 of 39
Walk and Wheel Projects
Page 16 of 39
Walk and Wheel Projects
Page 17 of 39
Walk and Wheel Projects
Page 18 of 39
QuestionsQuestionsQuestionsQ
Page 19 of 39
Update on Traffic Calming
Presented by
Thomas Shaw, Traffic Engineering Manager
Page 20 of 39
Neighborhood Traffic Calming Program Development
• Project Update
• City Council Study Session Scheduled for July 27th
• Program Overview & scoring metrics
• Anticipated timelines for 1st round evaluations and implementations
• Current Status & Schedule
Page 21 of 39
Proposed Evaluation Criteria
Page 22 of 39
On-Going Program Updates
• Staff will prepare semiannual program updates for City Council which will
include:
• Application / Evaluation results
• Design and implementation schedules
• Post implementation data collection analysis findings
Page 23 of 39
Future Traffic Calming Updates with ETAC
• September 2026
• Summary of final revisions to program document based on ETAC & Council feedback.
• General input from applicants and feedback received so far.
• November 2026
• 1st round Evaluation results
• Total number of applications.
• Breakdown of applications that did, and did not meet program evaluation thresholds.
• Prioritization based on evaluation scoring.
• Estimate on how many locations can proceed to design / construction based on existing
funding.
Page 24 of 39
QuestionsQuestionsQuestionsQ
Page 25 of 39
Overview of New Legislation
on School Zones
Colorado HB26-1318
Presented by
Thomas Shaw, Traffic Engineering Manager
Page 26 of 39
Summary & Background
• HB26-1318 (Traffic Safety Near Schools) is a new Colorado Bill that was
signed by Governor Polis this past May. The main points of the bill include:
• Expanded School Zone Boundaries & Minimum School Zone Requirements
• State Highway Exemptions
• School Street Designations
• Right-of-Way Priority
• Automated Enforcement Expansion
Page 27 of 39
Next Steps (1- 3 months)
• Continue to monitor bill status, and confirm if it will be moved to general
election in November. ( to track progress and to recognize any changes)
• Initiate review of existing school zone signage relative to new boundary
requirements.
• Begin preparing signs for compliance (School Zone – Fines Double & End
School Zone signs)
• Start coordinating with Englewood Schools and PD to organize response
and outreach plan.
Page 28 of 39
QuestionsQuestionsQuestionsQ
Page 29 of 39
E Dartmouth Roundabouts
Project Update
Presented by
Victor Rachael, Director of Public Works
Ryan Crum, Deputy Director of Public Works
Page 30 of 39
East Dartmouth Traffic Calming
• Project Design and Construction:
• Construction Start: Winter 2026
• Projected Completion: 2027
• Estimated Cost of Construction: $2.4M
Page 31 of 39
East Dartmouth Traffic Calming
• Project Highlights:
• Mini Roundabouts at Logan and
Downing
• Paint and Post Bulb-outs at
Sherman, Grant, Pearl, Lafayette,
Williams and Vine
• Project Outcome:
• Traffic calming effect due to
narrowness at intersections and
roundabouts
• Increased pedestrian safety due to
shorter and improved crosswalks
Page 32 of 39
East Dartmouth Traffic Calming
• Project Updates:
• Public Meeting held on May 5th. . Very well attended, good
feedback and input
• Staff to advance design revisions including addition of RRFBs at
pedestrian crossings
• Staff working with RTD on design considerations /
modifications
• Next Steps:
1. Come to resolution on RTD feedback, staff meeting with RTD
next week
2. Receive proposal for design revisions based on RTD and
RRFBs added to the project. Council approval likely required
3. Update design and submit to CDOT for review and approval
4. CDOT concurrence to bid / project goes out to bid
Page 33 of 39
East Dartmouth – RTD Considerations
Additional Design Time Additional Design
Option Current Time Schedule Pros Cons
Needed Cost
No additional redesign with cost
A or time impact
CDOT 1180 (2 mo) RTD may cancel or move current routes along the current
9/1/2026 None None route if only 40' buses used. Route 12 could be redirected
ITB September 2026 to Broadway or canceled entirely, at RTD’s sole discretion.
Construction late fall
2026
No additional redesign with cost
B or time impact
CDOT 1180 (2 mo)
9/1/2026 None None RTD likely not able to utilize 30' buses
ITB September 2026
Construction late fall
2026
Council date TBD
C (10/2026) Safety improvements of the roundabout are diminished.
Final Plan Submission The modified design would allow vehicles to travel
10/2026 $20,000 to 40' bus will not track over center through the roundabout on Downing Street faster than
(Redesign with oval Roundabout 2 to 3 months desired (based on NCHRP Report 1043 Guide for
CDOT 1180 (2 mo) $25,000 roundabout island
at Downing, 40' buses) Roundabouts) resulting in higher speeds through the
12/2026
roundabout and significant speed differential within the
ITB September 12/2026 roundabout that could lead to higher-than-expected crash
Construction early 2027 rates. There is a risk of CDOT rejecting this design.
Page 34 of 39
QuestionsQuestionsQuestionsQ
Page 35 of 39
University and Floyd Intersection
Presented by
Victor Rachael, Director of Public Works
Thomas Shaw, Traffic Engineering Manager
Page 36 of 39
History – University & Floyd
• Intersection was reviewed in 2019 and 2020
• 2019: Level of Safety Service (LOSS) was reported at 1 out of 4
• 2020: Presentation to ETAC
• Speed Data Summary:
• Posted Speed Limit: 35 MPH
• Location: University North of Floyd Place
• Dates: 9/11/2020 – 9/17/2020
• NB University:
• Average Speed: 31 MPH
• 85th Percentile Speed: 38 MPH
• SB University:
• Average Speed: 32 MPH
• 85th Percentile Speed: 39 MPH
• Based on data, no action taken
Page 37 of 39
Crash Response – University & Floyd
• In response to a fatal crash that occurred on June 20th at University Blvd &
Floyd Ave (west),staff & City Council met with Denver representatives to
discuss how the two agencies could coordinate an investigation into the
corridor.
• Once school is back in session, Englewood will begin traffic count
collection to evaluate the intersections from a traffic control, pedestrian
crossing, and crash mitigation standpoint to
identify potential modifications to the area.
• Count collection scheduled for Late August. Update to ETAC in October
Page 38 of 39
Questions & Thank You
Page 39 of 39