Minutes
645 Holbrook Street
TOWN OF ERIE Erie, CO 80516
Meeting Minutes
Sustainability Advisory Board
Tuesday, August 7, 2018 6:00 PM Board Room
STUDY SESSION
1. Call to Order
2. Roll Call
3. Erie Recycling Center Concerns
• Secure existing recycle site to avoid night “dumping”
o Currently being handled by the town with a gate, security cameras and
signage
• Existing site needs to handle more volume in order to avoid recycled materials
on the ground and the hauler not removing the bins
• Existing site too small and service too limited to support continued residential
growth of Erie
• Existing site too small and service too limited to support the needs of
construction or commercial recycling
• Existing site location in floodplain
4. Adjourn
1. Call to Order
2. Roll Call
Keith Barr – Present
Anna Clark – Present
Tom Doyle – Present
Monali Mujumdar – Present
Jeff Percell – Present
Coady Skelley – Present
Nathaniel Wardwell – Absent
3. Public Comment
Ray Schlott 255 Meadoview Parkway gave comment
DeAndrea Ardnt 828 Lehigh Circle gave comment
4. Erie Recycling Center Concerns
Todd Fessenden, Director of Public Works and Raelynn Ferrera Facility &
Special Projects Manager gave comments throughout the discussion
• Secure existing recycle site to avoid night “dumping”
o Currently being handled by the town with a gate, security cameras
and signage
Town has had issues during peak times and more recently, businesses
with a lot of cardboard taking up a lot of volume before residents can get
there. It can become a safety hazard and liability. However, most
frequently the town has had to shut down the site because of dumping.
Waste Connections cannot/will not access the site if they have to move
TOWN OF ERIE Page 1 Printed on 10/3/2018
Sustainability Advisory Board Meeting Minutes August 7, 2018
waste to get to the bins.
The town has 2 quotes/bids for a rolling gate, similar to the one at the
cemetery. They have another proposal for security cameras. Proposals
should be within the next month and be in budget. They would then
likely restrict hours to early morning to late evening.
• Existing site needs to handle more volume in order to avoid recycled
materials on the ground and the hauler not removing the bins
We have a lot of new residents and people moving. We have had people
M, W, F. We are having a lot of dumping. If it is a contaminated load it
goes to landfill. There end up being different charges. Number of
contaminated loads is going up.
• Existing site too small and service too limited to support continued
residential growth of Erie
Recommendations that we open it up to recyclable material from builders
and commercial. Perhaps expand – is more bins is sufficient? At what
point is the physical location limited? We could likely add one more bin,
but would also need to add the walk way and a concrete pad. There are
concerns of expanding in the current location because it’s in the
floodplain.
Need to answer the question of whether we want to provide this as a
service. Need to better understand the need/desire of this as a service vs
curbside. The town has been reluctant to offer large scale composting, as
there are lots of issues such as Emerald Ashborer. There is also the Fall &
Spring cleanup days which are a similar service.
• Existing site too small and service too limited to support the needs of
construction or commercial recycling
The town could look into the cost of adding 2 more bins. They would
probably need to meet with a consultant and ask for a further
recommendation. Possibly add capacity during “peak times” either
November-January or perhaps with more frequent pick ups.
• Existing site location in floodplain
The town owns property throughout town and the GIS folks could look for
options. One idea would be to do it at/by the landfill.
5. Adjourn
TOWN OF ERIE Page 2 Printed on 10/3/2018
Agenda
645 Holbrook Street
TOWN OF ERIE Erie, CO 80516
Meeting Agenda - Final
Sustainability Advisory Board
Tuesday, August 7, 2018 6:00 PM Board Room
STUDY SESSION
1. Call to Order
2. Roll Call
3. Erie Recycling Center Concerns
• Secure existing recycle site to avoid night “dumping”
o Currently being handled by the town with a gate, security cameras and
signage
• Existing site needs to handle more volume in order to avoid recycled materials
on the ground and the hauler not removing the bins
• Existing site too small and service too limited to support continued residential
growth of Erie
• Existing site too small and service too limited to support the needs of
construction or commercial recycling
• Existing site location in floodplain