Hearings Official Public Hearings
Regular MeetingEugene, OR · November 13, 2013
Agenda
AGENDA
Meeting Location:
Phone: 541-682-5377 Atrium Building – Sloat Room
www.eugene-or.gov/hearingsofficial 99 West 10th Avenue
The Eugene Hearings Official welcomes your interest in these agenda items. Feel free to come and go as you
please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired, FM
assistive-listening devices are available or an interpreter can be provided with 48 hours notice. To arrange for
these services, contact the Planning Division at (541)682-5481.
WEDNESDAY, November 13, 2013
(5:00 p.m.)
I. PUBLIC HEARING ON APPEAL OF PLANNING DIRECTOR’S DECISION
County Farm Landbank (PT 13-4)
Assessors Map: 17-03-17-11 Tax Lot: 800
Decision: Approval of tentative partition to create two lots
Appellant: Michael Reeder for Wally and Dianna Graff
Lead City Staff: Becky Taylor, Associate Planner
Telephone: (541) 682-5437
E-mail: becky.g.taylor@ci.eugene.or.us
Public Hearing Format:
1. Staff introduction/presentation
2. Public testimony from applicant and others in support of application.
3. Comments or questions from interested persons who neither are proponents nor opponents of the
proposal.
4. Public testimony from those in opposition to application.
5. Staff response to testimony.
6. Questions from Hearings Official.
7. Rebuttal testimony from applicant.
8. Closing of public hearing.
The Hearings Official will not make a decision at this hearing. The Eugene Code requires that a written
decision must be made within 15 days of close of the public comment period. To be notified of the
Hearings Official’s decision, fill out a request form at the public hearing or contact the lead City staff as
noted above. The decision will also be posted at www.eugene-or.us/hearingsofficial.
Planning & Development
Planning
City of Eugene
99 West 10th Avenue
Eugene, Oregon 97401
MEMORANDUM (541) 682-5377
(541) 682-5572 FAX
www.eugene-or.gov
Date: November 4, 2013
To: Ken Helm, Hearings Official
From: Becky Taylor, Associate Planner
Subject: Appeal of Tentative Partition Plan Approval for County Farm Land Bank (PT 13-4)
__________________________________________________________________________________
Background:
On October 3, 2013, the Planning Director granted tentative partition plan approval with six
conditions, under the Needed Housing criteria at EC 9.8220, to divide property, located at the
southwest corner of Park View Drive and County Farm Road, into two parcels. The City of Eugene
currently owns the subject property as a land-bank site for affordable housing. The property is being
partitioned into two parcels to facilitate the transfer of the subject property to two non-profit
housing sponsors for the development of affordable housing. The Housing and Community Services
Agency (HACSA) will acquire Parcel 1; St Vincent de Paul (SVDP) will acquire Parcel 2.
The subject property is approximately five acres and is zoned R-2 Medium-Density Residential. The
Planning Director’s written decision granting tentative partition plan approval is attached for
reference, as it provides background information, findings regarding compliance with the applicable
approval criteria, and other details of the approval (see Attachment A).
On October 8, 2013, notice of the decision was provided in accordance with EC 9.7220. On October
18, 2013, Micheal Reeder filed an appeal of the Planning Director’s written decision on behalf of
Wally and Dianna Graff, owners and residents of 2308 Park View Drive, which is located about 860
feet west of the subject property. The appellant argues that the Planning Director erroneously
approved the tentative partition. The assignment of error is based EC 9.8220(5)(b). The appellant’s
written statement is attached for reference (see Attachment B). Staff’s response to the appeal is
provided below.
The public hearing for this appeal is scheduled for November 13, 2013 and public notice of the appeal
hearing was mailed in accordance with applicable code requirements on October 24, 2013. As
described in the public notice, the decision on this tentative partition appeal is subject to the
procedural requirements of Eugene Code (EC) Sections 9.7600 through 9.7635, and the public hearing
_____________________________________________________________________________________________________________
County Farm Land Bank (PT 13-4) November 2013 Page 1
HO Agenda - Page 1
for this appeal will be conducted according to quasi-judicial hearing procedures in state law and
described at EC 9.7065 through 9.7095.
Pursuant to EC 9.7630, the Hearings Official shall affirm, reverse, or modify the Planning Director’s
tentative partition approval. EC 9.7630(2) clarifies that the Hearings Official can only reverse or
modify the Planning Director’s decision if he finds that the Planning Director failed to properly
evaluate the application or make a decision consistent with the approval criteria. It is noted that the
applicable approval criteria are the Needed Housing provisions at EC 9.8220, which is the City’s clear
and objective criteria for partitioning lands that are needed for housing.
Since the submittal of the appeal, staff has received no additional letters in response to the appeal
notice. Any written testimony or other evidence submitted between the date of this memorandum
and the appeal hearing will be forwarded for consideration as part of the decision on this appeal. In
addition to any public testimony or other evidence that may be forwarded or presented at the
upcoming public hearing, please review the attached items from the application file.
Appeal Issue and Staff Response:
The appeal essentially focuses on one approval criterion, EC 9.8220(5). The appellant states: “The
Planning Director erroneously approved the Application because the Application fails to provide for
adequate and safe pedestrian, bicycle and transit circulation to adjacent and nearby residential areas,
transit stops, and neighborhood activity centers as required by EC 9.8220(5)(b).” The Planning
Director’s decision determined that EC 9.8220(5)(a)-(c) did not apply to the subject partition, which is
as follows:
EC 9.8220(5)
If the provisions of EC 9.8220(2) require a public street, or if the applicant proposes the
creation of a public street, the following criteria also apply:
(a) The proposed land uses and densities within the partition are consistent with the
land use designation(s) shown on the Metro Plan Land Use Diagram, as refined in
any applicable refinement plan.
(b) Provision of pedestrian, bicycle and transit circulation among buildings located
within the development site, as well as to adjacent and nearby residential areas,
transit stops, neighborhood activity centers, office parks, and industrial parks,
provided the city makes findings to demonstrate consistency with constitutional
requirements. “Nearby” means uses within 1/4 mile that can reasonably be
expected to be used by pedestrians, and uses within 2 miles that can reasonably be
expected to be used by bicyclists.
(c) The street layout of the proposed partition shall disperse motor vehicle traffic onto
more than one public local street when the sum of proposed partition parcels and
the existing lots utilizing a local street as the single means of ingress and egress
exceeds 19.
The Planning Director concluded that the above criterion did not apply because EC 9.8220(2) did not
require a new street and the applicant did not propose the creation of a public street. The appellant
states:
_____________________________________________________________________________________________________________
County Farm Land Bank (PT 13-4) November 2013 Page 2
HO Agenda - Page 2
The PD Decision attempts to sidestep the requirements found in EC 9.8220(5)(b)
by arguing that this provision does not apply because the infrastructure
constructed pursuant to City Contract No. 2013-0008 (i.e. the intended extension
of Matt Drive from Park View Drive to the southern boundary of the Landbank
site) is ‘already’ an existing public street. See page 9 of the PD Decision.
However, the Application fails to meet the internal circulation standard, as well
as fails to provide safe and adequate pedestrian and bicycle circulation off-site.
The appellant asserts that EC 9.8220(5) applies because Matt Drive, which has already been
constructed through the subject property, is not yet a public street because it has not been dedicated
to the public. The appellant states that creation of a public street is not merely the physical
construction of the infrastructure that is intended to be dedicated as a public street, but the formal,
legal dedication of such area that encompasses the physical infrastructure. Hence, the appellant
asserts that platting these lots will include right-of-way dedication over Matt Drive to create a public
street. Based on the argument that EC 9.8220(5)(a)-(c) applies to this partition application, the
appellant asserts that (b) requires off-site extension of Matt Drive through lands to the south and
improvement of County Farm Road adjacent to the southerly properties to Crescent Avenue.
Staff disagrees with the appellant’s assertion that EC 9.8220(5)(a)-(c) applies. Even if EC 9.8220(5)(a)-
(c) applies, staff disagrees that the proposed partition, as conditioned by the Planning Director, fails
to comply with EC 9.8220(5)(b). Further, staff notes that several of the appellant’s assertions about
what is required of the subject partition do not relate to the Needed Housing approval criteria. Staff
addresses each of these arguments below.
The appellant asserts that EC 9.8220(5) applies based on the right-of-way dedication over Matt Drive.
Staff notes that EC 9.8220(5) is invoked “If the provisions of EC 9.8220(2) require a public street, or if
the applicant proposes the creation of a public street…” EC 9.8220(2)(b) requires demonstration of
compliance with Standards for Streets, Alleys and Other Public Ways (EC 9.6800-9.6875). One of
those standards is the street connectivity standards at EC 9.6815(2). The Planning Director’s decision
confirms that no new streets are needed to satisfy the street connectivity standards. The appellant
asserts that Matt Drive, which has been built through the subject property, is not yet a street.
EC 9.0500 defines “Street” as “an improved or unimproved public or private way, other than an alley,
that is created to provide ingress or egress for vehicular traffic to one or more lots or parcel…” Public
Way is also defined as follows: “Any street, road, alley, right-of-way, pedestrian or bicycle easement
or accessway, or utility easement for public use that is controlled by the city, county, or state.”
Matt Drive is a public street on public property. It satisfies the definitions of “street” and “public
way,” which do not require dedication, but only that the way be controlled by the city. Contrary to
the appellant’s assertion, public streets do not have to be dedicated rights-of-way. In fact, a number
of streets throughout the City are on property owned in fee-simple by the City (as compared to public
streets that consist of dedicated right-of-way). For example, the segment of Amazon Parkway,
between East 29th Avenue and Hilyard Street, is located on City parkland with no right-of-way
dedications. This is not uncommon in other jurisdictions as well, for example, ODOT commonly owns
the lands underlying their roadways. By requiring that Matt Drive be dedicated to the public through
_____________________________________________________________________________________________________________
County Farm Land Bank (PT 13-4) November 2013 Page 3
HO Agenda - Page 3
this partition, the City is essentially reserving rights to the public street in anticipation of dividing the
property into two parcels that will then be transferred out of City ownership. The partition is not the
only means of making this reservation. The City could dedicate right-of-way today, totally
independent of the partition process. The only reason the City has not dedicated right-of-way
previously is because the City owns the property and thus controls Matt Drive without any
dedication; hence there has been no compelling need for that additional paperwork.
For the reasons stated above, the Planning Director correctly concluded that EC 9.8220(5)(a)-(c) do
not apply to this partition.
Even if EC 9.8220(5)(b) did apply to this partition it does not require the off-site improvements
suggested by the appellant. The appellant asserts that there is “inadequate internal circulation” and
“inadequate offsite pedestrian and bicycle circulation” (see pages 2 and 3 of the appeal statement).
This terminology appears nowhere within the Needed Housing approval criteria, including criterion
EC 9.8220(5). The rest of the appeal statement (pages 4 through 8) relies on “public safety” and “City
Council Direction,” none of which relates to the applicable Needed Housing approval criteria.
The street connectivity standards at EC 9.6815(2) require connections “in the direction of all existing
or planned streets…” This language clearly limits the applicant’s obligation to on-site improvements,
by using the term “in the direction of.” This standard in no way requires applicants to dedicate and
improve streets across other adjacent parcels (which they do not own), as suggested by the
appellant. The applicant has already met their obligation through the construction of Matt Drive on
the subject property.
Furthermore, the partition, as conditioned by the Planning Director, complies with this criterion
because the proposed parcels will abut three public streets and approval is conditioned upon those
streets being improved with sidewalks. Specifically, the Planning Director conditioned tentative
approval (No. 5) on the following:
The applicant shall pave that portion of County Farm Road which is adjacent to the
development site to the width specified in EC 9.6870 Street Width, providing for drainage and
the construction of curbs and gutters, sidewalks, street trees and street lights according to the
Design Standards and Guidelines for Eugene Streets, Bikeways and Accessways and standards
and specifications adopted pursuant to Eugene Code Chapter 7 and other adopted plans and
policies.
The Planning Director’s decision (page 6) also noted the following requirements:
Along Matt Drive, there is sufficient right of way to accommodate both the street trees and
the setback sidewalks, thus, the sidewalks along Matt Drive shall be setback sidewalks as
provided in the City’s adopted design standards guidelines. To avoid damaging the sidewalks
during construction of the development, construction of the sidewalks on Park View Drive and
Matt Drive will be required through the building permit process (the sidewalk requirement is
applicable to building permit applicants and, if not previously satisfied, must be satisfied at
that time).
_____________________________________________________________________________________________________________
County Farm Land Bank (PT 13-4) November 2013 Page 4
HO Agenda - Page 4
As such, the transportation amenities required by EC 9.8220(5)(b) will be provided within the
development site, as well as to adjacent residential areas and transit stops. For the reasons discussed
above, even if EC 9.8820(2)(b) applies, the conditioned partition complies with the criteria.
Although not an approval criterion for the subject partition, and therefore not relevant to the scope
of the subject appeal, the City has mechanisms in place for street improvements to be provided on an
incremental basis, as properties develop and contribute their proportional share, or as a City-initiated
project. With regard to incremental improvements provided by development, staff notes that the
adjacent lands to the south have the potential for further development and division. In fact, a portion
of the properties to the south have received tentative subdivision approval (i.e. Hayward Subdivision,
City File ST 07-5), which will extend Matt Drive within 135 feet of the south boundary of the subject
property. The appropriate time for extending street improvements to the south would be when
those properties further develop. With regard to County Farm Road, the City has been collecting
assessments from developments abutting the roadway and the improvements have been identified
on the 2017-2020 State Transportation Improvement Program Needs List.
Staff Recommendation:
Based on the available evidence, and consistent with the preceding findings and specific clarifications
provided in response to the appeal issues raised, staff concludes that the Planning Director’s decision
was not in error or otherwise inconsistent with the applicable tentative partition approval criteria at
EC 9.8220. With the additional findings provided by staff and absent additional testimony or
evidence to indicate otherwise, as of the date of this report, staff recommends that the Hearings
Official affirm the decision of the Planning Director granting conditional tentative partition plan
approval for County Farm Land Bank (PT 13-4).
Attachments:
Attachment A: Findings and Decision of the Planning Director for County Farm Land Bank (PT 13-4)
Attachment B: Appeal Form and Written Statement
Attachment C: Air Photo
The full application file will be made available at the public hearing on this matter, and is otherwise
available for review at the Eugene Planning Division offices. Staff is forwarding the Hearings Official a
full-size copy of the applicant’s plans, written statement, and supporting documentation submitted
with the application, as well as a copy of all information received within and after the initial 14-day
comment period.
For More Information:
Please contact Becky Taylor, Associate Planner, Eugene Planning Division, by phone at (541) 682-5437
or by e-mail, at becky.g.taylor@ci.eugene.or.us.
_____________________________________________________________________________________________________________
County Farm Land Bank (PT 13-4) November 2013 Page 5
HO Agenda - Page 5
Attachment A
HO Agenda - Page 6
Attachment A
HO Agenda - Page 7
Attachment A
HO Agenda - Page 8
Attachment A
HO Agenda - Page 9
Attachment A
HO Agenda - Page 10
Attachment A
HO Agenda - Page 11
Attachment A
HO Agenda - Page 12
Attachment A
HO Agenda - Page 13
Attachment A
HO Agenda - Page 14
Attachment A
HO Agenda - Page 15
Attachment A
HO Agenda - Page 16
Planning Development
Planning
City of Eugene
B 99 West 10
h Avenue
2013 Eugene Oregon 97401
541 682
5377
5572 FAX
541 082
gov
or
www
eugene
APPEAL OF PLANNING D C ORJ
S
D ECISION
This appeal form applies to appeals of interpretation of this Land Use Code made according to EC
0
1
9 040 and to appeals to all Type II land use applications The appeal of the Planning Director
s
decision provides for a review of an administrative decision by a higher review authority specified in
this Land Use Code The Planning Director
s decision may be affirmed reversed or modified
Please check one of the following
Adjustment Review Modification ndards Review
Minor Conditional Use Permit
Major Planned Unit Development Subdivision
Site Review Tentative Plan
Code Interpretation Willamette Greenways Final Plat
Hazardous Materials Review Partition Traffic Impact Analysis
Tentative Plan
Historic Property Final Plat Vacation
Alteration Improved Public W
R
O
Demolition Planned Unit Development Improved Public Easement
Moving Final Unimproved Public R
O
W
with dedication
Re
ariance Site Review
File Name COUNTY FARM LANDBANK
Citv File Number PT 4
13
Date of Planning Director Decision October 3 2013 Mailed October 8 2013
Date Appeal Filed October 18 2013
This date must be within 12 days of the date of the mailing of the Planning Director
s decision
Attach a written appeal statement The appeal statement shall include a written statement of issues
on appeal and be limited to the issues raised in the appeal The appeal statement shall explain
specifically how the Planning Director
s decision is inconsistent with applicable criteria Please contact
staff at the Permit and Information Center 99 West 10 x Avenue 541 5377 682 for further
information on the appeal process
Appeal of Planning Director
s Decision Paue 1 of 2
HO Agenda - Page 17
A filing fee must accompany an appeal of a Planning Director decision with some
exceptions for
neighborhood groups The fee varies depending upon the type of application and is adjusted
periodically by the City Manager Check with Planning staff at the Permit and Information
Center to determine the required fee or check on the web at cneplannin
i
cu
www
Acknowledgment
I we the undersigned hereby acknowledge that I we have read the above appeal form understand
the requirements for filing an appeal of a planning director decision and state that the information
supplied is as complete and detailed as is currently possible to the best of my our knowledge
APPELLANT
Name print Michael M Reeder Phone 541 0188
484
Address 800 Willamette Street Suite 800
State
Zip
City Eugene OR 97401
Signature
APPELLANT
Name print Wally and Dianna Graf f Phone
Address 541 Willamette Street Suite 106
State
Zip
City Eugene OR 97405
Signature
IF this appeal is being filed by the affected recognized
neighborhood association complete the
following
Name of Association
Appeal of Planning Director
s Decision Noe 2 of 2
HO Agenda - Page 18
ARNOLD GALLAGHER
A Professional Corporation
ATTORNEYS AT LAW
U Bank Center
800 S
Telephone 541 4840188 Correspondence
800 Willamette Street Facsimile 541 4840536 P Box 1758
O
Eugene OR 97401 E
M ail mreeder@arnoldgallagher
com Eugene OR 9744
1758
www lagher
arnoldgal com
MICHEAL M REEDER
October 18 2013
Becky Taylor Associate Planner
City of Eugene Planning Division
99 West 10th Avenue U U ocr 18 1
2013
Eugene Oregon 97401 w
Pf
Re Appeal Statement County Farm Road Landbank PT
Dear Ms Taylor
As you know I represent Wally and Dianna Graff owners and residents of 2308 Park View
Drive Eugene very near the County Fann Landbank site that is subject to an application for a
Tentative Partition PT 13
4 the Application On October 3 2013 the Planning Director
conditionally approved the Application the PD Decision Please accept this letter as my clients
appeal statement supporting the appeal of the PD Decision
EC 7
1
9 605 Timeliness of Appeal Standing to Appeal
The PD Decision was mailed on October 8 2013 and the mailed notice states that any appeal
must be received by 0
5 0m
p on October 20 2013 This appeal is being filed on October 18 2013
and is therefore timely Additionally my clients provided written comments in regards to the
Application and are adversely affected and aggrieved by the initial decision
EC 7
2
9 605 Appeal Form Appeal Fee
This appeal statement is attached to the appeal form approved by the City Manager signed by
both me and my client Dianna Graff and includes a check in the amount of 3
1
4079 50 of the
original application fee paid by the City as applicant as the required appeal fee
EC 7
3
9 605
Appeal Statement of
The Eugene Code EC requires that an appeal include a statement of issues on appeal and
that the appeal statement explain specifically how the Planning Director
s decision is inconsistent
with applicable criteria
HO Agenda - Page 19
Becky Taylor Associate Planner
October 18 2013
Page 2
Statement of Issue Assignment of Errorh
The Planning Director erroneously approved the Application because the Application fails to
provide pedestrian bicycle and transit circulation among buildings located within the development
site and fails to providefor adequate and safe pedestrian bicycle and transit circulation to
adjacent
and nearbv residential areas transit stops and neighborhood activity centers as required by EC
b
5
9
8 220
Explanation of Assignment of Error
By proposing to not extend Matt Drive south to connect to Crescent Avenue and by
proposing to not provide curbs gutters sidewalks and bicycle lanes along the entire frontage west
side of County Farm Road from Park View Drive to Crescent Avenue the City violates EC
b
5
9
8 220 The Application also turns from its obligations of public safety and ignores the
direction from City Council to provide safety measures including sidewalks along the entire
unimproved portion of County Farm Road from Park View Drive to Crescent Avenue
EC 8
b
5
9 220
The Application does not meet the standard found in EC 8
b
5
9 220 wherein the applicant
must provide for the following
pedestrian bicycle and transit circulation among buildings located within the
development site as well as to adjacent and nearby residential areas transit stops
neighborhood activity centers office parks and industrial parks provided the city
makes findings to demonstrate consistency with constitutional requirements
Nearby means uses within mile that can reasonably be expected to be used by
pedestrians and uses within 2 miles that can reasonably be expected to be used by
bicyclists
The PD Decision attempts to sidestep the requirements found in EC
b
5
9
8 220 by arguing
that this provision does not apply because the infrastructure constructed pursuant to Contract
City
No 2013
0008 e
i the intended extension of Matt Drive from Park View Drive to the southern
boundary of the Landbank site is already an existing public street See page 9 of the PD Decision
However the Application fails to meet the internal circulation standard as well as fails to provide
safe and adequate pedestrian and bicycle circulation off
site
Inadequate Internal Circulation
The proposed developers of the Landbank site stated There will be a lot of kids in Bascom
Village It is obvious that this is the case since the May 31 2011 St Vincent de Paul Society of
Lane County Inc SVDP and Housing and Community Services Agency of Lane
County
HACSA Bascom Village joint Response to the City s Request for Proposal for the Landbank site
explicitly states that over 30 of the units for Bascom Village are for 3 and b
4 edroom units and
another 42
6 of the units will have 2 bedrooms The proposal for Bascom Village also included a
HO Agenda - Page 20
Becky Taylor Associate Planner
October 18 2013
Page 3
Head Start program The large number of units compared to the parcel size in addition to having
insufficient room for parking leaves virtually no open space dictating that the children
s play area
double as access for emergency responder vehicles There is no evidence in the record whether
emergency responders will be able to safely access the project through its single point of entry which
is the same and only exit that project residents would use to evacuate the project in an emergency
To access the offsite street parking on Park View Drive project residents will need to either cut
through adjacent neighborhood streets from the west or they will need to perform tUurns or utilize
the private driveways of nearby residents to turn around when accessing the offsite parking spaces
via County Farm Road from the east The projects only exit for 128 vehicles is located directly
opposite Matt Drive to the north which services 72 family
single residences During peak hours
such as during the morning commute as many as 200 vehicles will be attempting to access Park
View Drive at the same access point Those drivers will be attempting to merge onto Park View
Drive with vehicles traveling from the neighborhoods to the west which use Park View Drive to
access County Farm Road In addition the project proposes an on site Head Start program that will
be open to not just Project residents but the greater community as well and incorporates 4 offsite
parking spaces again on the southside of Park View Drive for parents who are dropping off and
picking up their children from the Head Start program
The project is a recipe for disaster mixing large numbers of school age children with heavy
volumes of traffic attempting to exit to County Farm Road through a narrow local neighborhood
street at the same time the Project will be drawing in school buses and parents dropping off children
Perhaps if the developer and the City had proposed to extend Matt Drive from Park View Drive to
Crescent Avenue the internal circulation issues could be addressed However the Application fails
to do so
Inadequate Offsite Pedestrian and Bicycle Circulation
The PD Decision states EC 8
2
9 220 does not require a public street and the applicant
does not propose the creation of a public street thus the criteria in EC 8
c
a
5
9 220 do not
apply Page 9 The PD Decision is in error
EC 8
5
9 220 states If the provisions of EC 8
2
9 220 require a public street or
if the
applicant proposed the creation of a public street the following criteria also apply
First contrary to the PD Decision
s assertion the existing pavement located on the Landbank
site that was constructed under City Contract No 0008
2013 is not a public street because it is not
yet dedicated to the public Merely because it is designed and constructed to eventually be a public
street does not make it in fact a public street The creation of a public street is not merely the
physical construction of the infrastructure that is intended to be dedicated as a public street but the
formal legal dedication of such area that encompasses the physical infrastructure So to be clear
the City is in fact proposing to create a public street as part of its partition process for the
Landbank site
Second even if the existing pavement located on the site is considered a public street prior to
dedication to the public the mere fact that the public street was constructed prior to the tentative
HO Agenda - Page 21
Becky Taylor Associate Planner
October 18 2013
Page 4
partition approval does not relieve the City of its obligation to meet the standard of EC 8 5
9 220
This is because there is no temporal requirement imbedded in EC 8 5
9 220 It is the provisions of
EC 8
2
9 220 that are the subject of the standard found at EC 8
5
9 220 111 other words the Bascom
Village development for which this partition is required requires a public street i
e the extension of
Matt Drive in order to meet the requirements of EC 8 The is
2
9 220 partition dependent upon the
construction and dedication of a public street i
e the extension of Matt Drive The City
s argument
is a form over substance argument and it fails It is the City
s attempt to skirt the requirement of
EC 8
b
5
9 220 Regardless of whether the physical construction of the extension of Matt Drive is
in fact already completed EC 8
2
9 220 requires a public street It makes no difference whether that
street is already in existence The trigger for compliance with the standards of EC 8
5
9 220 is
whether such a street is required not whether such street exists or does not exist
The City cannot show compliance with the standards of EC 8
b
5
9 220 and the PD
Decision must therefore be reversed and the Application denied
Public Safety
In my June 18 2013 oppositional letter to you on behalf of my clients I
explained in great
detail why the Application was flawed We took the position that the City or developer is required to
provide curbs gutters sidewalks street lighting and street trees along the entire unimproved section
of County Farm Road not just that portion that abuts the Landbank site In that letter I stated
The City acknowledges that the segrnent along County Farm Road is unsafe
However the City does not explain why providing curbs glitters sidewalks street
lights and street trees as required by the EC would be infeasible or hv 14 such
improvements to County Farm Road will create unnecessary safetv concerns
Perhaps the City is referring to the fact that even if the Landbank Site developer
improves County Farm Road along the Landbank Site that abuts County Far 111
Road only and leaves a significant portion of County Farm Road
unimproved to
the south that County Farm Road will still be unsafe for pedestrians and
bicyclists We agree However the solution is not to defer the improvernents
creating a more hazardous situation The remedy is to deny or withdraw the
Application At the very least the City could make the improvements along the
entire length of County Farm Road that does not have curbs gutters sidewalks
etc so thatfuture residents of the Landbank Site would be able to walk and bike to
the Lane Transit District bus stop and the other services near and
along Coburg
Road Crescent Avenue and Chad Drive The solution is not to ignore the safety
issues Page 2 emphasis added
My clients traffic engineer Kelly Sandow PE also provided a letter to you dated July 17
2013 wherein she concluded
until the rnissing section of Matt Drive is completed County Farin Road will
serve as the rnajor connection for pedestrians accessing services along Coburg Road
to the south This connection should have sidewalks provided to improve pedestrian
HO Agenda - Page 22
Becky Taylor Associate Planner
October 18 2013
Page 5
safety The City should strongly consider adding a sidewalk along County Fat
III
Roadfroin the County Farrn LandBanks s sic south property line to Coburg Road
This addition will create a continuous sidewalk for the neighborhood and iinprove
safety along this important pedestrian route Page 4
In response to my clients opposition and the letter from my clients traffic engineer Kelly
Sandow the PD Decision imposes a condition of approval that requires the developer to provide
curbs gutter sidewalks street lighting and street trees only along the portion of County Farm Road
that abuts the Landbank site It does not provide for continuous safety infrastructure along the entire
portion of County Fartn Road to Crescent Avenue as recommended by Ms Sandow Not only does
the Application violate the requirements found in EC 8
b
5
9 220 but it is also bad policy since it
endangers the safety of some of the City
s most vulnerable population The May 31 2011 SVDP
and HACSA Bascom Village joint Response to the City s Request for Proposal for the Landbank site
explicitly states that over 30 of the units for Bascom Village are for 3 and b 4edroom units and
another 42
6 of the units will have 2 bedrooms suggesting that there will be many children and
other driving
non residents who will rely heavily upon walking biking and bus service to meet their
transportation needs It is irresponsible to not provide safe access to services located to the south of
the proposed Bascom Village In my June 18 2013 letter to you I expressed our concern
The Federal Highwav Administration FHWA reports that of the 5
4 00
pedestrians killed in traffic crashes with motor vehicles annually in the United
States almost 8 percent are pedestrians killed while walking along the roadway
s
Not only do sidewalks snake pedestrian trips safer but it also encourages more
2
walking
Below is a photograph Photo 1 taken from the FHWA website showing an
example ofan uncomfortable and unsafe pedestrian path along a road in a suburban
conarnunity It is strikingly similar to the stretch ofCounty Farm Road see Photo 2
beloil that does not have curbs gutters and sidewalks
Photo 1 Example of unsafe conditions without sidewalks from FHWA
website
1
See safety
fhwa bike
gov
ped
dot
http tools solve
walkways trifold
Id By providing facilities that are more comfortable we can increase the number of trips made by
walking Providing sidewalks widened paved shoulders or stabilized shoulders Research indicates that people will walk
for recreational purposes if a facility is provided
HO Agenda - Page 23
Becky Taylor Associate Planner
October 18 2013
Page 6
Below is Photo 2 a photograph of County Farm Road that abuts the
Landbank Site This photo is looking south toward Crescent Avenite and the LTD
bits stop
Photo 2 County Fat
in Road
Photo 3 below shows the large Wildish trucks and other traffic that
is representative of the types of vehicles that prix with pedestrians and bicvclists
along this unimproved strip along County Farm Road
Photo 3 County Farm Road looking northeast south of Park View Drive
1
i t
J d4 NCI 14 C
N
I1
91
This is in stark contrast to the photo below Photo 4 that shows curbs gutters and
sidewalks along a vacant parcel that serves another low
income housing project
HO Agenda - Page 24
Becky Taylor Associate Planner
October 18 2013
Page 7
Santa Clara Place
Photo 4 Santa Clara Place on Santa Clara Avenue off ofRiver Road north of the
Beltline
Throughout the public process ofawarding the Landbank Site to the Bascom Village
developers the proponents and City staffargued that the safety and sidewalks issues
would be taken care of and that there was nothing to worry about
For example Norton Cabell chair of Intergovernmental Housing Policy Board
wrote in a Guest Viewpoint opinion article in The Register
Guard on November 23
2011 the following The location of the nearest bus stop and the lack ofsidewalks to
get there are a concern City staff already is working to figure out how to provide
sidewalks along County Farm Road The City has already admitted that County
Farm Road is problematicfor safety reasons But the City assured opponents ofthe
Bascom Village project that it was working on a solution to those problems
Pages 2
5
City Council Direction
When the City Council deliberated on the SVDP
HACSA joint response to the City
s
Landbank site RFP it was clear from the statements made by various City Councilors that the
pedestrian and bicycle safety issues were of great concern I explained this fact in my June 18 2013
letter to you as follows
The November 28 2011 City Council meeting minutes state Councilor Ortiz
deterrninedfrom Ms Wheeler that staff was working to fund a solution to the lack of
sidewalks serving the site Page 6 The minutes continue Councilor Pryor
wanted the council to take definitive action to ensure that the street capacity issues
brought up in testimonv were addressed and that the sidewalk access be required as
part of the project Id The minutes also state Councilor Poling was concerned
about the lack ofsidewalks and bicycle lanes on County Farm Road as well as about
HO Agenda - Page 25
Becky Taylor Associate Planner
October 18 2013
Page 8
bits routes Id Lastly the minittes state Councilor Clark appreciated the City
s willingness to consider safety improvements to ensure the safety of
Manager
children using the road which was now a gravel road i e gravel shoulder with no
sidewalks frequently traveled by large trucks Page 7 The Citv has vet to follow
through on these promises Page 5
Providing curbs gutters sidewalks street lighting and street trees along the approximately
200 feet of the west side of County Farm Road that abuts the Landbank site is a good first step but it
is inadequate and does not meet the intent of the City Council
Conclusion
The PD Decision should be reversed and the Application should be denied for the three
reasons set forth above and summarized as follows 1 it violates EC 8
b
5
9 220 2 it is bad
public policy and ignores public safety concerns and 3 it ignores direction from City Council to
provide sidewalks and other safety infrastructure along the entire length of County Farm Road from
Park View Drive to Crescent Avenue
Very truly yours
Micheal M Reeder
Attorney for Wally and Dianna Graff
jgh
MMR
Attachment Letter from Kelly Sandow PE
cc Clients a
w ttachment
N
F AGraff Wally Diamia andbank
18325 Site Partition Appeal 18325
Morrespondence Statement Ltr to Becky Taylor 101513
Appeal doc
HO Agenda - Page 26
SANDOWENGINEERING
July 17 2013
lam 5d
Michael Reeder
Arnold Gallagher P
C
800 Willamette Street Suite 800
Eugene OR 97401
RE Bascom Village Sidewalks
Dear Mr Reeder
Per your request I have evaluated the decision by the City of Eugene not to
require the County
Farm Landbank project to provide a sidewalk adjacent to their site along County Farm Road It is
my professional opinion as a Transportation Engineer that a sidewalk at this location is important
and should be provided This sidewalk will not only serve the needs of the residents of this
development but the need as an important neighborhood connection to provide safe and efficient
pedestrian connectivity as well The following elaborates my position that a sidewalk at this
location is necessary
COUNTY FARM LANDBANK SITE ACCESS
The consideration of sidewalks along County Farm for the development frontage should be based
upon site usage and modal choices existing and future connectivity for vehicles and pedestrians
and the location and routing to essential local services All of these factors should be evaluated to
ensure that safe and efficient access to the site is provided for all residents
Site Usage
The site is proposed as a multi
family affordable housing complex The objective of this type of
project is to serve the needs of community members that are at or below 50 of the median
income level
Modal Choices
Vehicle trips to affordable housing complexes are lower than vehicle trips to market rate apartment
complexes Studies I have done within Eugene have illustrated that there are up to 30 fewer
vehicle trips to affordable housing complexes over vehicle trips to market rate complexes Instead
these studies have shown there is heavier reliance on the usage of transit pedestrian and bicycle
trips Therefore it is important to provide safe and efficient access for all modal choices for this
development This access needs to be done at the time of development for the immediate safety of
the residents
2911 TENNYSON AVENUE EUGENE OREGON 97404 o 513
541
3376
HO Agenda - Page 27
Letter from Kelly Sandow PE
RE Bascom Village Sidewalk
July 17 2013
Page 2
Site Access
Connectivity
The site is bound by Park View Street to the North and County Farm Road to the East Matt Drive
will be developed through the property
Park View Street neighborhood collector has been developed to urban standards
with setback sidewalks on both sides except along the development site frontage
and connects County Farm Road to Lakeview Drive
County Farm Road major collector has not been updated to the City
s current
standards for this classification of roadway there are no sidewalks or bike lanes
however a wide shoulder is present along both sides County Farm provides direct
access to Coburg Road Coburg Road provides a connection to essential services
including transit employment and commercial activities
Matt Drive will be developed through the center of the property from Park View to
the southern property line There will be approximately 250 feet of undeveloped
private property from the south end of the development site before Matt Drive
picks up again and continues to Crescent Avenue
The only vehicle pedestrian or bicycle access to the site until such time that Matt Drive is
connected to the south will be from Park View Drive The nearest major roadway is Coburg Road It
is reasonable to assume that a majority of trips will access the site via County Farm Road and
Coburg Road as it is the most efficient and direct access to the site The Traffic Study prepared by
Branch Engineering evaluating the zone change for this project projected 90 of vehicle traffic will
use Coburg Road for access
County Farm
Access to Services
The nearest public transit stops to the development are located along Coburg Road and Crescent
Avenue Routes 66 and 67 provide the most convenient routing at 30 minute headways from 7 m
a
to 11 m
p The nearest transit stops for these routes are located along Crescent Avenue just west
of Coburg Road and just east of Chuckanut Street Attachment 1 illustrates the walking and biking
routes to the site from the transit stops Pedestrians traveling along Coburg Road to and from the
transit stop will save about 600 feet and 5 minutes of direction
out travel
of
Coburg Road provides a myriad of retail and employment opportunities for residents of this
development The closest retail services are located west of Coburg Road and south of Crescent
Avenue These shopping centers include
Shopko Petco Costco and medical offices Coburg Road
provides the most direct access to these amenities with any other existing routes adding over 15
minutes of extra travel time for a pedestrian
County Farm to Coburg Road provides the most direct and efficient route for pedestrians accessing
transit stops or nearby commercial or medical offices This important route should be
developed
with curbs gutters sidewalks and lighting to improve safety for residents who will use this route
SANDOW ENGINEERING 291 1 Tennyson avenue Suite 400 Eugene Oregon 97408 541
3376
513
HO Agenda - Page 28
Letter from Kelly Sandow PE
RE Bascom Village Sidewalk
July 17 2013
Page 3
NEIGHBORHOOD CONNECTIVITY
The second important factor to consider is the current and future neighborhood connectivity and
needs for pedestrians The sidewalk along County Farm Road will create an important connection
for pedestrian circulation within the Gilham neighborhood The sidewalk that should be developed
with this site will infill an important route to improve safety and efficiency of access
In January 2013 1 worked with the 4
1 School District to evaluate the Gilham School area for a Safe
Routes to School Study This analysis evaluated current and future alternative transportation routes
and identified deficiencies along these routes that would create actual or perceived safety issues
This study identified Park View Drive as a major route that currently serves and will continue to
serve the needs of students walking or biking to school The study showed that many children walk
and bike to school from the neighborhoods east of Crescent Village The children cut through the
field north of Crescent Village and Kinney Loop cross Coburg Road and travel County Farm Road to
Park View Drive to access the school This route is illustrated in Attachment 2 Aside from the field
the only section of the route that does not have sidewalks is the section of County Farm Road
between Coburg Road and Park View Drive This development
s sidewalk infill will complete an
important section for students walking or biking to school
Recently Spectrum Retirement Center has been approved and will be creating a new public street
Spectrum Road that will connect to Coburg Road and will have sidewalks on both sides The
street is expected to be built later this summer Right now the next phase of Crescent Village is
being designed and is expected to be built in the next few years This development is proposed as a
200 unit family
multi apartment complex The developer is currently negotiating to provide the
roadway connection from their site to Spectrum Road This roadway will also include sidewalks
The Crescent Village apartments will provide a pedestrian connection to Grand Cayman Drive
When these developments are completed there will be a paved connection for the families east of
Crescent Village to access Gilham Elementary School This creates an even greater need for a
sidewalk along the development frontage on County Farm Road This connection is illustrated in
Attachment 3
The City of Eugene
s Pedestrian and Bicycle Master Plan has identified County Farm Road from
Coburg Road to the north with a proposed sidewalk infill The inclusion of a sidewalk for this
development is consistent with this plan
CONCLUSION
The City of Eugene should reconsider their decision not to require a sidewalk for the County Farm
s frontage on County Farm Road The sidewalk will provide safe and efficient access for
Landbank
the residents of the project to access transit retail and community services Additionally the
sidewalk will improve neighborhood pedestrian connectivity to Gilham Elementary School
Matt Drive is planned to have a future extension from the development
property to Crescent
Avenue Once Matt Drive is fully completed it will serve as a very viable pedestrian route for this
SANDOW ENGINEERING 2911 Tennyson avenue Suite 400 Eugene Oregon 97408 541
3376
513
HO Agenda - Page 29
Letter from Kelly Sandow PE
RE Bascom Village Sidewalk
July 17 2013
Page 4
neighborhood However until the missing section of Matt Drive is completed County Farm Road
will serve as the major connection for pedestrians accessing services along Coburg Road to the
south This connection should have sidewalks provided to improve pedestrian safety
The City should strongly consider adding a sidewalk along County Farm Road from the County Farm
s south property line to Coburg Road This addition will create a continuous sidewalk for
LandBanks
the neighborhood and improve safety along this important pedestrian route
Should you have any questions or need any additional information please contact me at your
convenience
Sincerely
K y Sandow PE
SANDOW ENGINEERING 2911 Tennyson avenue Suite 400 Eugene Oregon 97408 513
541
3376
HO Agenda - Page 30
HO Agenda - Page 31
HO Agenda - Page 32
HO Agenda - Page 33
d
E
ID 691
o
m
y N Q I n 1 3
0 O
L
C O N CD
a p O to
Lo
m a O N H LL
U a U
c c N Qj 00 co co 0 0
c c c
eO C
O
C
O C
C
co N w
m m m
i a rn w
E N c
o
N
r
L
U
T E
76 cu E
co
II FOE u
N O V
n n H Q N LL fn Q
0
O
U LL O
a a
Q d
9 lM
Y I
r
to Efl ER ER ER 6s Efl Ef3
ER
U o
c g a
E n o m 0 O U
a U U N
L
7
O c
O O C C
C M
a co H LL J 0
cu N o
O
F 0 O
L
Q
d C C X co
O
f4
C
0
E H
D C
a
0
1l
V r o C
a
c
0
E
r r
a
0
6 D
a b o Q 6s LU Q Q a J a
co
a Q IL in cn
HO Agenda - Page 34
t
ii i t O I O O I O 1 O li II 1
II I v I I v I O I II II
II l I I 1 11 IT II 11
I I C13 11I 07 I J 07 I 07 I 3
6 I I C I I f l
I I I I ti ti ti 1 ti I I I I I I
II O 11 M t C7 7
C 1 C
7 I II C II Z I
II Co N i 1 I 1 I 11 U 1 1 10 Cf3 I I
II W co 11 r I I r I II 1C7 1 1 II
11 U O co I 4A I EJ fA I b3 I I I L i t y r I I
1
I LC3 i t i I I 11 I CU E I I
Ii I II I I I tl II L II
II fZ N I It 1 1 I fl r
11 L 11
II W 00 U II I I 1 1 E II 7 D II
II W CJJ CD O I1 I1 L 11 n W 11
I Z II CU II CU II O I
i t W F I I I I Q 11 L C 11
II CM 1
f II U I N 11
1 1 O E W t l Q W 4l 7 II O I I E In 1 1
II W V II Q O to L O II r II O 11
1 W Q LO II Q O 1d W 11 r II E II
11 L d O I I U U O CU I I 11 n C3 I
II O 2 07 11 m d J a C Cl II II U II
I i oa 1 O 11 C CD C CU C I I 7 11 U f l
II I O 11 r Q 1 0 41 0 11 it T II
I H Z3 O II C Q O W 11 C 11 L I 11
i t Z I 11 C 13r F 2 U f 1 L I I C I I
it UIH C
I
7 II 10 MCD 10 it O 11 O C 11
II D C17 II r E O Q 41 II I 11 O II
II J L O II d L ctY J O II CU II Cl E 11
m W II Q EL J F II C 11 Y a II
i I 4 LL Q I I CU I I 1O N I
I I co 0 W 11 O O Cm 11 CF 11 j I I
II 07 U Of II a W 1 1 II
11 W W I1 r L p 11 CU II a II
11 1
I j 1
4 J
CY 11 a II II n n II
tl 1 2 II CU C W O II 3 II 10 11
II C U 11 Q 7 U Z 11 3 fl CU 3 11
II
II
W
Cl
Q
U
11
11
Q O
Q U
W
Q
HO Agenda - Page II1135 3 11
11
r
d
3
3
11
11
wn
i ng D ale Ave
St
Dale Ave
Devon Ave
Attachment C
Riverbend Ave
Park Wo o d D
r
Lakeview Dr County Farm Rd
Belle Terra Dr
Pa De von Ave
rk
Matt Dr
Vie
w
Dr
Park View Dr
P a rk Grove Dr
Subject Property
C heryl St
Co
un
ty
Fa
Devon Ave rm
Rd
Wingate St
Kinney Lp
Matt Dr
Chuckanut St
Coburg Rd Kinney Lp
D ayna Ln
W ingate St
Da yna Ln
´
Crescent Ave
Caution:
This map is based on imprecise
source data, subject to change,
and for general reference only.
Ft
0 120 240 480 November 04, 2013
HO Agenda - Page 36