Hearings Official Public Hearings
Regular MeetingEugene, OR · September 2, 2020
Agenda
AGENDA
Meeting Location:
Virtual Meeting (via Zoom)
Phone: 541-682-5377
https://www.eugene-or.gov/406/Hearings-Official
The Eugene Hearings Official welcomes your interest in this agenda item. As this meeting is
being held virtually, feel free to join in and go as you please during the meeting. For
questions about accessing the virtual meeting, see the instructions* below or contact the
Planning Division: (541) 682-5437.
WEDNESDAY, SEPTEMBER 02, 2020 – 5:00 p.m.
I. Public Hearing: Compeau Family Trust (PDT 19- 2)
Request: The applicant requests Tentative Planned Unit
Development approval for 8 lots and one common
tract including 2 lots for existing single-family
dwellings, 2 duplex lots, and 4 lots for single-unit
dwellings.
Owner/Applicant: Compeau Family Trust
Representative: Jed Truett, Metro Planning
Assessor’s
Map/Tax Lot: 18-03-04-14 / 00700 and 00800
Address / Location: 2321 and 2323 Augusta Street
Lead City Staff Rodney Bohner, Associate Planner, Planning Division
541-682-5437 RBohner@eugene-or.gov
*IMPORTANT NOTE: To take preventative measures for community members and
staff safety against the spread of COVID-19, this public hearing will be performed
virtually. No interested parties may attend the public meeting in person. Instead,
staff has provided alternative opportunities for interested parties to participate and
stay safe. Therefore, the following opportunities are available to participate in this
land use process:
HOW TO ACCESS THE MEETING
• To join/watch the meeting from your computer, tablet or smartphone
(allows participation in Public Comment):
https://zoom.us/j/94793364472
• To join by phone (allows participation in Public Comment): Dial one of the below
numbers and enter the Meeting ID: 947 9336 4472.
Dial: + 1- 669- 900- 6833 or Toll Free 1- 877- 853- 5257 (US)
For higher quality, dial a number based on your current location.
International numbers available: https://zoom.us/u/adOYOpL5aB
• To Submit Written Testimony: You may submit written testimony by email to
RBohner@eugene-or.gov or by mail to Planning Division, c/o Rodney Bohner, 99
W 10th Avenue, Eugene, OR 97405. Written Testimony must be received by the
close of the public record.
To sign- up to speak for Public Comment:
o For those viewing the meeting on a computer, laptop, or other device, click
once on the blue “hand” icon.
o For those listening to the meeting on a phone, press *9 (Star-9)
o All persons providing comment will be asked to provide their name, address,
and whether they are in support, neutral, or in opposition to the application.
Public Hearing Format
1. Staff introduction/presentation
2. Public testimony from applicant
3. *Public Testimony from others in support of application.
4. *Comments or questions from interested persons who are not proponents, nor
opponents of the proposal (neutral persons).
5. *Public testimony from those in opposition to the application.
6. Staff response to testimony.
7. Questions from Hearings Official.
8. Rebuttal testimony from applicant.
9. Closing of public hearing.
*Due to the virtual meeting platform, the order of speakers will be based on order
that persons sign-up to speak, as opposed to the order noted above. For this
reason, each person providing comment will be asked to state whether they are in
support, neutral, or in opposition to the application.
The Hearings Official will not make a decision at this hearing. The Eugene Code
requires that a written decision must be made within 15 days of close of the record.
To be notified of the Hearings Official’s decision, please contact the lead City staff
noted above or provide public comment. The decision will also be posted at
https://www.eugene-or.gov/406/Hearings-Official.
City of Eugene - Hearings Official
Ph.: (541) 682-5877 https://www.eugene-or.gov/406/Hearings-Official Page 2
Atrium Building
99 West 10th Avenue
Eugene, Oregon 97401
Phone: 541-682-5377
Fax: 541-682-5572
www.eugene-or.gov/planning
PUBLIC HEARING STAFF REPORT
Tentative Planned Unit Development
File Name (Number): Compeau (PDT 19-2)
Owner: Compeau Family Trust
Applicant’s Representative: Jed Truett, AICP; Metro Planning, Inc.
Lead City Staff: Rodney Bohner, Associate Planner, Eugene Planning
Division, Phone: (541) 682-5437
Relevant Dates: Application Submitted: May 14, 2019
Deemed Complete: November 12, 2019
Public Hearing: September 2, 2020
Location: 2321 and 2323 Augusta Street
Map No. / Tax Lot(s): 18-03-04-14 / 00700 and 00800
Property Size: Approximately 1 acre
Application Summary:
Request for approval of a Tentative Planned Unit Development (PUD) to subdivide two existing
residential lots into 8 lots, with a total of 10 residential units consisting of 6 single-unit
dwellings and 2 duplex dwellings.
Purpose of the Staff Report
Staff reports provide community members an opportunity to learn more about the land use
request and to review staff analysis of the application. Per Eugene Code (EC) 9.7320, staff
reports are available seven days prior to the public hearing. The staff report provides only
preliminary recommendations and information. The Hearings Official will also consider
additional public testimony and other materials presented at the public hearing before making
a decision on the application. The Hearings Official’s written decision on the application is
generally made within 15 days following close of the public record, following the public hearing
(see EC 9.7330). For reference, the applicable quasi-judicial hearing procedures are described at
EC 9.7065 through EC 9.7095.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 1 of 28
APPLICATION DETAILS & PROCEDURE
The subject development site is located on Augusta Street immediately south of Oak Creek
Townhomes (PD 71-2). To the east is a large (22 acre) vacant property. The surrounding area is
zoned R-1 Low Density Residential and developed primarily with single-unit dwellings except for
the townhouses to the north and an undeveloped lot to the east. The subject property is
comprised of two tax lots totaling approximately one acre in size, zoned R-1, Low Density
Residential, and currently developed with two single-unit dwellings and accessory buildings. A
vicinity map is included as Attachment A for ease of reference. A map showing the zoning of
the area is also included as Attachment B.
The applicant is requesting for approval of a Tentative PUD for proposed development located
on Augusta Street in the Laurel Hill Valley Neighborhood. The proposed development creates
eight (8) lots and a common area tract. The initial proposal included two fourplexes but taking
into consideration feedback from the neighborhood meeting, the applicant has modified the
proposal to replace the northerly fourplex with three single-unit, detached dwellings and the
southerly fourplex with two duplexes, each duplex on its own lot. Details are shown on the
Tentative PUD site plan, included as Attachment C for ease of reference.
This Tentative PUD is being processed under the “General” (i.e. discretionary) approval criteria
at EC 9.8320. A Tentative PUD is not required to subdivide the subject development site.
However, the applicant has requested the PUD voluntarily under the allowance at EC 9.8305(4)
because the applicant seeks greater flexibility the design of the subdivision development than
would otherwise by allowed by the R-1 zoning.
Timing, Notice, and Testimony
A summary of the application timeline to date is included below for ease of reference:
Application Submitted May 14, 2019
Neighborhood Meeting June 10, 2019
Application
Application Complete November 12, 2019
Timeline
Public Notice (per EC 9.7315) August 3, 2020
Public Hearing September 2, 2020
Public Notice: Public notice of this Tentative PUD application was provided in accordance with
the requirements of EC 9.7315. A public notice was mailed to all residents in the affected area,
and signage was also posted, in accordance with EC 9.7315(3) and (4).
Testimony: At the time of the publishing of this staff report, no testimony was received
regarding these applications.
Staff responded in a series of emails with the co-Chairs of the Laurel Hill Valley Citizens, the
applicable neighborhood association, concerning the lack of follow-up neighborhood/applicant
meeting. Staff note that the applicant revised the proposal based on feedback from the initial
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 2 of 28
neighborhood meeting held on June 10, 2019. The co-Chairs express concern regarding the
dissimilarities between the site plans presented at the meeting and those currently under
review in the subject Tentative PUD. Staff maintain that the site plans under review remain in
substantial conformance with those presented and subsequently revised based on
neighborhood meeting input. Staff also acknowledge that the requirements around the
neighborhood meeting constitute an application requirement and not mandatory approval
criteria.
Referrals: The Planning Division also provided information concerning the application to
appropriate City departments, public agencies, service providers, and the affected
neighborhood group. All referral comments received by the Planning Division on this
application are included in the application file for reference. The substance of any relevant
referral comments is incorporated and addressed in the context of applicable approval criteria
and standards in the following evaluation.
TENTATIVE PUD EVALUATION
In accordance with EC 9.7330, the Hearings Official is required to approve, approve with
conditions, or deny a Type III land use application. The decision must be based on, and be
accompanied by, findings that explain the criteria and standards considered relevant to the
decision. It must also state the facts relied upon in rendering the decision and explain the
justification for the decision based upon the criteria, standards, and facts set forth.
To assist the Hearings Official in rendering a decision on the application, staff presents the
following Tentative PUD approval criteria (shown below in bold typeface), with findings related
to each, and recommended conditions of approval, based on the evidence available as of the
date of this staff report.
EC 9.8320(1): The PUD is consistent with applicable adopted policies of the Metro
Plan.
The subject property is designated Low Density Residential on the Metro Plan land use diagram,
which is consistent with the property’s existing R-1 zoning. The applicant’s written statement
provides findings of consistency regarding additional policies of the Metro Plan. To the extent
that those additional findings and policies of the Metro Plan are relevant and applicable to this
request, staff generally concurs and finds that the proposed development is consistent with the
Metro Plan and the above criterion. That said, and while they have been considered, none of
the relevant Metro Plan policies appear to directly apply as mandatory approval criteria for the
PUD.
EC 9.8320(2) - The PUD is consistent with applicable adopted refinement plan policies.
The following Laurel Hill Plan policies, indicated in italics, were found to be relevant to the
proposed development. To the extent that the findings and analysis in the applicant’s written
statement are relevant, those findings are also incorporated herein by this reference.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 3 of 28
Land Use and Future Urban Design
Policy 1: Approval of Valley Development will take into consideration:
a. Density. The appropriate density for residential development shall be determined
based on 1) the provision of the Metropolitan Area General Plan [Metro Plan]
calling for an overall density range of one to ten units per acre; and 2) provisions of
the South Hills Study, including those limiting density to five units per acre for sites
above 500 feet in elevation.
b. Size. Large apartment complexes (over thirty-two units) are objectionable because
their dominance would alter entirely the character of the Valley. Approval of
apartment complexes larger than 32 units will depend upon the feasibility of
providing adequate urban services, streets, schools, and transportation.
c. Dispersal. Planned Unit Developments composed primarily of multiple family
dwelling units shall be separated and dispersed and not abutting.
As noted by the applicant and supported by the site plan, the proposed development will result
in a gross density of 10 units per acre in compliance with policy (a) above. Gross density, as
defined at EC 9.0500 is the total number of dwelling units per each acre of land, including areas
devoted to dedicated streets… and other public facilities. As also noted by the application, the
development site is below 500 feet in elevation and, therefore, the South Hills Study does not
apply. Neither subsection (b) or (c) apply to the project since the applicant is proposing single-
unit and duplex dwellings on each lot.
Policy 5: New land divisions shall be planned to respect the existing topography and
ensure solar potential to the extent possible. Developers shall be encouraged to
investigate techniques other than grid-type division of land when planning for
development.
As shown on the applicant’s site plans, while the site is relatively flat therefore negating
topographical considerations, the relative configuration of the site in an east-west orientation
creates a challenging constraint regarding solar potential. As discussed later in the report, the
proposed PUD is exempt from the solar lot standards. The applicant proposes offset lots
surrounding common areas to include parking and stormwater treatment areas. Taken in the
context of the existing rectangular lots and the surrounding development pattern, the proposed
infill development is consistent with this policy.
Based on the available information and evidence, and the findings above, staff concludes that
the proposed PUD complies with applicable Laurel Hill Plan policies.
EC 9.8320(3) - The PUD will provide adequate screening from surrounding properties
including, but not limited to, anticipated building locations, bulk, and height.
The proposed development includes single-unit and duplex dwellings, either existing or
proposed totaling eight (8) residential structures. The existing and proposed dwellings are to be
one- and two-story. The buildings are generally oriented around the private street and shared
parking area. The property to the north is developed with multi-unit townhouses and lots to the
east and south are developed with detached single-unit dwellings. The applicant’s written
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 4 of 28
statement references a proposed fence or landscaping that will provide a buffer between the
proposed development and surrounding properties.
Generally speaking, and as discussed further under the landscaping standards at EC 9.8320(10),
the property is screened at a minimum by planting beds at least 5 feet in width. Staff recognize
the proposed use, single-family and duplex development, is generally compatible with existing
development in the surrounding area. However, due to the flexibility provided through the
PUD, the particular design as shown on site plan sheet LA-1 (prepared by Dougherty Landscape
Architects and dated November 6, 2019), resulting in small lots and shared parking, for
example, staff recognizes that additional consideration regarding screening is warranted
between the proposed development and surrounding single-unit dwellings.
Staff recommends that the proposed shared parking area be required, at a minimum, to meet
the basic parking area landscape standards at EC 9.6420(3) including a landscape strip at least 7
feet wide and designed to meet the L-3 High Screen Landscape Standard at EC 9.6210(3). As
proposed, the landscape buffer reduces to approximately 5 feet in width. Alternatively, the
applicant could seek an adjustment to the landscape standards. Based on these findings and to
mitigate anticipated glare from the vehicle lights, the following condition is warranted to
ensure adequate screening for the shared parking area:
x The applicant shall revise the final PUD site plan to meet the minimum parking area
landscape standards at EC 9.6210 or otherwise apply for and be granted an
adjustment to the applicable standards.
Based on these findings, as conditioned, the proposed development will meet this criterion.
EC 9.8320(4) - The PUD is designed and sited to minimize impacts to the natural
environment by addressing the following:
(a) Protection of Natural Features.
1. For areas not included on the City’s acknowledged Goal 5 inventory, the
preservation of significant natural features to the greatest degree
attainable or feasible, including:
a. Significant on-site vegetation, including rare plants (those that are
proposed for listing or are listed under State or Federal law), and
native plant communities.
b. All documented habitat for all rare animal species (those that are
proposed for listing or are listed under State or Federal law).
c. Prominent topographic features, such as ridgelines and rock outcrops.
d. Wetlands, intermittent and perennial stream corridors, and riparian
areas.
e. Natural resource areas designated in the comprehensive plan diagram
as “Natural Resource” and areas identified in any city-adopted natural
resource inventory.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 5 of 28
The development site is not included on the City’s acknowledged Goal 5 inventory and is
therefore subject to (4)(a)1. above. Per the applicant’s findings and evidence prepared by an
Oregon licensed landscape architect, the subject property is not encumbered by significant
vegetation, documented habitat, topographic features, wetlands, or designated natural
resource areas.
The site is relatively flat and does not contain any significant topographic features. Overall,
much of the proposed buildings and parking area are located on areas that are previously
developed. Staff note that a Goal 5 resource does closely approach the site’s north boundary
and the applicant’s proposal may impact off-site significant trees in the adjacent conservation
setback area. While the proposed development on Lot 1 appears to be located outside of the
conservation setback (and the subject property is not zoned with the /WR Water Resource
Conservation Overlay), careful attention should be taken to ensure that development activity
does not impact significant trees and the conservation area existing just to the north of the
development site, so as to avoid any encroachment or impact that may violate the applicable
overlay zoning.
Based on the evidence provided, the proposed development will meet this criterion.
(b) Tree Preservation. The proposed project shall be designed and sited to
preserve significant trees to the greatest degree attainable or feasible, with
trees having the following characteristics given the highest priority for
preservation:
1. Healthy trees that have a reasonable chance of survival considering the
base zone or special area zone designation and other applicable approval
criteria;
2. Trees located within vegetated corridors and stands rather than
individual isolated trees subject to windthrow;
3. Trees that fulfill a screening function, provide relief from glare, or shade
expansive areas of pavement;
4. Trees that provide a buffer between potentially incompatible land uses;
5. Trees located along the perimeter of the lot(s) and within building
setback areas;
6. Trees and stands of trees located along ridgelines and within view
corridors;
7. Trees with significant habitat value;
8. Trees adjacent to public parks, open space and streets;
9. Trees located along a water feature;
10. Heritage trees.
The proposed development appears to propose the removal of one tree that is 12 inches or
greater diameter at breast height (DBH) and 17 trees which appear less than 12 inches DBH.
The application materials provide no details justifying the removal of the 12-inch deciduous
tree on Lot 8, located near the south east portion of the lot. This existing tree appears to
provide a screening function and therefore warrants consideration for preservation. As staff see
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 6 of 28
no proposed development that would impact the Critical Root Zone (CRZ), the following
condition appears warranted to ensure preservation:
x The applicant shall revise the final PUD site plans to designate the 12-inch diameter
tree located on Lot 8 as “To Be Preserved.”
The removal of the sub-12-inch diameter trees is primarily associated with the location and
placement of the buildings and shared parking area. These trees are not considered significant
per EC 9.8320(4)(b) and removal is warranted in order to accommodate development that is
permitted in the R-1 zone.
The applicant plans to preserve at least two other significant trees on site, both of which are
located along Augusta Street on Lot 1 (see Attachment C: Applicant’s Site Plan). As part of their
application, the applicant did not provide the percentage of impact that development will have
on the CRZs. Per EC 9.0500 – Tree Removal, if a tree’s CRZ is impacted by more than 30%, it is
considered a technical kill. Therefore, to ensure that each of the trees to be preserved are not
impacted more than 30%, the following conditions are warranted:
x Prior to final PUD approval, the applicant shall provide a revised Tree Preservation
Plan that accurately lists the size, species, and health/condition of each preservation
tree and verifies that no more than 30% of the Critical Root Zone (CRZ) of trees to be
preserved will be impacted by construction activities. If more than 30% of any CRZ
will be impacted, the applicant shall provide a report from a certified arborist
verifying that the proposed construction activities can otherwise be conducted in a
manner that does not threaten the survival of the trees to be preserved.
x All building permits for construction on the site shall include a site plan in
compliance with the approved tree preservation plan. The building permit submittal
shall include sufficient detail to verify that no more than 30% of the Critical Root
Zones (CRZ) of trees to be preserved will be impacted by construction activities on
the lot, or a report from a certified arborist verifying that the proposed construction
activities can otherwise be conducted in a manner that does not threaten the
survival of the trees to be preserved. The building permit shall include tree
protection fencing to be erected at the perimeter of the CRZ’s for all trees to be
preserved (or an alternative location as approved and documented by a certified
arborist and the City).
x Protective fencing for trees identified to be preserved shall be inspected and
approved by the City prior to beginning any construction related activities. All
protective tree fencing shall remain in place until completion of all construction
activities; any relocation or removal of the protective fencing shall only occur under
the direction of a certified arborist or with approval by the City.
Based on these findings, as conditioned, the proposed development complies with this
criterion.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 7 of 28
(c) Restoration or Replacement.
1. For areas not included on the city’s acknowledged Goal 5 inventory, the
proposal mitigates, to the greatest degree attainable or feasible, the loss of
significant natural features described in criteria (a) and (b) above, through
the restoration or replacement of natural features such as:
a. Planting of replacement trees within common areas; or
b. Re-vegetation of slopes, ridgelines, and stream corridors; or
c. Restoration of fish and wildlife habitat, native plant habitat, wetland
areas, and riparian vegetation.
To the extent applicable, restoration or replacement shall be in compliance
with the planting and replacement standards of EC 6.320.
2. For areas included on the city’s acknowledged Goal 5 inventory, any loss of
significant natural features described in criteria (a) and (b) above shall be
consistent with the acknowledged level of protection for the features.
The applicant’s planting plan includes the proposed installation of 8 new trees. In order to
ensure the revised site plan provides adequate details and to ensure the replacement planting
occurs in a timely fashion, the following condition is warranted:
x Prior to final PUD approval, the applicant shall provide a revised planting plan that
substantially conforms to the tentatively approved plan and reflects the changes
required by the conditions of this tentative PUD approval. The revised planting plan
shall include a note stating that: “Replacement trees shall be native species and have
a minimum caliper of 2” for deciduous trees and a minimum height of 5’ for
coniferous or evergreen trees. Planting and inspection by City staff shall occur
before final occupancy of any new dwellings is permitted on the lot where the tree
will be planted. Watering and general maintenance of replacement trees shall be
conducted by the property owner in manner that ensures their establishment and
long-term survival.”
Based on these findings, as conditioned, the proposed development complies with this
criterion.
(d) Street Trees. If the proposal includes removal of any street tree(s), removal of
those street tree(s) has been approved, or approved with conditions according
to the process at EC 6.305.
This criterion is not applicable because the applicant does not propose the removal of any
street trees.
EC 9.8320(5) - The PUD provides safe and adequate transportation systems through
compliance with the following:
(a) EC 9.6800 through EC 9.6875 Standards for Streets, Alleys, and Other Public
Ways (not subject to modifications set forth in subsection (10) below).
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 8 of 28
The standards listed by EC 9.6800 through EC 9.6875 are concerned with the dedication, design
and location of public ways. As the applicant is proposing private streets on their site, the
standards apply only to answer the questions of whether public ways are required, and
whether the private streets are designed so as not to negatively impact the public street
system. The determination of whether (and what) improvements are required to the existing
public system is discussed by this recommendation at EC 9.6505. Referral comments from
Public Works provide an evaluation of each standard, and this recommendation provides
review of the applicable standards. It is also noted that EC 9.6875 specifically addresses the
standards for private street design as they relate to the applicant’s proposal.
EC 9.6805 Dedication of Public Ways
Pursuant to EC 9.6805, as a condition of any development, the City may require dedication of
public ways for bicycle and/or pedestrian use as well as for streets and alleys, provided the City
makes findings to demonstrate consistency with constitutional requirements. The public ways
for streets to be dedicated to the public by the applicant shall conform with the adopted right-
of-way map and EC Table 9.6870.
As discussed in EC 9.6870 Street Width, which is incorporated by reference, the applicant’s
proposal to dedicate an additional 2.5 feet of right-of-way in Augusta Street is acceptable and
no additional right-of-way dedication is required.
EC 9.6815 Connectivity for Streets
To meet street connectivity standards under EC 9.6815(2), the proposed development must, at
a minimum, provide extensions of the public way which are consistent with subsections (2)(b),
(2)(c) and (2)(d). EC 9.6815(2)(b) requires street connections in the direction of any planned or
existing streets within ¼ mile of the development site and connections to any streets that abut,
are adjacent to, or terminate at the development site. EC 9.6815(2)(c) requires that the
proposed development include streets that extend to undeveloped or partially developed land
adjacent to the development site. EC 9.6815(2)(d) requires secondary access for fire and
emergency vehicles. Exceptions to these requirements can be granted under the provisions at
EC 9.6815(2)(g), either due to physical preclusion or based on a local street connection study
provided by the applicant to demonstrate that the standards for an exception are met.
The development site abuts Augusta Street to the west, a large tract of undeveloped residential
land to the east (Tax lot 18-03-03-00-00101) and otherwise surrounded by residential
development and platted lots that preclude or otherwise obviate the need for any additional
public street connection. Regarding a connection to the undeveloped parcel to the east, the
applicant is seeking an exception and has submitted a street connectivity study per EC
9.6815(2)(g)(1). The applicant’s street connection study meets the intent of EC 9.6815(1) and
describes how the partially developed properties and the undeveloped property to the east
have frontage elsewhere along the existing public street system to facilitate development
without necessitating public street access through the subject development site.
Based on the available information, staff recommend that the Hearings Official grant the
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 9 of 28
exception under EC 9.6815(2)(g) and find that street connectivity standards are otherwise
satisfied by the fully developed street system in the area.
EC 9.6855 Street Names
This standard requires that names for new streets that are not in alignment with existing
streets are subject to approval by the planning director and shall not unnecessarily duplicate or
resemble the name of any existing or platted street in Lane County.
Staff notes that a street name has not been provided for the proposed private street. In order
to ensure compliance with this standard, the following conditions are warranted:
• Prior to final plat approval, a street name shall be submitted for review by the
regional road naming group and be approved in accordance with EC 9.6855. The
private street shall be labeled on the final plat and final PUD site plans as “Street
Name - Private”.
Based on the findings and condition above, this standard is met.
EC 9.6870 Street Width
Pursuant to EC 9.6870, the right-of-way and paving widths of streets shall conform to those widths
designated on the adopted Street Right-of-Way map. When a street segment right-of-way width is
not designated on the adopted Street Right-of-Way map, the required street width shall be the
minimum width shown for its type in Table 9.6870 Right-of-Way and Paving Widths, although a
greater width can be required based on adopted plans and policies, adopted Design Standards and
Guidelines for Eugene Streets, Sidewalks, Bikeways and Accessways or other factors which in the
judgment of the planning and public works director necessitate a greater street width.
Augusta Street, which is under City jurisdiction, is identified as a neighborhood collector with a
planned right-of-way width of 55 feet per the adopted Street Classification Map (Fig. 60 of the
Transportation System Plan (TSP)) and the Street Right-of-Way Map (Fig. 61 of the Arterial
Street Collector Plan (ASCP)). Augusta Street has an existing 50-foot right-of-way and was
improved to City standards with 36-foot paving and curbs and gutters under City Contract 1965-
28, with traffic calming bump outs being added under City Contract 1980-60. The 1965 street
design anticipated construction of curbside sidewalks, which have since been constructed along
the street on an intermittent basis. Augusta Street also has streetlights, but it lacks street trees
along most of the street. As shown on the applicant’s site plan, the applicant is proposing to
dedicate an additional 2.5-feet of right-of-way, which will result in a half right-of-way width of
27.5 feet on the east side of the Augusta right-of-way centerline. This proposal will result meet
the minimum required width as depicted in Figure 61 of the ASCP and therefore complies with
the applicable standards for public street width.
EC 9.6875 Private Street Design Standards
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 10 of 28
The proposed private street is permitted under EC 9.6815(2)(a). This standard requires private
streets to be designed and constructed in accordance with applicable requirements contained
in the adopted Design Standards and Guidelines for Eugene Streets, Sidewalks, Bikeways and
Accessways (which are more specifically identified in Section M. Private Streets and Alleys on
page 39 of Exhibit A of City Council Resolution No. 4608 in the ASCP).
Per Section M-1 of the adopted standards, private streets are required to comply with the
standards for public streets with respect to intersection configuration, minimum centerline
radius length, grade, sight distance, width, curb requirements, sidewalks and street alignments
relative to natural resource sites and water-related features. Per section M-2, private sidewalks
“must meet ADA requirements, which allows a minimum width of 3 feet, provided that ‘passing
space’ is provided at reasonable intervals, not to exceed 200 feet.”
Public Works staff notes that the proposed private street does not fully comply with the
applicable standards. As shown on Sheets C2.0 & C5.0 of the applicant’s tentative plans, the
proposed private street will consist of a 20-foot paved section and with a 3-foot sidewalk on the
south side of the private street. However, the street sections provided for the private street do
not depict curbs on both sides. Therefore, the following condition is warranted:
x The applicant shall revise the final PUD site plans to depict the proposed private
street as complying with “Design Standards and Guidelines for Eugene Streets,
Sidewalks, Bikeways and Accessways”, including the required curbs.
Per Section M-4 of the adopted standards, the structural design and construction inspection for
the private street will remain the developer’s responsibility. Certification by a licensed
engineer that a structural design meeting the public standards outlined above has been
completed must also be submitted at the time of the site development permit for the private
street. The following condition related to the creation of the private street is also warranted:
x Prior to final plat approval, the applicant shall submit a Private Joint Use Access and
Utility Easement and Maintenance Agreement (JAM). The JAM will include a
description defining the area of the private street and will also identify permitted
improvements, construction expectations, rights of usage and maintenance
responsibilities for the facilities in the street. The JAM will be recorded concurrent
with and cross-referenced on the final plat.
In order to ensure emergency access over the private street, the following condition is also
warranted:
x Provisions for public emergency access easement within the private street may be
included in the proposed JAM which creates the private street, or alternatively may
be dedicated as a Public Emergency Access Easement on a standard City form.
Based on the available evidence, and these findings and conditions, the criterion at EC
9.8320(5)(a) is met.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 11 of 28
(b) Pedestrian, bicycle and transit circulation, including related facilities, as
needed among buildings and related uses on the development site, as well as
to adjacent and nearby residential areas, transit stops, neighborhood activity
centers, office parks, and industrial parks, provided the city makes findings to
demonstrate consistency with constitutional requirements. “Nearby” means
uses within 1/4 mile that can reasonably be expected to be used by
pedestrians, and uses within 2 miles that can reasonably be expected to be
used by bicyclists.
The proposed development will provide paved paths and pedestrian connections within the site
that connect to the sidewalk along Augusta Street. From this connection, future residents will
have access to the network of sidewalks and public streets. A transit stop is located
approximately 280 feet north of the subject property. Augusta Street is designated a
Neighborhood Greenway in the City’s TSP and is currently marked with shared bicycle lane
markings, providing reasonable access for cyclists. From the access connections available to
pedestrians, cyclists, and transit users, future residents of the development will have access to
nearby areas, parks, and other amenities as required.
(c) The provisions of the Traffic Impact Analysis Review of EC 9.8650 through
9.8680 where applicable.
The anticipated traffic generated by the proposed development does not meet any of the
applicability thresholds established in EC 9.8670. Anticipated peak hour trips will not reach the
threshold of 100 or more, there are no documented concerns or analyses to warrant further
review, and the site does not abut any streets in the jurisdiction of Lane County. Based on
these findings, this standard is not applicable.
EC 9.8320(6) - The PUD will not be a significant risk to public health and safety,
including but not limited to soil erosion, slope failure, stormwater or flood hazard, or
an impediment to emergency response.
Compliance or anticipated future permit requirements demonstrate that no significant risk to
public health safety as related to erosion prevention, stormwater management, and
development within a special flood hazard area, which are discussed in detail at EC 9.8320(4),
(10)(c), (10)(j), and (11), respectively and incorporated herein by reference. Regarding the
emergency response, the proposed development was reviewed by the Eugene-Springfield Fire
Department. Based on their comments, the proposal does not raise any significant concerns,
nor does it find that there is any impediment to emergency response as access to the
development site is available from north or south on Augusta Street. However, as an
informational item, the Fire Marshal notes that available fire hydrants appear to exceed the
minimum required distance to supply water to the proposed lots and therefore a fire hydrant
would be required at the time of future development. Lastly, also as an informational item, “No
Parking Fire Lane” signs will be required along the apparatus access road and emergency
vehicle turnaround. Based on these findings and future permitting requirements, the proposed
development complies with this criterion.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 12 of 28
EC 9.8320(7) - Adequate public facilities and services are available to the site, or if
public services and facilities are not presently available, the applicant demonstrates
that the services and facilities will be available prior to need. Demonstration of future
availability requires evidence of at least one of the following:
(a) Prior written commitment of public funds by the appropriate public agencies.
(b) Prior acceptance by the appropriate public agency of a written commitment by
the applicant or other party to provide private services and facilities.
(c) A written commitment by the applicant or other party to provide for offsetting
all added public costs or early commitment of public funds made necessary by
development, submitted on a form acceptable to the city manager.
Public Works staff confirms that public wastewater and stormwater service are presently
available to the site. Findings at EC 9.8320(10)(b) and (j), regarding public improvements and
stormwater respectively and incorporated herein by reference, provide further evidence that
these services are available to the site. The provision of water and electric services and other
utilities is subject to review by EWEB or other utility providers. Comments from EWEB can be
reviewed in Attachment D. Given these findings, the proposal complies this criterion.
EC 9.8320(8) - Residents of the PUD will have sufficient usable recreation area and
open space that is convenient and safely accessible.
The applicant’s written narrative relies on the lawn and stormwater planters between the
proposed three single-unit dwellings and duplex dwellings (see sheet LA-1) to provide for
private recreation and open space. The applicant’s written narrative also relies on the
development’s proximity to Laurel Hill Park, approximately 1,080 feet south along Augusta
Street as an accessible recreation area. Staff agree that the nearby public park is convenient,
and the existing sidewalk network provides safe accessibility to the park. Based on the available
information, future residents will have sufficient recreational area and open space that is both
convenient and safely accessible. Therefore, the proposed development complies with this
criterion.
EC 9.8320(9) - Lots proposed for development with one-family detached dwellings
shall comply with EC 9.2790 Solar Lot Standards or as modified according to
subsection (10) below.
Solar lot standards of EC 9.2790 require that at least 70 percent of the lots in a subdivision be
designated as solar lots. The applicant has requested an exception to solar lot standards based
on EC 9.2790(2), which provides an exception where the proposed subdivision provides at least
70 percent of the maximum allowed density. The applicant proposes a density that exceeds 70
percent of the maximum allowed density and, therefore, staff recommend an exemption to
solar lot standards.
EC 9.8320(10) - The PUD complies with all of the following:
(a) EC 9.2000 through 9.4170 regarding lot dimensions, solar standards, and
density requirements for the subject zone and overlay zone. Within the /WR
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 13 of 28
Water Resources Conservation Overlay Zone, no new lot may be created if
more than 33% of the lot, as created, would occupy either:
1. The combined area of the /WR conservation setback and any portion of the
Goal 5 Water Resource Site that extends landward beyond the
conservation setback; or
2. The /WQ Management Area.
As previously noted, the proposed subdivision includes 8 residential lots. The proposed gross
density of 10 units per acre is consistent with the Metro Plan and Laurel Hill Plan. The net
density, as required by EC Table 9.2750 and calculated per EC 9.2751, is determined based on
the acreage of land considered part of the residential use and excludes public and private
streets. Extracting the area of the proposed private street (approximately 2,500 square feet)
from the total acreage appears to result in a net density of 11 units per acre, below the 14-unit
per acre maximum in the R-1 zone. Conditions related to the proposed private street may alter
the final total area of the extraction, and therefore the following condition is warranted to
ensure net density conformance:
x The applicant shall revise the final PUD site plan to clearly show the area of the
proposed private street. The applicant shall include a note on the final PUD site plan
with calculations demonstrating that the proposal complies with the net density
standard.
The applicant is requesting flexibility to several lot standards including lot area, lot frontage,
and minimum lot width. The proposal provides small lots (Lots 3-7) with surface areas ranging
between 2,904 square feet and 3,389 square feet. Additionally, Lots 4-6 do not have frontage
on a public or private street. The proposed non-compliance appears necessary and allowable
under EC 9.2761(1)(c), in order to accommodate a higher residential density and a variety of
housing types than would otherwise be attainable based on strict compliance with applicable
lot standards of the R-1 zone.
The “33%” rule for new lots is not applicable, because the development site is not regulated by
the /WR Water Resource Conservation Overlay or a /WQ Management Area. Therefore, this
standard does not apply.
Based on the available information, and with approval of the proposed non-compliance related
to lot standards as requested by the applicant, the proposed development complies with these
standards.
(b) EC 9.6500 through EC 9.6505 Public Improvement Standards.
EC 9.6500 Easements
This section authorizes the City to require dedication of easements for public utilities and
access under certain circumstances. As shown on the applicant’s site plan (Cover Sheet, dated
February 19, 2020), the applicant proposes to dedicate a 14-foot Public Wastewater Easement
within the proposed 28-foot Private Access easement. The applicant also proposes to dedicate
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 14 of 28
a 7-foot PUE along the proposed intersection of Augusta Street and the Private Street. The
applicant also proposes to dedicate 7-foot PUEs within Lots 6-8 and Tract A as well as Lots 3-5.
Otherwise, Public Works staff is unaware of the need for any additional on-site public
easements to address present or future public wastewater or public stormwater needs for
development of the area.
EC 9.6500 requires that no building, structure, tree or other obstruction shall be placed on or
located in a public utility easement and that prior to approval of a final PUD, final site review
plans or final plats, the above restriction shall be noted thereon. Therefore, for compliance
with this standard the following condition is warranted:
• The following restriction shall be noted on the final plat and final PUD plans: “No
building, structure, tree or other obstruction shall be placed or located on or in a
Public Utility Easement.”
Based on the findings and condition above, the proposed PUD complies with EC 9.6500.
EC 9.6505 Improvements - Specifications
This section requires that all public improvements be designed and constructed in accordance
with adopted plans, policies, procedures and standards specified in EC Chapter 7. All
developments are required to make and be served by the infrastructure improvements
described below.
1) Water Supply: Water service for the proposed development must be provided in accordance
with Eugene Water and Electric Board (EWEB) policies and procedures. A referral from EWEB
can be seen in Attachment D. In order to ensure compliance with this standard, the following
condition of approval is warranted:
• Prior to final plat approval, the applicant shall provide documentation that EWEB
has received a financial guarantee, ensuring that water will be provided to each lot
in the plat.
2) Sewage: This standard requires all developments to be served by wastewater sewage system of
the City, in compliance with the provisions of EC Chapter 6. As shown on Sheet C-4.0 of the
applicant’s plans, wastewater service to the proposed development is available from a 21-inch
public mainline (i.e. segment 3861-12807) located in Augusta Street. As depicted, the applicant
proposes to construct a new 8-inch public wastewater mainline located roughly 40 feet north of
manhole no. 3861.
There are two existing houses located on the development site (i.e. 2321 Augusta Street & 2323
Augusta Street) both of which will remain. The existing service line to Lot 2 (2321 Augusta Street) is
located roughly 75-feet north of manhole no 3861. This existing service line crosses over the
proposed Lot 1, and the applicant has elected to abandon this existing service line and construct a
new service line that will tap directly into the proposed extension of the public wastewater system.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 15 of 28
Based on these findings, the applicant’s proposed wastewater system conceptually complies with
applicable sewage specifications, subject to a more detailed review during the subsequent Privately
Engineered Public Improvement (PEPI) permit process.
3) Streets and Alleys and 4) Sidewalks: These standards require all public streets and sidewalks
in and adjacent to the development site to be paved to the width specified in EC 9.6870, and
improved according to adopted standards and specifications pursuant to EC Chapter 7, unless
such streets have already been paved to that width. The improvements are to include drainage,
curbs and gutters, sidewalks, street trees and streetlights adjacent to the development site
according to the Design Standards and Guidelines for Eugene Streets, Sidewalks, Bikeways and
Accessways and standards and specifications adopted pursuant to EC Chapter 7 and other
adopted plans and policies.
Per the findings at EC 9.6870 Street Width, incorporated herein by reference, Augusta Street is
improved to City standards except for street trees. For compliance with this standard, the following
condition is warranted:
x Prior to final plat approval, the applicant shall submit an Irrevocable Petition for public
improvements in Augusta Street to include street trees.
Irrevocable petitions enable the City to initiate a local improvement process and obligate the
property owners to pay their proportional share of the street construction costs in the future. The
City can complete the improvements when the majority of benefitting property owners agree to
pay for the improvements.
5) Bicycle Paths and Accessways: No additional public bicycle paths or access ways are available to
connect with, or otherwise required, in this instance.
Based on the above findings and as conditioned, the development complies with applicable
public improvement standards.
(c) EC 9.6706 Development in Flood Plains through EC 9.6709 Special Flood Hazard
Areas - Standards.
These standards do not apply because the subject property is not located within any of these
designations, per the Federal Emergency Management Agency’s (FEMA) Flood Insurance Rate
Map (FIRM) 41039C-1141-F, dated June 2, 1999.
(d) EC 9.6710 Geological and Geotechnical Analysis
Public Works staff confirms that the applicant’s analysis, prepared by Ronald J. Derrick , P.E. of
Branch Engineering Inc., meets the Level One Analysis requirements of EC 9.6710(4)(a), which
consists of a compilation of record geological data, on-site verification of the data and site
conditions and a report discussing site and soil characteristics in relation to the proposed
development and other applicable standards. The report concludes that the site appears to be
geologically stable and that no further investigation is needed except to verify soil type and stability
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 16 of 28
in the location of each individual structure and concludes that no further investigation is needed
for construction of public improvements. Based on these findings and this condition, the proposed
development will comply with this standard.
(e) EC 9.6730 Pedestrian Circulation On-Site
The proposed development includes pedestrian connections between all building entrances
and parking areas to the sidewalk and public right-of-way, Augusta Street.
(f) EC 9.6735 Public Access Required.
The proposed development complies with this standard as Lots 1 and 8 will have frontage on
Augusta Street, while Lots 2-7 will have frontage on the proposed private street. Access to Lot 2
will be taken from an existing driveway, and this existing driveway will encumber both Lots 1
and 2. Because this existing access connection will encumber both Lots 1 and 2, the following
condition of approval is warranted:
• Prior to final plat approval, the applicant shall submit a Joint Access Easement over
Lot 1, which is subject to City review and approval prior to recording with the final
plat, shall be cross-referenced on the plat and be accompanied by a maintenance
agreement which addresses the rights and responsibilities of each lot relative to the
shared driveway.
With this condition of approval, the standard for ensuring public access from all proposed lots
to Augusta Street is met. The proposed access connections will be subject to further review for
compliance with EC Chapter 7 requirements at the time of future permitting and development.
(g) EC 9.6750 Special Setback Standards
Per the findings at EC 9.6805 and EC 9.6870, incorporated herein by reference, no special
setbacks are required for future right-of-way or public utility easements.
(h) EC 9.6775 Underground Utilities
Per the applicant’s narrative, all existing and proposed utilities will be located underground. To
ensure compliance with these standards, the following condition is warranted:
x The applicant shall add a note to the final PUD plans that states: “All proposed
utilities (including, but not limited to gas, water, electric, telecommunications, and
sewer) will be installed underground to the extent required, in accordance with EC
9.6775.”
Based on these findings, as conditioned, the proposed development complies with this
standard.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 17 of 28
(i) EC 9.6780 Vision Clearance Area
Due to the proposal of the creation of a private street, this standard applies to Lots 1 and 8. The
applicant’s site plans do not depict a vision clearance triangle at the proposed intersection,
therefore the following condition is warranted:
x The final PUD plans shall be revised to depict a vision clearance triangle at the
intersection of Augusta Street and the proposed private street in accordance with EC
9.6780.
Based on these findings, as conditioned, the proposed development complies with this
standard.
(j) EC 9.6791 through 9.6797 regarding stormwater flood control, quality, flow
control for headwaters area, oil control, source control, easements, and
operation and maintenance.
EC 9.6791 Stormwater Flood Control and EC 9.6792 Stormwater Quality: Referral comments
from Public Works staff note that the site lies within stormwater basin WKCF-053, and the
City’s Basin Master Plan indicates deficiencies in the downstream system. Due to the existing
public system being flagged as deficient, the applicant has elected to keep post-construction
flow rates lower than the pre-construction flow rates via the stormwater planter and the two
rain gardens. As discussed in the applicant’s Stormwater Report, the two proposed rain
gardens have been sized in order to treat and detain runoff generated by Lots 3-7. Following
treatment and detention the treated runoff will be piped to a 6” storm line within the proposed
private street, and from the 6” storm line the runoff will then be piped to the existing 15” public
storm line within Augusta Street. The applicant has provided preliminary sizing based indicating
the proposed on-site facilities will meet the Stormwater Quality standards. Staff concurs that
the proposed filtration facilities are appropriate on a conceptual level, with design details to be
further evaluated through the building permit process.
EC 9.6793 through EC 9.6796 Stormwater Flow Control, Oil Control, Source Control, Easements:
These standards do not apply because the proposed development is at an elevation lower than
500 feet; does not drain to a Headwaters facility; does not generate high concentrations of oil
and grease; does not include any specific pollutants of concern identified in EC 9.6795(2); and
no public stormwater facilities are proposed.
EC 9.6797 Stormwater Operations and Maintenance: the shared stormwater system will be
privately owned, operated and maintained in accordance with EC Chapters 6 and 7, and the
Stormwater Management Manual. To further implement this standard the following condition
is warranted:
x The final PUD plans shall be revised to include the following note: “On-site
stormwater management facilities will be privately owned and operated. An
operation and maintenance plan will be developed consistent with the City’s
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 18 of 28
Stormwater Management Manual, and notice of this plan will be recorded, during
the building permit process.”
Based on the above findings, condition and subject to future permitting requirements, the
stormwater development standards are met.
(k) All other applicable development standards for features explicitly included in
the application except where the applicant has shown that a proposed
noncompliance is consistent with the purposes set out in EC 9.8300 Purpose of
Planned Unit Development.
This criterion addresses standards for features explicitly included in the application that are not
otherwise addressed by the PUD criteria and related standards elsewhere in this evaluation.
EC 9.2740-9.2750 Residential Zone Land Uses and Development Standards
Proposed Lot 1 and Lots 3 through 5 each propose a single, detached, single-family dwellings.
The proposed building layout on applicant’s cover sheet shows conceptual building footprints.
The applicant’s Sheet B “Augusta Duplexes,” prepared by William Heady and dated October 17,
2019, shows conceptual elevations for the duplex buildings. Albeit conceptual, the building
footprints and elevations are considered features explicitly included in the application.
Conceptually, the proposal meets EC 9.2750 Residential Zone Development Standards including
building height, interior yard setbacks, and lot coverage. The height of all proposed and existing
dwellings is below 35 feet, the maximum height in the R-1 zone. All existing and proposed
dwellings are sited at least 5 feet from all proposed lot lines, indicating that at a minimum, the
minimum interior yard setbacks of 5 feet will be met. None of the existing or proposed
dwellings appear to exceed the 50% lot coverage maximum and the applicant does not seek
flexibility to this standard.
EC 9.2741(4) requires that when located in the R-1 zone, a proposed duplex shall be either on a
corner lot at least 8,000 square feet in size or on a lot that was identified as being developable
for a duplex on a subdivision plat. The applicant clearly labels Lots 6 and 7 as duplex lots,
consistent with this standard.
The applicant proposes non-compliance regarding the following R-1 Residential Zone
Development Standards (EC Table 9.2750) and R-1 Residential Zone Lot Standards (EC Table
9.2760). As allowed under this subsection (11)(k), the applicant indicates that the standards
listed below are proposed for non-compliance through demonstrating consistency with the
PUD purpose statements.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 19 of 28
PUD Noncompliance Code Section Code Requirement Noncompliant Lots
EC 9.2750 – Front Yard Setbacks Front lot line 10-foot setback Lots 2—7
EC 9.2760 – Lot Area Minimum 4,500 square feet Lots 3—7
EC 9.2760 – Lot Frontage Minimum 50 feet Lots 3—7
EC 9.2760 – Lot Width Minimum 50 feet Lots 3—7
Findings regarding consistency with the purpose statements are provided below.
EC 9.8300 Purpose of Planned Unit Development. The planned unit development (PUD)
provisions are designed to provide a high degree of flexibility in the design of
the site and the mix of land uses, potential environmental impacts, and are
intended to:
(1) Create a sustainable environment that includes:
(a) Shared use of services and facilities.
(b) A compatible mix of land uses that encourage alternatives to
the use of the automobile.
(c) A variety of dwelling types that help meet the needs of all
income groups in the community.
(d) Preservation of existing natural resources and the opportunity
to enhance habitat areas.
(e) Clustering of residential dwellings to achieve energy and
resource conservation while also achieving the planned density
for the site.
(2) Create comprehensive site plans for geographic areas of sufficient size
to provide developments at least equal in quality to those that are
achieved through the traditional lot by lot development and that are
reasonably compatible with the surrounding area.
Regarding EC 9.2750 Front Yard Setbacks, EC 9.0500 defines the front lot line as the lot line
abutting a public street or in cases of private streets or access easements, the front lot line shall
be considered to be the boundary of the private street or access easement. Lot 1 and Lot 8
retain conforming frontages along Augusta Street. Lot 2 takes frontage along the proposed
private street. Lot 3 has approximately 8 feet of frontage on the private street and the
remaining lots (Lots 4-7) have none. The setback between the existing house on Lot 2 and the
private access easement does not meet the 10-foot front yard setback. Proposed non-
compliance to EC 9.2750 Front Yard Setbacks is warranted as the application shows that non-
compliance provides increased clustering of dwellings while also achieving the designated
density of the development site.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 20 of 28
Regarding Lot Area Minimum, Frontage Minimum, and Lot Width Minimum, the applicant is
proposing non-compliance on proposed Lots 3-7. The applicant is proposing small lots in order
to provide housing units at a higher density than would otherwise be possible through
traditional lot-by-lot development. Regarding the applicant’s proposed non-compliance, staff
support the request as it meets the PUD purpose statements (c) and (e) through residential
clustering and a variety of dwelling types that may help meet the needs of wider income groups
in Eugene.
Given that the purpose of planned unit development (PUD) provisions is to provide a high
degree of flexibility in the design of the site and the mix of land uses and potential
environmental impacts, per the findings above the applicant has demonstrated consistency
with the purposes of the PUD for the proposed non-compliance.
EC 9.6410 Motor Vehicle Parking and Loading Standards
The new development associated with the applicant’s proposal will include the construction of
a new parking area, making it subject to the standards provided by EC 9.6410 Motor Vehicle
Parking Standards.
The proposed shared parking area appears designed to accommodate 11 total parking spaces
including one Americans with Disabilities Act (ADA) parking stall. Based on the proposal for 10
total dwelling units, the 11 proposed parking spaces is within the minimum and maximum
number of allowed parking spaces for one-unit and duplex dwellings.
Staff are unsure of the applicant’s intent regarding the existing driveway on Lot 1. Removing
the driveway could provide additional vegetated open space. Alternatively, retaining the
driveway could provide additional parking for either Lot 1, Lot 2, or both lots. Staff see no
requirement to either remove or retain the driveway, and as an informational item recommend
indicating on the final PUD plans whether the driveway is to be retained or removed.
All proposed parking spaces and drive aisles comply with the applicable required dimensions
seen in EC Table 9.6420(1). Additionally, the proposed parking meets the applicable criteria for
surfacing and bumpers at EC 9.6420(6) as shown on the applicant’s Cover Sheet, dated
February 19, 2020.
Staff note that parking area lighting will be required, and that lighting must comply with EC
9.6725 Outdoor Lighting Standards. The site plans are void of any lighting details. To ensure the
applicant meets the required standards at the time of development, the following condition is
recommended:
x Prior to final PUD approval, the applicant shall add the following note to their final
PUD site plan: “Parking area lighting shall comply with EC 9.6725 Outdoor Lighting
Standards.”
The applicant’s landscaping plan, sheet LA-1 provides a preliminary landscaping plan. As
discussed at EC 9.8320(3), the applicant’s proposed landscaping reduces from a 7-foot wide
buffer to 5 feet which is narrower than the landscape buffer requirement of EC 9.6420(3)
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 21 of 28
Landscaping Standards. As conditioned above at EC 9.8320(3), a 7-foot wide landscaping area
meeting the L-3 landscaping standards is required along this frontage (as well as the entire
parking area perimeter) to mitigate impacts to neighboring properties. Furthermore, additional
details will be needed to meet the requirements of EC 9.6420(3) at the time the applicant
moves forward with their project. To ensure compliance, the following condition is
recommended:
x Prior to final PUD approval, the applicant shall add the following note to sheet LA-1
of their site plan: “Landscaping shall comply with EC 9.420(3) Landscaping
Standards.” Otherwise, the applicant shall apply for and be granted an adjustment
to EC 9.6420(3) Landscaping Standards.
Based on these findings and as conditioned, the proposed development complies with
applicable landscape standards.
The findings throughout this decision concerning development standards are also incorporated
herein as evidence that the features explicitly included in this application comply with
applicable development standards to the extent required for Tentative PUD approval,
consistent with this criterion. There are no other features explicitly included in the application
that are subject to additional review, beyond those addressed elsewhere in this evaluation.
Any additional details will be reviewed at the time of building permit as the property is
developed.
With approval of the applicant’s proposed non-compliance to certain applicable standards, and
based on the findings and conditions above, EC 9.8320(11)(k) is met.
EC 9.8320(11) - The proposed development shall have minimal off-site impacts,
including such impacts as traffic, noise, stormwater runoff and environmental quality.
The development will have minimal off-site traffic impacts per the findings provided previously
at EC 9.8320(5)(c) and the street standards beginning at EC 9.6800. Given the residential nature
of the proposal, it is not anticipated that noise will have negative off-site impacts. Off-site
impacts of stormwater runoff are addressed as part of the applicant’s proposed public
stormwater collection, conveyance, and treatment system, per the findings under EC
9.8320(10)(j). Per the findings at EC 9.8320(4), adequate protection of environment resources
and quality are anticipated for the proposed development. Based on these findings, staff
concludes that the proposed PUD will comply with the applicable criterion.
EC 9.8320(12) - The proposed development shall be reasonably compatible and
harmonious with adjacent and nearby land uses.
The applicant’s written statement relies on the concept of transition, in this case between the
multi-unit apartment development to the north and flag lot partition to the south, as evidence
of reasonable compatibility. Staff note that reasonable compatibility and harmony are rather
subjective, and therefore rely on the purpose statement for PUDs at EC 9.8300(2), specifically
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 22 of 28
the intent to create developments that are at least equal in quality to those achieved through
traditional lot-by-lot development.
In this lot-by-lot development scenario, the proposed duplexes and single-unit dwellings would
appear to meet residential development standards except where proposed non-compliance is
addressed and recommended for approval above. By clustering the required off-street parking
in one parking area, the proposal frees up additional open space which might otherwise contain
individual driveways and associated residential improvements.
Adjacent land uses as noted above are all listed under the broad category of residential per EC
Table 9.2740. Given the similar residential uses, there do not appear to be any inherent
conflicts that would keep the developments from being at least reasonably compatible and
harmonious.
Based on the available information and the findings above, this criterion is met.
EC 9.8320(13) - If the tentative PUD application proposes a land division, nothing in
the approval of the tentative application exempts future land divisions from
compliance with state or local surveying requirements.
The applicant is proposing to divide the subject property into 8 residential lots and one tract of
common open space. As stated above, nothing in the approval of this Tentative PUD
application exempts the future land division application from compliance with state or local
surveying requirements.
Furthermore, as required by the tentative subdivision approval criteria at EC 9.8515(12),
subsequent land division applications must be consistent with the approved PUD. Given the
extent of final design details that will be coordinated through the subsequent subdivision
application(s) and related permit review processes, staff highly recommends that the applicant
submit the final PUD application concurrent with the tentative subdivision application. This will
facilitate coordination of those subsequent reviews and various technical details to ensure
consistency with the approved tentative PUD, while also enabling a shorter timeline for
required land use application reviews.
EC 9.8320(14) - If the proposed PUD is located within a special area zone, the applicant
shall demonstrate that the proposal is consistent with the purpose(s) of the special
area zone.
This criterion does not apply because the subject property is not located in a special area zone.
EC 9.8320(15) - For property with the /SR Site Review Overlay Zone, the PUD complies
with any additional site-specific criteria that were specified at the time the /SR
designation was applied to the property.
This criterion does not apply because the subject property does not have a /SR overlay.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 23 of 28
STAFF RECOMMENDATION
Based on the available information, evidence, and preceding findings of compliance with the
Tentative PUD approval criteria at EC 9.8320, staff recommends the Hearings Official approve
the Tentative PUD request with the conditions listed below.
1. The applicant shall revise the final PUD site plan to meet the minimum parking area
landscape standards at EC 9.6210, or otherwise apply for and be granted an adjustment
to the applicable standards.
2. The applicant shall revise the final PUD site plans to designate the 12-inch diameter tree
located on Lot 8 as “To Be Preserved.”
3. Prior to final PUD approval, the applicant shall provide a revised Tree Preservation Plan
that accurately lists the size, species, and health/condition of each preservation tree and
verifies that no more than 30% of the Critical Root Zone (CRZ) of trees to be preserved
will be impacted by construction activities. If more than 30% of any CRZ will be
impacted, the applicant shall provide a report from a certified arborist verifying that the
proposed construction activities can otherwise be conducted in a manner that does not
threaten the survival of the trees to be preserved.
4. All building permits for construction on the site shall include a site plan in compliance
with the approved tree preservation plan. The building permit submittal shall include
sufficient detail to verify that no more than 30% of the Critical Root Zones (CRZ) of trees
to be preserved will be impacted by construction activities on the lot, or a report from a
certified arborist verifying that the proposed construction activities can otherwise be
conducted in a manner that does not threaten the survival of the trees to be preserved.
The building permit shall include tree protection fencing to be erected at the perimeter
of the CRZ’s for all trees to be preserved (or an alternative location as approved and
documented by a certified arborist and the City).
5. Protective fencing for trees identified to be preserved shall be inspected and approved
by the City prior to beginning any construction related activities. All protective tree
fencing shall remain in place until completion of all construction activities; any
relocation or removal of the protective fencing shall only occur under the direction of a
certified arborist or with approval by the City.
6. Prior to final PUD approval, the applicant shall provide a revised planting plan that
substantially conforms to the tentatively approved plan and reflects the changes
required by the conditions of this tentative PUD approval. The revised planting plan shall
include a note stating that: “Replacement trees shall be native species and have a
minimum caliper of 2” for deciduous trees and a minimum height of 5’ for coniferous or
evergreen trees. Planting and inspection by City staff shall occur before final occupancy
of any new dwellings is permitted on the lot where the tree will be planted. Watering
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 24 of 28
and general maintenance of replacement trees shall be conducted by the property
owner in manner that ensures their establishment and long-term survival.”
7. Prior to final plat approval, a street name shall be submitted for review by the regional
road naming group and be approved in accordance with EC 9.6855. The private street
shall be labeled on the final plat and final PUD site plans as “Street Name - Private”.
8. The applicant shall revise the final PUD site plans to depict the proposed private street
as complying with the Design Standards and Guidelines for Eugene Streets, Sidewalks,
Bikeways and Accessways, including the required curbs.
9. Prior to final plat approval, the applicant shall submit a Private Joint Use Access and
Utility Easement and Maintenance Agreement (JAM). The JAM will include a description
defining the area of the private street and will also identify permitted improvements,
construction expectations, rights of usage and maintenance responsibilities for the
facilities in the street. The JAM will be recorded concurrent with and cross-referenced
on the final plat.
10. Provisions for public emergency access easement within the private street may be
included in the proposed JAM which creates the private street, or alternatively may be
dedicated as a Public Emergency Access Easement on a standard City form.
11. The applicant shall revise the final PUD site plan to clearly show the area of the
proposed private street. The applicant shall include a note on the final PUD site plan
with calculations demonstrating that the proposal complies with the net density
standard.
12. The following restriction shall be noted on the final plat and final PUD plans: “No
building, structure, tree or other obstruction shall be placed or located on or in a Public
Utility Easement.”
13. Prior to final plat approval, the applicant shall provide documentation that EWEB has
received a financial guarantee, ensuring that water will be provided to each lot in the
plat.
14. Prior to final plat approval, the applicant shall submit an Irrevocable Petition for public
improvements in Augusta Street to include street trees.
15. Prior to final plat approval, the applicant shall submit a Joint Access Easement over Lot
1, which is subject to City review and approval prior to recording with the final plat, shall
be cross-referenced on the plat and be accompanied by a maintenance agreement
which addresses the rights and responsibilities of each lot relative to the shared
driveway.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 25 of 28
16. The final PUD plans shall be revised to depict a vision clearance triangle at the
intersection of Augusta Street and the proposed private street in accordance with EC
9.6780.
17. The applicant shall add a note to the final PUD plans that states: “All proposed utilities
(including, but not limited to gas, water, electric, telecommunications, and sewer) will
be installed underground to the extent required, in accordance with EC 9.6775.”
18. The final PUD plans shall be revised to include the following note: “On-site stormwater
management facilities will be privately owned and operated. An operation and
maintenance plan will be developed consistent with the City’s Stormwater Management
Manual, and notice of this plan will be recorded, during the building permit process.”
19. Prior to final PUD approval, the applicant shall add the following note to their final PUD
site plan: “Parking area lighting shall comply with EC 9.6725 Outdoor Lighting
Standards.”
20. Prior to final PUD approval, the applicant shall add the following note to sheet LA-1 of
their site plan: “Landscaping shall comply with EC 9.420(3) Landscaping Standards.”
Otherwise, the applicant shall apply for and be granted an Adjustment to EC 9.6420(3)
Landscaping Standards.
Hearings Official Decision
Consistent with EC 9.7330, unless the applicant agrees to a longer time period, within 15 days
following close of the public record, the Eugene Hearings Official shall approve, approve with
conditions, or deny this Type III application. The decision shall be based upon and be
accompanied by findings that explain the criteria and standards considered relevant to the
decision, stating the facts relied upon in rendering a decision and explaining the justification for
the decision based upon the criteria, standards, and facts set forth. Notice of the written
decision will be mailed in accordance with EC 9.7335. Within 12 days of the date the decision is
mailed, it may be appealed to the Eugene Planning Commission as set forth in EC 9.7650
through EC 9.7685. If no appeal is received, the decision will become effective on the 13th day
after the date the decision was mailed.
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 26 of 28
INFORMATIONAL ITEMS AND ATTACHMENTS
The following informational items are provided for the applicant’s benefit:
x While the proposed development on Lot 1 appears to be located outside of the
conservation setback, careful attention should be taken to ensure that development
activity does not impact significant trees existing just to the north of the
development site, to avoid any encroachment or impact that may violate the
applicable overlay zoning.
x Staff recommend indicating on the final PUD site plans the development intent
regarding the existing driveway on proposed Lot 1, to designate whether the
driveway is to be retained or removed.
For further information, contact Rodney Bohner at 541-682-5437; RBohner@eugene-or.gov
x Per EFC 507.5.1, hydrants shall be placed such that all portion of proposed buildings
shall be within 600 feet of such hydrants, as measured by an approved route around
the exterior of the building. It appears that the proposal does not meet this
requirement and a new hydrant will be required. These water supply requirements
will be reviewed at the time of building permit application.
x “No Parking Fire Lane” signs will be required along the apparatus access road and
emergency vehicle turnaround.
x If the Eugene/Springfield Fire Marshal (or the Fire Marshal’s designee) determines
that there is inadequate water supply, apparatus access, or both, to the site for the
development of single-family dwellings that will be subject to the Oregon Residential
Specialty Code, the Eugene Building Official’s designee) may require compliance with
one or more of the fire suppression of fire containment Uniform Alternate
Construction Standards set out at OAR 9180480-0125(4) and (5).
For more information regarding the item above, contact Eric Phillips-Meadow, Deputy Fire
Marshal, Eugene-Springfield Fire, at 541-780-4048; EPhillipsMeadow@eugene-or.gov
x An Engineering and Construction agreement is required for the private construction
of public improvements and must be submitted when the construction plans are
submitted for review and approval. The configuration and size of the public
improvements shall further be subject to approval by the City Engineer upon review
of the design and supporting analysis prepared by the applicant’s engineer.
x The structural design and construction inspection for the private street will remain
the developer’s responsibility. Certification by a licensed engineer that a structural
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 27 of 28
design meeting the public standards has been completed, must also be submitted at
the time of the site development permit for the private street.
x An approved and issued Erosion Prevention Permit will be required prior to any
construction activity on the site.
For further information, contact Nathan Scheib, Public Works, at 541-682-5264;
NScheib@eugene-or.gov
x The Eugene Water and Electric Board (EWEB) has provided a referral which lists
informational items and that states several items will be required prior to the
provision of electric, water, and/or fiber services from EWEB. While not items which
must be addressed for approval under the Eugene Code, the items are no less
important and are certainly applicable. The referral (including staff contact
information) is included as Attachment D for ease of reference.
Attachments
The following attachments are also provided for ease of reference:
Attachment A: Vicinity Map
Attachment B: Zoning Map
Attachment C: Applicant’s Site Plan
Attachment D: EWEB Referral Comments
The Hearings Official will receive a full set of record materials for review prior to the public
hearing. The application materials will also be made available to any interested parties
electronically or in hardcopy format, upon request.
As a courtesy, these materials may also be available on the City’s website at:
https://pdd.eugene-or.gov/LandUse/SearchApplicationDocuments?file=PDT-19-0002
For more information, please contact Rodney Bohner, Associate Planner, Planning Division, at:
(541) 682-5437; or by e-mail, at: RBohner@eugene-or.gov
August 2020 Compeau PUD (PDT 19-2) | Staff Report Page 28 of 28
Vicinity Map
Compeau PUD (PDT 19-2) Attachment A
AUGUSTA ST
MOON MOUNTAIN D R
Subject Property Caution: This map is based on
imprecise source data, subject to
Taxlots change, and for general reference only.
Created on 8/26/2020
by City of Eugene Planning Division
^
0 25 50
Ft
100 N
Zoning Map
Compeau PUD (PDT 19-2) Attachment B
AUGUSTA ST
R-1
MOON MOUNTAIN D R
PL
Subject Property Caution: This map is based on
imprecise source data, subject to
Zone Overlays change, and for general reference only.
PL Public Land
Created on 8/26/2020
R-1 Low-Density Residential by City of Eugene Planning Division
Taxlots
^
0 25 50
Ft
100 N
Attachment C
Eugene Water & Electric Board Attachment D
4200 Roosevelt Blvd.
P.O. Box 10148
Eugene, OR 97440-2148
August 19, 2020
City of Eugene Planning Division
Attn: Rodney Bohner
99 W 10th Ave.
Eugene, OR 97401
Re: PDT-19-2 2321 and 2323 Augusta St.
Dear Rodney,
EWEB staff has reviewed the Land Use Referral: PDT-19-2 2321 and 2323 Augusta St. Map:
18-03-04-14, TL 00700, 00800, and have no objections to the proposed land-use action
assuming the following comments and conditions are required to be addressed by the applicant
prior to obtaining electric, water, and/or Fiber services from EWEB.
General Comments:
Utility services for development are provided in accordance with EWEB policies and procedures
which are available at our main office or online at http://www.eweb.org/policies.
Electric Comments:
EWEB has overhead electric facilities on the west side of the property.The overhead electric
service to the existing outbuildings cross over Lot 1 for the benefit of lot 2 and Lot 5. In
accordance with EWEB policies and procedures, electric facilities extending across tax lots to
serve adjacent properties will require easement. Prior to recording the final plat, the applicant
shall provide EWEB with a 5’ wide PUE or EWEB Utility Easement centered on the overhead
facility or contact EWEB to have the service removed or relocated. EWEB Pole 9562 located on
the west side of development, near driveway. If pole is found to be in conflict with driveway and
relocation is needed the cost is to be borne by customer.
An electric service extension is required to serve Lots 1, 3 and 4. Extension of electric facilities
will be designed to meet the City of Eugene Utility Permitting ordinances, land use ordinances,
EWEB standards, and other applicable codes. The cost of facility relocation and extension to
these parcels will be borne by the requesting customer and executed under EWEB policies and
procedures at the time request for electric service is made.
The applicant or their representative should initiate a design with EWEB electric by contacting
Distribution Engineering at 541-685-7521 or DistributionEngineering@eweb.org to confirm
these easement and design needs.
Applicant to contact City Fire Marshal to determine location, size and other requirements of fire
lane.
Land Use: PDT-19-2 2321 and 2323 Augusta St.
Page 1 of 3
Eugene Water & Electric Board
4200 Roosevelt Blvd.
P.O. Box 10148
Eugene, OR 97440-2148
Electric comments or questions can be directed to:
Roxy Satterfield
Distribution Engineering Technician III
Eugene Water & Electric Board
Office/fax 541-685-7166; roxy.satterfield@eweb.org
Water Comments:
There is an existing 6" water main on west side of Agusta Street, each parcel is currently
served. Contact EWEB's Building & Renovation Services Department at (541) 685-7086 for
additional services as needed.
EWEB Water recommends the developer contact the Fire Marshall concerning fire protection
requirements for building permits.
EWEB water does not allow installation of any water facilities under proposed "rain gardens" or
any open drainage structure within the right-of-way. Provisions within the design must be made
to accommodate the installation of water facilities (services & hydrants) at common lot corners.
A minimum 5' wide "utility corridor" at service crossing and hydrant locations is required.
State Drinking Water regulations (OAR 333-061-0050(10)) require a minimum separation
between water and sewer lines of 10' where they run parallel to each other, unless the sewer
line is located with 1.5' of clearance lower than the water line then the required separation is 5'.
EWEB owned water facilities will be located in the right-of-way, or in a minimum 7' public utility
easement (PUE) adjacent to the public right-of-way, or in a minimum 14' PUE when not
adjacent to public right-of-way.
Water comments or questions can be directed to:
Bill Johnson
Water Engineering Technician IV
Eugene Water & Electric Board
Office/Fax 541-685-7377; bill.johnson@eweb.org
Right-of-Way Comments:
The “Proposed 28.00’ Joint Access and Utiliy Easement” is not adequate for EWEB electric
facilities. Easements must be either Public Utility Easements or EWEB Easements if they are to
accommodate EWEB’s electrical system. An easement for the existing electric service across
proposed Lot 1 serving the existing development on proposed lots 2 and 5 is required unless
the service is relocated prior to the final plat.
Because a Public Utility Easement (PUE) is designated on the plat, the plat should include the
customary Note for PUEs: “No building, structure, trees, shrubbery or other obstruction shall be
placed or located on or in a public utility easement.”
If an EWEB Easement is designated on the plat, a separate EWEB Easement document will
need to be created by EWEB Property Management. This document will be recorded with the
Plat. In addition, if an EWEB Easement is designated on the plat, EWEB requests that a Note
be added to the plat stating: “EWEB easements shall include EWEB and its joint users with
Land Use: PDT-19-2 2321 and 2323 Augusta St.
Page 2 of 3
Eugene Water & Electric Board
4200 Roosevelt Blvd.
P.O. Box 10148
Eugene, OR 97440-2148
whom it may contract. At no time shall any building, structure, sign or other obstruction be
erected or placed or located within an EWEB utility easement area without prior written consent
of EWEB.”
Right-of-Way comments or questions can be directed to:
Rafael Sebba
Right-of-Way Agent
Eugene Water & Electric Board
Office/Fax 541-685-7710; rafael.sebba@eweb.org
As always, EWEB recommends property owners and contractors call for locates before digging
for installation of any underground supports to verify that no utility facilities will be affected by
this construction.
Sincerely,
Rich Fatooh Wallace McCullough
Distribution Engineering Supervisor Water Engineering Supervisor
Eugene Water & Electric Board Eugene Water & Electric Board
(541) 685-7596 (541) 685-7435
richard.fatooh@eweb.org wallace.mccullough@eweb.org
Land Use: PDT-19-2 2321 and 2323 Augusta St.
Page 3 of 3
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.