Hearings Official Public Hearings
Regular MeetingEugene, OR · July 20, 2022
Agenda
AGENDA
Phone: 541-682-5481 Meeting Location:
www.eugene-or.gov/406/hearings-official Virtual Meeting (Via Zoom)
The Eugene Hearings Official welcomes your interest in these agenda items. The Permit and
Information Center (PIC) is open 12:00pm—4:00pm, Monday through Friday. Information about
online or other options for access and participation is available on the next page of this agenda.
For the hearing impaired, assistive-listening devices or an interpreter can be provided with 72-
hour notice prior to the meeting. Spanish-language interpretation may also be provided with 72-
hour notice. These services may not be available during the meeting but may occur as a follow
up service. To arrange for these services, contact the Planning Division at 541-682-5675.
WEDNESDAY, July 20, 2022 – Public Hearing 5:00 pm
Hearing Official: Virginia Gustafson Lucker
I. PUBLIC HEARING: ROSS LANE (CU 21-2)
Description: Request for approval of a Needed Housing—Conditional Use Permit (CUP)
for a 39-bed assisted care facility.
File Name (#): Ross Lane (CU 21-2)
Location: No Assigned Address; Located near the northeastern corner of Autumn
Avenue and Ross Lane, south of Helen Street.
Assessor’s Map / Tax Lots: 17-04-12-34 / 00500
Lead City Staff: Josh Hoff, Associate Planner, 541-682-5437, JHoff@eugene-or.gov
Page 1 of 13
PUBLIC HEARING FORMAT
1. Staff introduction/presentation
2. Public testimony from applicant.
3. Testimony from the public. Due to the virtual meeting platform, the order of speakers
will be based on order that persons request to speak (raise virtual hand), as opposed
to the order specified under EC 9.7625. For this reason, each person providing
comment will be asked to state whether they are in support, neutral, or in opposition
to the application.
4. Staff response to testimony.
5. Questions from Hearings Official.
6. Rebuttal testimony from applicant.
7. Closing of public hearing.
The Hearings Official will not make a decision at this hearing. The Eugene Code requires that a
written decision must be made within 15 days of close of the public comment period. To be
notified of the Hearings Official’s decision, state your name and address during the public
testimony portion of the public hearing or contact the lead City staff noted above. The decision
will also be posted at https://www.eugene-or.gov/406/Hearings-Official.
HOW TO ACCESS THE MEETING
To be able to participate in Public Comment join using one of the two following options:
1. Join on your computer, tablet or smartphone
Visit: https://eugene-or-gov.zoom.us/j/89675214646
Sign up to speak by clicking once on the “raise hand” icon
2. Join on your phone
Dial one of the below numbers and enter the Webinar ID: 896 7521 4646
+1 833-548-0276 (Toll Free); or
+1 833-548-0282 (Toll Free); or
+1 877-853-5257 (Toll Free); or
+1 888-475-4499 (Toll Free);
For higher quality, dial a number based on your current location.
International numbers available: https://eugene-or-gov.zoom.us/u/kBMeRzxTK
Sign up to speak by dialing *9 (Star-9)
Page 2 of 13
The Atrium Building
99 West 10th Avenue, Eugene, Oregon 97401
Phone: 541.682.5377 | Fax: 541.682.5572
www.eugene-or.gov/planning
PUBLIC HEARING STAFF REPORT
Conditional Use Permit
File Name (Number): Ross Lane Assisted Living (CU 21-2)
Applicant/Owner: Eugene Zagoruyko
5597 Tradition Alley
Eugene, OR 97402
Applicant’s Representative: Jed Truett, Metro Planning Inc.
846 A Street
Springfield, OR 97477
Lead City Staff: Joshua Hoff, Associate Planner
Relevant Dates: Application Submitted: November 19, 2021
Deemed Complete: April 27, 2022
Public Hearing: July 20, 2022
Property Location: North of Autumn Avenue, south of Helen Street, east of
Ross Lane, and west of Klamath Street
Map No. / Tax Lot: 17-04-12-34 / 00500
Size: Approximately 1.88 acres
Application Summary:
Request for a Needed Housing – Conditional Use Permit approval for an assisted group living
facility consisting of three separate buildings each containing 13 beds.
Purpose of the Staff Report
Staff reports provide community members an opportunity to learn more about the land use
request and review staff analysis of the application. Staff reports are available seven days prior
to the public hearing (see EC 9.7320). The staff report provides only preliminary
recommendations, and information. The Hearings Official will also consider additional public
testimony and other materials presented at the public hearing before making a decision on the
application. The Hearings Official’s written decision on the application is typically made within
15 days following close of the public record, following the public hearing (see EC 9.7330). For
reference, the applicable quasi-judicial hearing procedures are described at EC 9.7065 through
EC 9.7095.
Page 3 of 13
APPLICATION DETAILS & PROCEDURE
The applicant is requesting approval of a Needed Housing – Conditional Use Permit for the
development of an Assisted Living Care Facility. For the detailed description, see the applicant’s
written statement. The applicant submitted several iterations of materials. The set under
review is the written narrative submitted June 2, 2022, landscape plan submitted April 28,
2022, photometric plan submitted November 19, 2021, utility plans submitted April 28, 2022,
and the site plan submitted June 24, 2022. The subject site is identified as Tax Lot 00500 of
Assessor’s Map 17-04-12-34 and is currently vacant. The site is at the northeast corner of the
intersection of Autumn Avenue and Ross Lane, south of Helen Street, and west of Klamath
Street.
Timing, Notice, and Testimony
Application Submitted November 19, 2021
Deemed Complete at the April 27, 2022
Application Applicant’s Request
Timeline Timeline Extension of 30 days May 9, 2022
Noticed (per EC 9.7315) June 17, 2022
Public Hearing July 20, 2022
The applicant met with staff on November 18, 2020 to discuss the proposal, in compliance with
EC 9.7005 Pre-application Conference. The applicant held a neighborhood meeting on
September 27th, 2021 in compliance with EC 9.7007 Neighborhood/Applicant Meetings.
Public Notice
Public notice of this Conditional Use Permit application was provided in accordance with
Eugene Code (EC) 9.7315 requirements.
Testimony
No written testimony was received prior to issuance of this staff report.
Referrals
The Planning Division also provided information concerning the application to appropriate City
departments, public agencies, neighborhood associations, and service providers. All referral
comments received by the Planning Division on this application are included in the application
file for reference. The substance of any relevant referral comments is addressed in the context
of applicable approval criteria and standards in the following evaluation.
EVALUATION
In accordance with EC 9.7330, the Hearings Official is required to approve, approve with
conditions, or deny a Type III land use application. The decision must be based on, and be
Page 4 of 13
accompanied by, findings that explain the criteria and standards considered relevant to the
decision. It must also state the facts relied upon in rendering the decision and explain the
justification for the decision based upon the criteria, standards, and facts set forth.
To assist the Hearings Official in rendering a decision on the application, staff presents the
following conditional use permit approval criteria (shown below in bold), with findings related
to each, based on the evidence available as of the date of this staff report. Staff also provides a
recommendation to the Hearings Official following the staff evaluation.
EC 9.8100(1): The applicant has demonstrated that the proposed housing is needed housing
as defined by State statues.
Oregon Revised Statutes define needed housing as follows:
(1) As used in ORS 197.307, “needed housing” means all housing on land zoned
for residential use or mixed residential and commercial use that is determined to
meet the need shown for housing within an urban growth boundary at price
ranges and rent levels that are affordable to households within the county with a
variety of incomes, including but not limited to households with low incomes,
very low incomes and extremely low incomes, as those terms are defined by the
United States Department of Housing and Urban Development under 42 U.S.C.
1437a. “Needed housing” includes the following housing types:
a) Attached and detached single-family housing and multiple family
housing for both owner and renter occupancy;
b) Government assisted housing;
c) Mobile home or manufactured dwelling parks as provided in ORS
197.475 to 197.490;
d) Manufactured homes on individual lots planned and zoned for
single-family residential use that are in addition to lots within
designated manufactured dwelling subdivisions; and
e) Housing for farmworkers.
(2) Subsection (1)(a) and (d) of this section does not apply to:
a) A city with a population of less than 2,500.
b) A county with a population of less than 15,000.
(3) A local government may take an exception under ORS 197.732 to the
definition of “needed housing” in subsection (1) of this section in the same
manner that an exception may be taken under the goals.
To establish the type of housing proposed for development as “needed housing,” an applicant
must show that the proposed housing falls within the statutory definition (see above). The
proposal for an Assisted Living Care Facility is considered “needed housing” as the proposal will
provide housing on land zoned for residential use. Additionally, the Eugene Code lists Assisted
Care as a type of residential use, further demonstrating that it can be considered needed
housing (see EC 9.2740). Based on these findings, EC 9.8100(1) is met.
Page 5 of 13
EC 9.8100(2): If applicable, the proposal complies with the standards contained in EC 9.5500
Multiple-Family Standards.
This criterion is not applicable as this proposal is for an Assisted Living Care Facility and not a
Multiple-Family development.
EC 9.8100(3): For areas not included on the city’s acknowledged Goal 5 inventory, the
proposal will preserve existing natural resources by compliance with all of the following:
The subject site is located outside the city’s acknowledged Goal 5 inventory areas. The
following standards are applicable.
(a) The proposal complies with EC 9.6880 to EC 9.6885 Tree Preservation and Removal
Standards.
The applicant’s Existing Condition plan sheet shows 15 trees on the subject property. The
applicant’s written narrative indicates that all existing trees will be removed, and that new
trees will be planted. The applicant includes a landscape plan that shows new trees being
provided on the site.
EC 9.6885(2) requires an applicant to submit materials from a certified arborist or licensed
landscape architect that demonstrate that consideration of trees and whether they should be
preserved has occurred. While the applicant’s materials include a proposal for new trees,
materials from a licensed landscape architect or certified arborist that demonstrate
consideration of whether trees should be preserved is absent from the applicant’s materials. To
ensure that a certified arborist or landscape architect reviews existing trees on the site to see if
they can be retained, the following condition is provided:
• Prior to the issuance of a development permit, the applicant shall submit a report from
a certified arborist or licensed landscape architect that demonstrates compliance with
EC 9.6885(2).
Based on the available information and condition above, the applicable provisions from EC
9.6880 to EC 9.6885 will be met.
(b) Natural resource areas designated on the comprehensive plan diagram as
“Natural Resource” are protected. Protection shall include the area of the resource
and a minimum 50 foot buffer around the perimeter of the natural resource area.
The subject site is not designed as a Natural Resources area. This criterion is not applicable.
Based on the available information and findings above, EC 9.8100(3) is met.
Page 6 of 13
EC 9.8100(4): The proposal complies with all applicable standards, including, but not limited
to:
This criterion lists specific standards that a project must demonstrate compliance with, but also
includes a broad statement that indicates that it is not intended to be limiting and additional
standards may apply. For the purpose of review of the applicant’s request, staff has focused on
the listed standards necessary for CUP approval. Following that evaluation, staff has also
reviewed additional standards which the applicant has provided information about.
(a) EC 9.6706 Development in Flood Plains through EC 9.6709 Special Flood Hazard
Areas – Standards.
These standards are not applicable as the subject property is not located in a Special Flood
Hazard Area.
(b) EC 9.6710(6) Geological and Geotechnical Analysis.
This standard requires certification from a licensed Civil Engineer with geological experience or
a licensed Engineering Geologist that the proposed development activity will not be impacted
by existing or potential stability problems or any of the following site conditions: springs or
seeps, depth of soil bedrock, variations in soil types, or a combination of these conditions. In
the event any of these conditions exist, the engineer shall provide recommendations to safely
address the conditions, and the applicant is required to submit a statement agreeing to develop
in accordance with the engineer’s recommendations.
On July 12, 2022 the applicant submitted a geotechnical analysis prepared by Ronald J. Derrick,
P.E., G.E., that addresses this standard. The analysis concludes that the proposed development
will not be adversely impacted by the conditions noted by EC 9.6710(6) if designed and
constructed in accordance with generally accepted practices for geotechnical engineering in the
Eugene area. Based on the available information, this standard is met.
(c) EC 9.6730 Pedestrian Circulation On-Site.
(3) Per EC 9.6730 Design of On-Site Pedestrian Facilities. All on-site pedestrian
paths provided for the purposes of complying with this land use code shall
conform with the following standards:
(a) On-site pedestrian paths shall provide direct access from public
ways to building entrances.
The application materials include a site plan submitted June 24, 2022 illustrating direct access
from public ways to building entrances via direct connections or via crosswalks. This standard is
met.
Page 7 of 13
(b) On-site pedestrian paths shall be constructed of concrete, a
comparable hard surface material, or any property designed
pervious surface that complies with the Americans with Disabilities
Act.
The applicant notes sidewalks and paths will be composed of 3000 PSI concrete and provides
details on sheet C-3.1 to further demonstrate the proposed paths will meet this standard.
(c) On-site pedestrian paths shall be raised to standard curb height
when adjacent to public and private streets or driveways.
The applicant’s site plan submitted June 24, 2022 illustrates pedestrian paths raised to standard
curb height when adjacent to public and private streets or driveways. This standard is met.
(d) On-site pedestrian paths intersected by driving aisles shall be
marked with striping or constructed with a contrasting paving
material to indicate a pedestrian crossing area.
The applicant’s site plan submitted June 24, 2022 illustrates pedestrian crossing areas marked
with white striping. This standard is met.
(e) Pedestrian scale lighting in conformance with the standards in EC
9.6725 Outdoor Lighting Standards shall be provided along
pedestrian facilities
The applicant supplied a site plan with the statement “The following standards will be complied
with at the time of building permit submittal. EC 9.6725 – Outdoor Lighting Standards.” The
applicant also submitted on November 19, 2022 a lighting plan entitled “Ross Lane
Photometrics Report”. This report illustrates the lighting type and photometric impact of said
proposed lighting on the subject property. Detailed review of lighting standards will be
reviewed at the time of building permit review as stated on the site plan. This standard is met.
(d) EC 9.6735 Public Access Required.
The development site has frontage on Ross Lane and Klamath Street. Referral comments from
Public Works confirm that the proposed access to Ross Lane, classified as a medium-volume
local street, is consistent with applicable section of EC 7.420. This standard is met.
(e) EC 9.6750 Special Setback Standards.
This standard allows the City to require a special setback when public right-of-way widths are
less than the amount needed to design and construct streets in accordance with City standards.
The special setback ensures that buildings are constructed in a manner that they will conform
with front and interior setbacks when the streets upon which they front are widened and
improved to City standards.
Page 8 of 13
Ross Lane is a medium-volume local street with a 45-foot right-of-way width adjacent to the
site. The minimum width for a medium-volume local street in EC Table 9.6870 is 50 feet. The
applicant has proposed a special setback measuring 25 feet from the designated center line of
Ross Lane. Referral comments from Public Works staff note that improvements in Ross Lane
include a paved surface and street lights, but lack curb and gutter, sidewalk, and street trees.
Public Works staff confirms that the proposed special setback is sufficient to ensure that future
improvements can be provided. Based on the available information this standard is met.
(f) EC 9.6775 Underground Utilities.
The applicant states in the written narrative “All new on-site utility lines will be placed
underground. See sheet C-2.1 from A&O Engineering”. The site plan states “proposed utilities
to be located underground per EC 9.6775, unless connecting legally to established above
ground facilities.” As the applicant states all new on-site utility lines will be placed
underground, and includes a note on their site plan, this standard is met.
(g) EC 9.6780 Vision Clearance Area.
This proposal does not create public or private right-of-way intersections, and the site is not
located at an existing intersection. This standard is not applicable.
(h) EC 9.6791 through 9.6797 regarding stormwater flood control, quality, flow control
for headwaters area, oil control, source control, easements, and operation and
maintenance.
A stormwater report prepared A&O Engineering and signed by Scott Morris P.E. was submitted
to address Stormwater Management Standards.
EC 9.6791 and EC 9.6792 Stormwater Flood Control and Stormwater Quality: The applicant’s
stormwater report notes that soil conditions are suitable for on-site infiltration. Referral
comments from Public Works staff confirm that sizing calculations are provided which
demonstrate that facilities will accommodate the flood control design storm, and that post-
development flows will be less than existing conditions. Based on the information provided, the
applicant’s proposal is conceptually acceptable. At the time of building permit review,
additional evaluation of specific details will occur.
EC 9.6795 Source Controls: The proposed trash enclosure is classified as a solid waste storage
area per EC 9.6795(2)(c). The utility plan shows that the facility will be connected to the private
wastewater system on-site. Additional details of required source control standards, including
cover and hydraulic isolation, will be further evaluated at the time of building permit review.
EC 9.6793, EC 9.6794, EC 9.6796 Stormwater Flow Control, Oil Control, Easements: The
purpose of these standards is to protect waterways in headwater areas from erosive affects,
protect the city’s stormwater system from oil and grease from stormwater runoff of impervious
Page 9 of 13
surface areas, and designate easements for the maintenance of stormwater management
facilities. Because the proposed development is at an elevation lower than 500 feet; does not
drain to a Headwaters facility; does not include any characteristics identified in EC 9.6794(2);
and because no public stormwater facilities are proposed, these standards do not apply.
EC 9.6797 Stormwater Operations and Maintenance: Any stormwater facilities constructed
within the proposed development must be operated and maintained in accordance with EC
Chapters 6 and 7, and the Stormwater Management Manual. Operation of private facilities will
be evaluated as necessary through the building permit process should private stormwater
facilities be proposed in the future.
Based on the available information, and future permit requirements noted above, staff finds
that this criterion is met.
(i) An approved adjustment to a standard pursuant to the provisions beginning at EC
9.8015 of this land use code constitutes compliance with the standard.
No adjustments are proposed. This standard is not applicable.
Additional Standards Evaluation
The applicant has provided details that allow staff to provide analysis of development standards
in addition to those specifically listed by EC 9.8100(4). It is noted that at the time of building
permit additional standards not specifically listed by the approval criteria for a Needed Housing
– Conditional Use Permit may apply to the applicant’s request and will be reviewed at that
time.
Density: EC 9.2750 establishes the maximum density for the R-1 zone at 14 dwelling units per
acre. The stated lot size of the subject property is 82,097 square feet. The maximum number of
dwelling units for the subject property is 26 dwelling units. Per the definition of Assisted Care
found in EC 9.0500, 1.5 beds equals one dwelling. Per the applicant, 39 beds (26 dwelling units)
are proposed.
Setbacks: EC 9.2750 establishes the minimum building setbacks for the R-1 zone. The front yard
setback is 10 feet. The interior yard setback is five feet. The proposed buildings are sited to
meet the required setback distances.
Building Height: EC 9.2750 establishes the maximum building height within the R-1 zone as 30
feet. The applicant submitted building elevations, sheets A2.0, A2.2, A3.0, and an unlabeled
building elevation. The stated building heights on the elevations are below the maximum
building height of 30 feet.
Parking: The site plan submitted for review on June 24, 2022 illustrates 13 vehicle parking
spaces, inclusive of two ADA vehicle parking spaces. EC 9.6410 requires 1 parking space for
every 4 beds for Assisted Care Facilities with more than 6 people living in the facility. The
Page 10 of 13
applicant has proposed 39 beds, which would require approximately 10 spaces. As the applicant
has provided 13, they comply with the minimum number of parking spaces.
Based on the available information and findings above, EC 9.8100(4) is met.
EC 9.8100(5): Public improvements as required by this land use code or as a condition of
tentative plan approval have been completed, or:
(a) A performance bond or suitable substitute as agreed upon by the city has been
filed with the city finance officer in an amount sufficient to assure the completion
of all required public improvements; or
(b) A petition for public improvements and for the assessment of the real property for
the improvements has been signed by the property owner seeking the conditional
use permit, and the petition has been accepted by the city engineer.
The applicant has not proposed, and based on staff’s review, there are not any specific public
improvements that will be required of the applicant. At the time of development, it may be that
extension of public infrastructure or improvements to public infrastructure will become
necessary. At that time, the applicant will need to comply with the applicable standards for
development. Based on the available information, this criterion is met.
STAFF RECOMMENDATION
Based on the available information and evidence and preceding findings of compliance with the
Conditional Use Permit approval criteria at EC 9.8100, staff recommends the Hearings Official
conditionally approve the request.
1. Prior to the issuance of a development permit, the applicant shall submit a report from
a certified arborist or licensed landscape architect that demonstrates compliance with
EC 9.6885(2).
Consistent with EC 9.7330, unless the applicant agrees to a longer time period, within 15 days
following close of the public record, the Eugene Hearings Official shall approve, approve with
conditions, or deny this Type III application. The decision shall be based upon and be
accompanied by findings that explain the criteria and standards considered relevant to the
decision, stating the facts relied upon in rendering a decision and explaining the justification for
the decision based upon the criteria, standards, and facts set forth. Notice of the written
decision will be mailed in accordance with EC 9.7335. Within 12 days of the date the decision is
mailed, it may be appealed to the Eugene Planning Commission as set forth in EC 9.7650
through EC 9.7685.
Page 11 of 13
Attachments
Attachment A: Vicinity Map
More Information about the land use application process, approval criteria, and general
information can be found here: https://www.eugene-or.gov/3208/Land-Use-Information
The application materials, and file are available to review for any interested parties. As a
courtesy, materials may also be available on the City’s website at: https://pdd.eugene-
or.gov/LandUse/ApplicationDetails?file=CU-21-0002
To protect the health of staff and community members, staff can provide digital materials or
make appointments to view a physical set of materials. The Permit and Information Center is
open for limited hours from 12:00p-4:00p Monday through Friday. The Hearings Official will
receive a full set of application materials for review prior to the public hearing.
For more information, please contact Josh Hoff, Associate Planner, Planning Division, at: (541)
682-5437; or by e-mail, at: JHoff@eugene-or.gov.
Page 12 of 13
Ross Lane Conditional Use Permit (City File: CU 21-2)
Vicinity Map Attachment A
ECHO LN
TAITO ST
KLAMATH ST WA
Y
HELEN ST
ATTICUS
ROSS LN
WARE WAY
LN
JAN ELLE
AUTUMN AVE
JUSTINE LN
K AVE
E OA
LON
MOORE ST
Subject Property Caution: This map is based on
Taxlots
imprecise source data, subject to
change, and for general reference only.
Eugene UGB
^
Created on 7/13/2022
by City of Eugene Planning Division
Page 13 of 13
0 75 150
Ft
300 N
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.