Planning Commission
Regular MeetingEugene, OR · April 29, 2013
Agenda
AGENDA
Meeting Location:
Sloat Room—Atrium Building
Phone: 541-682-5481 99 W. 10th Avenue
www.eugene-or.gov/pc Eugene, OR 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired,
FM assistive-listening devices are available or an interpreter can be provided with 48 hours notice prior to the
meeting. Spanish-language interpretation will also be provided with 48 hours notice. To arrange for these
services, contact the Planning Division at 541-682-5675.
MONDAY, APRIL 29, 2013 – REGULAR MEETING (11:30 a.m. to 1:30 p.m.)
11:30 a.m. I. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for
public comment. The public may comment on any matter, except for items
scheduled for public hearing or public hearing items for which the record has
already closed. Generally, the time limit for public comment is three minutes;
however, the Planning Commission reserves the option to reduce the time allowed
each speaker based on the number of people requesting to speak.
11:40 a.m. II. CAPITAL IMPROVEMENT PROGRAM
Staff: Pavel Gubanikhin, 541-682-5512
Staff: Matt Rodrigues, 541-682-6036
12:25 p.m. III. LTD AND CORRIDOR PLANNING
Staff: Tom Schwetz, LTD
Staff: Robin Hostick, 541-682-5507
Staff: Rob Inerfeld, 541-682-5343
1:15 p.m. IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
B. Other Items from Commission
C. Learning: How are we doing?
Commissioners: Steven Baker; Jonathan Belcher; Rick Duncan; Randy Hledik, Chair; John Jaworski;
Jeffery Mills; William Randall, Vice Chair
AGENDA ITEM SUMMARY
April 29, 2013
To: Eugene Planning Commission
From: Carolyn Burke, Planning Director AIC
Subject: Capital Improvement Program Overview
ISSUE STATEMENT
This work session is an opportunity to provide the Planning Commission with an overview of the
Capital Improvement Program (CIP). Matt Rodrigues from Public Works Engineering and Pavel
Gubanikhin from Finance will provide information on the process for developing and approving the CIP
and projects that are in the recently adopted plan.
BACKGROUND
The recently adopted Capital Improvement Program for Fiscal Years 2014-2019 can be found at this
link: www.eugene-or.gov/CIP
FOR MORE INFORMATION
For questions about projects in the current CIP, contact Matt Rodrigues at 541-682-6036 or
matt.j.rodrigues@ci.eugene.or.us
For questions about the process for developing the CIP, contact Pavel G at 541-682-5512 or
pavel.e.gubanikhin@ci.eugene.or.us
PC Agenda - Page 1
4/24/2013
Capital
Improvement
Program
City of Eugene
Planning Commission
April 29, 2013
Pavel Gubanikhin, Finance
Matt Rodrigues, Public Works
1
CIP Goals
• Balanced program for capital improvements
for the next six years
• Shows unmet capital needs
• Basis for preparing capital budget for the next
two years (FY14 and FY15)
2
Sources of CIP Projects
Maintenance
& Monitoring
programs Infrastructure
Improvement
Prior plans &
&
studies
Replacement
Draft Programs
CIP
Council External
Direction Mandates or
Grants
Public
Requests
3
1
PC Agenda - Page 2
4/24/2013
CIP Projects Funding Status
• Funding Secured – projects with
secured/dedicated funding.
• Funding Identified – projects with a high
likelihood of having available funding.
• Funding Not Identified – no funding source
within six‐year planning horizon.
4
FY14‐19 CIP Summary
Funding Secured $147.4 million
Funding Identified $29.7 million
Total Funded Projects $177.1 million
Funding not Identified $152.8 million
FY14‐19 CIP Total $329.9 million
5
FY14‐19 CIP Projects
with Funding Secured and Identified
Facilities Other Sources
Replacement <$1M, $3.0
SDC, $13.4 Fund, $8.7 Passenger Facility
Charges, $10.0
Stormwater, $14.8
Street Bonds,
Airport $45.5
Construction, $7.9
Federal Aviation
Admin., $19.5
General Capital,
Pavement $23.1
Wastewater, $12.6 Preservation
Capital, $18.6
FY14‐19 CIP Totals $177.1 Million
for Funded Projects
$ Amounts (in millions)
6
2
PC Agenda - Page 3
4/24/2013
CIP Project Categories
• Airport
• Parks & Open Space
• Stormwater
• Transportation
• Wastewater
• Public Buildings & Facilities
7
FY14‐19 CIP Summary by Category
Wastewater Airport
$13.9 $39.5
Parks & Open
Transportation Space
$69.6 $9.1
Public Buildings
and Facilities
Stormwater $30.3
$14.8
FY14‐19 CIP Totals $177.1 Million
for Projects with Secured or Identified Funding
$ Amounts (in millions)
8
FY14‐19 CIP Timeline
Draft CIP
document
distributed to the City Council
Budget Committee Public Hearing
and published for and Action on
public review the FY14‐19 CIP
2/25/13 and
1/31/13 2/21/13 March 2013
3/11/13
Adopted CIP
Budget Committee
becomes the
meeting to review
basis of the
the draft CIP,
FY14 proposed
receive public
capital budget
comment on the
CIP, and provide
recommendation to
the City Council
9
3
PC Agenda - Page 4
4/24/2013
Airport
ASR‐01 South Ramp Reconstruction
10
Airport
Total Revenue Enplanements per Year
450,000
400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
0
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
11
Airport
Airport Funding Sources
FY14‐19 CIP Total $39,485,000 for Funded Projects
Airport
Passenger Construction,
Facility Charge, $7,925,000
$9,990,000
Customer Facility
Charges,
$2,100,000
Federal Aviation
Admin.,
$19,470,000
12
4
PC Agenda - Page 5
4/24/2013
Parks and Open Space
Ridgeline Open Space
13
Parks and Open Space
Creekside Park
14
Parks & Open Space
Parks & Open Space Funding Sources
FY14‐19 CIP Totals $9,055,000 for Funded Projects
Stormwater
General Capital
Utility ‐ Capital,
Projects,
$180,000
$1,995,000
Hays Trust,
$90,000
Parks SDC, Parks
$6,550,000 Maintenance,
$240,000
15
5
PC Agenda - Page 6
4/24/2013
Stormwater
Ferndale Park Swale
16
Stormwater
Stormwater Funding Sources
FY14‐19 CIP Totals $14,754,000 for Funded Projects
Wetlands Stormwater SDC,
Mitigation Bank, $1,200,000
$300,000
Stormwater
Utility,
$13,254,000
17
Transportation
Jefferson Street Paving
18
6
PC Agenda - Page 7
4/24/2013
Transportation
Alder Street Transportation Corridor
19
Transportation
Transportation Funding Sources
FY14‐19 CIP Totals $69,620,000 in Funded Projects
General Capital Pavement
Projects, $180,000 Preservation
Capital,
$18,600,000
Stormwater Utility
‐ Capital,
$1,200,000
Transportation
2012 SDC, $3,550,000
Transportation
Bond, $43,000,000 Wastewater Utility
‐ Capital, $600,000
2008
Transportation
Bond, $2,490,000
20
Wastewater
Wastewater Rehabilitation
21
7
PC Agenda - Page 8
4/24/2013
Wastewater
Wastewater Funding Sources
FY14‐19 CIP Totals $13,880,000 for Funded Projects
Wastewater SDC,
$2,050,000
Wastewater
Utility‐Capital,
$11,830,000
22
Public Buildings & Facilities
Police Headquarters
23
Steam Conversion Projects
8
PC Agenda - Page 9
4/24/2013
Steam Conversion Projects
Hult Center
25
Steam Conversion Energy Cost Savings
Monthly Total Energy Costs:
Atrium, Hult, Overpark, Parcade
$60,000
$50,000
$40,000
$30,000
$20,000
$10,000
$0
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Report period ending 06/2010 Report period ending 06/2012
Echo Hollow & Sheldon Pool Energy Upgrades
Sheldon Pool
27
9
PC Agenda - Page 10
4/24/2013
Echo & Sheldon Pool Energy Upgrades
• Upgrade Lighting
– Overhead Lights
– Underwater Lights
• Optimize Ventilation
• Automatic Pool Blankets
• Retro Commission Digital Controls
• Refurbish Solar Water Heating at Sheldon
28
Pool Upgrades Energy Cost Savings
Monthly Total Energy Costs:
Echo Hollow and Sheldon Pools
$30,000
$25,000
$20,000
$15,000
$10,000
$5,000
$0
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Report period ending 11/2010 Report period ending 11/2012
29
Public Buildings & Facilities
City Hall
30
10
PC Agenda - Page 11
4/24/2013
Public Buildings & Facilities
Public Buildings & Facilities Funding Sources
FY14‐19 CIP Totals $30,325,000 for Funded Projects
Stormwater Transportation
Wastewater Utility ‐ Capital, General Capital,
Utility ‐ Capital, $210,000 $285,000
$210,000
Facilities
Replacement
Fund,
$8,700,000
General Capital
Projects,
$20,920,000
31
Public Buildings & Facilities
Capital Preservation Funding Gap
FY04‐13 in Millions of Dollars
$8
$6.6 $6.7 $6.9
$7
$5.5 $5.8 $6.1
$6
$4.6 $5.1 $5.3 $4.6
$4.4 $4.5 $4.4 $4.5
$5 $4.4
$3.7 $3.9 $4.1 $4.3 $4.2
$4
$3
$2
$1
$0
FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
General Fund Preservation Funding
Recommended Funding Level (2% Replacement Value)
32
Additional Information
• CIP information: www.eugene‐or.gov/CIP
• Current Public Works capital projects:
www.eugene‐or.gov/pwprojects
• 2008 and 2012 street bond measures:
www.eugene‐or.gov/gobonds
• 2010 Facility Condition Report
• Staff contacts:
Pavel Gubanikhin/Finance Pavel.E.Gubanikhin@ci.eugene.or.us
(541) 682‐5512
Matt Rodrigues/Public Works Matt.J.Rodrigues@ci.eugene.or.us
(541) 682‐6036
33
11
PC Agenda - Page 12
4/24/2013
34
12
PC Agenda - Page 13
AGENDA ITEM SUMMARY
April 29, 2013
To: Eugene Planning Commission
From: Tom Schwetz, Lane Transit District
Rob Inerfeld, City of Eugene Transportation Planning
Robin Hostick, City of Eugene Planning Division
Subject: Envision Eugene Implementation:
LTD and Corridor Planning
ISSUE STATEMENT
This work session is an opportunity to update the Planning Commission on Lane Transit District’s
recent planning activities to implement a high-capacity transit network and to share information on
inter-agency collaboration in support of Envision Eugene goals.
BACKGROUND
Two primary goals of the Envision Eugene project are to: 1) determine how Eugene will accommodate
the next 20 years of growth in our community, as required by state law, and 2) create a future city that
is livable, sustainable, beautiful and prosperous. The City Manager’s March 2012 Envision Eugene
recommendation includes several strategies and actions to implement Envision Eugene. One strategy
calls for meeting all of the 20-year multi-family housing and commercial job needs within the existing
UGB with a focus on redevelopment of core commercial areas and key transit corridors. Frequent
transit service (defined as 15 minutes or less) plays a crucial role in the success of this strategy.
The concept of creating a high-capacity “Bus Rapid Transit (BRT)” network was incorporated into
TransPlan, the region’s long range transportation system plan, in 2001. The BRT concept was favored
because it delivers many of the benefits of streetcar service, is appropriate in scale and cost for a
community our size, it results in more efficient transit operation, and can be developed one line at a
time, as warranted by community demand and as allowed by funding. The BRT plan has been updated
several times since initial adoption, and remains a focus of Eugene’s and Springfield’s transportation
implementation strategies. The first Bus Rapid Transit segment (branded as EmX) became operational
in 2007, and a second line in Springfield opened in 2011.
In 2012 LTD revised its Frequent Transit Network (FTN) plan that identifies preliminary routes and
potential service types for frequent transit in the region (see Attachment A). According to the 2013–
2023 LTD Capital Improvement Plan projects within the FTN “. . . encompass the planning, design, and
construction of service that increases capacity along major travel corridors. The FTN strengthens
regional circulation by tying service and investment decisions to the level of development along
corridors on this network.”
PC Agenda - Page 14
Currently, the West Eugene EmX Extension (WEEE) project is entering the design phase. As one of the
first steps of the design process, expected to begin in the spring and summer of 2013, LTD and its
design team will work with property owners along the corridor to develop acceptable project
refinements that best meet the interests of property owners, businesses, and the need for reliable
transit service. See Attachment B for additional status updates on current LTD projects.
Collaboration between the City of Eugene and Lane Transit District has recently focused on
strengthening the alignment of agency goals, identifying needs and priorities, and preparing for next
phases of implementing the FTN and Envision Eugene through a partnership approach. There is
renewed emphasis on creating a built environment that supports frequent transit services, for example
by adjusting regulations and making strategic investments along key corridors. Based on the advice of
topic experts, research on best practices in other communities, and collaborative training, inter-agency
staff have identified a preliminary set of needs moving forward (see Attachment E).
NEXT STEPS
The City of Eugene and LTD continue to actively pursue grant opportunities with a current focus on
corridor segments connecting northwest Eugene to Lane Community College.
Efforts are also underway per direction of the Eugene City Council to outline a process for preserving
space for future multi-modal transit needs along key transit corridors.
ATTACHMENTS
A. LTD Frequent Transit Network Map
B. Status on Lane Transit District’s Planning Activities for High-Capacity Transit
C. NW Eugene – LCC Corridor Map
D. Draft LRTP, Section 4: Goals, Policies and Actions
E. Eugene Transit Corridor Strategy – Draft
FOR MORE INFORMATION
For questions about LTD, contact Tom Schwetz, Planning Manager, at 541-682-6203 or
tom.schwetz@ltd.org and Sasha Luftig, Development Planner, at 541-682-6135 or sasha.luftig@ltd.org
For questions about the Transportation System Plan update, contact Kurt Yeiter at 541-682-8379 or
kurt.m.yeiter@ci.eugene.or.us
For questions about Envision Eugene, contact Robin Hostick 541-682-5507 or at
robin.a.hostick@ci.eugene.or.us
PC Agenda - Page 15
Attachment A
PC Agenda - Page 16
Attachment B
Status on Lane Transit District’s Planning Activities for High-Capacity Transit
1) Long Range Transit Plan (LRTP) and Transportation System Plans (TSP) coordination effort
The purpose of the LRTP is to inform the required transit elements in the City of Eugene and City
of Springfield’s TSPs and to coordinate the policy language for consistency.
The Frequent Transit Network (FTN) is a key element that requires careful coordination to
ensure consistency within the LRTP and TSPs. See Attachment A for a map of the FTN.
Attachment D is a draft of the Goals, Policies and Actions section of the LRTP.
2) West Eugene EmX Extension (WEEE)
Since the Federal Transit Administration’s signing of the Finding of No Significant Impact (FONSI) in
December 2012, LTD staff has been working to secure the services of a design team to begin the
next phase of this project.
LTD has hired Parsons Brinckerhoff (PB) to oversee the design work of WEEE.
LTD, in conjunction with City staff and the consultant team, is developing the plan it will use
to work with impacted property owners. The estimated total area proposed for acquisition is
110,000 square feet (2.5 acres). This estimate may decrease through project design work.
LTD is coordinating project efforts with City of Eugene staff.
3) Northwest Eugene – Lane Community College Corridor
The City of Eugene and LTD have selected the Northwest Eugene – Lane Community College
Corridor (NW Eugene-LCC) for analysis of a future high capacity transit project consistent with local
and state transportation and land use plans. The NW Eugene-LCC Corridor would complete a major
segment of the region's 61-mile system of bus rapid transit (BRT).
See Attachment C for NW Eugene-LCC Corridor map.
LTD is working on a joint Transportation and Growth Management (TGM) grant application with
City or Eugene staff for land-use planning efforts along the corridor.
LTD is applying for a Surface Transportation Program Urban (STP-U) grant to fund the
alternatives analysis and planning phase of the project.
LTD submitted a grant application for Oregon Department of Transportation’s Statewide
Transportation Improvement Program (STIP) Enhance funding to conduct necessary
Environmental Assessment work. This project is in the first tier list of projects prioritized by the
Lane Area Commission on Transportation (ACT).
PC Agenda - Page 17
Attachment C
PC Agenda - Page 18
Attachment D
DRAFT Lane Transit District
Long-Range Transit Plan
2013
i|Page
PC Agenda - Page 19
Table of Contents
Planning to meet transit needs in a changing world……………………...ii
Section 1: Introduction………………………………………………………. 1
Section 2: Trends and Stressors…………………….…………………………..3
Section 3: Looking Ahead……..……………………………………………….6
Section 4: Goals, Policies and Actions…. ………………………………….12
Section 5: Monitoring to Adapt……...………………………………………23
i|Page
PC Agenda - Page 20
Section 4
Goals, Policies and Actions
An agency with high adaptive Eugene/Springfield
capacity must outline clear goals, metropolitan region that
policies and actions in order to provide viable alternatives to
clearly communicate long-term vehicle trips.
strategies with local and regional
stakeholders. Outlining these Definition and Intent: The frequent
strategies helps LTD and its transit corridors will be referred to
partners to better understand as the “Frequent Transit Network
regional priorities and opens a (FTN).” The FTN network represents
dialogue about a shared vision. the highest orders of transit
service within the region.
This exercise requires LTD to trust Implementation of this policy
and participate in a collaborative requires the support of the Cities
process that supports regional of Eugene and Springfield and
adaptation in a changing world. associated policy within their
Transportation System Plan’s.
Goal 1 - Provide attractive
travel options to improve Frequent Transit Network corridors
ease of connectivity will provide regional circulation
throughout LTD’s service through a well-connected
area. network that is compatible and
supportive of adjacent urban
LTD seeks to provide competitive design goals. The frequency is at
service that presents a variety of least every 10-15 minutes in peak
attractive travel options for travel times
residents in the Eugene and
Springfield region. The policies Action 1.1.A: Encourage transit-
and actions listed below foster supportive development along
that competitiveness. Frequent Transit Network corridors
through collaboration, such as
Policy 1.1 Implement a network public-private partnerships.
of higher capacity frequent
transit corridors serving existing Action 1.1.B: Zoning changes
and proposed high-density made within the comprehensive
land uses throughout the plan will inform the prioritization of
12 | P a g e
PC Agenda - Page 21
the Frequent Transit Network expand local and connecting
along high-density and mixed-use transit service to areas with
corridors. sufficient employment, activity
or residential density to support
Action 1.1.C: Develop level of
service guidelines based on land minimal transit service.
use characteristics, including Definition and Intent: Priority of
residential, employment and fixed route service is given to
commercial density, mix of uses, areas with community factors that
and building types. will support ridership. This policy
Policy 1.2 As part of the helps LTD to balance productivity
Frequent Transit Network and coverage of service to areas
beyond the Frequent Transit
continue to expand the Bus
Network.
Rapid Transit (BRT) network on
corridors, if it can be shown to Action 1.3.A: Where financially
increase transit mode split, sustainable prioritize the retention
demonstrate local government and expansion of service.
support, and financing of the
system is feasible. Policy 1.4 Support emerging
Definition and Intent: Bus Rapid transportation options through
Transit is an innovative, high improvement of infrastructure
capacity, lower cost public transit that strengthen accessibility
solution that can significantly and increases pedestrian,
improve urban mobility. This bicycle and transit usage.
permanent, integrated system
Definition and Intent: The nature
uses buses or specialized vehicles
of transportation demand is
on roadways or dedicated lanes
evolving and becoming
to quickly and efficiently transport
increasingly diversified. This policy
passengers to their destinations,
recognizes the importance of an
while offering the flexibility to
interconnected transportation
meet transit demand.
system that provides for ease of
transfer between modes of travel,
Action 1.2.A: Conduct analysis to
such as bus to bicycle, to
evaluate mode split, government
pedestrian.
support and financing of high
capacity transit. LTD seeks to be consistent with the
Regional Transportation Options
Policy 1.3 Outside of the Plan (RTOP) with regards to
Frequent Transit Network
13 | P a g e
PC Agenda - Page 22
connecting transit and other
transportation options Action 1.4.H: Design of
transportation infrastructure shall
Action 1.4.A: Coordinate with be consistent with the character
local governments to improve of the neighborhood.
bicycle sharing and connections
Policy 1.5 Fully integrate transit
to LTD routes and stops.
investments and land use
Action 1.4.B: Expand planning within Eugene,
Transportation Options (TO), Springfield and Coburg.
carshare, and bikeshare
programs to reduce the number Definition and Intent: When
of single‐occupant vehicles. making transit investment and
service decisions, LTD will consider
Action 1.4.C: Assure that all existing and future land use
areas within the catchment area
designations.
of a transit stop have safe, direct
all-weather access for As noted in the Regional
pedestrians. Transportation System Plan, the
cities will encourage transit-
Action 1.4.D: Increase the
supportive land uses, by removing
number of spaces available at
institutional barriers, i.e. zoning or
park-and-ride facilities through
other development regulations
expansion or addition of facilities.
that currently prevent
Action 1.4.E: Increase intermodal construction of high density
connectivity infrastructure residential, commercial, or other
through capital investments, such development that would be likely
as the existing EmX, future EmX to produce high levels of transit
expansions, park-and-ride ridership.
facilities, and mobility hubs, etc.
Action 1.4.F: Support enhanced Action 1.5.A: Support the
technologies that improve adoption of transit-supportive
accessibility to transit information land use regulations.
and ease of travel between all Action 1.5.B: Evaluate
modes. establishing a transit-oriented
Action 1.4.G: Coordinate the development (TOD) program to
integration of transit system support development along, or in
technologies with those connection with, Frequent Transit
implemented by the Cities of Network corridors.
Eugene and Springfield.
14 | P a g e
PC Agenda - Page 23
Action 1.5.C: Support the
adoption of transit-supportive
urban design regulations.
Policy 1.6 Coordinate transit
investments with local land-use
planning, for cities outside of
the Metropolitan area.
Definition and Intent: Integration
of land use and transit planning is
important to create a transit-
supportive built environment that
ensures high levels of ridership
and maximizes the efficiencies of
new transit investments.
Additionally, integrating land use
and transit corridors provides
travel options for community
members to access goods and
services. Cities that surround the
greater Eugene-Springfield area
are continuing to grow, increasing
transit demand to and from these
communities.
Action 1.6.A: LTD will consider
rural land use plans in
conjunctions with service
planning, i.e. UGB expansion,
zoning and proposed
development.
15 | P a g e
PC Agenda - Page 24
LTD maintains the Human Services
Goal 2: Ensure equitable Coordinated Plan that regularly
and accessible transit reevaluates service provided to
service. the community.
Equitable transit service is at the Action 2.1.A: Collaborate with
heart of LTD’s mission to the Eugene and Springfield to locate
community. LTD will ensure affordable housing, and health
equitable transit service for and community services along
populations that do not drive or Frequent Transit Network corridors.
bike and also areas outside of
major cities that are still included Action 2.1.B: Strengthen
in LTD’s service area. connectivity of accessible
transportation to health care
Policy 2.1 The allocation of services, through coordination of
resources for accessible RideSource and health care
services will consider the providers.
following priorities: (1) maintain Action 2.1.C: Provide cost-
a sustainable level of service effective and equitable human
(SLOS) for people who depend services transportation beyond
on public transportation; (2) the district, through coordination
respond to pressures of growth with rural areas and small cities.
and transportation demand Action 2.1.D: Evaluate services
within the limits of resource based on measures of cost
availability; and (3) optimize effectiveness through the
the resources to accommodate coordination of partner resources;
emerging community needs. group purchasing, cost sharing,
ride sharing, and group trips.
Definition and Intent: This policy
communicates LTD’s desire to
ensure that the benefits and the
impacts of our transportation
system are socially equitable.
LTD seeks to maintain a system
that enables people to gain
access to goods jobs, education,
and needed services as
affordable as possible.
16 | P a g e
PC Agenda - Page 25
safety improvements for routes
Goal 3: Maintain and used by LTD.
enhance safety and security
of LTD's services.
Practicing and continually
enhancing transit safety is a key
value of LTD. Maintaining safety
while riding the transit system and
also enhancing security at transit
stations and stops will ensure that
the community is secure and
comfortable while riding the
transit system.
Policy 3.1 Manage hazards that
affect employees, customers,
the public, and property.
Definition and Intent: Safety is a
key characteristic of our transit
system. This policy supports the
need for a comprehensive
approach to developing,
operating and maintaining the
transit system so that people feel
confident, safe and secure. LTD’s
System Safety Program Plan
(SSPP) integrates safety into all
Lane Transit system operations.
Action 3.1.A: Implement LTD's
System Safety Program Plan;
strategies include improved
lighting of high pedestrian and
bicycle use areas, and utilization
of safety controls during system
modification.
Action 3.1.B: Coordinate with
agency partners to implement
17 | P a g e
PC Agenda - Page 26
Goal 4: Use funding Environment: air pollution
efficiently and effectively in increases or decreases; sprawl
inducement or curtailment
adapting to future
conditions. Economy: faster or slower delivery
of products
Chapter 3 depicts the possible
ways that future conditions will Equity: faster or slower travel time;
affect LTD’s operational needs. contributions to increased or
When it comes to future funding— decreased air pollution, based on
there are many uncertainties. race and income
Funding sources may be stable Action 4.1.A: Apply LTD's Triple
over time or they could change, Bottom Line process when
or new funding sources may considering investment decisions
become available. LTD is a about service or infrastructure
publicly funded agency and must changes.
be judicious and innovative in its
use of taxpayer dollars. Policy 4.2 Respond to signals of
change including major shifts in
Policy 4.1 When making
emerging economic, social
investments in transit service
and environmental trends.
and infrastructure consider
long-term system interactions Definition and Intent: LTD’s ability
between social equity, to maintain a competitive
economic competitiveness and industrial advantage is
preservation of the natural dependent on our ability as an
environment. organization to readily adapt to
signals of change. LTD should
Definition and Intent: LTD must
experiment frequently with
determine which service and
products, services, business
infrastructure projects deliver the
models, processes and strategies.
best mix of benefits at costs that
are affordable. The triple bottom Action 4.2.A: Monitor and
line framework is a tool to assist evaluate internal and external
LTD in identifying the broad-range long-term trends; such as labor
of implications associated with a costs, workforce skills, and
proposed decision. transportation demands.
Triple bottom line performance Action 4.2.B: Develop internal
can be measured in each of the strategies to adapt to changes in
three areas: funding, technology, and other
18 | P a g e
PC Agenda - Page 27
conditions, revealed through fluctuation of long-term
long-term monitoring. transportation services.
Policy 4.3 Seek new funding
Definition and Intent: A
sources to improve LTD's
Sustainable Level of Service
services to the community. addresses the need to maintain
service levels in spite of reserve
Definition and Intent: This policy
fluctuations, so that LTD does not
places priority on identifying new
need to cut service during periods
and stable funding sources for LTD
of low revenue.
services and infrastructure. Payroll
taxes and farebox revenues are Action 4.4.A: Balance
not enough to support operations, considerations of productivity and
and thus LTD relies on other coverage in establishing annual
financial support, i.e. the Business service levels.
Energy Tax Credit (BETC). The
Business Energy Tax Credit is a
prime example of volatile funding,
as the program was curtailed—
eliminating subsidies.
Action 4.3.A: Engage the
broader community in the
discussion of an Appropriate Level
of Service (ALOS).
Action 4.3.B: Collaborate with
Federal and State partners to
identify alternative funding
streams; such as an alternative to
the Business Energy Tax Credit
(BETC) and a stable funding
source for Paratransit.
Action 4.3.C: Explore potential
local and regional public-private
partnerships.
Policy 4.4 Identify and
implement a Sustainable Level
of Service (SLOS) that minimizes
19 | P a g e
PC Agenda - Page 28
Action 5.1.B: Implement
Goal 5: Engage the regional recommendations of the Lane
community in LTD’s short Livability Consortium regarding
and long-term planning strategies to broaden community
participation.
processes.
LTD’s mission is to provide the
Policy 5.2 Establish working
community with the best transit relationships with public,
service imaginable. Therefore, it is private and non-profit
essential that the regional organizations invested in
community has an opportunity to community building.
engage in LTD’s short and long-
Definition and Intent: The primary
term planning processes.
intent of this policy is to ensure
Engaging the public will ensure
that diverse agencies are
that the community’s needs are
represented in discussions that
met by LTD decision makers.
seek to enhance the livability of
Policy 5.1 Engage broad the community.
community participation Action 5.1.B: Collaborate with
through diverse collaboration. partners to ensure that new transit
Definition and Intent: This policy system improvements address
communicates LTD’s desire to social, economic and
ensure that the benefits and the environmental concerns.
impacts of our transportation Action 5.2.C: Implement
system are equitably received. recommendations of the Lane
An equitable system allows Livability Consortium to improve
people to gain access to goods, effective collaboration with
jobs, education, and essential partners.
services. Public input will inform
decisions made by LTD, to most Action 5.2.D: Actively pursue
effectively serve the needs of the working with the State to
community. enhance its role in developing
transit statewide.
Action 5.1.A: Provide several
avenues of communication with
members of the community;
including, public meetings, a
comprehensive website, and
presence in local planning
processes.
20 | P a g e
PC Agenda - Page 29
Goal 6: Sustain and Action 6.1.B: Seek to prioritize
enhance economic Metropolitan Planning
Organization (MPO) investments
prosperity in the community
along Frequent Transit Network
through transit (FTN) corridors.
investments.
Policy 6.2 Support
Transportation has a large role in
transportation strategies that
economic development within a
community. LTD can help to
strengthen the economic
sustain and increase future vitality and opportunity of the
economic prosperity in its service region.
area by providing transit services Definition and Intent: The Eugene-
that move the community to Springfield economy is highly
areas of commerce and also dependent upon the local
bring regional visitors into the transportation system for the
Eugene-Springfield area. circulation of goods, services, and
Policy 6.1 Prioritize transit passengers. Investments in
related infrastructure transportation infrastructure can
support and promote regional
investments along Frequent
economic objectives.
Transit Network (FTN) corridors.
Definition and Intent: Frequent Action 6.2.A: Actively develop
Transit Network corridors are and maintain relationships with
associated with higher density economic development interests
development, and thus will likely throughout the region.
result in higher ridership and
increased productivity.
Action 6.2.B: Collaborate with
regional partners to align transit
The Frequent Transit Network is a service and infrastructure
regional initiative to better investments with economic
connect land use development development goals of the region.
to transit and is given priority in
the Eugene and Springfield Action 6.2.B: Provide reliable
Transportation System Plans. transit connections to the Metro
area.
Action 6.1.A: Reflect transit
investment priorities in the LTD
Capital Improvements Program
(CIP)
21 | P a g e
PC Agenda - Page 30
Goal 7: Advance regional Action 7.1.B: Participate in
sustainability efforts. regional sustainability reporting,
i.e. through the City of Eugene
As LTD moves into the future, it is Climate and Energy Action Plan
important to consider (CEAP) and other similar efforts
environmental impacts on the
region. LTD will evaluate negative Action 7.1.C: Actively engage
environmental impacts with network of partners to advance
current and future transportation regional sustainability efforts.
investments, such as the EmX
expansion, which will help protect
the region’s natural resources into
the future.
Policy 7.1 When making
investments in transit service
and infrastructure, implement
sustainable practices that
balance social, economic, and
environmental needs of the
community.
Definition and Intent: This policy
places priority on protecting the
natural environment, and reflects
LTD’s commitment to to
considering the three tenets of
sustainability in planning a
transportation system: economic,
environmental and social costs
and benefits.
Significant benefits can be
achieved by aligning the transit
planning process with the
principle of sustainability.
Action 7.1.A: Measure, monitor,
document, and evaluate LTD
programs and services based
upon sustainability metrics and
report to the board annually.
22 | P a g e
PC Agenda - Page 31
Eugene Transit Corridor Strategy
4.23.13
Based on expert advice, best practices and the study of other successful communities, the following
outline proposes one possible approach to establishing a well-integrated network of frequent, reliable,
high-capacity transit service in Eugene. The purpose of the outline is to capture ideas from recent
collaboration and begin to formulate a direction for future work. In general, the strategies described
below underscore the need for substantial high-level planning and public engagement to build a bridge
between broad system goals and local, corridor-by-corridor needs and opportunities. This effort will be
led by the City of Eugene in close cooperation with LTD and community partners in preparation for
and/or in support of area planning for specific frequent transit corridors.
Key Strategies:
Incrementally build public awareness of the role of high-capacity transit through:
o Direct and ongoing engagement of residents and business owners along corridors
(listening; defining the problem; asking “what are your needs?”)
o Community-wide education (sharing information; building understanding)
o Increased collaboration with community partners
Consider physical, land use, economic, transportation, social and environmental characteristics
as well as the mobility needs of each corridor
Refine long-term transit service needs, for example desired transit frequency, ridership,
destinations, and how these will change over time, to identify appropriate service types (e.g. bus
plus, BRT) for each corridor within the LTD Frequent Transit Network (FTN)
Develop conceptual right of way designs for frequent transit corridors that address the
following:
o Width and setback of sidewalks
o Types of bicycle facility with dimensions
o Number of travel lanes, turn lanes
o Type of facility for buses including mixed traffic, BAT lanes, dedicated lanes, and queue
jumps
o Location of bus stations – on outside of street or in median, in mixed traffic or dedicated
o Conceptual right of way designs will be refined and developed to a higher level of detail
during planning of individual corridors
Establish Right-of-Way needs for different types of transit service
Provide clear guidance to future projects such as refinement plans, area plans, regulatory
changes, incentives, and public improvements by:
o Defining station community types (e.g. residential communities, employment areas,
retail centers, etc.) and areas of influence (station communities generally include
properties within ¼ mile of a high-capacity transit station)
o Establishing criteria for locating stations within these areas
o Establishing design principles and guidelines for both the public and private realm in
station communities
PC Agenda - Page 32