Planning Commission
Regular MeetingEugene, OR · July 28, 2014
Agenda
AGENDA
Meeting Location:
Sloat Room—Atrium Building
Phone: 541-682-5481 99 W. 10th Avenue
www.eugene-or.gov/pc Eugene, OR 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired,
FM assistive-listening devices are available or an interpreter can be provided with 48 hour notice prior to the
meeting. Spanish-language interpretation will also be provided with 48 hour notice. To arrange for these
services, contact the Planning Division at 541-682-5675.
MONDAY, JULY 28, 2014 – REGULAR MEETING (11:30 a.m. to 1:30 p.m.)
11:30 a.m. I. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for
public comment. The public may comment on any matter, except for items
scheduled for public hearing or public hearing items for which the record has
already closed. Generally, the time limit for public comment is three minutes;
however, the Planning Commission reserves the option to reduce the time allowed
each speaker based on the number of people requesting to speak.
11:40 a.m. II. SOUTH WILLAMETTE SPECIAL AREA ZONE
Staff: Robin Hostick, 541-682-5507
Jennifer Knapp, 541-682-5445
1:15 p.m. III. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
B. Other Items from Commission
C. Learning: How are we doing?
Commissioners: Steven Baker; John Barofsky; Rick Duncan; John Jaworski (Vice-Chair); Jeffery Mills;
Kristen Taylor; William Randall (Chair)
AGENDA ITEM SUMMARY
July 28, 2014
To: Eugene Planning Commission
From: City of Eugene Planning Division
Subject: South Willamette Concept Plan Implementation: Draft Design Code
ISSUE STATEMENT
This work session is a continuation of previous discussions on May 5, May 19, June 2, June 23, July 14
and July 21 regarding the development of the South Willamette Special Area Zone; for additional
background, please see the AIS materials for these dates.
BACKGROUND
Commissioners began a review of code concepts for the proposed South Willamette Special Area Zone
in early May. At this time Commissioners provided input to prioritize more detailed review of several
key topic areas. Previous work sessions addressed the topics of transitions, flexibility, design
standards, and the proposed Single Family Options subdistrict. For additional information on these
discussions, refer to meeting materials for the above-listed dates.
In June, local members of the American Institute of Architects (AIA) performed a “test drive” of
preliminary code language, including case studies of several properties within the district. This is an
example of ongoing collaboration between the City of Eugene and the local AIA membership to further
design excellence in Eugene. John Rowell, principal of Rowell Brokaw Architects, will join the
Commission to provide a summary and discussion of the results.
The remainder of the work session will focus on conceptual standards for street design in the South
Willamette district, including the proposed introduction of a “special setback” on South Willamette and
29th Avenue to ensure that future development will allow room for a safe and attractive pedestrian
environment and on-street parking. These measures are critical for supporting the community’s desire
for walkability and business vitality.
It is important to note that the proposed code concepts are not related to the recent discussion of
travel lanes for the South Willamette Street Improvement Plan. The proposed code sets the stage for a
significantly improved “street-side pedestrian realm” that is designed to work with either a three-lane
or a four-lane configuration on Willamette Street, and does not depend on a particular outcome of the
trial re-striping or subsequent paving project.
Time permitting, staff will also follow up briefly on the South Willamette Special Area Zone Public
Engagement Plan and share preliminary input from the July 15 stakeholder focus group.
PC Agenda - Page 1
As we continue the review process, specific, actionable suggestions will be most useful for staff in
crafting a code that meets the Planning Commission’s expectations.
NEXT STEPS
Following revisions based on Planning Commission review of the code concepts, a draft code will be
introduced for public discussion later this summer and fall. Community outreach will continue
throughout the summer and fall prior to review of the final draft code in the fall. See the Draft Public
Engagement Plan outline for more information.
ATTACHMENTS
A. Street Design Standards – Proposed Concepts
FOR MORE INFORMATION
Robin Hostick at 541-682-5507 or Robin.A.Hostick@ci.eugene.or.us
Jennifer Knapp at 541-682-5445 or Jennifer.L.Knapp@ci.eugene.or.us
PC Agenda - Page 2
South Willamette Special Area Zone – Conceptual Standards and Provisions
“STREETSIDE REALM” DESIGN STANDARDS
July 24, 2014
NOTE: The following concepts address the LONG-TERM vision for streetside realm in the district. These
concepts DO NOT affect the outcome of recent discussion of travel lanes on South Willamette Street (“South
Willamette Street Improvement Plan”); all proposed standards will work with either a 3-lane or 4-lane paving
configuration. Both projects have been closely coordinated to ensure that this is possible. For more
information on the paving project, check the web page for the “South Willamette Street Improvement Plan.”
Options for Addressing Issues
Identified Issues Range of Potential Solutions
The current right of way along South • Purchase additional right of way and construct
Willamette Street and 29th Avenue does not improvements
allow adequate space for amenities • Establish a “special setback” to place future
supporting the vision of a walkable district buildings in the right location for the desired, future
and business vitality. streetside realm within the district.
Current code standards would place future
buildings permanently in locations needed
for streetside realm amenities along South
Willamette Street.
This issue exists on many “key transit
corridors” in Eugene.
No on-street parking is available along South • Purchase additional right of way and construct
Willamette Street within the district. improvements
• Establish a “special setback” to place future
On-street parking strongly supports business buildings in the right location for the desired, future
revenue in a walkable district. streetside realm within the district.
On-street parking is important for buffering
pedestrians from higher-traffic streets and
creating an attractive street-side realm.
There is not sufficient right of way to
provide on-street parking without removing
travel lanes or eliminating needed
pedestrian space.
Current businesses need existing parking • Apply proposed standards only when portions of the
and site improvements; requirements that streetside realm are reconstructed
impact these existing improvements could • Allow owners the option of constructing long-term
be damaging to the businesses. streetside realm improvements, including on-street
parking, at the time of redevelopment
Properties that redevelop (future businesses • If an owner chooses not to construct the long-term
or homes) need a way to create an improvements, the short-term standards apply.
PC Agenda - Page 3
attractive pedestrian realm, including on- • Short-term standards fit within the existing right of
street parking, as an option to support the way and would not impact existing improvements
success of the proposed development. on private property
Current street standards to not adequately • Introduce new standards to reflect the community’s
address the vision for the district. vision for the streetside realm
• Identify streetside realm standards for each street
The streetside character, including type within the district to promote consistency
sidewalks, street trees, on-street parking, • Apply the new standards when portions of the
crosswalks, and other features, are streetside realm are reconstructed
inconsistent throughout the district.
In other districts, envisioned opportunities
for improving the streetside realm have
been lost due to lack of standards.
Property owners and developers need • Apply the new standards only when portions of the
flexibility to make reasonable improvements streetside realm are reconstructed
and changes (short of complete
redevelopment) without triggering the
expense of reconstructing the pedestrian
realm to new standards.
PC Agenda - Page 4
Streetside Realm Design Standards – Proposed Concepts
Topic Current Code Standard Proposal
Special Setback
S-DR • 15’ special setback on either side of South Willamette
• Establishes new rights of way widths to accommodate Street; allows a 10’ sidewalk, 5’ planter strip with street
pedestrian-friendly street design suitable to a mixed use trees, and on-street parking
district • The special setback would allow the existing 60’ right of
• NOTE: the S-DR special area zone covers land with a single- way along South Willamette Street to increase to 90’
owner an no public streets currently in place within the district over time.
th
S-WS • 2’ - 6’ special setback on either side of 29 Avenue;
• Special setback along Franklin Blvd. to accommodate allows 8’ sidewalk and 6’ planter strip with street trees
th
future “multi-way boulevard” according to the vision for • The existing right of way along 29 Avenue varies from
the district 60’ to 70’. The special setback would allow the right of
th
way along 29 Avenue to increase to a consistent 72’
Other zones within the district over time.
• No special setback
• Commercial buildings in C-2 zone required to front the
street-facing property line; in some areas, new buildings
eliminate options for needed, future improvements such
as pedestrian amenities along the street
Streetside Realm S-DR • Proposed design standards require specific features and
Design Standards • Street design standards are provided for new streets dimensions for the streetside realm
within the district, including specific amenities in the • Different standards will apply depending on right of way
streetside realm width and surrounding uses
• The width of planter strips, sidewalks, travel lanes and • NOTE: standards will not specify vehicle travel lane
parking areas are specified configurations (this also applies to South Willamette
Street)
All other zones • Two sets of standards will apply to South Willamette
th
• New development must comply with the standards of the Street and 29 Avenue: 1) short-term standards to
Arterial and Collector Street Plan and the Design Standards address improvements within the existing right of way,
and Guidelines for Eugene Streets, Sidewalks, Bikeways and; 2) long-term standards to address improvements
and Accessways between the existing curb and the special setback
PC Agenda - Page 5
Threshold for new S-DR • Proposed standards apply when new facilities are
standards • N/A. Since all streets will be newly constructed, standards constructed, or when existing facilities are demolished
will apply to all streets in the district. and reconstructed
All other zones
• Standards apply when new facilities are constructed, or
when existing facilities are demolished and reconstructed