Planning Commission
Regular MeetingEugene, OR · June 8, 2015
Agenda
AGENDA
Meeting Location:
Sloat Room—Atrium Building
Phone: 541-682-5481 99 W. 10th Avenue
www.eugene-or.gov/pc Eugene, OR 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired,
FM assistive-listening devices are available or an interpreter can be provided with 48 hour notice prior to the
meeting. Spanish-language interpretation will also be provided with 48 hour notice. To arrange for these
services, contact the Planning Division at 541-682-5675.
MONDAY, JUNE 8, 2015 – REGULAR MEETING (11:30 a.m. to 1:30 p.m.)
11:30 a.m. I. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for
public comment. The public may comment on any matter, except for items
scheduled for public hearing or public hearing items for which the record has
already closed. Generally, the time limit for public comment is three minutes;
however, the Planning Commission reserves the option to reduce the time allowed
each speaker based on the number of people requesting to speak.
11:40 a.m. II. CLEAR LAKE OVERLAY ZONE
Staff: Zach Galloway, 541-682-5485
1:15 p.m. IV. ITEMS FROM COMMISSION AND STAFF
A. Other Items from Staff
B. Other Items from Commission
C. Learning: How are we doing?
Commissioners: Steven Baker; John Barofsky; Rick Duncan; John Jaworski (Vice-Chair); Jeffrey Mills;
Kristen Taylor; William Randall (Chair)
AGENDA ITEM SUMMARY
June 8, 2015
To: Eugene Planning Commission
From: Zach Galloway, City of Eugene Planning Division
Subject: Envision Eugene – Update on the Clear Lake Overlay Zone
ACTION REQUESTED
The Planning Commission will hold a work session to receive an update on the proposed /CL Clear
Lake Overlay Zone and its role in the urban growth boundary (UGB) expansion (See Attachment B for
a map of the study area). No formal action is requested at this time.
BRIEFING STATEMENT
The /CL Clear Lake Overlay zone (Attachment A) is a component of the overall UGB adoption
package. It is a regulatory tool intended to address two issues: (1) the preservation of large
development sites for light-medium industrial and campus employment uses and (2) address
environmental justice-oriented concerns around the siting of additional industrial and employment
uses in an area of existing concentration.
Large Lot Preservation
The state of Oregon requires all local jurisdictions to undertake an Economic Opportunity Analysis
(EOA) as part of a UGB expansion analysis. The EOA identifies competitive advantages and businesses
that are likely to locate in a city, along with the typical site characteristics associated with those
businesses. The site characteristics are an important legal aspect of the City’s reasons for proposing
to add land to the UGB. In the local economic opportunity analysis, one key site characteristic is the
size of the lot available for development. Eugene currently has a deficit of sites over 10 acres in size
to meet the projected 20-year need. The recognized deficit will be remedied by the proposed
expansion, and the various types of business forecast to locate here inform the general site sizes
needed, which range from 10 acres to more than 75 acres. The /CL Overlay zone will protect these
lots from subdivision into smaller lots; moreover, it preserves the necessary supply of lots in the four
site size ranges, as summarized in Table 1., below.
Table 1. Economic Opportunity Analysis’ Large Lot site size ranges and quantity
Site size ranges (acre) Minimum No. of Sites
10-19 4
20-49 2
50-74 3
75 and larger 2
The overlay zone provides a level of certainty that the City will satisfy the large lot demand for 11
development sites, while providing flexibility that allows a property owner to respond to site- or
PC Agenda - Page 1
development-specific needs. The overlay proposes two implementation options. The first is
prescriptive and requires large lots be provided in the physical arrangement depicted on the map in
Attachment A, while the second option offers flexibility to rearrange the needed development sites.
In both cases, the minimum number of large lots within the Clear Lake area must be provided, and a
minimum lot size of 10 acres is established.
Environmental Justice
During the Envision Eugene recommendation process in March 2012, the City Council directed
Planning staff to consider environmental justice (EJ) issues associated with the proposed siting of
residential land uses in the Clear Lake expansion area. Upon further study of potential residential
expansion areas, the Clear Lake area was removed from consideration and proposed instead for
campus employment uses similar to those found in the Chad Drive campus employment area. During
the fall of 2013 and summer of 2014, Planning staff worked with UO graduate students who
conducted planning and land use best practices research and completed an EJ briefing paper which
was shared with interested community members in two focus group meetings, as well as the
Planning Commission. The ‘environmental justice’ banner is broad, and below it there are numerous
subjects to address; therefore, the scope of the /CL Overlay is limited to those factors best addressed
through land use regulations. Other recommendations, such as collaborating with Lane County
Health Department to complete Health Impact Assessments, will occur outside of the regulatory
framework.
The proposed code language incorporates inter-agency coordination efforts with the Lane Regional
Air Protection Agency (LRAPA), increased neighborhood involvement opportunities, and attempts to
avoid potential negative impacts created by future industrial or employment uses. To those ends, the
/CL Overlay requires the following:
All proposed developments in the area must hold a neighborhood meeting.
Performance standards for noise, lighting, separation, and indoor activity are applied in
addition to the base zone standards. Odor and vibration nuisances will also be addressed.
Certain uses must be separated by 1,000 feet from any property planned for school or
residential use.
Certain uses are prohibited due to the high probability of potential hazardous or nuisance
emissions.
INVOLVED PARTIES
Subcommittee
The /CL Overlay has been drafted with the assistance of an 8 member subcommittee.
3 Planning Commissioners
2 Sustainability Commissioners (1 is also a resident of the Bethel neighborhood)
1 Human Rights Commissioner
1 Toxics Board member
1 Beyond Toxics member
In addition to Planning staff, the City’s Toxics Right-to-Know program coordinator also participated.
Agency Coordination
Planning staff has coordinated with the Lane County Public Health Department, Lane Regional Air
Protection Agency, and the City’s Toxics Right-to-Know Program throughout this project. These
PC Agenda - Page 2
agencies have provided valuable data and sources for sound decision making during the code writing
process. Additionally, the Environmental Justice Focus group participants will be provided an
opportunity to review the draft and submit comments prior to its finalization and inclusion in the
UGB adoption package for broad public review.
NEXT STEPS
The /CL overlay is still in development. Planning staff welcomes any ideas, comments, and questions
from the Commission and will work with the Subcommittee to address them. The subcommittee has
met 4 times and will finalize their role in the draft with a concluding meeting later in June. At that
point, the EJ focus group will be asked to review and provide comments. In late June, Planning staff
will hold a community open house in the Bethel neighborhood to discuss the UGB expansion area,
the draft /CL Overlay zone, and next steps for planning in the area. Staff will return to the Planning
Commission with a final draft as a component of the overall UGB adoption package later this
summer.
FOR MORE INFORMATION
Zach Galloway: 541-682-5485, zach.a.galloway@ci.eugene.or.us
ATTACHMENTS
A. DRAFT Clear Lake Overlay Zone: Version 5 (June 1, 2015)
B. Map of proposed UGB expansion area
PC Agenda - Page 3
Attachment A
/CL Clear Lake Overlay Zone
GENERAL
9.4150 Purpose of /CL Clear Lake Overlay Zone.
The /CL Clear Lake Overlay Zone is intended to provide and protect the City’s large-lot [>10
acres] industrial portfolio and ensure future development fulfills the community’s desired
outcomes for economic prosperity and increased employment opportunities, while addressing
environmental justice concerns. The /CL Overlay implements supporting comprehensive plan
policies that call for fairness and equity in achieving a healthy environment, vibrant community,
and improved quality of life for surrounding neighborhoods. In addition to the permitted uses in
the base zone, future development in the Clear Lake Area should build upon Eugene’s
competitive advantages and recognize the community’s values around climate change,
sustainability, local food systems, and natural resources.
9.4155 Applicability.
The /CL overlay zone applies to all property to which the /CL Clear Lake Overlay Zone has been
applied through the city’s rezoning process. The provisions of the /CL overlay zone supplement
those of the applicable base zone. Where the overlay zone and base zone provisions conflict,
the requirements of this overlay apply.
9.4160 Siting Requirements.
If consistent with the approval criteria in EC 9.8865 Zone Change Approval Criteria, the /CL
overlay zone may be applied to the area depicted as Light-Medium Industrial and Campus
Industrial in Figure 9.4165. Clear Lake Area.
LAND USE, DEVELOPMENT STANDARDS, AND PERMIT REQUIREMENTS
9.4165 Large-Lot Portfolio – Development and Site Needs
(1) Minimum lot size. Lands covered by the Clear Lake Overlay shall not be subdivided to
create lots that are less than 10 acres.
The following sections (2) and (3) shall be implemented through the EC 9.8210 Partitions or
EC 9.8510 Subdivision application processes. In addition to the General Approval criteria of
each section, the follow large lot portfolio standards are applicable.
(2) Prescriptive option [CONCEPT: DO WHAT THE MAP SHOWS]. Development proposals
shall subdivide and develop lots consistent with the development site size ranges depicted
in Figure 9.4165. Clear Lake Area – Sub-Areas and Large Lot Portfolio. The designated
sites follow tax lot lines, public rights-of-way, and natural drainage features to the the
greatest degree practicable.
(a) Development has flexibility to provide lots within the designated size range, as listed in
Table 9.4165(2). The required site size range may preclude further lot division.
(b) Sites designated for a particular range – A through D in Table 9.4165(2) – must provide
at least 1 lot within the size range. Additional lots may be created in accordance with the
minimum lot size standard in section (1), above.
2015-05-15 -1- DRAFT_CLOverlay_V4
PC Agenda - Page 4
Attachment A
/CL Clear Lake Overlay Zone
Table 9.4165(2). Large Lot Portfolio – Development site needs
Site size ranges (acre) Minimum No. of Sites
A. 10-19 4
B. 20-49 2
C. 50-74 3
D. 75 and larger 2
(3) Flexible option [CONCEPT: MOVE THE PUZZLE PIECES AROUND]. As an alternative to
subsection (2), development proposals within one of the sub-areas depicted in Figure
9.4165. Clear Lake Area – Sub-Areas and Large Lot Portfolio may alter the prescriptive
physical arrangement of lots in that sub-area, pursuant to the following criteria:
(a) The minimum lot size of subsection (1) remains applicable.
(b) All proposed lots must fall within the site size ranges listed in Table 9.4165(3).
(c) The proposal demonstrates that it advances the City’s goal to provide the minimum
number of large lots within a subarea and does not preclude the ability of adjacent
parcels to subdivide, as provided in Table 9.4165(3).
Table 9.4165(3). Large Lot Portfolio – Minimum development site needs by sub-area
Minimum No. of Sites per Site size range
Sub-area A. 10-19 B. 20-49 C. 50-74 D. 75 and larger
North --- 1 --- 1
Central 2 --- 2 1
South 2 1 1 ---
(4) Reducing minimum lot size. Once the minimum number of lots required within the
particular sub-area (Figure 9.4165) has been provided, an applicant may use this option to
subdivide below the 10 acre minimum, thereby reverting to the base zone standard.
Applicants shall demonstrate that the minimum number of sites within the Large Lot Portfolio
have been provided in order to justify the subdivision.
9.4170 Special Application and Development Standards
(1) Application Requirements. In addition to standard required application material, an
applicant shall address the following criteria:
(a) Demonstrate that the Lane Regional Air Protection Agency (LRAPA) has reviewed the
proposal and issued a pre-clearance letter that confirms the proposed use and
associated operations are in compliance or have the ability to meet air quality standards
with appropriate mitigation measures. The LRAPA pre-clearance letter does not
constitute formal approval of the use by either LRAPA or the City of Eugene.
(2) Development Standards. In addition to the development standards of the applicable
Employment and Industrial base zones, developments within the Clear Lake overlay shall
adhere to the provisions marked therein and described in subsection (a) through (d), below.
(a) Neighborhood Meeting. All applicants covered by the /CL Clear Lake Overlay shall
convene a neighborhood meeting in accordance with the process described in EC
2015-05-15 -2- DRAFT_CLOverlay_V4
PC Agenda - Page 5
Attachment A
/CL Clear Lake Overlay Zone
9.7007. In addition to the procedural requirements of EC 9.7007, applicants shall provide
notice of the meeting to the Lane Regional Air Protection Agency, Lane County Public
Health Department, and the City’s Toxics Right-to-Know program.
(b) Performance Standards. The following performance standards are applicable to all
development within the Clear Lake Overlay. Applicants shall demonstrate at the time of
submittal how a proposed use complies with each City standard.
1. Noise. The proposed use shall adhere to the Environmental Noise Disturbance
standards in EC 6.750. In addition to the standards therein, measurements of the 60
dBA limitation shall also be applicable to property lines of adjacent, affected public
lands (e.g., schools, public parks).
2. Lighting. The proposed use shall adhere to the Outdoor Lighting standards in EC
9.6725.
3. Stormwater. The proposed use shall adhere to the Stormwater standards in EC
9.6790 through 9.6797. This standard is not eligible for adjustment.
4. Indoor Activity. Manufacturing operations of the proposed use shall be conducted
indoors on lots located south of Clear Lake Road.
5. Odors. Emission of smoke, dust, fumes, vapors, odors, or gases shall not be
noticeable at the property line by a human observer relying on human senses without
the aid of a device. Water vapor (i.e., steam) is exempt. (Additionally, the permit
requirements of the State and/ or LRAPA remain applicable.)
6. Vibration. Uses shall be operated so that any generated ground vibrations –
continuous or recurrent – are not perceptible, without instruments, at any point along
the property boundary in which the use is located.
(c) Separation. The permitted uses in Table 9.4170(2) shall not be located within 1,000 feet
of properties planned for schools or residential use.
Table 9.4170(2). Permitted Uses affected by Separation requirement
Manufacturing (Includes processing, assembling, packaging, and repairing)
Concrete Mixing and Batching
Metal Products Fabrication, machine/welding shops (no blast furnaces)
Motor Vehicles and Transportation Equipment
Paints and Allied Products
Paper and Allied Products (excludes mills converting raw material, i.e. pulp, to paper)
Recycling – composting, facilities requiring DEQ permit
Motor Vehicle Related Uses
Service Station, includes quick servicing
Trucking Terminal
Trade (Retail and Wholesale)
Wholesale, Warehousing, and Distribution
(3) Prohibited Uses. The uses in Table 9.4170(3) are not permitted within the area covered by
the Clear Lake Overlay zone. The prohibited uses are not eligible for adjustment in EC
9.4175.
Table 9.4170(3). Uses Prohibited in the Clear Lake Overlay Zone
2015-05-15 -3- DRAFT_CLOverlay_V4
PC Agenda - Page 6
Attachment A
/CL Clear Lake Overlay Zone
Agricultural, Resource Production and Extraction
Mineral Resource Mining, Recovery, Stockpiling, Processing (excluding smelter or ore
reduction)
Entertainment and Recreation
Race Track, including drag strip and go-cart tracks
Manufacturing (Includes processing, assembling, packaging, and repairing)
Asphalt Mixing and Batching
Chemical products (includes synthetic fertilizers)
Cleaning and Dyeing Plant
Concrete, Gypsum, and Plaster Products
Chrome and Nickel plating
Manufactured and mobile homes
Petroleum/ Fuel refining and re-refining
Paper mill (conversion of raw material, i.e. pulp, to paper)
Reconstituted Wood Products
Recreational vehicles
Wood Preservation
Co-generation Plant/ Bio-mass
Rubber and Plastic Products (includes tire manufacturing and re-tread operations)
Medical, Health, and Correctional Services
Correctional Facility, excluding Residential Treatment Center
Personal Services
Dry Cleaner
Utilities and Communication
Wastewater (sewer) treatment facility
Other Commercial Services
Garbage Dump, Sanitary Land Fill
9.4175 Adjustments
Adjustments to the standards of EC 9.4170(2)(b) and (c) in this section may be made based on
criteria at EC 9.8030(36) /CL Clear Lake Overlay Zone.
[***SUBCOMMITTEE: See page 7 for the draft criteria***]
2015-05-15 -4- DRAFT_CLOverlay_V4
PC Agenda - Page 7
Attachment A
/CL Clear Lake Overlay Zone
Figure 9.4165. Clear Lake Area – Sub-Areas and Large Lot Portfolio
FIGURE KEY
Site size ranges (acre)
A: 10-19
B: 20-49
C: 50-74
D: 75 and larger
2015-05-15 -5- DRAFT_CLOverlay_V4
PC Agenda - Page 8
Attachment A
/CL Clear Lake Overlay Zone
OTHER CODE AMENDMENTS IN THIS AMENDMENT PACKAGE
Review and likely strike 5 acre maximum area for I-2 zone siting requirements. Review
‘floating zone’ concepts in prior Code and any Metro Plan enabling language, then
determine if they remain applicable.
+++++++++++++
Insert change to EC 9.1040
+++++++++++++
9.2450 Employment and Industrial Zone Land Use and Permit Requirements. The
following Table 9.2450 Employment and Industrial Zone Land Use and Permit
Requirements identifies those uses in the Employment and Industrial Zones that
are:
(P) Permitted.
…
Table 9.2450 Employment and Industrial Zone Land Use and Permit Requirements
E-1 E-2 I-2 I-3
Accessory Uses
Accessory Uses. Examples include administration P P P P
offices, and storage and distribution incidental to the
primary use of the site.
Agricultural, Resource Production and Extraction
Horticultural Uses. Examples include field crops, P P P P
orchards, berries, and nursery or flower stock.
+++++++++++++
9.7007 Neighborhood/Applicant Meetings.
(1) This section applies to the following types of land use applications:
(a) Type II: 3-lot partitions, tentative subdivisions, tentative cluster
subdivisions and design reviews;
(b) Type III: Only conditional use permits and tentative planned unit
developments;
(c) Type IV applications that are not city-initiated;
(d) Metro Plan amendments that are not city-initiated.
(e) All development proposal within the /CL Clear Lake Overlay zone.
+++++++++++++
Insert change to Table 9.7820 Equivalent Zones and Overlay Zones
+++++++++++++
9.8030 Adjustment Review - Approval Criteria. The planning director shall approve,
conditionally approve, or deny an adjustment review application. Approval or
2015-05-15 -6- DRAFT_CLOverlay_V4
PC Agenda - Page 9
Attachment A
/CL Clear Lake Overlay Zone
conditional approval shall be based on compliance with the following applicable
criteria.
…
(36) /CL Clear Lake Overlay Zone. Where this land use code provides that the
performance standards of the /CL overlay zone may be adjusted, the
adjustment request shall be granted upon demonstration by the applicant that
the alternative approach is consistent with the applicable corresponding
criteria, as follows:
(a) Development will improve public access to open space and restore
ecological functions of natural resources on-site.
(b) The proposed use advances the City’s goals for increased employment
opportunities by exceeding an average of 10 employees per acre.
(c) Development is consistent with local and regional economic development
goals (i.e., it is one of the targeted industries from the EOA (2014) or
Regional Prosperity Plan (2010)).
(d) Demonstrate the resulting development impacts will have negligible
effects on the surrounding residents, school, and park users and explain
how alternative mitigation measures will offset the non-compliance.
+++++++++++++
Insert cross-references + changes to EC 9.8215/ 8220 Partitions, EC 9.8415 Property Line
Adjustment, EC 9.8515/ 8520 Subdivision, and EC 9.8855/ 8865 Zone Change.
+++++++++++++
2015-05-15 -7- DRAFT_CLOverlay_V4
PC Agenda - Page 10
Clear Lake Area: Recommended UGB Expansion
Attachment B
Hollis Ln Brown Ln Prairie Rd
Awbrey Ln
Eugene
UGB
Link Rd
Green Hill Rd
Northrop Dr
Light-Medium
Industrial
Ln
No
rth
rop
Airport
Lockheed Dr
Monya Ln
ction Ct
Au
Northop Dr
ay
nW
ctio
Au
Woodruff St
E Enid Rd
Douglas Dr Prairi
e Rd
W Enid Rd
Airport Rd !!! Hallett St
Old Airport Rd !
!
!
! !! ! Kelso St
!!! Zumwalt St
e
o Av
Airport Rd Cl e
Carol Ave Leda Way
Cecil Ave
!
(99N
Terry St. Ext. (Conceptual)
Kokkeler Rd Light-Medium
Industrial
Gent Rd
O v e r l a y !!!
uality
Water Q !!! !
! !
! !! !
Clear Lake Rd Irving Rd
!
!! !
! !
! !!!
!!! Campus Industrial
Theona Ext. (Conceptual)
Theona Dr
Green Hill Rd
Government
& Education
Parks &
e
Current Eugene Urban Growth Boundary (UGB) Open Space el
tl i n
B
Proposed Clear Lake Rd UGB Expansion Area Wilbur Ave
pe
McDougal Ln
Pa Ashley Ln
Light-Medium Industrial (LMI) designation Water Quality Overlay
Randy
Elizabeth St
Arnold Ave
Jessen Dr Jessen Dr
Campus Industrial designation
N Te r r y S t
Green Hill Rd
Jessen Dr
Rosebay St
on North Way
Wisconsin St
Dakota St
ev
Commercial designation
Melrose Lp
Minnesota St
Sugarpine Cir Tr
Ohio St
W Irwin Way
l a re y St
Devos St
St
C ubi t N C
E Irwin Way Noah St
tivy Ave
Mangan St
C oe
Government & Education designation
St
Cody Ave
Parks & Open Space designation Proposed UGB Expansion Acreage 1 inch = 425 feet
Light Medium Ind 520
Water Quality Overlay
Stormwater Conveyance channels
Campus Ind 127
Commercial 001
Golden Gardens 222
I
Notes: This map is based on
imprecise source data, subject to
Bethel Schools 054 change, and for general reference
only. This illustration is created to
inform discussion within the scope of
N'hood Commercial
!!
Water Bodies TOTAL 924
the Envision Eugene project.
!
!!
! !! !
!!
Data Sources: City of Eugene, Lane County, RLID, Air photo 2013 Name: 14-12-05_Clear_Lake_RECOMMENDATION_No_City_Limit
Date Saved: 12/5/2014
PC Agenda - Page 11
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.