Planning Commission
Regular MeetingEugene, OR · April 17, 2017
Agenda
AGENDA
Meeting Location:
Sloat Room—Atrium Building
Phone: 541-682-5481 99 W. 10th Avenue
www.eugene-or.gov/pc Eugene, Oregon 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired,
FM assistive-listening devices are available or an interpreter can be provided with 48 hour notice prior to the
meeting. Spanish-language interpretation will also be provided with 48 hour notice. To arrange for these
services, contact the Planning Division at 541-682-5675.
MONDAY, APRIL 17, 2017 – REGULAR MEETING (11:30 a.m.)
I. PUBLIC COMMENT 11:30 AM
The Planning Commission reserves 10 minutes at the beginning of this meeting for public
comment. The public may comment on any matter, except for items scheduled for public
hearing or public hearing items for which the record has already closed. Generally, the time
limit for public comment is three minutes; however, the Planning Commission reserves the
option to reduce the time allowed each speaker based on the number of people requesting to
speak.
II. ITEMS FROM COMMISSION AND STAFF 11:40 AM
A. Other Items from Commission
B. Other Items from Staff
C. Learning: How are we doing?
III. WORK SESSION: ENVISION EUGENE- URBAN GROWTH BOUNDARY PROPOSAL
DELIBERATIONS (2 of 3) Including the Clear Lake Overlay Zone 12:00 PM
Lead Staff: Terri Harding, 541-682-5635
terri.l.harding@ci.eugene.or.us
Commissioners: Steven Baker; John Barofsky (Vice Chair); John Jaworski; Jeffrey Mills; Brianna
Nicolello; William Randall; Kristen Taylor (Chair)
.
AGENDA ITEM SUMMARY
April 17, 2017
To: Eugene Planning Commission
From: Terri Harding and Heather O’Donnell, City of Eugene Planning Division
Subject: Envision Eugene: Urban Growth Boundary Proposal Deliberations
Clear Lake Overlay Zone
ISSUE STATEMENT
Eugene is preparing to adopt a new Urban Growth Boundary (UGB) following several years of
community work and technical analysis. The Eugene and Lane County Planning Commissions held
a public hearing on the UGB adoption package on March 7. On April 10, the Eugene Planning
Commission began its deliberations on the proposal. On April 17, the meeting will be devoted
mostly to the topic of the Clear Lake overlay zone proposed to be applied in the Clear Lake
expansion area (Attachment A). Their deliberations are anticipated to conclude on April 24.
BACKGROUND
The UGB adoption package is made up of two main components: a jobs, parks and schools
package, and a residential package. Each Planning Commissioner was provided a binder
containing the draft UGB adoption package materials from January 2017 and February 2017
updates, which are available online at http://www.eugene-or.gov/2987/Adopting-Our-
Urban-Growth-Boundary.
Public testimony received through the close of the Planning Commission’s record can be found
here https://www.eugene-or.gov/DocumentCenter/View/31250. Verbal testimony can be
viewed by watching the March 7 Planning Commission webcast here:
http://eugene.ompnetwork.org/.
Public Testimony, Planning Commissioner Questions, and Staff Responses
Attachment F to the April 10 Planning Commission packet describes the main themes raised
in public testimony and in questions from the Planning Commissions during their work
sessions and after the public hearing. The memo includes staff responses to the main themes
and questions, including those related to the future regulation of development in the Clear
Lake expansion area.
Staff have prepared revisions to the proposed Clear Lake Overlay Zone (/CL) to address
issues raised in public testimony (Attachment A). Staff will walk through the changes at the
meeting. The previous version of the Clear Lake Overlay Zone is attached as Attachment B.
Deliberations Process
The meeting of April 17 will begin with the Clear Lake expansion area, in particular issues and
changes to the draft Clear Lake Overlay Zone (/CL). Any remaining time will be used to pick up
Page 1
.
where the April 10 meeting left off, with the parks expansion study. Eugene Planning
Commission deliberations will conclude with a recommendation to the City Council on April 24.
Lane County’s Planning Commission is scheduled to deliberate and form their recommendations
on May 2.
NEXT STEPS
Each Planning Commission will hold its own deliberation meetings and form separate
recommendations to their respective elected bodies. The Eugene City Council and Lane
County Board of Commissioners will hold work sessions, a public hearing, and deliberations
to consider the Planning Commissions’ recommendations beginning in May.
ATTACHMENTS
A. Staff Proposed Revisions to Clear Lake Overlay Zone (April 2017)
B. Previous Clear Lake Overlay Zone (February 2017)
FOR MORE INFORMATION
Contact Terri Harding at 541-682-5635, terri.l.harding@ci.eugene.or.us
Heather O’Donnell, 541-682-5488, heather.m.o’donnell@ci.eugene.or.us
Page 2
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
● Sections 9.4150 through 9.4170 are added to the Eugene Code, 1971,
to provide as follows:
9.4150 Purpose of /CL Clear Lake Overlay Zone. The /CL Clear Lake Overlay Zone is
intended to provide and protect the City’s large-lot industrial portfolio in the
Clear Lake expansion area. A minimum of eleven large lots of various sizes
(10-20, 20-50, 50-75, and greater than 75 acres) will be provided as a means to
ensure future development fulfills the community’s desired outcomes for
economic prosperity and increased employment opportunities, while
addressing environmental justice concerns. The /CL Overlay implements
supporting comprehensive plan policies that call for fairness and equity in
achieving a healthy environment, vibrant community, and improved quality of
life for surrounding neighborhoods. To this end, the /CL Overlay regulations
identify certain uses that are restricted or prohibited. These prohibitions and
restrictions are intended to avoid incompatibilities between odorous
emissions or particulate discharges and nearby residences, schools, or parks.
In addition to the permitted uses in the base zone, future development in the
Clear Lake area is encouraged to build upon Eugene’s competitive advantages
and recognize the community’s values around climate change, sustainability,
local food systems, and natural resources.
9.4155 /CL Clear Lake Overlay Zone Applicability. EC 9.4150 through EC 9.4175 apply
to all property to which the /CL Clear Lake Overlay Zone has been applied
through the city’s rezoning process. The provisions of the /CL Clear Lake
Overlay Zone supplement those of the applicable base zone. Where the
overlay zone and base zone provisions conflict, the requirements of this
overlay shall apply.
9.4160 /CL Clear Lake Overlay Zone Siting Requirements. When consistent with the
approval criteria in EC 9.8865 Zone Change Approval Criteria, the /CL Clear
Lake Overlay Zone shall be applied only to the area depicted on Figure 9.4160
Clear Lake Area Overlay Zone.
9.4165 /CL Clear Lake Overlay Zone Special Application and Development Standards
(1) Application Requirements. In addition to standard required application
materials, a development permit proposing a new building, change of
use, additional use, or building expansion that exceeds 25 percent of the
existing building square footage on the development site or a land use
application (except a Type I application described at EC 9.7105) shall
include the following additional application material at the time of
submittal:
(a) Demonstration of compliance with EC 9.7007
Neighborhood/Applicant Meetings. Developments that require
multiple applications may convene a single neighborhood/
applicant meeting to address all materials; and
Page 1 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 3
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
(b) Except for land use applications, a pre-clearance letter issued by
the Lane Regional Air Protection Agency (LRAPA) confirming that
the proposed use and associated operations have the ability to
meet air quality standards with appropriate control technologies
and mitigation measures. The LRAPA pre-clearance letter does not
constitute formal approval of the use by either LRAPA or the City
of Eugene.
(2) Development Standards. In addition to the development standards of
the applicable base and overlay zones, a development permit for any use
other than agriculture, horticulture, or residential use proposing a new
building, change of use, additional use, or building expansion that
exceeds 25 percent of the existing building square footage on the
development site or a land use application (except a Type I application
described at EC 9.7105) shall demonstrate compliance with the following
standards at the time of application submittal.
(a) Single Business Operation. Development shall be limited to a
single business operation per tax lot as shown on Figure 9.4170 or
subsequently created as permitted by the lot standards in EC
9.4170.
(b) Lighting. The proposed use shall comply with the Outdoor
Lighting standards in EC 9.6725.
(c) Indoor Activity. For development located south of Clear Lake Road
only, manufacturing operations of the proposed use shall be
conducted indoors.
(d) Separation. The following uses shall be located at least 1,000 feet
from the abutting property line of a parcel that is designated in the
comprehensive plan as Government and Education, Parks and
Open Space, or Residential (except property lines of parcels owned
by the City of Eugene Airport):
1. Concrete mixing and batching.
2. Manufactured and mobile homes manufacturer.
3. Metal products fabrication, machine/welding shops (no blast
furnaces).
4. Motor vehicles and transportation equipment manufacturer.
5. Paints and allied products manufacturer
6. Paper and allied products (not including mills converting raw
material, i.e., pulp to paper).
7. Recreational vehicles manufacturer.
8. Recycling – composting, facilities requiring DEQ permit.
9. Service station, includes quick servicing.
10. Trucking terminal.
11. Wholesale, warehousing, and distribution (unless provided in
association with a business in one of Eugene’s targeted
industries as identified in the Envision Eugene
Comprehensive Plan, such as food and beverage
manufacturing).
(3) Performance Standards. In addition to the development standards of the
applicable base and overlay zones, a development permit proposing a
new building, change of use, additional use, or building expansion that
Page 2 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 4
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
exceeds 25 percent of the existing building square footage on the
development site or a land use application (except a Type I application
described at EC 9.7105) shall provide a statement on the application
plans committing the applicant to compliance with the following
performance standards during operation:
(a) Odors and Emissions. Emission of smoke, dust, fumes, odors, or
gases associated with the proposed use are not noticeable at the
property line by a human observer relying on human senses
without the aid of a device. Additionally, the permit requirements
of the State and/ or LRAPA remain applicable.
(b) Vibration. Uses are operated so that any generated ground
vibrations – continuous or recurrent – are not perceptible, without
instruments, at any point along the property boundary within which
the proposed use is located.
(c) Noise. The proposed use shall comply with the Environmental
Noise Disturbance standards in EC 6.750. In addition to the
standards therein, measurements of the 60 dBA limitation shall
also be applicable along property lines of adjacent, affected public
lands (i.e., schools, public parks).
(4) Prohibited Uses in the /CL Clear Lake Overlay Zone. The following uses
are prohibited within the /CL Clear Lake Overlay zone:
(a) Asphalt mixing and batching.
(b) Chemical products manufacturer (includes synthetic fertilizers).
(c) Chrome and nickel plating.
(d) Cleaning and dyeing plant.
(e) Correctional facility, excluding residential treatment center.
(f) Concrete, gypsum, and plaster products manufacturer.
(g) Dry cleaner.
(h) Garbage dump, sanitary land fill.
(i) Mineral resource mining, recovery, stockpiling, processing
(including smelter or ore reduction).
(j) Paper mill (conversion of raw material, i.e., pulp to paper).
(k) Petroleum/fuel refining and re-refining.
(l) Race track, including drag strip and go-cart tracks (not including
indoor uses).
(m) Reconstituted wood products manufacturer.
(n) Rubber and plastic products manufacturer (includes tire
manufacturing and re-tread operations).
(o) Wood preservation.
(p) Wood biomass-fueled cogeneration facility.
(q) Wastewater (sewer) treatment facility (not including industrial pre-
treatment facilities).
(5) Adjustment Review.
(a) The standards at EC 9.4165(2) through (3) may be adjusted in
accordance with EC 9.8030(36).
(b) Even if adjustment would be allowed in the base zone, the
stormwater standards in EC 9.6790 through 9.6797 are not eligible
for adjustment in the /CL Clear Lake Overlay Zone.
Page 3 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 5
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
9.4170 /CL Clear Lake Overlay Zone Lot Standards.
(1) Industrial Site Portfolio Attainment. The area subject to the /CL Clear
Lake Overlay Zone is included in the urban growth boundary for the
purpose of meeting Eugene’s long-term need for a specific number of
large industrial sites in specific size ranges. This need, referred to as the
“Large Lot Portfolio” in the Envision Eugene Comprehensive Plan, is
identified in Table 9.4170(1) Clear Lake Area: Large Lot Portfolio – Lot
Size Ranges, below. The lot standards in this section are intended to
preserve the ability of this area to meet the portfolio of needed sites
identified in Figure 9.4170 Clear Lake Area – Large Lot Portfolio.
Table 9.4170(1) Clear Lake Area: Large Lot Portfolio – Lot Size Ranges
Large Lot Category
(See Figure 9.4170) Lot Size Range (Acres)
A 10 to 19
B 20 to 49
C 50 to 74
D 75 or greater
(2) Tax lots in existence as of January 1, 2017 that are less than 10 acres in
size and do not meet an identified portfolio need (identified in Figure
9.4170 as “S-#”) are not subject to additional lot size requirements that
apply to other tax lots as identified below.
(3) Tax lots in existence as of January 1, 2017 that meet an identified
portfolio need (identified in Figure 9.4170 as A, B, C, or D) are prohibited
from land division with the exception of the tax lot shown as C-2/A-1,
which is divided by a utility tax lot (S-4), and may partition only along
those existing tax lot lines. Portfolio tax lots may pursue a property line
adjustment, so long as the property line adjustment does not reduce
either tax lot below its needed portfolio acreage (identified in Table
9.4170) of contiguous unconstrained land or result in an adjusted lot
reduced to less than 10 acres in size. Unconstrained land is defined as
land that is free from: slopes in excess of 5%, the Special Flood Hazard
Area (i.e. FEMA mapped 100-year floodplain), Goal 5 protected areas,
wetlands without a fill permit, or overlay zones that prohibit
development such as the /WQ Water Quality Overlay Zone.
(4) Tax lots in existence as of January 1, 2017 that are not expected to
contribute to the large lot portfolio need due to existing natural
constraints and future transportation corridors (identified in Figure
9.4170 as *) may pursue property line adjustments so long as the
adjusted lots are no less than 10 acres in size.
(5) Tax lots in existence as of January 1, 2017 bisected by future street
extensions will be eligible to pursue a partition along the right of way
when right of way is established, provided that the partition does not
result in any new lot of less than 10 acres in size.
Page 4 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 6
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
Page 5 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 7
.
Attachment A
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
Figure Key
Large Lot Category Lot Size Range (Acres)
A 10 to 19
B 20 to 49
C 50 to 74
D 75 or greater
S Less than 10
* Non-portfolio site
● Figure 9.4160 Clear Lake Overlay Area is added to the Eugene Code,
1971, as shown on Attachment 1 to this Exhibit.
Page 6 of 6 APRIL 2017 DRAFT
{00175259;13 }
Page 8
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
● Sections 9.4150 through 9.4170 are added to the Eugene Code, 1971,
to provide as follows:
9.4150 Purpose of /CL Clear Lake Overlay Zone. The /CL Clear Lake Overlay Zone is
intended to provide and protect the City’s large-lot industrial portfolio in the
Clear Lake expansion area. A minimum of eleven large lots of various sizes
(10-20, 20-50, 50-75, and greater than 75 acres) will be provided as a means to
ensure future development fulfills the community’s desired outcomes for
economic prosperity and increased employment opportunities, while
addressing environmental justice concerns. The /CL Overlay implements
supporting comprehensive plan policies that call for fairness and equity in
achieving a healthy environment, vibrant community, and improved quality of
life for surrounding neighborhoods. To this end, the /CL Overlay regulations
identify certain uses that are restricted or prohibited. These prohibitions and
restrictions are intended to avoid incompatibilities between odorous
emissions or particulate discharges and nearby residences, schools, or parks.
In addition to the permitted uses in the base zone, future development in the
Clear Lake area is encouraged to build upon Eugene’s competitive advantages
and recognize the community’s values around climate change, sustainability,
local food systems, and natural resources.
9.4155 /CL Clear Lake Overlay Zone Applicability. EC 9.4150 through EC 9.4175 apply
to all property to which the /CL Clear Lake Overlay Zone has been applied
through the city’s rezoning process. The provisions of the /CL Clear Lake
Overlay Zone supplement those of the applicable base zone. Where the
overlay zone and base zone provisions conflict, the requirements of this
overlay shall apply.
9.4160 /CL Clear Lake Overlay Zone Siting Requirements. When consistent with the
approval criteria in EC 9.8865 Zone Change Approval Criteria, the /CL Clear
Lake Overlay Zone shall be applied only to the area depicted on Figure 9.4160
Clear Lake Area Overlay Zone.
9.4165 /CL Clear Lake Overlay Zone Special Application and Development Standards
(1) Application Requirements. In addition to standard required application
materials, a development permit proposing a new building, change of
use, or a building expansion that exceeds 25 percent of the existing
building square footage on the development site or a land use
application (except a Type I application described at EC 9.7105) shall
include the following additional application material at the time of
submittal:
(a) Demonstration of compliance with EC 9.7007
Neighborhood/Applicant Meetings. Developments that require
multiple applications may convene a single neighborhood/
applicant meeting to address all materials; and
(b) Except for land use applications, a pre-clearance letter issued by
the Lane Regional Air Protection Agency (LRAPA) confirming that
the proposed use and associated operations have the ability to
Page 1 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 9
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
meet air quality standards with appropriate control technologies
and mitigation measures. The LRAPA pre-clearance letter does not
constitute formal approval of the use by either LRAPA or the City
of Eugene.
(2) Development Standards. In addition to the development standards of
the applicable base and overlay zones, a development permit proposing
a new building, change of use, or a building expansion that exceeds 25
percent of the existing building square footage on the development site
or a land use application (except a Type I application described at EC
9.7105) shall demonstrate compliance with the following standards at
the time of application submittal.
(a) Lighting. The proposed use shall comply with the Outdoor
Lighting standards in EC 9.6725.
(b) Indoor Activity. For development located south of Clear Lake Road
only, manufacturing operations of the proposed use shall be
conducted indoors.
(c) Separation. The following uses shall be located at least 1,000 feet
from the abutting property line of a parcel that is in residential or
public use or a parcel that is designated in the comprehensive plan
as Government and Education, Parks and Open Space, or
Residential:
1. Concrete mixing and batching.
2. Manufactured and mobile homes manufacturer.
3. Metal products fabrication, machine/welding shops (no blast
furnaces).
4. Motor vehicles and transportation equipment manufacturer.
5. Paints and allied products manufacturer
6. Paper and allied products (not including mills converting raw
material, i.e., pulp to paper).
7. Recreational vehicles manufacturer.
8. Recycling – composting, facilities requiring DEQ permit.
9. Service station, includes quick servicing.
10. Trucking terminal.
11. Wholesale, warehousing, and distribution.
(3) Performance Standards. In addition to the development standards of the
applicable base and overlay zones, a development permit proposing a
new building, change of use, or a building expansion that exceeds 25
percent of the existing building square footage on the development site
or a land use application (except a Type I application described at EC
9.7105) shall provide a statement on the application plans committing
the applicant to compliance with the following performance standards
during operation:
(a) Odors and Emissions. Emission of smoke, dust, fumes, odors, or
gases associated with the proposed use are not noticeable at the
property line by a human observer relying on human senses
without the aid of a device. Additionally, the permit requirements
of the State and/ or LRAPA remain applicable.
(b) Vibration. Uses are operated so that any generated ground
vibrations – continuous or recurrent – are not perceptible, without
Page 2 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 10
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
instruments, at any point along the property boundary within which
the proposed use is located.
(c) Noise. The proposed use shall comply with the Environmental
Noise Disturbance standards in EC 6.750. In addition to the
standards therein, measurements of the 60 dBA limitation shall
also be applicable along property lines of adjacent, affected public
lands (i.e., schools, public parks).
(4) Prohibited Uses in the /CL Clear Lake Overlay Zone. The following uses
are prohibited within the /CL Clear Lake Overlay zone:
(a) Asphalt mixing and batching.
(b) Chemical products manufacturer (includes synthetic fertilizers).
(c) Chrome and nickel plating.
(d) Cleaning and dyeing plant.
(e) Correctional facility, excluding residential treatment center.
(f) Concrete, gypsum, and plaster products manufacturer.
(g) Dry cleaner.
(h) Garbage dump, sanitary land fill.
(i) Mineral resource mining, recovery, stockpiling, processing
(including smelter or ore reduction).
(j) Paper mill (conversion of raw material, i.e., pulp to paper).
(k) Petroleum/fuel refining and re-refining.
(l) Race track, including drag strip and go-cart tracks (not including
indoor uses).
(m) Reconstituted wood products manufacturer.
(n) Rubber and plastic products manufacturer (includes tire
manufacturing and re-tread operations).
(o) Wood preservation.
(p) Wood biomass-fueled cogeneration facility.
(q) Wastewater (sewer) treatment facility (not including industrial pre-
treatment facilities).
(5) Adjustment Review.
(a) The standards at EC 9.4165(2) through (3) may be adjusted in
accordance with EC 9.8030(36).
(b) Even if adjustment would be allowed in the base zone, the
stormwater standards in EC 9.6790 through 9.6797 are not eligible
for adjustment in the /CL Clear Lake Overlay Zone.
9.4170 /CL Clear Lake Overlay Zone Land Division Requirements and Lot Standards.
(1) Land Division.
(a) Land division or property line adjustment approval may be
required to create lots that are consistent with the city’s large lot
portfolio, as defined in the city’s Economic Opportunity Analysis.
Partition approval is subject to the applicable provisions of EC
9.8200 through EC 9.8245, property line adjustment approval is
subject to the applicable provisions of EC 9.8400 through EC
9.8420, and subdivision approval is subject to the applicable
provisions of EC 9.8500 through EC 9.8580. To create the larger
lots in the portfolio, applications are exempt from the property line
adjustment application requirement of EC 9.8405(1)(c).
Page 3 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 11
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
(b) In lieu of compliance with the lot standards applicable to the base
zone at EC 9.2000 through 9.3915, applications for partitions,
property line adjustments, and subdivisions in the /CL Clear Lake
Overlay Zone shall demonstrate compliance with the land division
requirements and lot standards in subsections (2) through (4),
below.
(c) Nothing contained herein shall preclude lot consolidation within
the /CL Clear Lake Overlay Zone to create the large lots designated
in Figure 9.4170.
(d) A development site, as defined in EC 9.0500, may be considered a
single site in order to fulfill the requirements of the large lot
portfolio in subsections (2) and (3) of this section.
(2) Large Lot Portfolio – Mapped Option.
(a) Through compliance with the following standards, land divisions
or property line adjustments shall result in lots consistent with the
lot size ranges in the identified Large Lot Category as depicted in
Table 9.4170 Clear Lake Area–Large Lot Portfolio. When locating
the boundaries depicted on Figure 9.4170, follow tax lot lines,
public rights-of-way, and natural drainage features to the greatest
degree practicable.
(b) Property identified for a particular lot size range, or ranges, as
shown on Figure 9.4170 and Table 9.4170(2) must provide at least
one lot within each of the applicable lot size ranges for each
Category indicated on the property. The applicable lot size range
may preclude division.
(c) Any additional resulting lot or lots shall be no less than 10 acres in
size, except as provided in subsection (4) of this section. The
minimum lot size shall be 10 acres. However, upon provision of
the required large lot, where residual areas are less than 10 acres
in size, new lots may be created according to the base zone lot
standards.
Table 9.4170(2) Clear Lake Area: Large Lot Portfolio – Lot Size Ranges
Large Lot Category
(See Figure 9.4170) Lot Size Range (Acres)
A 10 to 19
B 20 to 49
C 50 to 74
D 75 or greater
(3) Large Lot Portfolio – Collaborative Option. As an alternative to
subsection (2) above, land divisions within one of the sub-areas
depicted in Figure 9.4170 Clear Lake Area – Large Lot Portfolio may alter
the prescriptive physical arrangement of lots in that sub-area, upon
demonstration of compliance with the following:
(a) All new lots must fall within the lot size ranges listed for the sub-
area in Table 9.4170(3).
Page 4 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 12
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
(b) Any additional resulting lot or lots shall be no less than 10 acres in
size, except as provided in (4). The minimum lot size shall be 10
acres.
(c) The tentative partition or subdivision plan or property line
adjustment shall include a conceptual site plan that demonstrates
the following:
1. That the remainder of the sub-area can achieve the minimum
number of large lots without consolidation of more than 2 tax
lots; and
2. That the proposal does not preclude the division of adjacent
parcels, as provided in Table 9.4170(3).
Table 9.4170(3). Large Lot Portfolio – Flexible Option – Minimum Lots by sub-area
Minimum No. of Sites per Lot size range
Sub-area A. 10-19 acres B. 20-49 C. 50-74 D. 75 and larger
North --- --- 1 1
Central 2 1 1 1
South 2 1 1 ---
TOTALS 4 2 3 2
(4) Reducing the minimum lot size. When the minimum number of lots
required within the particular sub-area (Figure 9.4170) have been
provided, an applicant may use this option to create lots below the 10
acre minimum. As part of the land division request, an applicant shall
demonstrate that the new lots are consistent with the lot standards of
the applicable base zone and that the minimum number of lots in the
Large Lot Portfolio have been created within the applicable sub-area.
Page 5 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 13
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
Figure 9.4170 Clear Lake Area – Large Lot Portfolio
* Undesignated areas of the Clear Lake Overlay zone. These areas are subject to all development
and performance standards, including minimum lot size standards, but are not part of the large lot
portfolio due to local geographic uncertainties (i.e., water courses, future transportation
corridors).
Figure Key
Large Lot Category Lot Size Range (Acres)
A 10 to 19
B 20 to 49
C 50 to 74
D 75 or greater
Page 6 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 14
.
Attachment B
Exhibit E
[Exhibit F-3 to Lane County Ordinance]
● Figure 9.4160 Clear Lake Overlay Area is added to the Eugene Code,
1971, as shown on Attachment 1 to this Exhibit.
Page 7 of 7 FEBRUARY 2017 DRAFT
{00175259;13 }
Page 15
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.