Planning Commission
Regular MeetingEugene, OR · August 14, 2018
Agenda
AGENDA
Meeting Location:
Sloat Room—Atrium Building
Phone: 541-682-5481 99 W. 10th Avenue
www.eugene-or.gov/pc Eugene, OR 97401
The Eugene Planning Commission welcomes your interest in these agenda items. Feel free to come and go as
you please at any of the meetings. This meeting location is wheelchair-accessible. For the hearing impaired,
FM assistive-listening devices are available or an interpreter can be provided with 48 hour notice prior to the
meeting. Spanish-language interpretation will also be provided with 48 hour notice. To arrange for these
services, contact the Planning Division at 541-682-5675.
TUESDAY, AUGUST 14, 2018 – REGULAR MEETING (5:30 p.m. to 7:30 p.m.)
A. PUBLIC COMMENT
The Planning Commission reserves 10 minutes at the beginning of this meeting for
public comment. The public may comment on any matter, except for items
scheduled for public hearing or public hearing items for which the record has
already closed. Generally, the time limit for public comment is three minutes;
however, the Planning Commission reserves the option to reduce the time allowed
each speaker based on the number of people requesting to speak.
B. ACTION: PLANNING COMMISSION ELECTIONS
Staff: Robin Hostick, 541-682-5507
C. ACTION: COMMITTEES, LIAISONS & PROJECT RESOURCES
Staff: Robin Hostick, 541-682-5507
D. WORK SESSION: CLEAR LAKE DEVELOPMENT STRATEGY
Staff: Chad Cramer, 541-682-5561
E. ITEMS FROM COMMISSION AND STAFF
1. Other Items from Staff
2. Other Items from Commission
3. Learning: How are we doing?
Commissioners: Steven Baker; John Barofsky (Chair); Tiffany Edwards; Lisa Fragala; Chris Ramey;
William Randall; Kristen Taylor
Page 1
AGENDA ITEM SUMMARY
August 14, 2018
To: Eugene Planning Commission
From: Chad Cramer, Urban Designer, Planning Division
Subject: Clear Lake Development Strategy Update
ACTION REQUESTED
Information only; no formal action is requested at this time.
OVERVIEW
The Clear Lake area is a recently adopted expansion of Eugene’s urban growth boundary (UGB)
needed for additional jobs, parks, and schools. Eugene is a regional economic hub with forecasts
calling for the city to add about 37,000 jobs by 2032. Estimates show the Clear Lake area should
accommodate approximately 3,000 of these jobs. The community envisions the Clear Lake area
primarily as an employment center offering large development sites greater than 10 acres for select
manufacturing, light industrial uses, offices, health & technology uses, and supporting commercial
services. The area also contains land for a future Bethel School District school and Golden Gardens
Park, a large community park adjacent to the existing Bethel neighborhood. Expansion of city
infrastructure will incrementally provide services to these developments as they annex into the city.
The UGB expansion for jobs in the Clear Lake area was the first step to providing enough land for future
industrial job growth. Historically, Eugene has not had large, developable industrial sites in our
inventory, and local businesses had to look outside the community if they needed to expand (Grain
Millers, Rexius, etc.). Expanding the UGB to include large employment sites was a significant
undertaking, and required creation of the /CL Clear Lake overlay zone to provide needed protections for
site size and environmental health. However, work remains before these lands can be developed.
A coordinated development strategy demonstrates commitment to business development by providing
places for Oregon companies to grow and thrive per our state economic strategy. We aim to foster local
business growth while still allowing opportunities to expand our national and international
portfolio. We will identify and seek solutions for barriers to development, including wetland constraints
and storm water and other infrastructure demands. We need to fully understand the economic impacts
of these barriers and find creative solutions to address them in order to prepare land for business and
job development. This work includes establishing a wetland mitigation bank and strategy, storm water
management planning and design, identifying infrastructure needs, and a funding strategy to accomplish
these efforts.
The growth and development of the Clear Lake area will follow the city of Eugene’s commitment to
utilizing the triple bottom line approach to decision-making. We consider the economic, social, and
environmental impacts of our decisions to realize best outcomes. Key components of development for
the area that follow that approach are outlined below.
Page 2
JOBS & ECONOMIC GROWTH (ECONOMIC)
Eugene is a regional economic hub with forecasts calling for the city to add about 37,000 jobs for
residents by 2032. Estimates show the Clear Lake area accommodating up to 3,000 of these jobs. The
area is relatively free of certain development constraints (e.g., floodplain, steep slopes) and embodies
the necessary site characteristics for many of Eugene’s targeted industries:
1. Food Processing & Manufacturing
2. Software/Information Technology Services
3. Biosciences
4. Clean Technology/Renewable Energy
5. Environmental Services
6. Waste Remediation
7. Health & Wellness
8. Specialized Manufacturing
The Clear Lake area has numerous parcels greater than 10 acres and access to major transportation
routes. It contains enough of these large, undeveloped lots to meet the needs of our target industries –
industries that pay higher than average wages and have a strong likelihood of locating or expanding
here. Ensuring a 20-year supply of employment land can help contribute to Eugene’s role as a regional
economic hub, help local and new businesses grow in Eugene rather than looking elsewhere, contribute
to reducing unemployment, and increase the average wage of our residents.
PUBLIC HEALTH, SCHOOLS, & PARKS (SOCIAL)
Nearby heavy industry produces approximately 99% of Eugene’s toxic air emissions and the children of
the Bethel School District experience asthma at nearly double the rate of children in other Eugene
neighborhoods. In combination with appropriate riparian vegetation, greenspace plantings, and
landscape requirements, the low-impact uses proposed create a built buffer between future industrial
emissions and existing residential uses, limit the total amount of industrial emissions that will come out
of the expansion area, and utilize natural systems to help purify toxins from the environment. Industrial
toxins and their adverse health effects do not have boundaries, and safer and healthier industrial uses in
the area comes as a benefit to us all. Vegetation, especially trees, improves air quality and removes
pollutants such as nitrogen dioxide, carbon monoxide, sulfur dioxide, ozone, and airborne particulates.
They purify the air and remove pollutants, which can save money in long-term healthcare and
associated costs. While improving air quality and reducing related respiratory illnesses, riparian
vegetation can also reduce stress for people who live or work close to these areas.
The Bethel School District owns approximately 54 acres in the expansion area and has identified
approximately 25 acres for school use. The remaining wetland areas on their property may be able to be
conserved for educational and mitigation purposes, which would have positive social and environmental
effects for the area.
Nearby residents have less access to parks and greenspace amenities than residents of other areas in
Eugene. The Clear Lake area will provide 222 acres of needed greenspace for these underserved
residential neighborhoods. The Golden Gardens Community Park will provide recreational opportunities
and accommodate large group activities. These parks typically include a children’s play area, basketball
Page 3
courts, open play areas, picnic areas, restrooms, ball fields, pathways, trails, natural areas, on-site
vehicle and bicycle parking, and transit access. The city of Eugene’s Parks, Recreation, & Open Space
Comprehensive Plan contains policy commitments to protect natural resources in park design that
support a balance between planned park development and environmental conservation. Recreational
facilities constructed in suitable areas of the site alongside restored natural features will enhance park
users’ experience of and access to nature and amenities.
ECOLOGY & ENVIRONMENTAL SUSTAINABILITY (ENVIRONMENTAL)
The entire Clear Lake expansion area contains 924 acres of land amidst active streams, canals, and
wetlands of the Willamette Valley, which are an invaluable asset to our local and regional ecosystems.
The City of Eugene’s Stormwater Basin Master Plan provides area-wide guidance to manage stormwater,
protect wetland and floodplain resources, and mitigate impacts to natural resources. While wetlands are
present throughout the entire Clear Lake expansion area, many are of lower habitat quality than those
in other areas studied and have potential for alternative stormwater functions or open space uses.
An environmental analysis of significant wetlands and riparian corridors was completed for the UGB
expansion project. Due to the relatively low quality of existing wetlands in the area – and conflicts with
airport operations and safety – the analysis found it inappropriate to encourage restoration of additional
wildlife habitat near the Eugene Airport. Therefore, the focus going forward is on protecting water
quality and storage functions of wetlands and drainage channels, through the City’s /WQ Overlay Zone,
rather than protecting the area within existing boundaries of wetlands that have been significantly
degraded as a result of farming practices.
Project Goals
1. Facilitate private development of employment lands in the Clear Lake expansion area by addressing
barriers to development readiness.
2. Determine a logical sequence to provide key urban services including roads, water, electric service,
and wastewater services to allow for economic development, educational facilities, and recreational
amenities.
3. Define the City’s approach to addressing stormwater management and wetland mitigation in the
area.
4. Encourage and support environmentally sustainable industrial enterprises.
5. Recommend potential public and private environmental enhancements, ecological restoration, and
integration of built and natural systems to improve air quality, water quality, and habitat.
6. Identify opportunities to implement long-standing community plans and priorities, such as the
Rivers to Ridges Master Plan.
7. Provide recommendations for encouraging vibrant and accessible destinations, amenities, and
businesses in the Clear Lake area.
8. Provide recommendations for creating a welcoming gateway to and from the airport.
PUBLIC INVOLVEMENT & KEY STAKEHOLDERS
The Clear Lake area and the /CL Overlay Zone have had extensive public involvement to date identifying
preferred development outcomes and public amenities for the area. Previous activities include
committee work to establish a recommended overlay zone to meet the dual goals of large employment
Page 4
site preservation and environmental health. The committee included representatives of the Planning
Commission, Sustainability Commission, Human Rights Commission, Active Bethel Neighbors, and
Beyond Toxics, as well as collaboration with multiple City departments, Lane County Public Health and
the Lane Regional Air Protection Agency.
For purposes of the development readiness project, staff will be conducting property owner and
stakeholder interviews and meetings as a main component of public outreach. In addition, staff will use
the Planning Division website, newsletter, and Planning Commission meetings to share information and
updates with the general public as the project moves forward. Public stakeholders such as Parks and
Open Space and Bethel School District will conduct separate, independent public outreach processes for
future development of the park and school sites, and for major infrastructure projects.
NEXT STEPS
Planning Staff are developing a project charter to outline partner roles and responsibilities, timeline,
budget and deliverables. We will continue to determine project needs through stakeholder meetings and
interviews through summer and fall 2018. We will return to present the draft charter to the Planning
Commission later in the fall.
FOR MORE INFORMATION
Chad Cramer, Urban Designer: 541-682-5561, chad.r.cramer@ci.eugene.or.us
ATTACHMENTS
A. Clear Lake Area map
B. Clear Lake Precedent Analyses
Page 5
Attachment A: Clear Lake Area Map
Page 6
ATTACHMENT: B
Precedent Analyses
ECO-INDUSTRIAL SITES
Menomonee Valley Industrial Center and Community Park – Milwaukee, WI
This remediation project converts a polluted and previously abandoned industrial zone into a public park
and stormwater management facility that reconnects economically distressed neighborhoods to the
broader city. It facilitates economic revitalization while helping to improve ecological conditions. Located
on the site of an abandoned rail yard, the new park features trails and pedestrian bridges that link the site
to adjoining neighborhoods and offer residents improved access to economic and recreational
opportunities.
Known as Three Bridges Park, the 24-acre site also includes landscape features designed to resemble
natural landforms and a system for collecting and storing storm-water runoff underground before
dispensing it to wetland habitats.
1|Page
Page 7
Precedent Analyses
WETLAND PARKS
South Los Angeles Wetland Park – Los Angeles, CA
The South L.A. Wetland Park infrastructure project is located in a historically underserved area of the city.
The project protects public health by removing pollution from the City's watercourses, in order to meet
Federal Clean Water Act requirements. Features include remediation of a former brownfield site to create
new urban green space and a public park. The Clear Lake Area could benefit from consideration of
enhanced park features around wetlands to further reinforce their prominence as a necessary wetland
feature and amenity.
2|Page
Page 8
Precedent Analyses
WETLAND PARKS CONTINUED
Magnuson Park – Seattle, WA
Local regulatory agencies call Magnuson Park a standard for urban ecology. The park creates high
performance wetlands on what had been 12 acres of impervious concrete, bridged the disparate
recreational or ecological park uses, and intelligently re-used materials and resources to enhance the user
experience. Through the creation of sports fields, ecologically rich wetlands, and paths for exploration and
education, the former Naval Base site creates an integrative public amenity that successfully meshes the
ecological and human needs of the site.
3|Page
Page 9
Precedent Analyses
WETLAND PARKS CONTINUED
Elko Park – Elko, NV
This Sports Complex includes numerous baseball fields, soccer fields and softball fields along with other
areas for recreation alongside the low wetland areas of the Humboldt River. The park utilizes stormwater
drainage from the sports complex area to augment flow through the adjacent wetland area, increasing
the ecological and environmental functions of the site.
4|Page
Page 10
Precedent Analyses
ECOLOGICAL SCHOOL SITES
The Willow School – Gladstone, NJ
This 34-acre middle school encourages students to succeed academically while teaching them the
importance in building ethical relationships with people and nature. Willow School students learn about
the importance of living in harmony with ecological systems through the protection and conservation of
natural resources. Sustainable environmental management practices are restoring the surrounding native
habitat and depleted soils. The stormwater and wastewater treatment systems not only improve the local
environment but also serve as learning laboratories for students who actively study the positive impacts
of these sustainable landscape features.
When a sample of students were asked to list environmentally-friendly features of green buildings, 82%
listed landscape features such as rainwater harvesting, composting, vegetable gardens, or wetlands.
When asked about stormwater, 86% of students knew that asphalt and concrete were not ideal ground
surfaces for managing stormwater around a building. The site also treats and infiltrates 380,000 gallons
of wastewater annually with a system that includes constructed wetlands and a sand filter.
5|Page
Page 11
Precedent Analyses
ECOLOGICAL SCHOOL SITES CONTINUED
Sidwell Friends Middle School – Washington, DC
As the world’s first LEED-NC Platinum K-12 school building, the Sidwell Friends Middle School embodies
its philosophy to educate and guide students in developing social and environmental awareness. The
school extends the learning environment into the landscape with a green roof, outdoor classroom, biology
pond, butterfly meadow and Washington DC’s first constructed wetland.
Water conservation played a central role in the project design with a closed-loop wastewater system and
underground cistern that collects roof runoff, stores it, and supplies water to the biology pond during dry
summer months. The campus achieved recognition from the National Wildlife Federation as a wildlife
habitat for its use of native plantings, which attract birds and insects to the middle school courtyard.
6|Page
Page 12
Precedent Analyses
AIRPORT GATEWAY
LAX Airport Gateway – Los Angeles, CA
Gateways enhance the boundaries and edges that create psychological transitions between spaces. They
delineate a sense of arrival into an area. Being an integral part of a boundary, gateways are interfaces
between two types of activity. In order to heighten the sense of transition, they often involve changes of
topology, crossing water, light and surface changes, and can take on many forms.
A gateway, when effectively implemented, can offer much more than simply a threshold moment of
arrival; it can create a sense of what is to come. By utilizing lush natural landscape elements, lighting, and
signage, for example, a gateway can offer clues that visitors are entering an environmentally significant
area containing contemporary technological enhancements.
7|Page
Page 13
Get email alerts for Eugene
A daily email when new agendas and minutes are posted.