Muyni
← Back to Everett

Everett City Council

Regular Meeting

Everett, WA · November 13, 2024

Agenda

Agenda

CITY OF EVERETT BUILT ENVIRONMENT COUNCIL COMMITTEE Date: November 13, 2024 Time: 5:00 p.m. – 6:00 p.m. Location: Everett City Council Chambers The public is welcome to attend in person or remotely. There will be no public comment during committee meetings. To watch remotely: You may call in or listen to the meeting by dialing: 425-616-3920, Conference ID: 724 887 726# View on YouTube: https://www.youtube.com/everettcity/live Agenda Items I. Port Gardner Storage Facility Program Update from Staff II. 1301 Lombard Avenue Property Disposition Covenants Discussion III. Next Meeting Agenda Topics Pending Items for Future Agendas: • Comprehensive Cost of Water/Sewer Utility Service Study Briefing from Staff: 12/11/24 • Everett Mall Way Traffic Calming • BNSF Bond Street Project Briefing • Permitting Processes and Online Resources for Development • Comprehensive Plan Periodic Update: Transportation Element • Related Mayoral Directive Update and Progress Committee Members: Councilmembers Zarlingo, Vogeli (co-chairs) and Bader The City of Everett does not discriminate on the basis of disability in the admission or access to, or treatment in, its programs or activities. Requests for assistance or accommodations can be arranged by contacting the Everett City Council Office at 425.257.8703. For additional information, please visit our website at https://www.everettwa.gov/3129/American-Disabilities-Act-ADA-and-Title-. Port Gardner Storage Facility Built Environment Committee, Nov. 13, 2024 Souheil Nasr, Utilities Engineering Manager Zach Brown, Principal Engineer Overview • Background/How did we get here? • Agreed Order/Project goals • Reuse of existing infrastructure • Conveyance system • Project phases and schedule • Financial summary • Questions Background • 13 Combined Sewer Outfalls (CSO) – Seven discharge to Port Gardner and six to Snohomish River • 1985 – Requirement for “greatest possible reduction of CSOs at earliest possible date” • 1987 – Ecology adopted one untreated CSO event per year limit • 1987 CSO Control Plan submitted to Ecology – Plan shows all 13 CSOs in regulatory compliance by 2017 • March 1988 – Ecology approved City’s CSO plan How did we get here? • 1987 CSO Control Plan; updated seven times • Four outfalls in compliance by 2012 • Northwest Everett sewer separation program, 2010-2019 • Kimberly-Clark (KC) vacated in 2012; City acquired facilities in 2019 • City proposed to bring three additional outfalls into compliance by 2017 • City requested 10-yr extension to bring last six outfalls into compliance • August 2015 – Agreed Order to achieve CSO compliance by 2027 Agreed Order Agreed Order between Ecology and City of Everett • Must reduce combined sewer overflows (CSOs) to no more than one event per outfall per year by December 31, 2027 • Up to $10,000 per day penalty for failure to comply • City may not appeal the Agreed Order Method to comply • Temporarily store excess CSOs at PGSF during wet weather events • Acquiring KC facilities presented the City with opportunity to exceed Agreed Order requirement by reusing existing infrastructure • Allows for City to treat stormwater from separated stormwater systems and discharge stormwater effluent to deep-water outfall through a new pump station (funded by grants from Ecology) Project goals Enhance Puget Sound water quality • Achieve reduction in CSO events as required by Agreed Order • Reuse of existing facility allows future flexibility • Improve water quality in Possession Sound and Port Gardner Bay • Reduce untreated stormwater discharges and combined sewer overflows at nearshore outfalls • Provide stormwater treatment in step with collection system separation projects Reuse of existing infrastructure • Facility constructed in 1980, decommissioned in 2012 • Cost-effective use of existing on-site structures • Enables greater reduction in CSO events than required by Agreed Order for same cost PGSF and conveyance system infrastructure Project phases Phase 1 is complete. • Engineering analysis and report of the sewer system and affected area; approved by Ecology, March 2022 Project phases Phase 2 is ongoing. • Engineering design related to PGSF site and regional conveyance pipelines; select demolition (completed) at the site in preparation for construction Project phases Phase 3 is the final phase. • Site construction and regional stormwater and sewer system improvements • Dec. 31, 2027, deadline to be operational Project financial summary PGSF site Conveyance pipelines • Funding Ord. #3916-21 = $39.6 M • Funding Ord. #3967-23 = $4.5 M - Design = $15.7 M - Design = $4.5 M - Demolition = $ 3.4 M • Future funding ordinance = TBD - Const mgmt = $ 8.5 M - Construction = $72 M* • Future funding ordinance = TBD Total = $76.5 M* - Construction = $106 M Total = $133.6 M *Estimate based on 30% design Funding This project is funded through a combination of utility rates and grant funds. Dept. of Ecology Water Quality Combined Financial Assistance Grants: • FY24 grant (received) = Design for $4.4 M • FY26 grant (applied) = PGSF site construction for $16.4 M • FY27 grant (future) = Conveyance pipeline construction, amount TBD QUESTIONS?

Get email alerts for Everett

A daily email when new agendas and minutes are posted.

Report an issue with this meeting