Everett Historical Commission
Regular MeetingEverett, WA · January 26, 2016
Minutes
APPROVED
Everett Historical Commission
Minutes
January 26, 2016
Members Present Members Absent Visitors City Staff
Allan White Mark Soine Andrea Tucker Ross Johnson
Arnold Morrison Eli Griffin David Stahlheim
Bill Vincent Sandra Alder Niels Tygesen
Bobby Olsen Fred Cruger Paul Popelka
Dale Good Chris Jenkins
Glenn Hunter Dick and Shirley Prouty
Jack O’Donnell Lauren Kraetz
Laura Cameron- Jeff Heinz
Behee
Neil Anderson Mark Thunberg
Steve Fox Wendy Poischbeg
CALL TO ORDER
The regular meeting of the Everett Historical Commission was scheduled for Tuesday,
January 25, 2016 at 7:00 p.m., in the Hearing Room in Everett City Hall at 2930
Wetmore Avenue, Everett, WA 98201.
Chair Olsen called the meeting to order at 7:00 p.m.
APPROVAL OF MINUTES
Chair Olsen requested action on the January 26 meeting minutes. Commissioner
Anderson moved to approve the January 26, 2016 minutes as written. Motion
seconded by Commissioner Morrison. Motion passed unanimously.
CITIZEN COMMENTS
Andrea Tucker
3330 Wetmore, Everett, WA
Ms. Tucker noted that Historic Everett held its annual retreat on January 23. She
handed out a brochure, Everett’s Historic Storefronts, and suggested that Historic
Everett and the Historical Commission work together to revive the brochure.
ELECTION OF OFFICERS
Chair Olsen called for nominations for the 2016 Commission Chair. Commissioner
Anderson nominated Jack O’Donnell for the 2016 Chair. Nomination passed
unanimously. No Vice-Chair was nominated.
Chair O’Donnell noted that the Vice-Chair has traditionally assumed the Chair’s position
at the next election. The Vice Chair position will be addressed again at the next
meeting.
COMMISSIONER COMMENTS
Commissioner Cameron-Behee learned of the Trinity College closing and expressed
her regret about that closing. She also noted that Gene Fosheim has released a book,
Mill Town Boy, and suggested that he be invited to make a presentation to the
Commission.
Commissioner Anderson shared a Seattle Times article on the planned restoration of
a Pike Street building in Seattle similar to the Hodges building. The owners plan to
restore the building for a boutique hotel.
Commissioner Fox requested that three projects discussed in the past be completed
this year, including freeway signage for the Hewitt National Historic District; Hewitt
District signage to recognize the district based on a presentation from 2015; and
sidewalk standards for overlay districts to more closely match existing sidewalks.
Commissioner Fox proposed that signage be installed along the Mill Town Trail from
Bayside to the Riverside Park, possibly adapting existing bike route signs to add trail
signage.
Commissioner Fox noted that Jan Meston has worked on these projects and met
some challenges, particularly with the freeway signage. He agreed that these issues
should be resolved so projects can be completed.
Commissioner O’Donnell welcomed the new and recent city staff, and representatives
from Snohomish County. He expressed concerns about endangered buildings, including
the Hodges building, which may be eligible for the national register; the Longfellow
building, which may be the most endangered building in the city; the YMCA, which is
more threatened with the Trinity closure; the Masonic Temple; and what may be
Everett’s oldest house, the Swalwell Cottage, which is on the National Register but is in
poor condition. He also proposes to revisit the Hewitt District and update the Everett’s
Historic Storefronts brochure. He noted that non-contributing structures in that area
should be for considered for possible contributing structures.
He also noted some positive trends in Everett. Changes in the downtown are bringing
back its historic character with pedestrian oriented projects, buildings replacing parking
lots and seeing more people downtown.
He noted that November 5, 2016 is the 100th anniversary for the Everett Massacre and
for the Big Snow in January 2016. He suggested visiting the Historic Everett website to
check Commissioner Steve Fox’s contributions.
He also welcomed new Commissioner Glenn Hunter.
.ADDITIONS TO THE AGENDA
There were no additions to the agenda.
Page 2 of 4
BRIEFING ON CARNEGIE BUILDING RENOVATIONS
Sandra Alder, Capitol Architects, presented plans for restoring the Carnegie building.
She presented proposed restoration building plans and elevations for restoring the
exterior that includes replacing existing windows, exposing windows that are now below
grade or filled in with masonry, replacing storefront style windows and doors with the
correct materials, tuckpointing, gutters/downspouts, light fixtures and balustrades. The
proposal replaces original windows that will replicate the 1904 building.
The County is requesting that the Historical Commission provide a letter of support of
the County’s efforts to restore this facility.
Eli Griffin, Pella Corporation, provided an overview of their historic preservation work.
He provided a handout of projects and reviewed several local area restoration projects
that include window replacements that match the original window design.
Discussion with the Commission included the following:
• Extensive discussion of restoring rather than replacing existing windows
Existing windows are in poor condition, are not energy efficient, and have lead-
based paint If the original windows were restored, that would require extensive
ongoing maintenance and poor insulation and sealing; the estimated cost to
restore the windows is prohibitive.
The County’s grant from the Department of Archaeology and Historic
Preservation (DAHP) requires LEED Silver construction. Life cycle costs of the
original windows, including increased energy costs, are also prohibitive.
The County will consider using some of the original windows in some area of the
building.
Mark Thunberg, Snohomish County Facilities, noted that the cost of restoring windows
was over $200,000. With the limited budget, other proposed building improvements,
possibly including the window well, tuckpointing, and/or façade reconstruction would be
cut to fund the window restoration.
Further discussion included the following:
• Color of window cladding
The color will be changed to match the dark brown color of the original windows.
• South building façade
Building is mostly below grade; a window well will be built to expose the existing
windows.
• Storefront infill with concrete vs brick
Concrete was chosen as matching bricks are not available and wood was not a
viable material.
• Project costs
Exterior improvements are estimated at $800,000; interior improvements are a
separate budget of $1.8 million.
Page 3 of 4
Commissioner White moved to have staff write a letter of recommendation to
Snohomish County accepting the Carnegie Building updates providing the proposed
windows maintain the integrity of the building. Motion seconded by Commissioner
Good.
Further discussion included the following:
• It was noted that DAHP requested an interpretive project as part of the building
restoration, possibly displaying an original window(s). Similar projects may be
done in other Everett buildings.
• Three suppliers provided estimates for restoring the windows with costs ranging
from $200-300,000.
• Replacing the windows will allow the project to be completed as proposed, fully
utilize the grant funding, and be occupied with new uses.
Motion passed unanimously.
ADDITIONAL TOPICS
Staff updated the Commission on staff assignments, upcoming CLG training, selecting a
consultant for the Claremont Heights Inventory, and the Metropolitan center Subarea
Plan.
ADJOURNMENT
The meeting was adjourned at 7:45 p.m.
Page 4 of 4
Get email alerts for Everett
A daily email when new agendas and minutes are posted.