I. Call to Order
The meeting was called to order at 7:00 PM by Mike Domenica, City Liaison to the
Task Force
II. Attendees
Task Force Members: Rolf Anderson, David Deitch, Dave Gustafson, Ellen
Heather, Jeff Jardine, Hans Miller, Lauren Pinkus, Matthew Ries
City Staff: Wyatt Shields/City Manager, Michael Whitfield/Director, Department of
Public Works, Alan Dalton/Senior Engineer, Mike Domenica/Task Force Liaison for
City
III. Approval of Minutes of Previous Meeting
The minutes of the previous meeting were approved without change
IV. Discussion and Decisions
1. There was a discussion of the need for and election of a Chairperson. Dave
Gustafson was nominated, seconded and elected as Chairperson of the Task Force.
2. The Task Force discussed the site visits with each members volunteering their
impressions / comments. Mike Domenica stated that the “Trammel Branch” project
had been re-named “West Columbia” so that all projects were consistently
identified by street names.
3. A brief discussion of each project ensued with a description of the proposed
improvements and preliminary cost estimates. The West Columbia project was
discussed in greater detail before it was decided that we needed to move to other
projects due to time constraints. The items discussed for West Columbia project
included:
a. A link between sanitary sewage overflows and stormwater issues (I&I).
1
b. A discussion of the existing private obstructions (bridges, driveways, walls,
etc.) within the drainageway.
c. A discussion of the “dry pipe” that could be added to the W&OD widening
and possible “daylighting” of the outfall.
4. The other projects were discussed in lesser depth with some general discussion
including a request for the map showing where sanitary sewers have been relined
(8/7/19 Town Hall meeting exhibit and also included with the CIP Budget
presentation). The GKY Project Information Sheets were presented/reviewed.
There was also a discussion as to the possibility of the City buying houses that are
flooded versus constructing projects that would have minor (10 year storm) benefits
for drainage but would not solve flooding for larger events. The two small projects
were added to the discussion with Mike Domenica stating that the Laura/Poplar
Drive project would, if moved forward, require replacement of the existing 15 in.
corrugated metal pipe due to its condition as determined through TV inspection.
Regarding the Lincoln Ave. – West project, the flooding of the yard and ground-
floor level of the house is due primarily to the elevation of the house and basement
and that there was not much that could be done for this site. The surface grate inlet
in the rear of the house, serving multiple homes, ids intended to discharge to the
conduit adjacent to the W&OD Trail, but the hydraulic head between the water
surface at the grate and the water elevation in the W&OD conduit appears to be
very low, negating options for discharge to the W&OD conduit during periods of
significant pipe flow.
5. The group discussed draft evaluation criteria and methodologies for assigning
ranking rates. It was suggested that a coarser scoring range, say 1 to 3 rather than 1
to 10, be used.
6. Potential outfall issues with Fairfax / Arlington were discussed along with the
design criteria for frequency of flooding (10 year event except possibly for West
Columbia / Trammel Branch).
7. The opportunity for public input and public hearings to obtain frequency of flood
damage and other information on the respective projects was discussed. It was
decided that the Task Force members would conduct door-to-door assessment in
their areas. Ms. Pinkus volunteered to develop a questionnaire/survey questions.
(Note: This questionnaire was drafted by Ms. Pinkus, circulated to the team for
review, modified accordingly and sent to the Task Force members to use in their
neighborhoods.
8. The group asked if there was a stormwater model for the entire City and the 2007
C.O.E. The “StormCad” model used by the Corps and report was discussed. The
report/model is located at P:\PUBLIC WORKS\STORMWATER\Reports and
Studies\2007 COE Stormwater Assessment.
9. The City’s Chesapeake Bay Act was discussed along with any impacts of the
projects on the RPA. The only project that would impact the RPA, at this time is
the West Columbia/Trammel Branch project, with a possible minor impact for a
potential East. Jefferson outfall pipe.
2
10. Flood Insurance rates and potential actions that the City might take to reduce the
rates were discussed. The City has a CRS rate of 6 and no municipality in Virginia
has a lower rate. In order to lower the rate beyond 6, we will need to map our
floodplains at a smaller threshold for tributary area (we currently use FEMA 1
square mile scale) and start to remove homes from the floodplain. The smaller
tributary area would add homes to the floodplain.
11. A brief discussion of the C.I.P. budget was led by Mike Domenica, with the note
that the construction costs were “place holders”, until the preliminary designs were
completed, Task Force ranking/recommendations finished, and approval by the
City Council obtained.
12. Internal email communication with the Task Force was discussed. Wyatt Shields
advised that the Task Force was a “public body” and that all deliberations must be
open to the public. Any meetings of more than two Task Force members would be
considered a public meeting and would need to meet public meeting laws of the
state and city. No more than two Task Force members can communicate by e-mail
at any time and all communications should copy Mike Domenica.
V. Next Meeting Dates
Dates on which Task Force members could attend the next three task force meetings
were discussed. It was suggested that Mike Domenica send to the Task Force a list
of potential dates from which the best dates could be selected.
VI. Adjournment
The meeting was adjourned at 9:10 PM
3
Agenda
AGENDA
2nd MEETING
STORMWATER TASK FORCE
of the
CITY OF FALLS CHURCH, VIRGINIA
Date: Thursday, January 30, 2020
Time: 7:00 PM
Location: Council Chambers, City Hall
300 Park Avenue, Falls Church, VA 22046
I. Call to Order
II. Approval of Minutes of 1st Meeting
III. Selection of Task Force Chairperson
IV. Debrief on Site Reconnaissance Visits
V. Review and Discussion of Project Evaluation Methodologies
VI. Review and Discussion of Evaluation Criteria
VII. Review of Stormwater Rate Study Scope and Deliverables
VIII. Other Issues and Comments
IX. Adjournment