MPO Policy Committee
Regular MeetingFarmington, NM · April 17, 2014
Minutes
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
March 20, 2014
Policy Members Present: Dan Darnell, City of Farmington
Gayla McCulloch, City of Farmington
Scott Eckstein, San Juan County
Technical Members Absent: Sherri Sipe, City of Aztec
Bloomfield representative currently vacant
Staff Present: Mary Holton, MPO Officer
Joe Delmagori, MPO Planner
June Markle, MPO Administrative Aide
Duane Wakan, MPO Associate Planner
Staff Absent: None
Also Present: Priscilla Benavides, NMDOT-CRD Albuquerque
Cassandra D’Antonio, Sites SW
Brian Degani, Liaison, NMDOT Planning Division,
via telephone
Larry Hathaway, San Juan County
Robert Luna, HDR Engineering, Inc.
David Quintana, NMDOT District 5, via telephone
David Sypher, City of Farmington
1. CALL TO ORDER
Councilor Darnell called the meeting to order at 1:40 p.m.
2. APPROVE THE MINUTES FROM THE JANUARY 16, 2014 POLICY COMMITTEE
MEETING
Councilor Darnell moved to approve the minutes from the January 16, 2014 Policy
Committee meeting. Councilor McCulloch seconded the motion. The motion was passed
unanimously.
3. APPROVE THE MINUTES FROM THE MARCH 10, 2014 SPECIAL POLICY
COMMITTEE MEETING
Councilor McCulloch moved to approve the minutes from the March 10, 2014 Policy
Committee meeting. Councilor Darnell seconded the motion. The motion was passed
unanimously.
4. RECEIVE A PRESENTATION ON THE NM 371 CORRIDOR STUDY (HDR, INC.)
Subject: NM 371 Corridor Study
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
BACKGROUND
NMDOT is preparing a corridor study for NM 371 from I-40 at Thoreau to Murray
Dr. in Farmington.
The study is intended to identify improvements to the corridor.
Particular emphasis for the FMPO will be on intersection improvements at N36.
RECOMMENDATION
It is recommended that the Policy Committee receive a presentation on the NM
371 Corridor Study.
DISCUSSION: Mr. Delmagori introduced Mr. Robert Luna with HDR, Ms. Priscilla
Benavides with NMDOT, and Ms. Cassandra D’Antonio with Sites SW. These individuals
and their agencies worked on a corridor study of NM 371.
Ms. Benavides reported that NMDOT received some funding through their Planning
Division in order to conduct safety and traffic analyses on certain corridors throughout
the state. One of those corridor studies was NM 371 from I-40 in Thoreau to US 64
(Murray Drive) in Farmington. She noted that there had been a stakeholder’s meeting in
Crownpoint about a week ago and input was received from various agencies and
chapter houses.
Ms. Benavides stated that NMDOT had contracted with HDR to perform the study. The
project objective was to identify a purpose and need and look at ways to improve the
safety of the overall corridor. HDR was contracted to conduct a modified scoping report
that included an inventory of all existing roadway structures, drainage features, and
fencing along the corridor. NMDOT will then evaluate each of the items inventoried and
see how to improve them.
Ms. Benavides said that NMDOT had not identified any funding to further develop the
design of the corridor and that the current focus was only on the study. NMDOT will look
at alternative analyses and recommendations that may come out of the study and
prioritize those recommendations. Ms. Benavides said once the prioritizations are
established, funding may be programmed but no dates have been established for this to
happen. She stated that it is not currently programmed in the STIP so funding for this
corridor could be several years out.
Ms. Benavides stated that the next step in the project is to receive public comments.
NMDOT has handed out comment cards to the stakeholders and is hoping to receive
some good feedback.
Mr. Robert Luna gave a PowerPoint presentation on the corridor study being conducted
by HDR. This is a preliminary study phase which is a scoping report to identify the issues
and potential solutions and then put together some planning costs for possible future
construction.
Mr. Luna said the project began in Thoreau and extended to the intersection of US 64 in
Farmington. The roadway is primarily a two-lane minor arterial throughout the corridor.
He said the average daily traffic ranges from 740 in the rural interior parts of the corridor
to 4300 at the external points of the corridor at Thoreau and Farmington.
Mr. Luna said the project was defined by segments and potential improvements could be
considered based on that roadway segment. Since the roadway travels mainly through
the Navajo Nation, HDR worked to identify each chapter and sought local input.
Mr. Luna said the study was to identify a purpose and need for the project, determine
what needed to be done or what needed to be further studied, and then determine how
the project might move forward. HDR evaluated the existing corridor and identified
potential improvements for pedestrians and operational safety, ways to correct roadway
deficiencies or roadside features, how to best develop a common, typical roadway so it
was consistent throughout the corridor, and then develop a list of potential priority
projects for both District 5 and District 6.
Mr. Luna explained the current physical road conditions and the issues noted by HDR
such as bleeding, transitional cracking, rutting, and spawling of the pavement. Some
areas have had improvements made already. HDR also took a major sign inventory
which showed significant damage to many of the signs while others were missing
entirely or vandalized.
Since the area had not been engineered or surveyed recently, HDR field crews used an
I-Pad and were able to catalog every sign, barrier, pavement section, and roadside
feature and include descriptions and observations of the pictures they took. Mr. Luna
stated that it took the crew five days to walk the entire 107-mile corridor and to document
everything along the way. The information collected created a GIS database that would
allow, for instance, a review of the signs along the corridor or drill down and view just the
regulatory or warning signs. Mr. Luna said that there were many damaged guard rails
noted in the study that needed to be replaced to ensure safety. Information on each
specific feature - guard rails, signs, bus stops, culverts, and bridge structures along the
corridor - was collected and that data will now be given to NMDOT to utilize for their
future maintenance improvements.
Also as part of the location study, HDR conducted a traffic operational analysis. This
included a roadway analysis and intersection analyses at the major intersections along
the corridor. The study determined that the present level of service and service for
twenty years into the future was satisfactory. The determination was made that there
was no need to widen the roadway to four lanes. Also there were no major issues with
the larger intersections although some may benefit from the addition of left or right-hand
turn lanes.
Councilor Darnell asked if the terminus was at Bisti Highway and Murray Drive or at
Main Street. After some discussion, it was determined that the terminus was actually at
Murray Drive.
Along with the traffic analysis, Mr. Luna reported that HDR had conducted a safety
analysis of the corridor. This meant evaluating all the crashes along the corridor and at
some intersections. Some of this data would need to be refreshed after additional
information was received from Navajo DOT. HDR also conducted a highway safety
analysis to identify the crash frequency. Intersections within the urban areas were
evaluated and many had no crosswalks, no pedestrian markings, push buttons are not
ADA compliant, and pedestrian crossings are not ADA compliant.
Ms. Cassandra D’Antonio with Sites SW reported that they inventoried the natural and
cultural resources adjacent to the corridor through record searches which included both
federal and state databases. She noted that no field surveys have been conducted to
date. Once projects and funding have been identified, field surveys would be conducted.
Through the record searches, Sites SW found that the corridor crosses nine flood plains,
five major drainages, some possible wetland areas, and numerous federal, state, and
Navajo Nation species and habitats along the corridor as well.
Ms. D’Antonio stated that the vast majority of the larger cultural resource surveys in the
corridor were fairly old. There were approximately 100 surveys conducted from the
1970’s through the early 1990’s. The surveys identified 39 archeological sites within the
right-of-way and six national registry and historical registered sites within one mile of the
corridor.
Mr. Luna stated that now that the survey was completed, HDR would begin to make
some recommendations and prepare a final report. They would look at what could
immediately be improved by NMDOT such as signage and guardrails, and then look at
what larger geometric projects should be considered. Mr. Luna said that NMDOT had
conducted a road safety audit (RSA) at the intersection of NM 371 and N36 so no
additional analyses were conducted at the intersection by HDR.
Mr. Luna stated that this completed their contract with NMDOT and no future work was
anticipated until funding was identified. Ms. Benavides stated that NMDOT would benefit
from HDR’s report and analysis and also gains a huge database of the corridor for future
information.
Councilor Darnell asked why maintenance efforts seemed highly visible on US 550 but
that on corridors such as NM 371 maintenance was almost non-existent. Ms. Benavides
commented that all NMDOT facilities should be regularly maintained. She noted that NM
371 did span both District 5 and District 6 areas and she was not able to comment on
how the specific districts handled their road sections. Ms. Benavides said the lack of
funding for maintenance was a concern brought up at the stakeholders’ meeting. The
stakeholders were encouraged to contact their state legislators to push for needed
improvements to the NM 371 corridor. She said that much of the NM 371 corridor is in
District 6 and there were representatives from District 6 in attendance at the meeting so
they were made aware of the concerns. Mr. Luna stated that maintenance and upkeep
of US 550 was built into that construction contract and was stipulated in the award. This
is perhaps why more diligence is seen on US 550 because the contractor is required to
keep up with maintenance issues.
Councilor Darnell recommended that NMDOT consider posting signs along the roads
giving a hotline telephone number for motorists to call and report maintenance issues
they encounter when traveling the corridor.
Councilor Darnell also asked if there was any coordination with a parallel study being
conducted into the potential construction of a rail line from Thoreau to Farmington. He
asked if there might be any advantage to coordinating the two studies. Both Ms.
Benavides and Mr. Luna said that were not aware of any rail study. Ms. Holton
commented that NMDOT is doing a freight study and the MPO and local entities have
provided comment for the study. Councilor Darnell added that the footprints for both
project and the study of historical and cultural concerns could impact both potential
projects. Mr. Brian Degani stated that Mr. Paul Sittig was doing the freight study in
conjunction with the state’s 2040 multi-modal long range plan. He said he would e-mail
Mr. Sittig’s contact information to Ms. Benavides so she could contact him. Ms.
Benavides re-stated that this had been only an initial study and once individual projects
were identified, further environmental examinations would be done. She expected,
however, that any NM 371 projects would be within current NMDOT right-of-way.
Mr. Delmagori also mentioned Mr. Bill Craven with the State Rail Plan and the status of
that document. Numerous comments from the MPO, local entities, and an economic
development agency were submitted to Mr. Craven about including this rail line as part
of the rail plan.
Mr. David Sypher commented on the stakeholder meeting held in Crownpoint and the
presentation made to the stakeholders. He said that the City of Farmington had offered
comments to the study specifically on the intersection of N36 and NM 371. He provided
the consultant team with comments from Steve Krest, who is with Farmington’s Traffic
Engineering division.
Ms. Benavides said that the study should be completed by the summer and both
Districts 5 and 6 will have the recommendations from HDR on how to proceed forward.
Getting the many identified potential projects into the STIP and funded would be the next
steps.
ACTION: The presentation was received.
5. CONSIDER APPROVAL OF AMENDMENT #5 TO THE FFY2014-2019
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND THE SELF-
CERTIFICATION FOR AMENDMENT #5
Subject: FFY2014-2019 TIP Amendment #5
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
BACKGROUND
On February 12, 2014 the Farmington MPO advertised Amendment #5 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds one project to the TIP as described in the attached notice.
A public hearing on Amendment #5 was held on February 27, 2014 during the
Technical Committee meeting.
The Technical Committee recommended approval of Amendment #5 to the
FFY2014-2019 TIP.
CURRENT WORK
• The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
• NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
• Upon completion of this phase, the middle section will be the remaining phase of
this project.
RECOMMENDATION
It is recommended that the Policy Committee approve Amendment #5 to the
FFY2014-2019 TIP and the MPO Self-Certification for Amendment #5 to the
FFY2014-2019 TIP.
DISCUSSION: Mr. Delmagori reported that Amendment #5 to the FFY2014-2019 TIP
was to add the next phase of the East Arterial project into the TIP. The East Arterial will
be the relief route on the perimeter of Aztec.
Mr. Delmagori explained that this project had been in the previous TIP cycle. It was
removed because there was no logical terminus for the project. At the January meeting,
the Policy Committee approved an amendment to add Legion Road to the TIP which
created the logical termini for the East Arterial. Mr. Delmagori said that District 5 was
now able to program money toward the project which was from the intersection of US
550 to Legion Road. The project, which is targeted for FFY2015, will use $2,990,400 in
federal STP funds with a corresponding match of $509,600 for a total of $3,500,000.
Mr. Delmagori said that Mr. Quintana had reported at the Technical Committee meeting
in February that District 5 was committed to finding the funding for the remaining phases
which would connect the northern end by the sports complex back down to this phase on
the south end.
Mr. Delmagori reported that the Technical Committee had recommended approval of
Amendment #5 and that no comments were received during the public comment period.
ACTION: Commissioner Eckstein moved to approve Amendment #5 to the FFY2014-
2019 TIP and the MPO Self-Certification for Amendment #5 to the FFY2014-2019 TIP.
Councilor McCulloch seconded the motion. The motion was passed unanimously.
6. COMPLETE STREETS
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Associate Planner
Date: March 13, 2014
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates all
modes of travel, such as walking, biking, and transit.
Staff has worked with the Advisory Group on development of land use context
areas (LUCAs) and road typology overlays.
The Advisory Group recommended preliminary approval of the titles and
definitions for the road typologies and land use context areas at their January 22
meeting.
The Technical Committee recommended approval of the road typologies and
land use context areas at their February 27 meeting.
The Advisory Group held its latest meeting on February 19.
CURRENT WORK
The Advisory Group completed exercises in which they identified titles and
descriptions for land use context areas (LUCAs) and road typologies for the MPO
Complete Streets program.
The Road Typologies and LUCAs will be used to create the design guidelines for
the MPO road network.
Staff introduced four themes (Adoptability, Resourcefulness, Flexibility &
Simplicity) that will steer the development of design guidelines and the Complete
Streets document.
RECOMMENDATION
It is recommended that the Policy Committee review and recommend approval of
the preliminary list of the titles and definitions for the road typologies and land
use context areas. It is further recommended that the Policy Committee receive
a presentation on Complete Streets design guidelines.
DISCUSSION: Mr. Wakan reported that the Complete Streets Advisory Group had met
several times to formulate and develop titles and description for road typologies and land
use context areas. The Advisory Group asked that the Technical Committee review and
recommend preliminary approval of these road typologies and context areas. At their
February 27 meeting, the Technical Committee recommended preliminary approval of
the road types and context areas.
Mr. Wakan noted that the list of road typologies and context areas could be found on
Pages 6-8 of the Agenda. He said these titles sought to describe road classifications in
non-conventional ways. These titles and descriptions were developed to make the
Complete Streets document distinct from regular zoning or typical road classifications.
These distinct titles would hopefully encourage distinct approaches to Complete Streets
design guidelines.
ACTION: Councilor Darnell moved to approve the preliminary list of the titles and
definitions for the road typologies and land use context areas. Councilor McCulloch
seconded the motion. The motion was approved unanimously.
Mr. Wakan said that the second part of the Complete Streets agenda item was a
presentation related to some themes that were introduced to the Advisory Group and
explained to the Technical Committee in February.
Mr. Wakan explained four themes that the Advisory Group hoped to carry through the
Complete Streets design process.
• Adoptable - To have the document eventually adopted by the MPO Policy
Committee;
• Resourceful - For the document to be a usable resource for developers and
public works departments in all the local entities, as well as understandable by
the general public;
• Simple - Principles and guidelines which are easy to interpret and to understand;
• Flexible - Build in multiple flexible options into the document to ensure it is more
readily accepted and used by everyone in the region.
Adoptable
Mr. Wakan stated that the MPO and the four entities work in coordination with the MPO
Technical and Policy Committees, as well as NMDOT and FHWA. He stated that neither
NMDOT nor FHWA have put forward any Complete Streets documents yet, but when
this does happen, the MPO will be that much further ahead having already developed
their Complete Streets design guidelines.
Mr. Wakan illustrated several spectrum diagrams to explain possible outcomes when
developing the Complete Streets document and design guidelines. One spectrum
ranged from very complex to very simple and another from very prescriptive to
very interpretive MPO Staff believed that a document that is simple to understand and is
more interpretive in design, acceptance and approval of the final Complete Streets
document will be more favorable than unfavorable.
Mr. Wakan stated that the guidelines also needed to be Resourceful. He explained that
the City of Charlotte had developed Complete Streets guidelines in 2007. In 2009, the
North Carolina DOT (NCDOT) adopted Complete Streets design guidelines which were
then developed in 2012. Their guidelines are usable statewide and there is now
consistency between the City of Charlotte and the state’s documents.
Mr. Wakan showed a drawing from the City of Charlotte (see below) and explained how
they developed a very interpretative and simple document. The diagram shows the
different development zones, pedestrian zones, green zones, and parking areas.
City of Charlotte
North Carolina’s DOT then used Charlotte’s example and created their own, very similar
diagram with visualizations and dimensions.
Mr. Wakan also referenced the North Main extension in Aztec and some of the Complete
Streets elements they are considering. He showed the consultant’s drawing depicting
the buffered sidewalks, bike lanes, and parking zones. The possible inclusion of green
infrastructure was also noted. Mr. Wakan explained this was capturing storm water,
retaining it, and then re-using it on the green zones. This type of infrastructure has been
strongly encouraged nationwide for any Complete Streets design guidelines.
Mr. Wakan said the Complete Streets document also needed to be Simple. He showed
the intricate, prescriptive matrix used by the Pennsylvania DOT (PennDOT) and said the
Advisory Group thought this was too complex and prescriptive for the regional Complete
Streets document they wanted to develop. Mr. Wakan explained that the Advisory Group
had also looked at the NCDOT document which showed the visual cross-section
diagram with some simple dimensions and notes to provide some guidance as to
sidewalks and bike lanes.
The Charlotte roadway cross-section with the zone types displayed was very
interpretive. Staff believed this was a good approach for the MPO Complete Street
document as a means to introduce the concept to the region and creating a document
that is more interpretative and easier to understand. Mr. Wakan noted that parts of the
Charlotte document do set out some prescriptive guidelines for new built areas and
those sites that were being redeveloped.
Mr. Wakan also showed an example from the City of Johannesburg, South Africa and
stated that Complete Streets had become an international movement. Their guidelines
gave a perspective diagram view side by side with a plan view of the street. They also
included some simple dimensional prescriptions which helped in accomplishing their
goals. Their diagram provided an easily understood visual for the lay-audience and the
general public, while the street plan view, which was more technical, provided needed
information for the planners and engineers.
Mr. Wakan said the document also needed to be Flexible. The combination of the road
typologies and the land use context areas will eventually create the design guidelines.
Additionally, multiple options will be created for each of the design guidelines. Mr.
Wakan provided an example of how a main street in a central business district might
look by providing multiple options for the same cross-section. This will provide built-in
flexibility for developers and public works departments.
Mr. Wakan said other cities and agencies were researched to see what other types of
combinations they had used for their land use context areas and road typologies:
PennDOT 7 land use context areas 35 possible design guidelines
5 road typologies (not including flexible options)
Roanoke, VA 8 land use context areas 32 possible design guidelines
4 road typologies (not including flexible options)
Charlotte 7 land use context areas 35 possible design guidelines
5 road typologies (not including flexible options)
FMPO 8 land use context areas 72 possible design guidelines
9 road typologies (not including flexible options)
Mr. Wakan explained the Advisory Group’s initial approach to developing context areas
and road typologies came up with 72 possible design guidelines. In speaking about
having a simple, flexible, and interpretive document, this number of possible design
guidelines would definitely impact the complexity or prescriptiveness of the final
document. Mr. Wakan stated that the Advisory Group and the Technical Committee had
recommended that this list of context areas and road typologies be scaled back to
simplify the list and to bring the number of possible design guidelines closer to 35. Mr.
Wakan said that, at future meetings, the Advisory Group would work to consolidate their
current list of road typologies and context areas.
Mr. Wakan showed a map that displayed the vulnerability of pedestrians in Farmington
for the years of 2010 and 2011. He also provided some pictures of several sections
along Hutton Avenue and 20th Street where sidewalks were missing. Mr. Wakan said the
City of Farmington had recently received Transportation Alternative Program (TAP)
funding for sidewalk construction along 20th Street. It is hoped that the Public Works
Department will consider some Complete Streets design for this project.
Councilor Darnell asked how Complete Streets design impacted these types of projects
and how much less sidewalk could be built in order to add Complete Streets designs.
Ms. Holton said no cost estimates done were done yet but, that as a planning document,
the Advisory Group is working to provide a level of flexibility by giving a menu of
potential options. She noted that the pedestrian issues along 20th Street are not only due
to the lack of sidewalks, but also to the number of curb cuts and other conflicts as well
as the number of vehicles that travel that road. Ms. Holton added that providing the
separation between the road and the sidewalks was valid. The pictures also showed
power poles that were in the middle of the existing sidewalk and moving these would
likely require additional right-of-way. This would be a factor when considering a retrofit.
She stated that the ideal scenarios for the incorporation of Complete Streets concepts
would be in the new development areas. For older built areas, Complete Streets designs
could be considered when they are retrofitted or upgraded.
Councilor Darnell said he was thinking of a project on Vine Street. He added there was a
right-of-way issue at this location and cost was a definite factor because CDBG funds
cannot be used to acquire right-of-way. He added that there would certainly be an added
cost associated with acquiring more right-of-way and in maintaining any green area. Ms.
Holton said that Staff wanted to make the Complete Streets document a living document
and to provide a type of overall planning guide for the community.
Councilor McCulloch said she had spoken with Mr. Sypher to ask about making the
project along 20th Street more attractive. She added that the Advisory Group discussed
the need for the City of Farmington to offer more opportunities for public input on
projects. Councilor McCulloch commented that other cities have neighborhood
associations that weigh in on all local projects before the project is designed and
constructed. She commented that many City of Farmington projects do not get the
needed input from the neighborhoods before proceeding with the project.
Mr. Sypher commented that the concept of Complete Streets had been around for some
time, it just had not been called Complete Streets until now. He said he supported
Complete Streets but added that money would likely be an issue. Mr. Sypher said that
for the 20th Street project the department is looking to see what can be done to
incorporate some Complete Streets ideas. He noted that there were some challenges
with incorporating green areas into a design here because, unlike the northwest part of
the United States where rainfall is plentiful, this area sees limited rainfall and would
require a complex and maintained irrigation system. Mr. Sypher said that trees which are
more tolerant could more easily be included in designs than grass.
Mr. Sypher stated that not all the analyses have been completed for the 20th Street
sidewalk project. He said if right-of-way was available, the sidewalk could meander
along the street or include bulb-outs with trees. He said he hoped to be able to make the
city as beautiful as possible with the available dollars. Mr. Sypher explained that the
surveying for the 20th Street TAP project was completed and they will now begin
penciling in some ideas.
Councilor McCulloch said she hoped that with this very visible corridor, the city could
illustrate to the community what Complete Streets was about and how it could impact
economic development in the area. She added that she hoped this could be a first step
in showing the vision the Advisory Group has for Complete Streets.
Mr. Delmagori added that the Advisory Group had decided to start big with their road
typologies and context areas knowing the list could always be scaled back to a more
manageable number. The Advisory Group believed they were developing a good
product and had vetted the process thoroughly by starting with this broad range of ideas.
ACTION: The presentation was received.
7. CONSIDER APPROVAL OF THE LIST OF PROPOSED FUNCTIONAL
CLASSIFICATION CHANGES FOR THE FARMINGTON MPO
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
Staff discussed the schedule and reviewed the list of proposed changes with the
Policy Committee on January 16 and with the Technical Committee on January
23.
In February, staff met with the entities individually to discuss their proposed
classification changes.
The Technical Committee recommended approval of the list of functional
classification changes on February 27.
CURRENT WORK
Classification changes are divided into four categories: declassify, classify up,
classify down, and add classification.
For this list, only current roads and proposed roads in the TIP-STIP are to be
included in the list; future roads beyond the near term cannot be included in this
functional class update.
All of these recommended changes will be provided to NMDOT.
RECOMMENDATION
It is recommended that the Policy Committee approve the list of proposed
functional classification changes for the Farmington MPO.
DISCUSSION: Mr. Delmagori reported that in November 2013, NMDOT began working
with a consultant to do a statewide functional classification update. This work will be in
partnership with the MPOs and RTPOs.
Early this year, the list of proposed changes was discussed with the Policy and
Technical Committees. During February, Staff met with the entities individually to
discuss their proposed classification changes. The final list of functional classification
changes that the MPO would like to recommended to NMDOT was on Pages 10-12 of
the Agenda.
Mr. Delmagori noted there were four major action categories for the classifications:
• Declassify – the road was previously classified but no longer functions as a road
but more as a simple access road. Roads in this category would be removed
from the list.
• Reclassify Down – NMDOT has a higher classification of the road than the
MPO’s classification. Roads in this category are recommended to be reclassified
to match the MPO classification.
• Reclassify Up – NMDOT has a lower classification than the MPO’s
recommended classification. Roads in this category are recommended to be
reclassified to match the MPO classification.
• Add Classification – Road classifications that are part of regional and local
thoroughfare plans that are not in the NMDOT database.
Mr. Delmagori stated that NMDOT and the consultant requested that any future roadway
projects that went beyond four years needed to be removed from this functional
classification change. The functional classification system was not a long-range plan and
only near-term projects could be included. Those projects were already removed from
the list after discussions with local staff and the Technical Committee.
Mr. Delmagori said that March was identified as the preliminary opportunity to provide a
list of changes to the state. The entire process would take another year or so to
complete at the state level, but the state wanted MPO and RTPO input early in the
process.
ACTION: Councilor McCulloch moved to approve the list of proposed functional
classification changes for the Farmington MPO. Commissioner Eckstein seconded the
motion. The motion was approved unanimously.
8. RECEIVE A REPORT FROM NMDOT
Mr. David Quintana provided an update on District 5 projects:
• US 64 – Phase 3 of the project from mile marker 60-62 – the contractor is ahead
of schedule and making good progress.
• US 64 – Phase 2 – contractor is working to replace some cracked concrete
panels at the intersection with US 550. Some impacting of traffic is expected as
they complete this work. Mr. Quintana said there were still some punch list items
before the project is wrapped up.
• NM 516 – Intersection with Light Plant Road – this project is on a temporary
suspension until school lets out for the summer.
• NM 173 – District 5 is negotiating with the consultant, Wilson & Company, to do a
final design of the project. Mr. Quintana said the contract should be finalized in
the next three to four weeks.
• NM 371 & N36 – Representative Clahchischillage was able to obtain some
capital outlay funding for a temporary flashing beacon. District 5 is working to
design a signalized intersection project. Mr. Quintana said it is hoped to have a
full-signalized intersection in the next two years or so depending on funding.
• NM 371 corridor – Mr. Quintana reported that District 5 has been doing some
resurfacing work along this corridor. Work was completed in the past year on a
section of the road approximately 40 miles south of Farmington. He stated there
was a project being developed to repave another ten miles of the corridor
approximately 20-25 miles south of Farmington. This project is being developed
as a “shelf” project so that it can be brought into the STIP and, if money became
available or if another project currently programmed could not meet their
schedule, this project would be a back-up project. Mr. Quintana expected this
project to be funded and be programmed into the STIP in the next two years.
Councilor Darnell asked about the Pinon Hills extension project and the potential loss of
$3,000,000 for the first phase of the project. Councilor Darnell thought that this phase of
the project was similar to the East Arterial project in Aztec with having a road to
nowhere. Councilor Darnell said the project area in Farmington concerned two
neighborhoods, one on the north side and one on the south side where connections
were going to be made to the Pinon Hills extension. Initially there was concern by the
residents of both neighborhoods about the connection because they liked their quiet
neighborhoods. One of the neighborhoods has now come to the realization that if they
are connected to the extension and regardless of whether the road extends across the
river, they will have access to a signal. This neighborhood has two hills to climb that can
be difficult to traverse during inclement weather and then they have to try and merge
onto a heavily traveled Main Street. Councilor Darnell added that as this district’s
Council representative, he was trying to find the best solution for both neighborhoods
and not force anyone into accepting something they did not want.
Councilor Darnell explained that for the second neighborhood on the north side, the road
would only go into their neighborhood and nowhere else. He clarified that the Pinon Hills
extension would take traffic only into this neighborhood and would not connect to any
other neighborhood. He stated, however, that the extension through the neighborhood
on the south side would allow traffic to get to many other places. Councilor Darnell said
the residents in the northern neighborhood are concerned with the additional traffic the
extension would bring traffic into their neighborhood. Much of that traffic would have no
reason to be in the area, so the residents expressed some concern about increased
burglaries and vandalism.
Councilor Darnell said there was a thought that perhaps the access on the north side
could be a crash gate for emergency purposes and used for ingress and egress. For the
other neighborhood the extension would be a full connection to the Hubbard
neighborhood. He stated that the City Engineer was told by NMDOT that their concern
with this option had to do with environmental justice. Councilor Darnell said it appeared
there was a perception that the northern neighborhood was more affluent than the other.
He said that this had not factored into the equation as a solution that worked for
everyone was sought. Councilor Darnell said he planned to call Mr. Miguel Gabaldon
and discuss the local concerns with this issue, but wanted it first brought up through the
MPO process.
Mr. Quintana stated that he was not familiar with the specifics of the environmental
justice issue. He noted that because the project would be federally funded,
environmental justice is one of the aspects that are considered when the environmental
documentation is reviewed before the funding obligated. Mr. Quintana said he would
speak with Mr. Elias Archuleta and Mr. Gabaldon to better understand the specifics of
the environmental justice issue. Mr. Quintana suggested that Councilor Darnell could
contact Mr. Gabaldon directly to explain the City of Farmington’s position and to further
discuss the issues.
Mr. Quintana added that he had just sent an e-mail to Mr. Gabaldon, Mr. Archuleta, Mr.
Degani, and Ms. Gweneth Duncan who handled environmental oversight on local
government projects on the environmental justice concerns being raised about this
project. He anticipated being able to meet with everyone in the next day or so.
Mr. Brian Degani reported on the Planning Division updates:
The freight advisory committee which has representatives from private companies will be
meeting the week of April 14-18 in Albuquerque. Notes from the freight working group
were sent out and a future timetable for both the freight working group and the freight
advisory committee were sent out on March 3. Mr. Paul Sittig is responsible for the
development of the freight plan in conjunction with the state’s long-range plan. Mr.
Degani reported that these two freight groups looked at key corridors and regions and
identified criteria for freight projects. Additionally they will discuss various relationships to
the long-range plan efforts, stakeholder outreach, processes, interviews, and key
questions during an April meeting. As more information is developed, Mr. Degani will
provide updates to both the Policy and Technical Committees.
The Data Management Bureau of the Planning & Safety Division is updating GIS files
from the base year of 2007 to 2013. This will then reflect the shape files the MPOs have
on record.
The Planning & Procedures Manual is being finalized. The draft amendment is due to
FHWA on April 1 and revised manuals will then be provided to NMDOT and MPO staff
for review and presentation.
The Recreational Trails Program was reassigned from the Energy, Minerals & Natural
Resources Department to NMDOT on January 1. Memorandums of agreement are being
prepared for existing grantees whose projects were transferred. It will take several
months to prepare the program, budget, project selection process, and guidance. Once
completed, it will be distributed to the MPO.
The 2040 statewide long-range, multi-modal transportation plan website is available
online. Mr. Claude Morelli is responsible for the ongoing updates to the plan. The
process will take approximately 18 months to complete. The group is now looking at
where the process is at currently and what the existing conditions were. This summer
they will begin to address the vision for the system’s future.
The TAP Coordinator is reviewing the TAP process program for FY2014 and FY2015.
The NMDOT Local Government Agreement Unit will now require separate agreements
for the design and construction phases of projects even when they are part of the same
project. The draft agreements for design phases will be forthcoming. The construction
agreement boilerplate is being drafted. Local governments need to complete their design
phases and PS&E packages before the draft instruction agreements will be sent out. Mr.
Sean Sandoval is the contact for this information and he can be reached at (505) 476-
3784.
The local entities who were awarded TAP funding should be working on their certification
agreement processes. For FY2014 construction funds, the certifications must be
completed by July 15.
Mr. Degani asked if Mr. Quintana would include him in any discussions on the Pinon
Hills extension environmental justice issues. As part of the planning division and in
working with MAP-21, he needs to be aware of environmental justice concerns. He said
he had not been involved in any of the Pinon Hills discussions, but noted that there had
been other environmental justice issues in the state.
9. 2040 METROPOLITAN TRANSPORTATON PLAN
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Duane Wakan, MPO Associate Planner
Date: March 13, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning document
that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees, Councils, and other organizations.
The Stakeholder Workshop was held on February 5.
CURRENT WORK
Overview presentations will continue to be provided to various groups in the
coming months.
A Stakeholder Workshop on February 5 provided good feedback for the plan.
Public meetings were held to gather ideas on transportation projects that can
then be analyzed later in the MTP process.
Staff will discuss key questions with the Policy Committee to assist with
development of the plan.
A 2040 MTP timeline of activities will be reviewed on March 20.
RECOMMENDATION
It is recommended that the Policy Committee receive a report on comments
received during the Stakeholder Workshop and public meetings, hold a
discussion on addressing key questions for developing the 2040 MTP, and
review the 2040 MTP timeline.
DISCUSSION: Mr. Wakan reported that the MPO had begun work in November on
updating the 2040 Metropolitan Transportation Plan (MTP). Staff held a Stakeholder
Workshop on February 5, has presented to all the Councils and Commissions, and has
had numerous other presentations and public meetings on the MTP. Good feedback for
the MTP plan is being received.
Mr. Wakan referred to Page 15 of the Agenda which showed the comments received
during the Stakeholder Workshop. The comment categories were Roads, Bike/Ped,
Transit, and Other Modes. Mr. Wakan elaborated on some of the comments received.
Councilor Darnell thought that some of the Red Apple Transit concerns noted had been
addressed in the Red Apple Transit study done several years ago. Mr. Delmagori said
they had been, but issues still remained and further improvements were needed.
Mr. Wakan said that a brainstorm session with the members on improving the plan and
reviewing the timeline for development of the MTP would be held off until the next Policy
Committee meeting.
ACTION: The report was received.
10. INFORMATION ITEMS
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
INFORMATION ITEMS
a. Workshop with NMDOT. The Workshop between the MPO Technical
Committee and NMDOT is now scheduled for April 3.
b. Highway Safety Program Applications. Staff will provide an overview of the
Highway Safety Improvement Program and some of the new changes.
c. FFY2015-2016 UPWP. The new work program for the MPO covering FFY2015-
2016 will be drafted for review in April. Final approval will occur in June so the
document is ready to go into effect on October 1, 2014.
d. Other
DISCUSSION: Mr. Delmagori reported that the workshop with the Technical Committee
and NMDOT was cancelled again and will not be held on April 3. Staff is waiting to hear
from District 5 on a new date that is convenient for them.
Mr. Delmagori reported that applications for the Highway Safety Improvement Program
(HSIP) would now be accepted on a continuous cycle instead of just once a year. Now,
every 90 days, a committee will review the applications received. The committee will
include MPO and RTPO staff that will rotate onto the committee every 90 days. Mr.
Wakan will be part of the first committee that will meet on the May cycle. Mr. Delmagori
said there was discussion of having targeted funding goals for each MPO and RTPO. It
was thought that FMPO would be somewhere around $570,000. The details still have to
be worked out but Mr. Delmagori said it would great to know that FMPO would receive a
particular amount of money. Mr. Wakan added that even if an application exceeded the
allocated MPO amount, the limit was not fixed and entities were encouraged to apply as
many times as needed.
Mr. Delmagori said the new UPWP cycle for FY2015-2016 has begun. Staff planned to
have a draft UPWP for the Policy Committee review in April and have targeted the June
meeting for final approval.
Councilor Darnell said he was sorry to hear that Mr. Delmagori was leaving the City of
Farmington and stated that he would be missed. Mr. Delmagori said that he had
accepted a job with the MPO in Milwaukee, Wisconsin and that his last day with FMPO
is April 10. He thanked everyone for all their efforts and for the interest and participation
in the MPO by the Policy Committee members. Ms. Holton announced that Mr. Fran
Fillerup would be the Acting MPO Planner until Mr. Delmagori’s position can be filled.
11. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no business from the Chairman, Members or Staff.
12. BUSINESS FROM THE FLOOR
There was no business from the floor.
13. ADJOURNMENT
Councilor McCulloch moved to adjourn the meeting. Commissioner Eckstein seconded
the motion. Councilor Darnell adjourned the meeting at 3:23 p.m.
__________________________ ________________________________
Dan Darnell, Chair June Markle, MPO Administrative Aide
Agenda
POLICY COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
April 17, 2014
1:30 p.m.
Executive Conference Room
Farmington City Hall
800 Municipal Drive
Farmington, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
April 17, 2014 1:30 PM
This meeting will be held at in the Executive Conference Room at Farmington City Hall, 800
Municipal Drive, Farmington, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the March 20, 2014 Policy Committee meeting. 20
3. Review and discuss the draft FFY2015-2016 Unified Planning Work Program 1
(UPWP)
4. Receive a report on Complete Streets 2
5. Receive a report from NMDOT
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
6. Receive a report on the Spring 2014 traffic count location list. 5
7. 2040 Metropolitan Transportation Plan. 8
a. Hold a discussion on addressing key questions for development of the
2040 MTP.
b. Review and discuss goals/objectives of the 2040 MTP.
c. Review current and future population/employment data
d. Review the timeline for development of the 2040 MTP.
8. Information Items: 19
a. NMDOT & Technical Committee Workshop
b. National APA Conference
c. Other
9. Business from the Chairman, Members, and Staff
10. Business from the Floor
11. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of
a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can be
provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2015-2016 Unified Planning Work Program
Prepared by: Fran Fillerup, Acting MPO Planner
Date: April 9, 2014
BACKGROUND
The Unified Planning Work Program (UPWP) is the fiscal year work plan for the
MPO.
In FY2014, the MPOs agreed to align the work activities and budget with the federal
fiscal year to provide for better coordination and timely distribution of PL funds.
The UPWP covers planning activities and work products to be completed during two
federal fiscal years, 2015 and 2016, consistent with MPOs throughout the state.
The time covered will be October 2014 to September 2016.
CURRENT WORK
Staff is working with the entities and NMDOT to identify projects for FFY2015-2016.
Staff has reviewed the current UPWP to identify partially completed projects that
may carry into FFY2015.
Staff will work with NMDOT to develop PL and 5303 estimates for the MPO budget.
Based on the NMDOT Planning Procedures Manual, a working draft will be
provided to NMDOT by April 30.
ATTACHMENTS
A draft FFY 2015-2016 UPWP, including a list of possible activities by program
area, will be provided at the Policy Committee meeting.
ANTICIPATED WORK
Develop the UPWP in April and May.
Develop the UPWP budget in April and May.
Review of the UPWP by the Technical Committee in April and May.
Seek approval of the FFY2015-2016 UPWP by the Policy Committee in June.
RECOMMENDATION
It is recommended that the Policy Committee receive a report on the FY2015-2016
Unified Planning Work Program.
1
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Associate Planner
Date: April 8, 2014
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates all
modes of travel, such as walking, biking, and transit.
Staff has worked with the Advisory Group on development of land use context
areas (LUCAs) and road typology overlays.
The Advisory Group held its latest meeting on April 16.
CURRENT WORK
The Advisory Group went through an exercise to create road cross-section
diagrams using an on-line illustration tool (Streetmix.net).
Staff will identify and summarize common themes to be considered in the design
guideline creation process.
The Road Typologies and LUCAs will be consolidated and confirmed to steer the
design guideline process.
Staff is working on Photo Visions to illustrate the flexibility of Complete Streets
applications across the region.
Staff will continue to apply the four themes (Adoptability, Resourcefulness,
Flexibility & Simplicity) as activities continue to move forward.
ANTICIPATED WORK
Continue to develop Complete Streets design guidelines.
Prepare and submit CS progress updates and documents to Dan Burden as he
prepares for his workshops in May.
Staff will research other complete street elements to include in the document
such as intersection design, green infrastructure and a treatment tool box.
ATTACHMENTS
A compilation of some of the road cross-section diagrams created by the
advisory group.
A PowerPoint illustrating photo visions of complete streets applied in a regional
context will be presented at the meeting.
RECOMMENDATION
It is recommended that the Policy Committee receive an update on Complete
Streets.
2
3
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: 2014-2015 Traffic Count Program
Prepared by: Duane Wakan, MPO Associate Planner
Date: April 9, 2014
BACKGROUND
The MPO maintains traffic counts for over 220 locations throughout the MPO
area.
Locations are counted according to a three-year cycle and periodically change
due to the deletion or addition of various locations.
Staff split the annual traffic count list into a semi-annual calendar which began in
the fall of 2013.
The 2014 Traffic counts are in the second year of a three-year cycle.
CURRENT WORK
The MPO scheduled 47 weekday and 10 weekend volume counts (16
Speed/Class) to take place on the week of April 27, 2014.
MPO Staff has renewed a one-year contract with a consultant to take counts for
2014 and 2015.
ANTICIPATED WORK
Staff will analyze the results of the traffic counts in late May and begin to post the
volumes into GIS formats.
ATTACHMENTS
The 2014 Spring traffic count location (weekday, weekend and re-count
locations).
RECOMMENDATION
Staff recommends that the Policy Committee receive a report on the 2014-2015
Traffic Count Program.
5
2014 Spring Weekday Traffic Count Locations
LOCAL_ID Posted Route On Road From To Located At Functional Class Speed/Class Trvl Ln All Ln Area County MPO Comments
AZ_125 FL4185 Park Ave Rio Grande Ave Chaco St At intersection of Llano St. Collector 2 2 Aztec San Juan
AZ_32 FL4188 Blanco Mesa Verde E Urban Limit At Pollard Collector 2 2 Aztec San Juan
AZ_41 FL4184 Chaco St NM 516 Park Ave Animas River Crossing Minor Arterial Y 2 2 Aztec San Juan
AZ_92 FL4189 McCoy US 550 End of Route South of Willow Collector 2 2 Aztec San Juan
AZ_94 FL4181 Mesa Verde Chuska Blanco At Chaco St Collector 2 2 Aztec San Juan
AZ_95 FL4181 Mesa Verde Blanco US 550 North of Safford Collector Y 2 2 Aztec San Juan
FM_1 FL4395 20th Municipal Dr Sunset At Summit Dr Minor Arterial Y 2 2 Farmington San Juan
FM_10 FL4396 30th Dustin Butler West of Crestridge Dr Minor Arterial Y 4 4 Farmington San Juan
FM_102 FL5398 Navajo St E Vine Ave Main St Approx. 500' North of Main Collector 2 2 Farmington San Juan NMDOT needs to create TIMS ID for this section
FM_105 NM0170 NM 170 US 64 Pinon Hills Blvd Approximately 4500' north of US 64 Principal Arterial Y 4 4 Farmington San Juan
FM_148 FL4388 Sullivan 15th 20th At intersection of 18th St. Minor Arterial Y 2 3 Farmington San Juan
FM_153 FL5321 Twin Peaks Rd NM 170 Troy King Rd One mile east of Troy King Rd Collector Y 4 4 Farmington San Juan
FM_184 FL5369 Wildflower Pkwy NM 516/Browning Wildflower Mesa Dr Approximately 500' west of Wildflower Mesa Minor Arterial 2 3 Farmington San Juan
FM_20 FL4391 Apache US 64/W Main Palmer Between Comanche & Hicks Minor Arterial Y 2 3 Farmington San Juan
FM_22 FL4391 Apache Airport Auburn Approximately 200' west of Schwartz Ave Minor Arterial 2 3 Farmington San Juan
FM_225 FL4387 Butler Carlton Ave Sunrise Pkwy Approximately 500' North of Carlton Ave Minor Arterial Y 2 2 Farmington San Juan NMDOT needs to create TIMS ID for this section
FM_25 FL5375 Arrington Airport Wall West of Auburn Collector 2 2 Farmington San Juan
FM_3 FL4395 20th Dustin Butler Approximately 100' E of Monterrey Minor Arterial 4 4 Farmington San Juan
FM_40 FL5382 Carlton Murray US 64/Broadway Approximately 1000' north of Murray Collector 2 2 Farmington San Juan
FM_43 FL5471 Cliffside Fairview Hutton Between Culpepper and Rio Vista Collector Y 2 2 Farmington San Juan
FM_66 FL5386 Fairview Main St 20th Between 16th and 17th Collector 2 2 Farmington San Juan
FM_7 FL5373 24th Glade Sunset West of Western Ave Collector 2 2 Farmington San Juan
FM_71 FL5323 Hood Mesa Tr Pinon Hills Anasazi Trail Approximately 1000' northeast of Kokopelli Trail Collector 2 2 Farmington San Juan
FM_78 FL4384 Lake St US 64/Broadway Main St Approximately 100' N of US 64/Broadway Collector 2 3 Farmington San Juan NMDOT needs to create TIMS ID for this section
FM_79 FL5390 Largo St NM 516/E Main St English East of Washington Collector 2 3 Farmington San Juan
FM_80 FL5390 Largo St English Rail Road Approximately 500' east of Kayenta Collector 2 2 Farmington San Juan
FM_83 FL4357 Main St US 64/Broadway Airport Approximately 200' W of Airport Principal Arterial Y 4 4 Farmington San Juan
FM_86 FL4357 Main St Auburn Butler Approximately 400' W of Butler Principal Arterial 4 4 Farmington San Juan
FM_9 FL4396 30th Sunset Dustin West of Cresent Ave Minor Arterial 4 4 Farmington San Juan
FM_97 FL4394 Municipal Dr Navajo 20th Between Gladden and Ashurst Minor Arterial 2 2 Farmington San Juan
SJ_111 NM0371 NM 371 Old Fruitland Hwy/NR 36 Murray Dr/NM 5001 San Juan River Crossing Minor Arterial Y 4 4 County San Juan
SJ_174 US0064 US 64 CR 5500 Church Approximately 4 mi east of CR 5500 Principal Arterial Y 4 4 County San Juan
SJ_49 453500 CR 350 CR 5580 CR 5030 Between CR 5589 and CR 5030 Collector Y 4 4 County San Juan
SJ_50 453500 CR 350 CR 5030 CR 3000 Approximately 500' S of CR 3000 Collector Y 4 4 County San Juan
SJ_55 453500 CR 3940 Morningstar Dr CR 3934 At CR 3937 Collector 2 2 County San Juan
SJ_56 455500 CR 5500 US 64 CR 5510 San Juan River Crossing Collector 2 2 County San Juan
SJ_99 NM5001 Murray Dr/NM 5001 Pinon St Miller Animas River Crossing Principal Arterial 4 4 County San Juan
6
2014 Spring Weekend Count Locations
LOCAL_ID Posted Route On Road From To Located At Functional Class Speed/Class Trvl Ln All Ln Area County MPO Comments
AZ_119 NM 516 Lt Plant Rd Ruins Rd Approximately 200' East if Light Plant Road Principal Arterial 4 4 Aztec San Juan Weekend Count Location
BL_155 US 550 Sullivan Rd US 64 San Juan River Crossing Principal Arterial 4 5 Bloomfield San Juan Weekend Count Location
FM_129 Pinon Hills Blvd College NM 516/Main St Approximately 500' west of English Road Principal Arterial 4 4 Farmington San Juan Weekend Count Location
FM_165 US 64 NM 489 (CR 6100) NM 170 Approximately 3000' east of CR 6100 Principal Arterial 4 4 Farmington San Juan Weekend Count Location
FM_5 20th Sullivan Hutton Between Tucker and Huntzinger Minor Arterial 4 5 Farmington San Juan Weekend Count Location
FM_85 Main St Lake St Auburn Approximately 300' east of Schwartz Ave Principal Arterial 4 5 Farmington San Juan Weekend Count Location
FM_89 Main St San Juan Blvd Browning Pkwy Approximately 400' east of San Juan Blvd Principal Arterial 6 6 Farmington San Juan Weekend Count Location
SJ_111 NM 371 Old Fruitland Hwy/NR 36 Murray Dr/NM 5001 San Juan River Crossing Minor Arterial 4 5 Farmington San Juan Weekend Count Location
SJ_161 US 550 NM 173 5.362 mi S of Col State Line At CR 2800 Principal Arterial 4 4 County San Juan Weekend Count Location
SJ_49 CR 350 CR 5580 CR 5030 Between CR 5589 and CR 5030 Collector 4 4 County San Juan Weekend Count Location
2013 Fall Re-count Locations
LOCAL_ID Posted Route On Road From To Located At Functional Class Speed/Class Trvl Ln All Ln Area County MPO Comments
FM_149 FL4388 Sullivan 20th 30th Approximately 100' S of Cliffside Dr. Minor Arterial 4 4 Farmington San Juan 2013 Recount Locations (weekday)
FM_2 FL4395 20th Sunset Dustin West of Brookside Dr. Minor Arterial 4 4 Farmington San Juan 2013 Recount Locations (weekday)
FM_38 FL4387 Butler Ute 20th North of Ute Minor Arterial 2 3 Farmington San Juan 2013 Recount Locations (weekday)
FM_65 FL5385 Fairgrounds Main St Cooper Between Navajo and 11th St Collector 2 2 Farmington San Juan 2013 Recount Locations (weekday)
FM_84 FL4357 Main St Airport Lake St At Giles Principal Arterial 4 4 Farmington San Juan 2013 Recount Locations (weekday)
FM_112 NM0516 NM 516 Morningstar E Main St Animas River Crossing Principal Arterial Y 4 4 Farmington San Juan 2013 Recount Locations (weekday)
FM_185 FL5369 Wildflower Pkwy Wildflower Mesa Dr Andrea Dr Approximately 1200' west of Andrea Dr. Minor Arterial 2 2 Farmington San Juan 2013 Recount Locations (weekday)
SJ_163 US0064 US 64 CR 6700 CR 6800 Between CR 6700 and CR 6825 Principal Arterial 4 4 County San Juan 2013 Recount Locations (weekday)
SJ_173 US0064 US 64 CR 5569 CR 5500 Approximately 200' east of CR 5568 Principal Arterial 4 4 County San Juan 2013 Recount Locations (weekday)
7
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: 2040 Metropolitan Transportation Plan (MTP)
Prepared by: Fran Fillerup, Acting MPO Planner
Date: April 9, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning document
that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees, entity Councils and Commissions, and other organizations.
The Stakeholder Workshop was held on February 5.
The Technical Committee reviewed the goals and objectives on March 27.
CURRENT WORK
Staff will discuss key questions about the 2040 MTP with the Policy Committee
on April 17. (The 2035 MTP can be found online at fmtn.org, under government
select Metropolitan Planning Organization, select Metropolitan Transportation
Plan, then follow the 2035 MTP link near the bottom of the page.)
Staff values comments and input from our committee members to steer the
development of the MTP.
Identify goals and strategies that will guide the articulation of the 2040 Mission
and Vision Statements.
Previously developed population and employment data will be reviewed.
Staff is developing an RFQ to hire a consultant to work on the public participation
efforts for the Plan.
ANTICIPATED WORK
Select a consultant based on the RFQ for Public Participation efforts.
Approve the Vision/Mission and Goals/Objectives based on public outreach.
Data collection for performance measures.
ATTACHMENT
Questions for developing the framework of the MTP.
Vision and Mission Statements, Goals and Objectives.
Timeline for the MTP process.
2040 Population/Employment data will be provided at the meeting.
RECOMMENDATION
It is recommended that the Policy Committee:
a. Provide comments on key questions regarding the 2035 MTP;
b. Review and discuss the MTP goals and objectives;
c. Review current and future population/employment data;
d. Review overall MTP timeline.
8
2040 Metropolitan Transportation Plan
Questions for Developing the Project Planning Process
What aspects of the 2035 MTP do you like and want to repeat for the update?
• Keep document to about 10 chapters
• Structure of chapter by mode (but interaction among modes would be useful)
• Utilize GIS skills for improved illustrations, maps, and graphics
• Overview presentations and a MTP snapshot brochure
• Landscape format
What aspects of the 2035 MTP should be changed or improved upon?
• Stronger discussion with Navajo DOT, NAPI, Navajo Nation
• Continued interaction with 4CED
• Improved planning for freight, air, and rail (cite the state planning processes for these modes
as they are developed)
List new stakeholders, clubs, and other organizations that need to be involved in the MTP update
process.
• NAPI, Navajo Nation
• Trucks and freight movement
• Rail companies
• 4CED
What areas of the MTP need additional focus?
• Crash data – UNM releases data to the MPO on a quarterly or semi-annual basis; Provide
shape-file data that we transform into thermal maps
9
• NAPI and its impact on freight and the State Rail Plan
• Consultant for public outreach and marketing; include online components
Identify planning elements that are not part of the current 2035 MTP that should be part of the
update.
• Complete Streets – use products of that process for MTP update
• The needs of the graying population and the millennial population
• Title VI and survey targeting
• Use data from the Census On the Map program
Provide initial thoughts on performance measures and targets? What data can the MPO use?
What should the performance measures be trying to improve?
• Research what other MPOs are doing
• Gather crash data
• Gather traffic data
• Reducing traffic volumes by x% over y years
• Increasing pedestrian activity by x% over y years in what parts of the region
• Converting x% of existing road network into Complete Streets over y years
10
Below are the Vision and Mission Statements, plus the table of Goals and Objectives from the
2035 Metropolitan Transportation Plan, pages 1-2 and 1-4.
1.2) VISION AND MISSION STATEMENTS
The Metropolitan Transportation Plan is shaped within the framework of the vision and mission
statements for the MPO. These were developed in response to the planning factors outlined by
SAFETEA-LU and in cooperation with the MPO Technical Committee, the MPO Policy
Committee, and NMDOT.
Vision Statement
The Farmington Metropolitan Planning Organization vision is for a safe, efficient and reliable
multi-modal transportation system that meets the needs of residents and visitors in the region.
Mission Statement
Provide a forum to develop an effective transportation system to move people and goods safely,
economically and efficiently while maintaining a high quality of life.
1.3) GOALS AND OBJECTIVES
GOALS OBJECTIVES
• Support the economic vitality of the 1. Provide adequate land area and
MPO region by providing a balanced, access for commercial opportunities to
multi-modal transportation system that serve future population growth
moves people, goods and information 2. Minimize congestion to improve
safely, economically and efficiently. delivery of goods and services
• Foster regional coordination and 1. Maximize use of current transportation
transportation system continuity system
2. Involve local planners in the
transportation planning process
• Develop and connect transportation 1. Increase transit, bicycle and pedestrian
systems and associated facilities into a connections
cohesive intermodal system
• Minimize congestion on the 1. Minimize congestion and minimize
transportation system delay
• Provide reasonable access to services 1. Increased multi-modal accessibility
and jobs for all of the region’s
residents, regardless of age, income or
disability
• Minimize negative environmental 1. Minimize air quality impacts
impacts and enhance the 2. Minimize impacts to existing
environmental quality of the MPO neighborhoods
region 3. Develop strategies to educate the
public about how travel choices affect
air quality
• Identify and develop funding sources 1. Minimize total transportation system
adequate to build, operate and costs
maintain the metropolitan 2. Maximize transportation system
transportation system performance per project costs
• Identify and implement new technology 1. Improve multi-modal street design for
11
for balanced multi-modal transportation high activity areas
2. Increase mode split
• Develop a transportation system that 1. Minimize access to adjacent
maintains and/or enhances the existing developments along key arterials to
quality of life and works in concert with maximize capacity
cultural and environmental resources
and adopted local plans
• Integrate transportation and land use 1. Encourage the local entities to
planning to improve quality of life and integrate regional transportation
to protect the natural environment policies into their adopted local plans
• Ensure public safety for all modes 1. Improve system safety through
improved levels of service and reduced
congestion
2. Promote safety design practices for all
modes
3. Minimize emergency vehicle response
time
• Coordinate with local agencies on 1. Implement Intelligent Transportation
security planning and strategies Systems (ITS) technologies for
improving the safety and security of
transportation modes
12
Below is an example from a plan document of an MPO in the state of Washington. Here,
objectives and specific strategies are identified which will help to meet the goals of the plan.
Goal (1 of 8). The Washington metropolitan region's transportation system will provide
reasonable access at reasonable cost to everyone in the region.
Metropolitan Washington Council of Governments, www.mwcog.org
Objectives Strategies
1. A comprehensive range of choices 1. Plan, implement, and maintain a
for users of the region’s truly integrated, multi-modal regional
transportation system transportation system
2. Accurate, up to date and 2. Plan and implement a tourist friendly
understandable transportation system that encourages the use of
system information which is transit and provides international
available to everyone in real time, signage and information
and is user friendly for first time 3. Make the region’s transportation
visitor and residents, regardless of facilities safer, more accessible, and
mode of travel or language of the less intimidating for pedestrians,
traveler bicyclists, and persons with special
3. Fair and reasonable opportunities for needs.
access and mobility for persons with 4. Plan and implement a uniform fare
special accessibility needs system for transit and commuter rail
4. Convenient bicycle and pedestrian 5. Adopt a regional transit planning
access process and plan, with priority to
uniformity, connectivity, equality, and
cost effectiveness and reasonable
fares.
13
DRAFT PROJECT TIMELINE/MILESTONES FOR THE
2040 METROPOLITAN TRANSPORTATION PLAN
October 2013 to April 2015
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
TASK STATUS 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015
PRELIMINARY ACTIVITIES
Identify activities and
elements of the MTP Complete
Identify stakeholders for
involvement in the process Ongoing
Review/Approve Goals & Review in March; possibly
Objectives approve in April?
Review/Approve Vison
PUBLIC PARTICIPATION
Councils/Comm. complete
MTP overview presentations in Jan Feb Mar
Review and expand Completed for Stakeholder
stakeholder contact list Workshop in Feb
Stakeholder Kickoff Mtg Held February 5
4 public mtgs held in late
Public meetings Jan & Feb
Presentations to clubs/
organizations
Stakeholder meetings
Hire Consultant for Public
Participation process RFP in Mar/Apr
Consultant develops Survey
& analyzes results
Consultant & social media
Consultant & other methods
MTP displays at public
events
POPULATION/EMPLOYMENT
Review current year
population/employment data Review in March & April
Review mid-range and long
range projections Review in March & April
Maps & charts for
illustrations
Draft MTP chapter
Final Work Products
14
DRAFT PROJECT TIMELINE/MILESTONES FOR THE
2040 METROPOLITAN TRANSPORTATION PLAN
October 2013 to April 2015
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
TASK STATUS 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015
ROADWAY PLAN
Complete traffic model Calibration & review,
calibration/validation update documentation done in Mar
Gather data on proposed
future roads
Determine areas of
congestion and deficiency
Finalize project details for
proposed roads
Run alternatives in model
and perform analysis
Approve prioritized list of
proposed roads
Incorporate Completes
Streets guidelines & policies
Develop roadway policies
and strategies
Final Work Products
TRANSIT PLAN
Finalize mapping and
illustrations of data collection
Discuss with Red Apple their
goals and needs
Gather historical ridership
and other data collected
Determine projections for
ridership
Identify and analyze route
changes
Identify scheduling and route
improvements
Develop transit policies and
strategies
Final Work Products
15
DRAFT PROJECT TIMELINE/MILESTONES FOR THE
2040 METROPOLITAN TRANSPORTATION PLAN
October 2013 to April 2015
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
TASK STATUS 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015
BICYCLE/PED PLAN
Identify future projects
Collect project details
Rank and prioritize projects
Develop Safe Routes to
School strategies
Incorportate Complete
Streets guidelines & policies
Develop bike/walk policies
and strategies
Final Work Products
Summer 2015 based on
Update MPO Bike/Ped Plan MTP process
Complete Streets
Road Typologies & Land Use Prelim approval by CSAG in
Context Areas Jan; TC in Feb; PC in Mar
Develop design guidelines Started in Feb
Intersection design
guidelines
CS Policies
FREIGHT PLAN
Be involved in NMDOT NMDOT held meetings in
Freight Plan Dec & Feb
Gather truck volume and
classification data
Identify trucking stakeholders
for their input
Identify existing and future
truck routes
Coordinate regional freight
planning with NMDOT Freight
Plan update
Develop freight policies
Final Work Products
16
DRAFT PROJECT TIMELINE/MILESTONES FOR THE
2040 METROPOLITAN TRANSPORTATION PLAN
October 2013 to April 2015
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
TASK STATUS 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015
OTHER PLAN ELEMENTS
Transportation/Land Use
Planning
Rail Planning
Airport Planning
Equestrian Planning
Environmental Justice
Air Quality/Environmental
Planning
Safety Planning
Security Planning
Integrate the East Main Study
into Road Plan
Received from UNM in Jan;
Collect crash data ongoing
Vehicle & bike/ped maps
Produce crash maps complete
Intergrate crash data into
modal plans & performance
measures
Planning for the Generations
(elderly, millenials)
Final Work Products
PERFORMANCE MEASURES
Collect national and state No national measures as of
measures Feb 2014
Identify MPO measures
Collect existing data to
supprt MPO measures
Identify methods for carrying
out MPO measures
Develop a means of
assessment for MPO
measures
Final Work Products
17
DRAFT PROJECT TIMELINE/MILESTONES FOR THE
2040 METROPOLITAN TRANSPORTATION PLAN
October 2013 to April 2015
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
TASK STATUS 2013 2013 2013 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2014 2015 2015 2015 2015
FINANCIAL PLAN
Local entity cost & revenue
estimates
Targets from District 5
Year of Expenditure figures
Link cost estimates to
projected revenues
Financial charts and
summary
Final Work Products
DELIVERABLES
Draft MTP Development
Final MTP Development
Final Public Comment
Adoption
18
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item
Subject: Information Items
Prepared by: Fran Fillerup, Acting MPO Planner
Date: April 9, 2014
INFORMATION ITEMS
a. Workshop with NMDOT and MPO Technical Committee. A new date of May 6
is being proposed for this Workshop.
b. National APA Conference. Mr. Wakan will be attending the National APA
Conference in Atlanta on April 26 – 30, 2014.
c. Other
19
PC Final Draft Minutes
March 20, 2014
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
March 20, 2014
Policy Members Present: Dan Darnell, City of Farmington
Gayla McCulloch, City of Farmington
Scott Eckstein, San Juan County
Technical Members Absent: Sherri Sipe, City of Aztec
Bloomfield representative currently vacant
Staff Present: Mary Holton, MPO Officer
Joe Delmagori, MPO Planner
June Markle, MPO Administrative Aide
Duane Wakan, MPO Associate Planner
Staff Absent: None
Also Present: Priscilla Benavides, NMDOT-CRD Albuquerque
Cassandra D’Antonio, Sites SW
Brian Degani, Liaison, NMDOT Planning Division,
via telephone
Larry Hathaway, San Juan County
Robert Luna, HDR Engineering, Inc.
David Quintana, NMDOT District 5, via telephone
David Sypher, City of Farmington
1. CALL TO ORDER
Councilor Darnell called the meeting to order at 1:40 p.m.
2. APPROVE THE MINUTES FROM THE JANUARY 16, 2014 POLICY COMMITTEE
MEETING
Councilor Darnell moved to approve the minutes from the January 16, 2014 Policy
Committee meeting. Councilor McCulloch seconded the motion. The motion was passed
unanimously.
3. APPROVE THE MINUTES FROM THE MARCH 10, 2014 SPECIAL POLICY
COMMITTEE MEETING
Councilor McCulloch moved to approve the minutes from the March 10, 2014 Policy
Committee meeting. Councilor Darnell seconded the motion. The motion was passed
unanimously.
20
PC Final Draft Minutes
March 20, 2014
4. RECEIVE A PRESENTATION ON THE NM 371 CORRIDOR STUDY (HDR, INC.)
Subject: NM 371 Corridor Study
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
BACKGROUND
NMDOT is preparing a corridor study for NM 371 from I-40 at Thoreau to Murray
Dr. in Farmington.
The study is intended to identify improvements to the corridor.
Particular emphasis for the FMPO will be on intersection improvements at N36.
RECOMMENDATION
It is recommended that the Policy Committee receive a presentation on the NM
371 Corridor Study.
DISCUSSION: Mr. Delmagori introduced Mr. Robert Luna with HDR, Ms. Priscilla
Benavides with NMDOT, and Ms. Cassandra D’Antonio with Sites SW. These individuals
and their agencies worked on a corridor study of NM 371.
Ms. Benavides reported that NMDOT received some funding through their Planning
Division in order to conduct safety and traffic analyses on certain corridors throughout
the state. One of those corridor studies was NM 371 from I-40 in Thoreau to US 64
(Murray Drive) in Farmington. She noted that there had been a stakeholder’s meeting in
Crownpoint about a week ago and input was received from various agencies and
chapter houses.
Ms. Benavides stated that NMDOT had contracted with HDR to perform the study. The
project objective was to identify a purpose and need and look at ways to improve the
safety of the overall corridor. HDR was contracted to conduct a modified scoping report
that included an inventory of all existing roadway structures, drainage features, and
fencing along the corridor. NMDOT will then evaluate each of the items inventoried and
see how to improve them.
Ms. Benavides said that NMDOT had not identified any funding to further develop the
design of the corridor and that the current focus was only on the study. NMDOT will look
at alternative analyses and recommendations that may come out of the study and
prioritize those recommendations. Ms. Benavides said once the prioritizations are
established, funding may be programmed but no dates have been established for this to
happen. She stated that it is not currently programmed in the STIP so funding for this
corridor could be several years out.
21
PC Final Draft Minutes
March 20, 2014
Ms. Benavides stated that the next step in the project is to receive public comments.
NMDOT has handed out comment cards to the stakeholders and is hoping to receive
some good feedback.
Mr. Robert Luna gave a PowerPoint presentation on the corridor study being conducted
by HDR. This is a preliminary study phase which is a scoping report to identify the issues
and potential solutions and then put together some planning costs for possible future
construction.
Mr. Luna said the project began in Thoreau and extended to the intersection of US 64 in
Farmington. The roadway is primarily a two-lane minor arterial throughout the corridor.
He said the average daily traffic ranges from 740 in the rural interior parts of the corridor
to 4300 at the external points of the corridor at Thoreau and Farmington.
Mr. Luna said the project was defined by segments and potential improvements could be
considered based on that roadway segment. Since the roadway travels mainly through
the Navajo Nation, HDR worked to identify each chapter and sought local input.
Mr. Luna said the study was to identify a purpose and need for the project, determine
what needed to be done or what needed to be further studied, and then determine how
the project might move forward. HDR evaluated the existing corridor and identified
potential improvements for pedestrians and operational safety, ways to correct roadway
deficiencies or roadside features, how to best develop a common, typical roadway so it
was consistent throughout the corridor, and then develop a list of potential priority
projects for both District 5 and District 6.
Mr. Luna explained the current physical road conditions and the issues noted by HDR
such as bleeding, transitional cracking, rutting, and spawling of the pavement. Some
areas have had improvements made already. HDR also took a major sign inventory
which showed significant damage to many of the signs while others were missing
entirely or vandalized.
Since the area had not been engineered or surveyed recently, HDR field crews used an
I-Pad and were able to catalog every sign, barrier, pavement section, and roadside
feature and include descriptions and observations of the pictures they took. Mr. Luna
stated that it took the crew five days to walk the entire 107-mile corridor and to document
everything along the way. The information collected created a GIS database that would
allow, for instance, a review of the signs along the corridor or drill down and view just the
regulatory or warning signs. Mr. Luna said that there were many damaged guard rails
noted in the study that needed to be replaced to ensure safety. Information on each
specific feature - guard rails, signs, bus stops, culverts, and bridge structures along the
corridor - was collected and that data will now be given to NMDOT to utilize for their
future maintenance improvements.
Also as part of the location study, HDR conducted a traffic operational analysis. This
included a roadway analysis and intersection analyses at the major intersections along
the corridor. The study determined that the present level of service and service for
twenty years into the future was satisfactory. The determination was made that there
was no need to widen the roadway to four lanes. Also there were no major issues with
the larger intersections although some may benefit from the addition of left or right-hand
turn lanes.
22
PC Final Draft Minutes
March 20, 2014
Councilor Darnell asked if the terminus was at Bisti Highway and Murray Drive or at
Main Street. After some discussion, it was determined that the terminus was actually at
Murray Drive.
Along with the traffic analysis, Mr. Luna reported that HDR had conducted a safety
analysis of the corridor. This meant evaluating all the crashes along the corridor and at
some intersections. Some of this data would need to be refreshed after additional
information was received from Navajo DOT. HDR also conducted a highway safety
analysis to identify the crash frequency. Intersections within the urban areas were
evaluated and many had no crosswalks, no pedestrian markings, push buttons are not
ADA compliant, and pedestrian crossings are not ADA compliant.
Ms. Cassandra D’Antonio with Sites SW reported that they inventoried the natural and
cultural resources adjacent to the corridor through record searches which included both
federal and state databases. She noted that no field surveys have been conducted to
date. Once projects and funding have been identified, field surveys would be conducted.
Through the record searches, Sites SW found that the corridor crosses nine flood plains,
five major drainages, some possible wetland areas, and numerous federal, state, and
Navajo Nation species and habitats along the corridor as well.
Ms. D’Antonio stated that the vast majority of the larger cultural resource surveys in the
corridor were fairly old. There were approximately 100 surveys conducted from the
1970’s through the early 1990’s. The surveys identified 39 archeological sites within the
right-of-way and six national registry and historical registered sites within one mile of the
corridor.
Mr. Luna stated that now that the survey was completed, HDR would begin to make
some recommendations and prepare a final report. They would look at what could
immediately be improved by NMDOT such as signage and guardrails, and then look at
what larger geometric projects should be considered. Mr. Luna said that NMDOT had
conducted a road safety audit (RSA) at the intersection of NM 371 and N36 so no
additional analyses were conducted at the intersection by HDR.
Mr. Luna stated that this completed their contract with NMDOT and no future work was
anticipated until funding was identified. Ms. Benavides stated that NMDOT would benefit
from HDR’s report and analysis and also gains a huge database of the corridor for future
information.
Councilor Darnell asked why maintenance efforts seemed highly visible on US 550 but
that on corridors such as NM 371 maintenance was almost non-existent. Ms. Benavides
commented that all NMDOT facilities should be regularly maintained. She noted that NM
371 did span both District 5 and District 6 areas and she was not able to comment on
how the specific districts handled their road sections. Ms. Benavides said the lack of
funding for maintenance was a concern brought up at the stakeholders’ meeting. The
stakeholders were encouraged to contact their state legislators to push for needed
improvements to the NM 371 corridor. She said that much of the NM 371 corridor is in
District 6 and there were representatives from District 6 in attendance at the meeting so
they were made aware of the concerns. Mr. Luna stated that maintenance and upkeep
of US 550 was built into that construction contract and was stipulated in the award. This
23
PC Final Draft Minutes
March 20, 2014
is perhaps why more diligence is seen on US 550 because the contractor is required to
keep up with maintenance issues.
Councilor Darnell recommended that NMDOT consider posting signs along the roads
giving a hotline telephone number for motorists to call and report maintenance issues
they encounter when traveling the corridor.
Councilor Darnell also asked if there was any coordination with a parallel study being
conducted into the potential construction of a rail line from Thoreau to Farmington. He
asked if there might be any advantage to coordinating the two studies. Both Ms.
Benavides and Mr. Luna said that were not aware of any rail study. Ms. Holton
commented that NMDOT is doing a freight study and the MPO and local entities have
provided comment for the study. Councilor Darnell added that the footprints for both
project and the study of historical and cultural concerns could impact both potential
projects. Mr. Brian Degani stated that Mr. Paul Sittig was doing the freight study in
conjunction with the state’s 2040 multi-modal long range plan. He said he would e-mail
Mr. Sittig’s contact information to Ms. Benavides so she could contact him. Ms.
Benavides re-stated that this had been only an initial study and once individual projects
were identified, further environmental examinations would be done. She expected,
however, that any NM 371 projects would be within current NMDOT right-of-way.
Mr. Delmagori also mentioned Mr. Bill Craven with the State Rail Plan and the status of
that document. Numerous comments from the MPO, local entities, and an economic
development agency were submitted to Mr. Craven about including this rail line as part
of the rail plan.
Mr. David Sypher commented on the stakeholder meeting held in Crownpoint and the
presentation made to the stakeholders. He said that the City of Farmington had offered
comments to the study specifically on the intersection of N36 and NM 371. He provided
the consultant team with comments from Steve Krest, who is with Farmington’s Traffic
Engineering division.
Ms. Benavides said that the study should be completed by the summer and both
Districts 5 and 6 will have the recommendations from HDR on how to proceed forward.
Getting the many identified potential projects into the STIP and funded would be the next
steps.
ACTION: The presentation was received.
5. CONSIDER APPROVAL OF AMENDMENT #5 TO THE FFY2014-2019
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND THE SELF-
CERTIFICATION FOR AMENDMENT #5
Subject: FFY2014-2019 TIP Amendment #5
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
24
PC Final Draft Minutes
March 20, 2014
BACKGROUND
On February 12, 2014 the Farmington MPO advertised Amendment #5 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds one project to the TIP as described in the attached notice.
A public hearing on Amendment #5 was held on February 27, 2014 during the
Technical Committee meeting.
The Technical Committee recommended approval of Amendment #5 to the
FFY2014-2019 TIP.
CURRENT WORK
• The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
• NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
• Upon completion of this phase, the middle section will be the remaining phase of
this project.
RECOMMENDATION
It is recommended that the Policy Committee approve Amendment #5 to the
FFY2014-2019 TIP and the MPO Self-Certification for Amendment #5 to the
FFY2014-2019 TIP.
DISCUSSION: Mr. Delmagori reported that Amendment #5 to the FFY2014-2019 TIP
was to add the next phase of the East Arterial project into the TIP. The East Arterial will
be the relief route on the perimeter of Aztec.
Mr. Delmagori explained that this project had been in the previous TIP cycle. It was
removed because there was no logical terminus for the project. At the January meeting,
the Policy Committee approved an amendment to add Legion Road to the TIP which
created the logical termini for the East Arterial. Mr. Delmagori said that District 5 was
now able to program money toward the project which was from the intersection of US
550 to Legion Road. The project, which is targeted for FFY2015, will use $2,990,400 in
federal STP funds with a corresponding match of $509,600 for a total of $3,500,000.
Mr. Delmagori said that Mr. Quintana had reported at the Technical Committee meeting
in February that District 5 was committed to finding the funding for the remaining phases
which would connect the northern end by the sports complex back down to this phase on
the south end.
Mr. Delmagori reported that the Technical Committee had recommended approval of
Amendment #5 and that no comments were received during the public comment period.
25
PC Final Draft Minutes
March 20, 2014
ACTION: Commissioner Eckstein moved to approve Amendment #5 to the FFY2014-
2019 TIP and the MPO Self-Certification for Amendment #5 to the FFY2014-2019 TIP.
Councilor McCulloch seconded the motion. The motion was passed unanimously.
6. COMPLETE STREETS
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Associate Planner
Date: March 13, 2014
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates all
modes of travel, such as walking, biking, and transit.
Staff has worked with the Advisory Group on development of land use context
areas (LUCAs) and road typology overlays.
The Advisory Group recommended preliminary approval of the titles and
definitions for the road typologies and land use context areas at their January 22
meeting.
The Technical Committee recommended approval of the road typologies and
land use context areas at their February 27 meeting.
The Advisory Group held its latest meeting on February 19.
CURRENT WORK
The Advisory Group completed exercises in which they identified titles and
descriptions for land use context areas (LUCAs) and road typologies for the MPO
Complete Streets program.
The Road Typologies and LUCAs will be used to create the design guidelines for
the MPO road network.
Staff introduced four themes (Adoptability, Resourcefulness, Flexibility &
Simplicity) that will steer the development of design guidelines and the Complete
Streets document.
RECOMMENDATION
It is recommended that the Policy Committee review and recommend approval of
the preliminary list of the titles and definitions for the road typologies and land
use context areas. It is further recommended that the Policy Committee receive
a presentation on Complete Streets design guidelines.
DISCUSSION: Mr. Wakan reported that the Complete Streets Advisory Group had met
several times to formulate and develop titles and description for road typologies and land
use context areas. The Advisory Group asked that the Technical Committee review and
recommend preliminary approval of these road typologies and context areas. At their
February 27 meeting, the Technical Committee recommended preliminary approval of
the road types and context areas.
26
PC Final Draft Minutes
March 20, 2014
Mr. Wakan noted that the list of road typologies and context areas could be found on
Pages 6-8 of the Agenda. He said these titles sought to describe road classifications in
non-conventional ways. These titles and descriptions were developed to make the
Complete Streets document distinct from regular zoning or typical road classifications.
These distinct titles would hopefully encourage distinct approaches to Complete Streets
design guidelines.
ACTION: Councilor Darnell moved to approve the preliminary list of the titles and
definitions for the road typologies and land use context areas. Councilor McCulloch
seconded the motion. The motion was approved unanimously.
Mr. Wakan said that the second part of the Complete Streets agenda item was a
presentation related to some themes that were introduced to the Advisory Group and
explained to the Technical Committee in February.
Mr. Wakan explained four themes that the Advisory Group hoped to carry through the
Complete Streets design process.
• Adoptable - To have the document eventually adopted by the MPO Policy
Committee;
• Resourceful - For the document to be a usable resource for developers and
public works departments in all the local entities, as well as understandable by
the general public;
• Simple - Principles and guidelines which are easy to interpret and to understand;
• Flexible - Build in multiple flexible options into the document to ensure it is more
readily accepted and used by everyone in the region.
Adoptable
Mr. Wakan stated that the MPO and the four entities work in coordination with the MPO
Technical and Policy Committees, as well as NMDOT and FHWA. He stated that neither
NMDOT nor FHWA have put forward any Complete Streets documents yet, but when
this does happen, the MPO will be that much further ahead having already developed
their Complete Streets design guidelines.
Mr. Wakan illustrated several spectrum diagrams to explain possible outcomes when
developing the Complete Streets document and design guidelines. One spectrum
ranged from very complex to very simple and another from very prescriptive to
very interpretive MPO Staff believed that a document that is simple to understand and is
more interpretive in design, acceptance and approval of the final Complete Streets
document will be more favorable than unfavorable.
Mr. Wakan stated that the guidelines also needed to be Resourceful. He explained that
the City of Charlotte had developed Complete Streets guidelines in 2007. In 2009, the
North Carolina DOT (NCDOT) adopted Complete Streets design guidelines which were
then developed in 2012. Their guidelines are usable statewide and there is now
consistency between the City of Charlotte and the state’s documents.
27
PC Final Draft Minutes
March 20, 2014
Mr. Wakan showed a drawing from the City of Charlotte (see below) and explained how
they developed a very interpretative and simple document. The diagram shows the
different development zones, pedestrian zones, green zones, and parking areas.
City of Charlotte
North Carolina’s DOT then used Charlotte’s example and created their own, very similar
diagram with visualizations and dimensions.
Mr. Wakan also referenced the North Main extension in Aztec and some of the Complete
Streets elements they are considering. He showed the consultant’s drawing depicting
the buffered sidewalks, bike lanes, and parking zones. The possible inclusion of green
infrastructure was also noted. Mr. Wakan explained this was capturing storm water,
retaining it, and then re-using it on the green zones. This type of infrastructure has been
strongly encouraged nationwide for any Complete Streets design guidelines.
Mr. Wakan said the Complete Streets document also needed to be Simple. He showed
the intricate, prescriptive matrix used by the Pennsylvania DOT (PennDOT) and said the
Advisory Group thought this was too complex and prescriptive for the regional Complete
Streets document they wanted to develop. Mr. Wakan explained that the Advisory Group
had also looked at the NCDOT document which showed the visual cross-section
diagram with some simple dimensions and notes to provide some guidance as to
sidewalks and bike lanes.
The Charlotte roadway cross-section with the zone types displayed was very
interpretive. Staff believed this was a good approach for the MPO Complete Street
document as a means to introduce the concept to the region and creating a document
that is more interpretative and easier to understand. Mr. Wakan noted that parts of the
Charlotte document do set out some prescriptive guidelines for new built areas and
those sites that were being redeveloped.
Mr. Wakan also showed an example from the City of Johannesburg, South Africa and
stated that Complete Streets had become an international movement. Their guidelines
gave a perspective diagram view side by side with a plan view of the street. They also
included some simple dimensional prescriptions which helped in accomplishing their
goals. Their diagram provided an easily understood visual for the lay-audience and the
28
PC Final Draft Minutes
March 20, 2014
general public, while the street plan view, which was more technical, provided needed
information for the planners and engineers.
Mr. Wakan said the document also needed to be Flexible. The combination of the road
typologies and the land use context areas will eventually create the design guidelines.
Additionally, multiple options will be created for each of the design guidelines. Mr.
Wakan provided an example of how a main street in a central business district might
look by providing multiple options for the same cross-section. This will provide built-in
flexibility for developers and public works departments.
Mr. Wakan said other cities and agencies were researched to see what other types of
combinations they had used for their land use context areas and road typologies:
PennDOT 7 land use context areas 35 possible design guidelines
5 road typologies (not including flexible options)
Roanoke, VA 8 land use context areas 32 possible design guidelines
4 road typologies (not including flexible options)
Charlotte 7 land use context areas 35 possible design guidelines
5 road typologies (not including flexible options)
FMPO 8 land use context areas 72 possible design guidelines
9 road typologies (not including flexible options)
Mr. Wakan explained the Advisory Group’s initial approach to developing context areas
and road typologies came up with 72 possible design guidelines. In speaking about
having a simple, flexible, and interpretive document, this number of possible design
guidelines would definitely impact the complexity or prescriptiveness of the final
document. Mr. Wakan stated that the Advisory Group and the Technical Committee had
recommended that this list of context areas and road typologies be scaled back to
simplify the list and to bring the number of possible design guidelines closer to 35. Mr.
Wakan said that, at future meetings, the Advisory Group would work to consolidate their
current list of road typologies and context areas.
Mr. Wakan showed a map that displayed the vulnerability of pedestrians in Farmington
for the years of 2010 and 2011. He also provided some pictures of several sections
along Hutton Avenue and 20th Street where sidewalks were missing. Mr. Wakan said the
City of Farmington had recently received Transportation Alternative Program (TAP)
funding for sidewalk construction along 20th Street. It is hoped that the Public Works
Department will consider some Complete Streets design for this project.
Councilor Darnell asked how Complete Streets design impacted these types of projects
and how much less sidewalk could be built in order to add Complete Streets designs.
Ms. Holton said no cost estimates done were done yet but, that as a planning document,
the Advisory Group is working to provide a level of flexibility by giving a menu of
potential options. She noted that the pedestrian issues along 20th Street are not only due
to the lack of sidewalks, but also to the number of curb cuts and other conflicts as well
as the number of vehicles that travel that road. Ms. Holton added that providing the
separation between the road and the sidewalks was valid. The pictures also showed
power poles that were in the middle of the existing sidewalk and moving these would
likely require additional right-of-way. This would be a factor when considering a retrofit.
She stated that the ideal scenarios for the incorporation of Complete Streets concepts
29
PC Final Draft Minutes
March 20, 2014
would be in the new development areas. For older built areas, Complete Streets designs
could be considered when they are retrofitted or upgraded.
Councilor Darnell said he was thinking of a project on Vine Street. He added there was a
right-of-way issue at this location and cost was a definite factor because CDBG funds
cannot be used to acquire right-of-way. He added that there would certainly be an added
cost associated with acquiring more right-of-way and in maintaining any green area. Ms.
Holton said that Staff wanted to make the Complete Streets document a living document
and to provide a type of overall planning guide for the community.
Councilor McCulloch said she had spoken with Mr. Sypher to ask about making the
project along 20th Street more attractive. She added that the Advisory Group discussed
the need for the City of Farmington to offer more opportunities for public input on
projects. Councilor McCulloch commented that other cities have neighborhood
associations that weigh in on all local projects before the project is designed and
constructed. She commented that many City of Farmington projects do not get the
needed input from the neighborhoods before proceeding with the project.
Mr. Sypher commented that the concept of Complete Streets had been around for some
time, it just had not been called Complete Streets until now. He said he supported
Complete Streets but added that money would likely be an issue. Mr. Sypher said that
for the 20th Street project the department is looking to see what can be done to
incorporate some Complete Streets ideas. He noted that there were some challenges
with incorporating green areas into a design here because, unlike the northwest part of
the United States where rainfall is plentiful, this area sees limited rainfall and would
require a complex and maintained irrigation system. Mr. Sypher said that trees which are
more tolerant could more easily be included in designs than grass.
Mr. Sypher stated that not all the analyses have been completed for the 20th Street
sidewalk project. He said if right-of-way was available, the sidewalk could meander
along the street or include bulb-outs with trees. He said he hoped to be able to make the
city as beautiful as possible with the available dollars. Mr. Sypher explained that the
surveying for the 20th Street TAP project was completed and they will now begin
penciling in some ideas.
Councilor McCulloch said she hoped that with this very visible corridor, the city could
illustrate to the community what Complete Streets was about and how it could impact
economic development in the area. She added that she hoped this could be a first step
in showing the vision the Advisory Group has for Complete Streets.
Mr. Delmagori added that the Advisory Group had decided to start big with their road
typologies and context areas knowing the list could always be scaled back to a more
manageable number. The Advisory Group believed they were developing a good
product and had vetted the process thoroughly by starting with this broad range of ideas.
ACTION: The presentation was received.
30
PC Final Draft Minutes
March 20, 2014
7. CONSIDER APPROVAL OF THE LIST OF PROPOSED FUNCTIONAL
CLASSIFICATION CHANGES FOR THE FARMINGTON MPO
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
Staff discussed the schedule and reviewed the list of proposed changes with the
Policy Committee on January 16 and with the Technical Committee on January
23.
In February, staff met with the entities individually to discuss their proposed
classification changes.
The Technical Committee recommended approval of the list of functional
classification changes on February 27.
CURRENT WORK
Classification changes are divided into four categories: declassify, classify up,
classify down, and add classification.
For this list, only current roads and proposed roads in the TIP-STIP are to be
included in the list; future roads beyond the near term cannot be included in this
functional class update.
All of these recommended changes will be provided to NMDOT.
RECOMMENDATION
It is recommended that the Policy Committee approve the list of proposed
functional classification changes for the Farmington MPO.
DISCUSSION: Mr. Delmagori reported that in November 2013, NMDOT began working
with a consultant to do a statewide functional classification update. This work will be in
partnership with the MPOs and RTPOs.
Early this year, the list of proposed changes was discussed with the Policy and
Technical Committees. During February, Staff met with the entities individually to
discuss their proposed classification changes. The final list of functional classification
changes that the MPO would like to recommended to NMDOT was on Pages 10-12 of
the Agenda.
Mr. Delmagori noted there were four major action categories for the classifications:
31
PC Final Draft Minutes
March 20, 2014
• Declassify – the road was previously classified but no longer functions as a road
but more as a simple access road. Roads in this category would be removed
from the list.
• Reclassify Down – NMDOT has a higher classification of the road than the
MPO’s classification. Roads in this category are recommended to be reclassified
to match the MPO classification.
• Reclassify Up – NMDOT has a lower classification than the MPO’s
recommended classification. Roads in this category are recommended to be
reclassified to match the MPO classification.
• Add Classification – Road classifications that are part of regional and local
thoroughfare plans that are not in the NMDOT database.
Mr. Delmagori stated that NMDOT and the consultant requested that any future roadway
projects that went beyond four years needed to be removed from this functional
classification change. The functional classification system was not a long-range plan and
only near-term projects could be included. Those projects were already removed from
the list after discussions with local staff and the Technical Committee.
Mr. Delmagori said that March was identified as the preliminary opportunity to provide a
list of changes to the state. The entire process would take another year or so to
complete at the state level, but the state wanted MPO and RTPO input early in the
process.
ACTION: Councilor McCulloch moved to approve the list of proposed functional
classification changes for the Farmington MPO. Commissioner Eckstein seconded the
motion. The motion was approved unanimously.
8. RECEIVE A REPORT FROM NMDOT
Mr. David Quintana provided an update on District 5 projects:
• US 64 – Phase 3 of the project from mile marker 60-62 – the contractor is ahead
of schedule and making good progress.
• US 64 – Phase 2 – contractor is working to replace some cracked concrete
panels at the intersection with US 550. Some impacting of traffic is expected as
they complete this work. Mr. Quintana said there were still some punch list items
before the project is wrapped up.
• NM 516 – Intersection with Light Plant Road – this project is on a temporary
suspension until school lets out for the summer.
• NM 173 – District 5 is negotiating with the consultant, Wilson & Company, to do a
final design of the project. Mr. Quintana said the contract should be finalized in
the next three to four weeks.
• NM 371 & N36 – Representative Clahchischillage was able to obtain some
capital outlay funding for a temporary flashing beacon. District 5 is working to
design a signalized intersection project. Mr. Quintana said it is hoped to have a
full-signalized intersection in the next two years or so depending on funding.
• NM 371 corridor – Mr. Quintana reported that District 5 has been doing some
resurfacing work along this corridor. Work was completed in the past year on a
32
PC Final Draft Minutes
March 20, 2014
section of the road approximately 40 miles south of Farmington. He stated there
was a project being developed to repave another ten miles of the corridor
approximately 20-25 miles south of Farmington. This project is being developed
as a “shelf” project so that it can be brought into the STIP and, if money became
available or if another project currently programmed could not meet their
schedule, this project would be a back-up project. Mr. Quintana expected this
project to be funded and be programmed into the STIP in the next two years.
Councilor Darnell asked about the Pinon Hills extension project and the potential loss of
$3,000,000 for the first phase of the project. Councilor Darnell thought that this phase of
the project was similar to the East Arterial project in Aztec with having a road to
nowhere. Councilor Darnell said the project area in Farmington concerned two
neighborhoods, one on the north side and one on the south side where connections
were going to be made to the Pinon Hills extension. Initially there was concern by the
residents of both neighborhoods about the connection because they liked their quiet
neighborhoods. One of the neighborhoods has now come to the realization that if they
are connected to the extension and regardless of whether the road extends across the
river, they will have access to a signal. This neighborhood has two hills to climb that can
be difficult to traverse during inclement weather and then they have to try and merge
onto a heavily traveled Main Street. Councilor Darnell added that as this district’s
Council representative, he was trying to find the best solution for both neighborhoods
and not force anyone into accepting something they did not want.
Councilor Darnell explained that for the second neighborhood on the north side, the road
would only go into their neighborhood and nowhere else. He clarified that the Pinon Hills
extension would take traffic only into this neighborhood and would not connect to any
other neighborhood. He stated, however, that the extension through the neighborhood
on the south side would allow traffic to get to many other places. Councilor Darnell said
the residents in the northern neighborhood are concerned with the additional traffic the
extension would bring traffic into their neighborhood. Much of that traffic would have no
reason to be in the area, so the residents expressed some concern about increased
burglaries and vandalism.
Councilor Darnell said there was a thought that perhaps the access on the north side
could be a crash gate for emergency purposes and used for ingress and egress. For the
other neighborhood the extension would be a full connection to the Hubbard
neighborhood. He stated that the City Engineer was told by NMDOT that their concern
with this option had to do with environmental justice. Councilor Darnell said it appeared
there was a perception that the northern neighborhood was more affluent than the other.
He said that this had not factored into the equation as a solution that worked for
everyone was sought. Councilor Darnell said he planned to call Mr. Miguel Gabaldon
and discuss the local concerns with this issue, but wanted it first brought up through the
MPO process.
Mr. Quintana stated that he was not familiar with the specifics of the environmental
justice issue. He noted that because the project would be federally funded,
environmental justice is one of the aspects that are considered when the environmental
documentation is reviewed before the funding obligated. Mr. Quintana said he would
speak with Mr. Elias Archuleta and Mr. Gabaldon to better understand the specifics of
the environmental justice issue. Mr. Quintana suggested that Councilor Darnell could
33
PC Final Draft Minutes
March 20, 2014
contact Mr. Gabaldon directly to explain the City of Farmington’s position and to further
discuss the issues.
Mr. Quintana added that he had just sent an e-mail to Mr. Gabaldon, Mr. Archuleta, Mr.
Degani, and Ms. Gweneth Duncan who handled environmental oversight on local
government projects on the environmental justice concerns being raised about this
project. He anticipated being able to meet with everyone in the next day or so.
Mr. Brian Degani reported on the Planning Division updates:
The freight advisory committee which has representatives from private companies will be
meeting the week of April 14-18 in Albuquerque. Notes from the freight working group
were sent out and a future timetable for both the freight working group and the freight
advisory committee were sent out on March 3. Mr. Paul Sittig is responsible for the
development of the freight plan in conjunction with the state’s long-range plan. Mr.
Degani reported that these two freight groups looked at key corridors and regions and
identified criteria for freight projects. Additionally they will discuss various relationships to
the long-range plan efforts, stakeholder outreach, processes, interviews, and key
questions during an April meeting. As more information is developed, Mr. Degani will
provide updates to both the Policy and Technical Committees.
The Data Management Bureau of the Planning & Safety Division is updating GIS files
from the base year of 2007 to 2013. This will then reflect the shape files the MPOs have
on record.
The Planning & Procedures Manual is being finalized. The draft amendment is due to
FHWA on April 1 and revised manuals will then be provided to NMDOT and MPO staff
for review and presentation.
The Recreational Trails Program was reassigned from the Energy, Minerals & Natural
Resources Department to NMDOT on January 1. Memorandums of agreement are being
prepared for existing grantees whose projects were transferred. It will take several
months to prepare the program, budget, project selection process, and guidance. Once
completed, it will be distributed to the MPO.
The 2040 statewide long-range, multi-modal transportation plan website is available
online. Mr. Claude Morelli is responsible for the ongoing updates to the plan. The
process will take approximately 18 months to complete. The group is now looking at
where the process is at currently and what the existing conditions were. This summer
they will begin to address the vision for the system’s future.
The TAP Coordinator is reviewing the TAP process program for FY2014 and FY2015.
The NMDOT Local Government Agreement Unit will now require separate agreements
for the design and construction phases of projects even when they are part of the same
project. The draft agreements for design phases will be forthcoming. The construction
agreement boilerplate is being drafted. Local governments need to complete their design
phases and PS&E packages before the draft instruction agreements will be sent out. Mr.
Sean Sandoval is the contact for this information and he can be reached at (505) 476-
3784.
34
PC Final Draft Minutes
March 20, 2014
The local entities who were awarded TAP funding should be working on their certification
agreement processes. For FY2014 construction funds, the certifications must be
completed by July 15.
Mr. Degani asked if Mr. Quintana would include him in any discussions on the Pinon
Hills extension environmental justice issues. As part of the planning division and in
working with MAP-21, he needs to be aware of environmental justice concerns. He said
he had not been involved in any of the Pinon Hills discussions, but noted that there had
been other environmental justice issues in the state.
9. 2040 METROPOLITAN TRANSPORTATON PLAN
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Duane Wakan, MPO Associate Planner
Date: March 13, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning document
that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees, Councils, and other organizations.
The Stakeholder Workshop was held on February 5.
CURRENT WORK
Overview presentations will continue to be provided to various groups in the
coming months.
A Stakeholder Workshop on February 5 provided good feedback for the plan.
Public meetings were held to gather ideas on transportation projects that can
then be analyzed later in the MTP process.
Staff will discuss key questions with the Policy Committee to assist with
development of the plan.
A 2040 MTP timeline of activities will be reviewed on March 20.
RECOMMENDATION
It is recommended that the Policy Committee receive a report on comments
received during the Stakeholder Workshop and public meetings, hold a
discussion on addressing key questions for developing the 2040 MTP, and
review the 2040 MTP timeline.
35
PC Final Draft Minutes
March 20, 2014
DISCUSSION: Mr. Wakan reported that the MPO had begun work in November on
updating the 2040 Metropolitan Transportation Plan (MTP). Staff held a Stakeholder
Workshop on February 5, has presented to all the Councils and Commissions, and has
had numerous other presentations and public meetings on the MTP. Good feedback for
the MTP plan is being received.
Mr. Wakan referred to Page 15 of the Agenda which showed the comments received
during the Stakeholder Workshop. The comment categories were Roads, Bike/Ped,
Transit, and Other Modes. Mr. Wakan elaborated on some of the comments received.
Councilor Darnell thought that some of the Red Apple Transit concerns noted had been
addressed in the Red Apple Transit study done several years ago. Mr. Delmagori said
they had been, but issues still remained and further improvements were needed.
Mr. Wakan said that a brainstorm session with the members on improving the plan and
reviewing the timeline for development of the MTP would be held off until the next Policy
Committee meeting.
ACTION: The report was received.
10. INFORMATION ITEMS
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: March 12, 2014
INFORMATION ITEMS
a. Workshop with NMDOT. The Workshop between the MPO Technical
Committee and NMDOT is now scheduled for April 3.
b. Highway Safety Program Applications. Staff will provide an overview of the
Highway Safety Improvement Program and some of the new changes.
c. FFY2015-2016 UPWP. The new work program for the MPO covering FFY2015-
2016 will be drafted for review in April. Final approval will occur in June so the
document is ready to go into effect on October 1, 2014.
d. Other
DISCUSSION: Mr. Delmagori reported that the workshop with the Technical Committee
and NMDOT was cancelled again and will not be held on April 3. Staff is waiting to hear
from District 5 on a new date that is convenient for them.
36
PC Final Draft Minutes
March 20, 2014
Mr. Delmagori reported that applications for the Highway Safety Improvement Program
(HSIP) would now be accepted on a continuous cycle instead of just once a year. Now,
every 90 days, a committee will review the applications received. The committee will
include MPO and RTPO staff that will rotate onto the committee every 90 days. Mr.
Wakan will be part of the first committee that will meet on the May cycle. Mr. Delmagori
said there was discussion of having targeted funding goals for each MPO and RTPO. It
was thought that FMPO would be somewhere around $570,000. The details still have to
be worked out but Mr. Delmagori said it would great to know that FMPO would receive a
particular amount of money. Mr. Wakan added that even if an application exceeded the
allocated MPO amount, the limit was not fixed and entities were encouraged to apply as
many times as needed.
Mr. Delmagori said the new UPWP cycle for FY2015-2016 has begun. Staff planned to
have a draft UPWP for the Policy Committee review in April and have targeted the June
meeting for final approval.
Councilor Darnell said he was sorry to hear that Mr. Delmagori was leaving the City of
Farmington and stated that he would be missed. Mr. Delmagori said that he had
accepted a job with the MPO in Milwaukee, Wisconsin and that his last day with FMPO
is April 10. He thanked everyone for all their efforts and for the interest and participation
in the MPO by the Policy Committee members. Ms. Holton announced that Mr. Fran
Fillerup would be the Acting MPO Planner until Mr. Delmagori’s position can be filled.
11. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no business from the Chairman, Members or Staff.
12. BUSINESS FROM THE FLOOR
There was no business from the floor.
13. ADJOURNMENT
Councilor McCulloch moved to adjourn the meeting. Commissioner Eckstein seconded
the motion. Councilor Darnell adjourned the meeting at 3:23 p.m.
__________________________ ________________________________
Dan Darnell, Chair June Markle, MPO Administrative Aide
37
Get email alerts for Farmington
A daily email when new agendas and minutes are posted.