MPO Policy Committee
Regular MeetingFarmington, NM · August 25, 2016
Agenda
MPO POLICY COMMITTEE
AGENDA
August 25, 2016
1:30 p.m.
Executive Conference Room
Farmington City Hall
800 Municipal Drive
Farmington, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
POLICY COMMITTEE MEETING
August 25, 2016 1:30 PM
This regular meeting of the MPO Policy Committee will be held in the Executive Conference
Room, Farmington City Hall, 800 Municipal Drive, Farmington, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the June 23, 2016 Special Policy Committee meeting. 8
3. Receive a report on the Safety Plan 1
Presented by: Duane Wakan
4. Receive a report on the 2016 Proposed Fall Traffic Counts 3
Presented by: Derrick Garcia
5. Reports from NMDOT
a. District 5 (Paul Brasher)
b. Planning Division (Robin Elkin)
6. Review and consider approval of the final draft Complete Streets Design 6
Guidelines
Presented by: Duane Wakan
7. Information Items 7
a. TAP Project Feasibility Review
b. Red Apple Transit Ridership Update
c. APA Affiliate Memberships
d. Grant Writing Workshop
e. Citizens Advisory Committee
f. Other
Presented by: Derrick Garcia
8. Business from Chairman, Members, and Staff
9. Business from the Floor
10. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is
in need of a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary
aid or service to attend or participate in the hearing or meeting, please contact the MPO
Administrative Aide at the Downtown Center, 100 W Broadway, Farmington, New Mexico or at
505-599-1466 at least one week prior to the meeting or as soon as possible. Public documents,
including the agenda and minutes, can be provided in various accessible formats. Please
contact the MPO Administrative Aide if a summary or other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Safety Plan
Prepared by: Duane Wakan, MPO Planner
Date: August 16, 2016
BACKGROUND
The MPO needs to develop a Safety Plan for use in evaluating needs and
targeting safety related projects throughout the MPO area.
The Safety Plan will be a resource for the entities and NMDOT to use in
improving the safety of the transportation system by identifying improvements to
be made for all modes of travel and areas of greatest need.
A Safety plan is a tool whereby local projects can be prioritized with the
appropriate safety countermeasure(s).
NMDOT recognized MPOs who have developed safety plans when considering
Highway Safety Improvement Plans and funding opportunities.
All modes should be considered when developing a safety plan.
MPO Funds will use a combination of PL and 5303 programs by formula to pay
for the primary consulting services.
This report was presented to the Technical Committee on August 10.
CURRENT WORK
Establish a steering committee to ascertain regional safety goals and objectives
Create a RFQ/P to attract the appropriate consultant
MPO Intern is currently creating the preliminary crash data maps for use in the
public participation process
Integrate historic crash data with the MPOs travel demand model (Bob Shull)
Staff research consistently found the four E’s of safety to be prevalent in safety
plans, Engineering, Education, Enforcement and Emergency Medical Services
(EMS) – Data Driven plan – Goals and Objectives- Safety Counter Measures
MPO Staff will present the timeline for moving forward with development of the
Safety Plan.
ANTICIPATED WORK
Work with consultant to outline the planning particulars with clear deadlines.
Collect crash data from UNM and BBER crash reporting unit.
Provide input to HSIP program at the State level: Data Driven (reactionary) vs
Close calls (proactive)
INFORMATION ITEM
This is an informational item requesting feedback from the Policy Committee
members.
1
Safety Plan - Phases of Implementation
Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17
Travel Demand Modeling
Hire Facilitator
Public Outreach
Write Plan
Present Final Plan for Committee Review
2
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: 2016 Proposed Fall Traffic Counts
Prepared by: Derrick Garcia, MPO Associate Planner
Date: August 17, 2016
BACKGROUND
The MPO maintains traffic counts for over 220 locations throughout the MPO
area.
Locations are counted according to a three-year cycle and change periodically.
Staff split the administration of the annual traffic count calendar into spring and
fall iterations which began 2013.
NMDOT Traffic Count Division has asked the FMPO to count an additional 15
locations which have been spread out over the spring and fall schedule. Several
of the locations were in marked contrast to previous counts and Staff was asked
to follow up and verify the validity of those counts and ensure the accuracy of the
numbers.
Spring counts took place the week of April 25th. There were a total of 47
locations (21 speed and class).
CURRENT WORK
Traffic counts are scheduled for the week of August 29th.
The Fall traffic count list is attached.
Aggregating data for trend analysis.
Interactive traffic count map now available on FMPO website.
(www.fmtn.org/375/MPO-Traffic-Counts)
ANTICIPATED WORK
Work flow development with consultants.
Perform traffic count data mapping and analysis.
Data upload to NMDOT and MS2.
INFORMATION ITEM
A report on the proposed 2016 Fall Weekday Traffic Counts.
3
LOCAL_ID ON_ROAD FROM_ TO Area SpeedClass LATEST_YR
AZ_125 Park Ave Rio Grande Ave Chaco St Aztec Y 2014
AZ_32 Blanco Mesa Verde E Urban Limit Aztec 2014
AZ_47 CR 3008 CR 3000 CR 3009 Aztec 2013
AZ_93 Mesa Verde Zia Chuska Aztec 2013
BL_X1 Kirby Street Evans Ln Oakwood Dr Bloomfield
BL_226 E Blanco/CR 4899 N Kirby St Deer Trail Bloomfield Y 2013
BL_155 US 550 Sullivan Rd US 64 Bloomfield Y 2016
BL_175 US 64/Broadway Church US 550 S Bloomfield 2014
SJ_154 CR 6480 Troy King Rd CR 6200 County 2013
SJ_178 US 64/Broadway CR 4899 CR 4800 County Y 2012
SJ_195 CR 3000 CR 3950 CR 350 County Y 2012
SJ_203 NM 489 (CR 6100) CR 6400 US 64 County Y 2012
SJ_52 Old Aztec Hwy/ CR NM 516 CR 3590 County 2012
3520
SJ_53 Old Aztec Hwy/ CR CR 3590 CR 350 County 2012
3520
SJ_76 Lake St Murray Pinon St County 2012
SJ_161 US 550 NM 173 5.362 mi S of Col State County Y 2014
Line
SJ_164 US 64 CR 6500 NM 489 (CR 6100) County Y 2012
SJ_172 US 64/Broadway Browning Pkwy CR 5569 County Y 2012
SJ_198 CR 390 Andrea Dr CR 350 County Y 2012
SJ_221 US 64 CR 6800 CR 6500 County Y 2012
SJ_48 CR 350 US 64 CR 5580 County Y 2012
FM_X1 24th St Municipal Dr Glade Rd Farmington
FM_X2 Miller Ave Broadway Miller Farmington
FM_27 Auburn Ave N Apache Glade Farmington 2014
FM_1 20th Municipal Dr Sunset Farmington 2014
FM_17 Airport Main Apache Farmington 2012
4
LOCAL_ID ON_ROAD FROM_ TO Area SpeedClass LATEST_YR
FM_209 Foothills Pinon Hills Blvd Crestwood Dr Farmington Y 2012
FM_21 Apache Palmer Airport Farmington Y 2012
FM_211 Foothills Rinconada End of Route Farmington 2012
FM_26 Auburn Ave N US Apache Farmington 2012
64/Broadway
FM_29 Beckland Dr NM 516/E Main End of Route Farmington 2012
FM_39 Butler 20th 30th Farmington Y 2012
FM_63 English Largo NM 516/E Main St Farmington Y 2012
FM_64 English NM 516/E Main Pinon Hills Farmington 2012
St
FM_73 Hutton 20th Cliffside Farmington 2012
FM_8 30th Pinon Hills Sunset Farmington 2014
FM_90 Marseille Blvd NM 516/E Main Martello Farmington 2012
St
FM_91 McCormick School Murray US 64/Broadway Farmington 2012
FM_153 Twin Peaks Rd NM 170 Troy King Rd Farmington Y 2014
FM_214 Browning Pkwy US 64 So Side River Rd Farmington 2012
FM_116 NM 516 Country Club CR 350 Farmington 2012
FM_212 Main St Scott Sullivan Farmington 2012
FM_215 Browning Pkwy So Side River Morningstar Farmington 2012
Rd
FM_35 Butler San Juan Blvd E Main St Farmington 2012
FM_86 Main St Auburn Butler Farmington Y 2014
FM_98 Murray Dr/NM 5001 US 64/W Main W Pinon St Farmington 2012
FM_34 Butler US San Juan Farmington 2012
64/Broadway
FM_217 NM 516 Largo Shopping Center Farmington 2012
FM_218 NM 516 English Pinon Hills Blvd Farmington 2014
FM_88 Main St Sullivan San Juan Blvd Farmington 2012
5
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Planner
Date: August 16, 2016
PREVIOUS WORK
Complete Streets are a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Complete Streets Advisory Group (CSAG) on content,
and design guidelines for the FMPO planning area.
The Advisory Group held its last meeting on September 3, 2015 and reviewed
the draft Complete Streets Design Guidelines document.
Technical Committee Workshops were held on February 24, March 16, and April
26 to review and provide edits to the draft Design Guidelines document.
The Technical Committee reviewed the Intersection section on June 22, 2016
and their recommendations were included.
The Technical Committee reviewed the Intersection and Equity sections on July
23, 2016.
A final Technical Committee Workshop was held on August 24, 2016 to complete
a final review of the draft Design Guidelines document. The final version will be
presented to the Policy Committee on August 25.
CURRENT WORK
The Technical Committee has had many opportunities provide comments and
adjustments to the design guidelines.
Seek input from PC members on any updates and recommendations.
ANTICIPATED WORK
Publish final document and distribute to entities.
Create a regional Complete Streets resolution for regional consideration and
adoption.
ATTACHMENTS
A final draft of the Complete Streets Design Guidelines was sent out on August
18th and can also be downloaded on the following link:
http://www.fmtn.org/DocumentCenter/View/8695.
ACTION ITEM
It is recommended that the Policy Committee consider approval of the final draft
of the Complete Streets Design Guidelines.
6
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Information Items
Prepared by: Derrick Garcia, MPO Associate Planner
Date: August 16, 2016
INFORMATION ITEMS
a. TAP Project Feasibility Review. MPO and entities staff met with District 5
engineering staff and NMDOT planning representatives in Santa Fe on
August 8, 2016 to review and discuss TAP project feasibility forms.
b. Red Apple Transit Ridership Update.
2015-2016 comparison (January to July)
Route 2015 2016 Percent Change
Red 8,007 6,199 -22.6%
Green 13,919 12,700 -8.8%
Purple 9,874 9,829 -0.5%
Yellow 9,671 11,210 15.9%
Blue 21,432 22,645 5.7%
Saturday Rte 1,127 2,100 86.3%
2016 Fmtn Routes 64,030 65,786 2.7%
Tiger (Aztec) 2,119 3,854 81.9%
Bobcat (Bloomfield) 2,975 3,137 5.4%
Bronco (Kirtland) 4,034 4,000 -0.8%
Total Ridership 73,158 76,688 4.8%
c. APA Affiliate Memberships. The accepted applications for APA Affiliate
Membership for each Policy Committee member were received. Several
Technical Committee members, who were not already APA members, were
also registered for Affiliate Membership.
d. Grant Writing Workshop. Mr. Garcia attended a grant writing workshop in
Albuquerque on July 20 and 21, 2016
e. Other.
7
TC Draft Special Meeting Minutes
June 23, 2016
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
SPECIAL POLICY COMMITTEE MEETING
June 23, 2016
Policy Members Present: Curtis Lynch, City of Bloomfield
Nate Duckett, City of Farmington
Linda Rodgers, City of Farmington
Larry Hathaway, Alternate, San Juan County
Policy Members Absent: Sherri Sipe, City of Aztec
Paul Brasher, NMDOT District 5
Jimmy Voita, San Juan County
Staff Present: Mary Holton, MPO Officer
Duane Wakan, MPO Planner
Derrick Garcia, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Others Present: Terri Kennedy, Citizen & Place Matters Member
David Sypher, City of Farmington
Steven Saavedra, City of Farmington
1. CALL TO ORDER
Councilor Duckett called the meeting to order at 1:35 p.m.
2. APPROVE THE MINUTES FROM THE MAY 26, 2016 POLICY COMMITTEE
MEETING
Mr. Hathaway moved to approve the minutes from the May 26, 2016 Policy Committee
meeting. Ms. Rodgers seconded the motion. The motion was passed unanimously.
Mr. Wakan introduced the new MPO Associate Planner, Derrick Garcia to the Policy
Committee.
3. FFY2017-2018 UNIFIED PLANNING WORK PROGRAM
Subject: FFY2017-2018 Unified Planning Work Program
Prepared by: Duane Wakan, MPO Planner
Date: June 14, 2015
8
TC Draft Special Meeting Minutes
June 23, 2016
BACKGROUND
The Unified Planning Work Program (UPWP) is the fiscal year work plan for the
MPO.
The FFY2017-2018 UPWP will cover planning activities and work products to be
completed from October 1, 2016 to September 30, 2018.
Based on the Planning Procedures Manual (PPM), the MPO needs to provide a
draft UPWP to NMDOT in April with final approval in June.
The Technical Committee reviewed the final draft of the FFY2017-2018 Unified
Planning Work Program and their recommended approval is anticipated on June
22.
CURRENT WORK
Annual activities will include reporting and budgeting, the traffic count program, TIP
maintenance, GIS activities, and Safe Routes to School activities, transit data
collection and mapping.
Major activities will include land-use and transportation scenario planning, transit
studies, travel demand modeling updates, and completion of the safety plan.
Staff estimates base federal PL funds of $207,125 and base federal 5303 funds of
$57,119 for both FFY2017 and FFY2018.
Staff consolidated sections and deleted a couple sections based on
recommendations from the Technical Committee.
ACTION ITEM
It is recommended that the Policy Committee consider approval of the FFY2017-
2018 UPWP.
DISCUSSION: Mr. Wakan said in lieu of reviewing the entire final draft of the Unified
Planning Work Program (UPWP) he would provide an outline of the changes made since
the May Policy Committee meeting:
UPWP Revisions/Updates
- The document has been shortened after receiving feedback from NMDOT;
- Data collection activities consolidated into one new activity (3.6) under Task 3.
This data includes population/employment, land use, demographic data, crash
data, transit, and kid counts for Safe Routes to School (SRTS);
- Some tasks deleted as plans were recently worked on and are complete, and
there will be no need to address them in the next two years (as examples);
o Highway Functional Classification Review and Update – completed once
every 10 years with NMDOT;
o Intelligent Transportation Systems (ITS) – technology in our signals or
signage that alerts motorists to traffic issues. This infrastructure plan was
updated last year. No work will need to be done on this other than to
manage new TIP projects that might want to incorporate ITS;
- Access Management Plan will be kept in the UPWP in order to update the plan
and get regional adoption. It was adopted with mixed success in 2009. This Plan
addresses turns and driveways, excess ingress/egress for businesses, and looks
at consolidation to reduce conflicts for bikes and pedestrians.
9
TC Draft Special Meeting Minutes
June 23, 2016
- New Special Studies and Activities
o Storm Water Management – San Juan County already has a regional
body that meets (MS4) to address storm water management issues. The
MPO will join and participate in this discussion;
o Travel & Tourism – assist with the city and county branding campaigns;
contribute conceptual planning and visualization to impact tourism
o Regional Models of Cooperation – MPO already does but FHWA wanted
this task included in the UPWPs. This activity is participating in activities
outside of the MPO area and help coordinating projects (TIGER grants)
and communities;
- Travel Demand Modeling – add language, “coordinate with NMDOT to ensure
statewide model interfacing with the MPO model;
- Safety Plan – work to develop a regional plan and work with stakeholders who
can help guide and direct the plan. NMDOT wants to participate in this plan and
FMPO has encouraged both NMDOT engineers and planners participate to
ensure a more comprehensive look is provided;
- Public Health Activities – goals for public health and including active
transportation amenities in planning were included in the MPO’s MTP. These
MTP goals are now tied to the UPWP.
Mr. Wakan stated that the Technical Committee recommended the UPWP be approved
with the inclusion of the Access Management Plan as a task along with the minor
NMDOT changes.
Mr. Hathaway asked if this was a one or two year plan. Mr. Wakan replied that it was a
two-year plan that would begin on October 1, 2016.
ACTION: Councilor Lynch moved to approve the FFY2017-2018 UPWP. Councilor
Rodgers seconded the motion. The motion was passed unanimously.
4. COMPLETE STREETS
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Planner
Date: June 14, 2016
BACKGROUND or PREVIOUS WORK
Complete Streets are a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Complete Streets Advisory Group (CSAG) on content,
and design guidelines for the FMPO planning area.
The Advisory Group held its last meeting on September 3, 2015 and reviewed
the draft Complete Streets Design Guidelines document.
Staff made editorial revisions based on input from CSAG members. Works cited
and minor grammatical errors will be corrected or updated on an ongoing basis.
10
TC Draft Special Meeting Minutes
June 23, 2016
A Technical Committee Workshop was held on February 24, March 16, and April
26 to review and provide edits to the draft Design Guidelines document.
CURRENT WORK
The Technical Committee reviewed the Intersection section of the Design
Guidelines document at the June 22 meeting.
INFORMATION ITEM
Complete the review of the draft Design Guidelines document.
DISCUSSION: Mr. Wakan reported that the Technical Committee met and reviewed the
Intersection chapter to the draft Complete Street Design Guidelines on June 22. They
went over the chapter page by page and made the following
recommendations/comments:
Page 1
Add the words “multi-modal” to the title.
Page 2
Remove the last two sentences in the 3rd paragraph and the diagram associated with the
text. This level of detail regarding turning movements and radii are too specific to the
more generalized, regional design guidelines being developed.
Page 3
There is a question in the last sentence of the 2nd paragraph as to whether the 10%
reduction in accidents refers to all accidents or just to bicycle accidents. This is a quote
from another’s research and Staff wants to clarify the author’s meaning.
Page 4
Not many substantive changes recommended on this page.
Conclusion
3rd sentence: “Where possible, the intersection should be designed for the most
vulnerable street user rather…”; the street is not designed for one mode or group over
another, it is designed for all modes. Delete this sentence. Also, the last sentence in
the paragraph clarifies that the design is for all modes
Mr. Wakan stated that the final draft design guidelines will be reviewed again by the
Technical Committee and the Policy Committee in July and August.
ACTION: The report was received.
11
TC Draft Special Meeting Minutes
June 23, 2016
5. REPORTS FROM NMDOT
There were no NMDOT representatives at the meeting.
Mr. Wakan recapped the NMDOT updates presented the day before at the Technical
Committee meeting. The following is the engineering update from District 5:
• NMDOT met with the City of Aztec June 22nd regarding the East Arterial Route.
Staff has not heard the outcome of this recent meeting. NMDOT wants the City of
Aztec to expand the right-of-way so that any future road exchange would be for a
four-lane facility. The East Arterial is currently being built as a two-lane relief
route facility. This expanded right-of-way is encroaching on an old landfill
managed by the BLM and this environmental issue is causing setbacks in the
design. By taking this facility to four lanes, it becomes a bypass and not a relief
route and what then is the economic impact to the City of Aztec in this scenario.
• Mr. Sypher reported on Phases I and II of the Pinon Hills Boulevard project.
There has been some movement from NMDOT, but nothing conclusive and it is
coming much too late in the process. The current deadline is June 30 which they
said they can extend until August 31. All the remaining processes are with
NMDOT and they cannot meet the tighter time frames. Mr. Sypher said that
without some intervention, NMDOT has successfully killed this project.
Nica Westerling has travelled to Santa Fe to take them another set of documents
that they claim they cannot find. The boxes of materials were given to NMDOT
last November and they had never looked at them, but now they say they cannot
find them. Mr. Sypher said the City of Farmington has provided six separate
duplicate submittals over the past few years.
Mr. Sypher added that NMDOT’s environmental comments were ready over a
year ago, but were withheld pending the review resolution of the right-of-way
issues. In the meantime, NMDOT’s right-of-way division did not review any of
their documents. Mr. Sypher said the City of Farmington will wait and see for
another week and then push the issue up a level to Mr. Butch Mathews. Mr.
Mathews is not aware of the newest developments.
• There were no updates from the Planning Division. There is a training regarding
a workshop for anyone seeking grants for Brownsville remediation. Mr. Wakan
will forward the e-mail to the Policy Committee members.
6. INFORMATION ITEMS
Subject: Information Items
Prepared by: Duane Wakan, MPO Planner
Date: June 15, 2016
12
TC Draft Special Meeting Minutes
June 23, 2016
INFORMATION ITEMS
a. Associate Planner. Welcome Derrick Garcia.
b. MPO Quarterly. The Farmington MPO hosted the MPO Quarterly on June 13
& 14.
c. 30th Street & Hutton Pedestrian Boulevard. Presentation by Anngela
Wakan, Safe Routes to School Coordinator.
d. Other
DISCUSSION: a. Derrick Garcia came on board as the Associate Planner with the MPO
on June 20. Mr. Garcia said he had been an intern with the MPO in 2012 collecting Red
Apple Transit ridership data throughout the summer. He went to UNM in 2013 and
earned his Master in Community & Regional Planning. Following graduation, he went to
work with Texas DOT. The FMPO Associate Planner position opening gave him the
opportunity to return to his hometown of Farmington.
b. The MPO Quarterly was a two-day event that began with a tour of the US 64 and US
550 facilities in Bloomfield specifically the refuge islands/medians and intersections. The
refuge islands are difficult to access in a wheelchair and there is an isolated pork chop
island that can leave pedestrians stranded. Mr. Maurice Williams with UNM’s Center for
Injury Prevention Research & Education (CIPRE) also participated in the tour. The
Center provides safety awareness promotional campaigns and is willing to partner with
the MPOs. He gathered some ideas for infrastructure improvements in Bloomfield and
Staff will work with Mr. Williams again in the future.
Day two of the Quarterly provided the MPOs and NMDOT an opportunity to discuss a
host of topics. Councilor Duckett and Mr. Hathaway participated in the meeting and
agreed that some good ideas were shared and the meeting is a valuable opportunity for
all the agencies to communicate and work together.
c. Mrs. Wakan, Safety Routes to School Coordinator, presented a proposal for a 30th
Street & Hutton pedestrian boulevard. The following is a summary of her presentation:
- 8 80 City – if it works for an eight-year old and it works for an eighty-year old, it
will work for everyone in between. Would like to make Farmington an 8 80 city;
encourage other cities to consider changes for their community;
- Walking and biking are the only individual mode of mobility for youth; additional
health aspects for all;
- Dignify walking and biking by building the facilities for them;
- Need physical separation of pedestrians/bicycles from vehicles;
- Impatiens (something done quickly and inexpensively to show progress and what
can be achieved) vs. orchids (long-term, more expensive changes);
- Roads are public and not just meant for vehicles; need to be creative in how
roadways are used;
- Take outside lanes of 30th Street from Sunset to Hutton (and then down Hutton to
Main Street) and turn them into a bike/ped facility; roughly three miles;
13
TC Draft Special Meeting Minutes
June 23, 2016
- The infrastructure is already in place and the city has the right-of-way;
- Eventually take the pedestrian boulevard down Hutton to address equity issues
and help balance low income neighborhoods near Animas Elementary and
Heights Jr. High;
- Proposing to start pedestrian boulevard with the use of paint and bollards;
- Average daily peak traffic count (from 2012) in single-lane sections of 30th Street
is 16,000 vehicles; one lane roads can easily handle 18,000-25,000 cars per day;
other vehicle travel options are Pinon Hills Boulevard, 20th Street, and Main
Street;
- The boulevard could offer connections for seven local schools (Farmington has
16 total schools): FHS, Ladera, Northeast, Hermosa, Mesa Verde, Heights, and
Animas;
- The boulevard could eventually connect with parks, library, aquatic center,
recreation center, Boys & Girls Club, baseball/soccer fields, and be designed in a
way to access the downtown area;
- Add specialized crosswalk on 30th Street between Knudsen and Carlton;
- Possibly consider secondary future phases to expand down Dustin and Sullivan
Avenues;
- San Juan County Partnership is planning to hire a county-wide SRTS coordinator
who could help with these types of concepts for Aztec and Bloomfield.
Mrs. Wakan said that she has also identified some pedestrian safety projects that she
asked to be considered for possible 2018 TAP funding:
- Speed Indicator Flashing Beacons
- Pedestrian Activated Flashing Beacons
- Sidewalks
- Crosswalks
- Bollards for secondary phases of Pedestrian Boulevard
14
TC Draft Special Meeting Minutes
June 23, 2016
There are two school zone flashing beacons missing for Bluffview Elementary and on
20th Street near Hutton Avenue for Animas Elementary. These would help slow traffic
down to 15 mph (this is the required speed in school zones in New Mexico) during
school hours.
Mrs. Wakan also noted where some solar-powered pedestrian activated flashing
beacons ($8,000 each) on each side of the roadway that could be used when there is no
(or absent) crossing guard that would assist pedestrians to cross busy streets. The
beacons remain off unless activated by a pedestrian and then gives 30-40 seconds for
the pedestrian to cross the street before shutting off:
• Butler: McKinley Elementary crosswalk
• Dustin: McKinley Elementary crosswalk
• Apache: Apache Elementary crosswalk
• 30th Street: Between Knudsen and Carlton - crosswalk for Hermosa and
Northeast
• Sullivan and Cliffside
• Hutton and Cliffside (new crosswalk)
• Veterans Park: Cross Butler (new crosswalk)
• Foothills: Country Club crosswalk
• Sunset: FHS crosswalk
Missing sidewalk sections (it was noted that these are typically at an undeveloped lot
and that the sidewalk is funded when the lot is developed):
• 30th Street between Butler and Knudsen
• 30th Street on northwest corner of Sullivan
• East side of Hutton between 20th and 30th Streets
Proposed new areas for crosswalks:
• Special paint or treat crosswalk and move from 30th Street and Knudsen to
between Knudsen and Carlton
• Across Butler near North Carlton: connects to bus line and Veterans Park
• Across Hutton near Cliffside
In conclusion, Mrs. Wakan said she would like to encourage making some inexpensive,
quick changes (impatiens) now and begin looking at the more expensive, future
amenities (orchids).
Councilor Rodgers spoke about the issues she is aware of in the Bluffview Elementary
School and Sycamore Park Community Center areas. She was very interested in how
these ideas could also be considered and implemented for this area. Mrs. Wakan said
she will be meeting with the Bluffview principal in July and that school’s safety concerns
will be discussed. Councilor Rodgers thought some of these ideas could be implemented
as a visible, interim measure until sidewalks or something more costly could be
constructed. Mrs. Wakan said she had started with the 30th Street location because that
area is what she is most familiar with. The innovations could certainly be considered for
anywhere in Farmington.
Councilor Duckett said Mrs. Wakan had presented this proposal to him a few weeks ago.
He commented on growing up in Denver and the multitude of bike paths that provided
15
TC Draft Special Meeting Minutes
June 23, 2016
access to wherever he needed to go. Councilor Duckett said people have asked for and
he would like to see the community look at building trails and bike routes from north
Farmington down to the river and to the downtown area. He acknowledged that funding
is tight with the other projects scheduled and under construction.
Councilor Duckett commented that there are questions and obvious concerns with
narrowing 30th Street which are magnified by the current construction on 20th Street
construction making 30th Street the main travel road. Councilor Duckett said the changes
need to be taken step by step and the costs considered for each. Mrs. Wakan said her
research estimated a few thousand per mile for paint and bollards. Mr. Sypher said there
were a lot of considerations and he would prefer to spend some time and calculate a
more accurate cost estimate.
Mr. Sypher said there are numerous considerations with the pedestrian boulevard
proposal: shared bike/pedestrian paths are not preferable as they each want their own
space; lower speeds would have to be looked at, average daily traffic (ADT), and; the
possible future growth of Farmington that could necessitate taking 30th Street back to
four travel lanes. Mr. Sypher added that the number of available grants has shrunk. The
City of Farmington has $20,000,000 in pending street/surface repairs. The additional
proposed projects make maintaining the status quo even more difficult.
Mr. Sypher said the sidewalk issues will be studied and, if they are warranted, they will
be installed. He said there are numerous reasons why a sidewalk section could be
missing, but that 90% of the time it was because the lot was undeveloped.
Councilor Rodgers said she was excited about the concept. Along with the safety and
traffic aspects, she thought taking the pedestrian boulevard along Hutton would be a
great amenity to an under-served area. Mr. Wakan stated that having bicycle and
pedestrian amenities raise property values and increases economic development in
those areas.
Mr. Wakan showed a video on changes to street designs made in New York City over a
six-year period. They realized the need to focus on quality of life and the efficiency of
their infrastructure. Mr. Wakan said that although Farmington is not a New York City, it
is a microcosm of New York City with many of the same problems. He noted the
leadership, innovation and risk it took to implement these changes, and he hoped the
MPO committees and staff could begin to make some similar changes in Farmington
and across the region.
Mr. Hathaway commented on this video and the benefits the city of Bogotá, Colombia
experienced when they eliminated all vehicular traffic on their downtown main street. An
unexpected benefit they saw was a reduced crime rate because having more
pedestrians on the street increased awareness and visibility.
Councilor Duckett asked what the current TAP projects were. Mr. Sypher said the City of
Farmington was going to be applying for three projects that, unfortunately, will all
compete against each other:
• Phases II and III of Foothills; this project is already designed; will incorporate
some aspects of a multi-use path; the City may decide to only seek funding for
Phase II;
16
TC Draft Special Meeting Minutes
June 23, 2016
• 20th Street; complete streets project including great landscaping, curbs, separate
sidewalks, ADA improvements, some underground power, resurfacing, bike
paths and all new utilities;
• Downtown Main Street; complete streets project for Farmington’s downtown Main
Street.
Mr. Wakan explained that a city can only be awarded a maximum of $2,000,000 in TAP
funding. Additionally, there is a minimum project cost of $75,000 or more (excluding the
SRTS Coordinator position). Mr. Sypher said that the Foothills project alone is a
$2,000,000 project. Mr. Wakan said that the school districts are their own entity and can
apply for their own funding and are separate from any entity requests. Mr. Sypher added
that the TAP/RTP funding is for a two-year cycle with year one being for planning and
design, and construction happening in year two. He said it was important to note that the
projects selected will be the only projects for the next two years.
7. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no business from the Chairman, Members and Staff.
8. BUSINESS FROM THE FLOOR
There was no business from the floor.
9. ADJOURNMENT
Councilor Lynch moved to adjourn the meeting. Mr. Hathaway seconded the motion.
Councilor Duckett adjourned the meeting at 2:55 p.m.
___________________________ _____________________________
Councilor Duckett, Chair June Markle,
MPO Administrative Aide
17