MPO Technical Committee
Regular MeetingFarmington, NM · January 23, 2014
Minutes
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
DECEMBER 19, 2013
Technical Members Present: Roshana Moojen, Alternate, City of Aztec
Teresa Brevik, City of Bloomfield
Cynthia Lopez, City of Farmington
Chico Quintana, Alternate, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: Nica J. Westerling, City of Farmington
Staff Present: Joe Delmagori, MPO Planner
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: Mary Holton, MPO Officer
Also Present: Brian Degani, NMDOT Planning Liaison
David Quintana, NMDOT District 5
Larry Hathaway, San Juan County
Joshua Hedgpeth, City of Aztec
1. CALL TO ORDER
Mr. Dave Keck called the meeting to order at 10:00 a.m.
2. APPROVE THE MINUTES FROM THE NOVEMBER 21, 2013 TECHNICAL COMMITTEE
MEETING
Ms. Lopez made a motion to approve the minutes from the November 21, 2013
Technical Committee meeting. Mr. Chico Quintana seconded the motion. The motion
to approve the minutes was passed unanimously.
3. AMENDMENT #4 TO THE FFY2014-2019 TRANSPORTATION IMPROVEMENT
PROGRAM (TIP)
Subject: FFY2014-2019 TIP Amendment #4
Prepared by: Joe Delmagori, MPO Planner
Date: December 9, 2013
BACKGROUND
On December 1, 2013 the Farmington MPO advertised Amendment #4 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds one project to the TIP as described in the attached
notice.
CURRENT WORK
• For the East Arterial project in the City of Aztec, Legion Road will be upgraded
to city standards and will become the terminus for the next phase of the East
Arterial project (Phase 1B).
• The city will upgrade Legion Rd from its current terminus to the end of Phase
1B of the East Arterial.
• This project creates a logical terminus for Phase 1B of the East Arterial.
A public hearing on Amendment #4 will be held on December 19, 2013 during
the Technical Committee meeting.
RECOMMENDATION
It is recommended that the Technical Committee review the project in
Amendment #4, hold a public hearing, and recommend approval of Amendment
#4 to the FFY2014-2019 TIP.
DISCUSSION: Mr. Delmagori explained that Amendment #4 (Page 2 of the Agenda
showed the Public Notice) added one project to the TIP. As previously discussed, the
federal funding that was to go to Phase 1B of the East Arterial project in Aztec was
deprogrammed because it was determined there was no logical termini to the project.
District 5 worked with the City of Aztec to better define where this phase would begin
and end and Legion Road was identified.
Legion Road is south of Aztec near the Aztec Speedway and is actually an existing road
for a short stretch before it reverts back to dirt. The City of Aztec will be using local
funds to upgrade this road to city standards and it will then become the terminus for
Phase 1B of the East Arterial project.
Mr. Delmagori reported that the public comment period began on December 1, 2013
and would run until January 8, 2014.
Mr. Keck opened the Public Hearing on Amendment #4. There were no comments from
the public to Amendment #4. The Public Hearing was closed.
ACTION: Ms. Lopez moved to recommend approval of Amendment #4 to the FFY2014-
2019 TIP. Ms. Brevik seconded the motion. The motion was approved unanimously.
4. CONSIDER RECOMMENDING APPROVAL OF THE JOINT POWERS AGREEMENT (JPA)
WITH MAP-21 PROVISIONS AND THE NEW CONFLICT RESOLUTION PROCESS
Subject: Joint Powers Agreement Amendment
Prepared by: Joe Delmagori, MPO Planner
Date: December 9, 2013
BACKGROUND
The FHWA MPO Review indicated that the MPO needs to amend the current
Joint Powers Agreement (JPA) to meet new provisions of MAP-21 and to include
a conflict resolution process to address disagreements.
As recommended by FHWA, the revised JPA would reflect current
transportation federal law in effect since October 1, 2012 and capture the
requirements of MAP-21.
The proposed MAP-21 provisions to be included in the JPA and the development
of the conflict resolution process for the JPA were reviewed by the Technical
Committee on October 24 and November 21.
CURRENT WORK
MAP-21 provisions are included in Section 4 referencing performance measures
for the MTP, TIP, and other planning documents.
Section 7 is expanded to address conditions that would indicate when the JPA
needs to be updated.
Staff developed a conflict resolution process based on the FHWA-NMDOT
oversight agreement.
The conflict resolution process includes working with the Technical and Policy
Committees on agreement.
If an issue is not resolved at that point, local entity councils and commissions
will work to reach agreement.
Staff provided the revisions to FHWA for review and they were accepted on
December 5.
ANTICIPATED WORK
Seek recommended approval of the JPA update by the Technical Committee in
December.
Seek approval of the JPA update by the Policy Committee in January.
Seek approval from the local entities.
RECOMMENDATION
It is recommended that the Technical Committee recommend approval of the
JPA with the MAP-21 provisions and the new conflict resolution process.
DISCUSSION: Mr. Delmagori reviewed the proposed changes to the Joint Powers
Agreement (JPA). The FHWA MPO Review that was completed in 2012 indicated that
the MPO needed to amend the current JPA to meet the new provisions of MAP-21 and
also to include a conflict resolution process that would address disagreements.
Section Four
Mr. Delmagori referred to Pages 5 and 6 of the Agenda which showed the addition to
the JPA of the seven National Planning Goals of MAP-21.
Section Seven
This Section will be expanded to include actions or instances where the JPA may need
to be amended.
Section Ten
This Section is the new conflict resolution process based on an example currently used
by NMDOT and the Federal Highway Administration.
Staff had provided a copy of the draft JPA to Technical Committee members and Mr.
Delmagori stated that no feedback was received. One change from the draft provided
was the addition of the last paragraph under Section Ten which addressed mediation
being held within the MPO planning area. This addition had been recommended by the
MPO Officer.
Ms. Lopez asked about the difference between the Urbanized Area (UZA) population of
53,049 shown on Page 1 of the JPA and the population of 45,877 shown on Page 8. Mr.
Delmagori clarified that the UZA number reflected population beyond the City of
Farmington limits. The 45,877 is the official 2010 Census data for only the City of
Farmington. Mr. Delmagori added that the UZA is used for MPO planning purposes
while for funding purposes the individual entity population numbers are considered.
Ms. Lopez also said she thought that Complete Streets goals should be shown on Page 5
of the JPA in the list of MAP-21 National Planning Goals. She commented that MPOs
nationally were being encouraged to include Complete Streets concepts and processes
in their work and she thought Complete Streets should be included in this section as
one of the goals.
Mr. Degani replied that the goals in the JPA are those on a broader, national level.
More specific FMPO goals would be reflected in the metropolitan transportation plan
and the UPWP where they can be better defined. He stated that Complete Streets was
more appropriately addressed outside of the JPA because the JPA was the overall
framework or structure for the MPO. Mr. Delmagori referred to Item #10 shown on
Page 6 which addressed incorporating performance based measures into other
transportation plans which might be where Complete Streets is identified. Ms. Lopez
said that if the MPO was going to actively work on Complete Streets then she thought
it should be shown in all MPO documents and plans.
ACTION: Ms. Lopez moved to approve the JPA with the MAP-21 provisions and the new
conflict resolution process. Ms. Moojen seconded the motion. The motion was passed
unanimously.
5. CONSIDER RECOMMENDING ADOPTION OF THE TC RESOLUTION 2013-1,
ESTABLISHING THE PROCEDURES TO BE FOLLOWED AND NOTICE TO BE GIVEN
PURSUANT TO THE PROVISIONS OF THE NEW MEXICO OPEN MEETINGS ACT,
PROVIDING FOR THE ANNUAL DETERMINATION OF REASONABLE NOTICE OF
MEETINGS, AND ESTABLISHING THE MEETING TIMES, DATES, AND LOCATIONS FOR
THE FMPO TECHNICAL COMMITTEE DURING CALENDAR YEAR 2014.
Subject: Annual Meetings Resolution
Prepared by: Duane Wakan, MPO Associate Planner
Date: December 11, 2013
BACKGROUND
Each year the Technical Committee approves a resolution ensuring compliance
with the open meetings act and establishes its meeting schedule for the coming
year.
CURRENT WORK
Staff presented a proposed meeting schedule for discussion with the Technical
Committee in November.
It is suggested that the Technical Committee hold regular monthly meetings
during 2014 that continue to be held on the fourth Thursday at 10:00am on a
rotating basis among the entities or held at more appropriate days and times.
The committee will have an opportunity to modify the proposed meeting
schedule prior to adoption.
RECOMMENDATION
It is recommended that the Technical Committee adopt TC Resolution 2013-1,
establishing the procedures to be followed and notice to be given pursuant to
the provisions of the New Mexico Open Meetings Act, providing for the annual
determination of reasonable notice of meetings, and establishing the meeting
times, dates, and locations for the FMPO Policy Committee during calendar
year 2014.
DISCUSSION: Mr. Wakan explained that, pursuant to the New Mexico Open Meetings
Act, the Technical Committee must establish their meeting calendar for the coming
year (shown on Page 8 of the Agenda).
Mr. Wakan noted that the meetings are scheduled for the fourth Thursday of each
month except for November and December when they are moved up one week due to
the Thanksgiving and Christmas holidays. He asked if there were any conflicts with the
proposed 2014 calendar and none were noted.
ACTION: Ms. Moojen moved to adopt TC Resolution 2013-1, establishing the
procedures to be followed and notice to be given pursuant to the provisions of the
New Mexico Open Meetings Act, providing for the annual determination of reasonable
notice of meetings, and establishing the meeting times, dates, and locations for the
FMPO Policy Committee during calendar year 2014. Ms. Lopez seconded the motion.
The motion was passed unanimously.
6. CONSIDER RECOMMENDING APPROVAL OF AMENDING THE FFY2014-2015 UPWP
BUDGET BASED ON FY2013 CARRYOVER AND NEW WORK AUTHORIZATION FUNDING
AMOUNTS.
Subject: FFY2014-2015 UPWP Budget Amendment
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND or PREVIOUS WORK
The MPO prepared its FFY2014-2015 Budget based on initial funding estimates
from NMDOT for FHWA PL and FTA 5303.
Work Authorizations now provide official amounts for PL and 5303 funding.
CURRENT WORK
The MPO is receiving a new base amount in federal PL funding.
The MPO received approval to carryover federal PL funds from FY2013 to
FFY2014.
The MPO is receiving federal FTA 5303 funding that will cover transit activities
from October 1, 2013 to September 30, 2014.
RECOMMENDATION
It is recommended that the Technical Committee recommend approval of the
amendment to the FFY2014-2015 UPWP Budget based on FY2013 carryover and
new Work Authorization funding amounts.
DISCUSSION: Mr. Delmagori explained that when the UPWP is first developed, Staff
uses preliminary estimates for the federal planning and transit amounts. Once the
official work authorizations are received, those amounts are incorporated into the
UPWP. The work authorizations were received last week and the UPWP budget is now
ready to be amended.
Mr. Delmagori reviewed the funding amounts and the current balances:
Farmington MPO FFY2014 Budget -- October 1, 2013 to September 30, 2014
FFY2013 FFY2014
FY2014 Est. Authorized FFY2014 FY2013 Authorized Amt FFY2014 Final
Budget (June Amts (Jul 2013) Authorized Carryover (Oct (Dec 2013) Budget (Dec
Fund Source 2013) P513130 Amt (Jul 2013) 2013) P500020 P514120 2013)
FHWA PL - Federal Share $ 196,487.00 $ 196,487.00 $ 71,863.82 $ 170,013.00 $ 438,363.82
FHWA PL Required Match $ 33,483.74 $ 33,483.74 $ 12,246.46 $ 28,972.25 $ 74,702.45
FHWA PL Total $ 229,970.74 $ 229,970.74 $ 84,110.28 $ 198,985.25 $ 513,066.27
FHWA PL Traffic Counts - Federal
FHWA PL Required Match
FHWA PL Traffic Counts Total
FTA 5303 - Federal Share $ 36,000.00 $ 51,175.87 $ 51,175.87
FTA 5303 Required Match $ 9,000.00 $ 12,793.97 $ 12,793.97
FTA 5303 Total $ 45,000.00 $ 63,969.84 $ 63,969.84
Federal Share of MPO Budget $ 232,487.00 $ 489,539.69
Local Required Match $ 42,483.74 $ 87,496.42
Additional Local Funding Total $ 51,827.26 $ 0.00
MPO Grand Budget $ 326,798.00 $ 577,036.11
Maximum Total Local Contribution
(Required Match & Additional Local) $ 94,311.00 $ 87,496.42
Maximum Aztec Share (10%) $ 9,431.10 $ 8,749.64
Maximum Bloomfield Share (10%) $ 9,431.10 $ 8,749.64
Maximum Farmington Share (60%) $ 56,586.60 $ 52,497.85
Maximum SJ County Share (20%) $ 18,862.20 $ 17,499.28
Mr. Delmagori reiterated that over the past year, the MPO had transitioned from the
State fiscal year to the Federal fiscal year for budget purposes.
The second column above shows the initial Federal PL and FTA 5303 amounts, the
required match, the MPO Grand Budget, and the maximum local contributions as of
June 2013 when the UPWP budget was approved.
The third column shows the amount received in July 2013 to help bridge the three-
month gap transitioning from the State fiscal year to the Federal fiscal year. Also
around this same time, the DOT Transit Bureau provided the FTA 5303 funding for the
federal fiscal year of $51,175.87.
As the MPO moved into the next fiscal year, there was $71,863.82 in carryover money
which was approved by NMDOT to be carried over. Mr. Delmagori said that as the MPO
transitioned into FFY 2014, there was $170,013.00 in PL funding awarded. With the
FTA 5303 money, the total federal budget for the MPO is $489,539.69 for the period of
October 1, 2013 to September 30, 2014. Additionally, there would be $87,496.42 in
local required match in order to spend the federal dollars.
The chart above also shows the funding breakdown at the local level and Mr.
Delmagori stated that with the increase in federal funding, the actual local
contributions are slightly lower.
ACTION: Ms. Brevik moved to recommend approval of the amendment to the FFY2014-
2015 UPWP Budget based on FY2013 carryover and new Work Authorization funding
amounts. Ms. Lopez seconded the motion. The motion was passed unanimously.
7. RECEIVE A REPORT FROM NMDOT
Mr. Degani provided a Planning update for the Technical Committee. He reported that
the next meeting of the freight working group would be in January. Mr. Paul Sittig
from the Planning Division will be e-mailing the meeting information to all parties.
The update to the state long-range plan is underway at the direction of Mr. Claude
Morelli. Mr. Degani said several working groups have been identified. The first
cooperative roundtable session with NMDOT, the MPOs, and the RTPOs is scheduled for
January 9 at the Indian Pueblo Cultural Center.
The seven state working groups will have their first meetings at the end of January.
The boilerplates for the TAP working agreements were reviewed by NMDOT’s general
counsel. The local government agreements along with the Agreement Request Forms
were mailed out to the entities for review and signatures for the state fiscal years of
2014 and 2015. Mr. Degani said to let him know if those had not been received.
Mr. Degani also mentioned that FHWA has requested that NMDOT stabilize the annual
obligation process. In order to comply with this request, all signed agreements for
FFY2014 and FFY2015 must be submitted by March 15, 2014. This will also apply to the
TAP applications. Mr. Degani stated that all certification packages will work through a
local project agency (LPA) coordinator. Mr. Delmagori stated that a copy of the letter
Mr. Degani referenced was provided to the Technical Committee members today for
their reference.
Mr. Keck thought the change to March would be better to avoid bumping up against
the fiscal year deadline in October. Mr. Degani agreed that it provides NMDOT with the
time they need for review of all the packages and funding obligations.
Mr. Quintana was on his way, but had not yet arrived at the meeting. Mr. Keck moved
on to Agenda Item #8.
8. RECEIVE A REPORT ON THE WORKSHOP WITH NMDOT TO DISCUSS
COMMUNICATIONS AND MAINTENANCE CONCERNS
Subject: Workshop with NMDOT
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND
On August 22, the Technical Committee discussed the need to address several
community and regional concerns with NMDOT.
The concerns relate to interactions with NMDOT District 5 with regards to
regional priorities, communications, and maintenance.
A summary of these concerns was discussed with the Policy Committee on
September 19.
It was agreed that a workshop will be held to discuss the concerns and develop
solutions.
The discussion items for the workshop were developed during the November 21
Technical Committee meeting.
CURRENT WORK
This workshop will be a staff level discussion focusing on MPO involvement with
regional priorities, communications and project management, maintenance,
and inter-governmental agreements.
The local entities will address these topics with various members of NMDOT.
The workshop is expected to be held in February or March 2014.
ANTICIPATED WORK
Determine the content and schedule a day/time for the workshop.
Outline and discuss the community and regional concerns.
Develop solutions and courses of action.
RECOMMENDATION
It is recommended that the Technical Committee receive a report on the
workshop with NMDOT to discuss regional priorities, communications and
project management, maintenance, and intergovernmental agreements.
DISCUSSION: Mr. Delmagori explained the draft agenda for the planned workshop with
NMDOT to discuss regional, communication, and maintenance concerns. Mr. Delmagori
noted that at the November meeting, Mr. David Quintana had recommended several
different NMDOT staff he thought should be involved in the workshop. He had also
suggested separating the meeting into different discussion groups based on the topic.
Mr. Delmagori said he suggested targeting February or March to hold the workshop and
asked the Technical Committee members to review the list of topics in the meantime.
Mr. Keck said he thought the draft agenda looked good.
TOPIC NMDOT PARTICIPANTS
Regional Priorities District 5 engineers
Communications & Project NMDOT Local Government Unit
Management
Maintenance & Inter-government District 5 maintenance and
Agreements engineers
ACTION: The report was received.
9. STATEWIDE FUNCTIONAL CLASSIFICATION UPATE
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
NMDOT and its consultant team are targeting February 2015 for completion of
the review and update.
Discussion on the functional classification process was tabled at the November
21 meeting.
CURRENT WORK
The Functional Classification Guidance Manual explains the new class types and
the criteria for the specific classes.
The MPO identified many classification changes in 2011.
The adopted MPO Major Thoroughfare Plan identifies the recommended current
and proposed classifications for the region.
All of these potential changes will serve as the basis for recommended changes
by the MPO to NMDOT.
Staff will review the list of proposed changes with the Technical Committee on
December 19.
ANTICIPATED WORK
Work with the entities on proposed classification changes.
Approve a list of recommended classification changes to NMDOT in March 2014.
RECOMMENDATION
It is recommended that the Technical Committee:
a. Discuss the update process and upcoming schedule and activities.
b. Discuss the proposed functional class changes list from 2011.
DISCUSSION: Mr. Delmagori said that this item had been tabled at the November
meeting due to time constraints.
Mr. Delmagori reported that at the beginning of November, NMDOT had a statewide
meeting with the MPOs and RTPOs to discuss the kickoff to the state functional
classification update process. NMDOT has hired a consultant to review all the roads at
the state level and determine the appropriate classification. Mr. Delmagori said the
last update to the functional classification was in 2004 and significant changes are
anticipated with this update.
Mr. Delmagori said that NMDOT and its consultant team have targeted February 2015
for completion of the review and update. One of the first steps is to seek
recommended changes from the MPOs and RTPOs.
Mr. Delmagori reviewed some of the information provided in the NMDOT Functional
Classification Guidance Manual. There are seven functional classifications overall and,
except for the Interstate classification, all should apply to the FMPO region.
Classification Description
1 Interstate
2 Principal Arterial - Other
Freeways and Expressways
3 Principal Arterial – Other
4 Minor Arterial
5 Major Collector
6 Minor Collector
7 Local
The Manual explains each of the classifications and elaborates on the criteria for
defining what a road classification should be. It also speaks to traffic generators,
volumes, speeds, and the different characteristics of a road.
The state has asked all the MPOs to provide their recommendations by March and Mr.
Delmagori would like to take the next few months to discuss and consider the
recommendations from FMPO.
Mr. Delmagori explained that in 2011, Staff began working on classification changes for
the region and referred to the handout provided to the Technical Committee
members. There were some discrepancies noted at that time and Staff had begun to
identify recommended changes to road classifications in the area. The reasoning for
the proposed changes was justified by traffic count data and other available
information such as nearby land uses and traffic generators.
The road classification changes shown on the handout were color-coded to denote
roads to be declassified, roads to be reclassified down or up, and several regionally
significant roads that required a new classification because they were not in NMDOT’s
database at all.
Mr. Delmagori said the process that was begun two years ago provides a basis to work
from. At the January meeting, Staff would like to address the classification in more
detail and receive feedback from the Technical Committee members.
Mr. Delmagori said he would e-mail the Guidance Manual to the members to assist
them with reviewing current and recommended road classifications. Ms. Lopez asked
if, following the MPO road classification review, the entities would need to go back
and review their own major thoroughfare plan. Mr. Delmagori said he thought a
majority of the noted changes were already shown in both the local and MPO major
thoroughfare plans, but it will need to be verified.
ACTION: The report was received.
Mr. David Quintana arrived at approximately 10:40 and gave the District 5
update for Agenda Item #7:
Mr. Quintana reported that State Representative Sharon Clahchischilliage had met with
Mr. Miguel Gabaldon regarding the intersection of N36 and NM 371. District 5 has
committed to developing a project to install a signal at the intersection. In the
interim, District 5 will install a single span flasher this spring. The signal project is
anticipated to be programmed for 2015. Mr. Quintana said this intersection is outside
of the Navajo Nation and expected that a JPA would have to be agreed to by BIA, San
Juan County, and NMDOT. He added that the City of Farmington had asked about
street lighting leading to the intersection and District 5 will look at whether lighting
could be incorporated into the intersection project or if a separate lighting project
would be needed.
Funding assistance for the project will be sought from NMDOT’s traffic tech support
section. Mr. Quintana said Representative Clahchischilliage would also seek some
capital outlay money this session for the temporary flasher. If not, Mr. Gabaldon will
set aside some contract maintenance funds to get the project completed. The cost of
the project is expected to be approximately $100,000.
Mr. Quintana stated that some maintenance concerns along US 64 in the Kirtland area
were brought to the attention of NMDOT. There are some drainage concerns along the
north side of the road. Mr. Quintana said District 5 would address the issues as
weather permitted.
Mr. Quintana said District 5 is amenable to participating in the workshop and said that
the February/March timeframe should work for District 5 representatives.
Ms. Brevik asked if Mr. Quintana had an update on construction at the intersection of
US 550 and US 64 in Bloomfield. Mr. Quintana said that construction is expected to be
completed in early 2014, but the current contractor was not making much progress.
However, because the project is so near completion, NMDOT does not want to hold
them in breach of contract. Mr. Quintana said the progress is slow due to the hours the
contractor is limiting their employees to as well as having to work around the winter
weather. Ms. Brevik said the City of Bloomfield had been told that the turning lanes
would be open by December 14. Mr. Quintana said he was not aware of that date but
would follow-up and provide Staff with any updates.
10. RECEIVE AN UPDATE ON COMPLETE STREETS
Subject: Complete Streets
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates
all modes of travel, such as walking, biking, and transit.
On August 7, the Policy Committee approved a vision statement, values, and
goals for Complete Streets which create the framework for the program.
Staff has been working with the Advisory Group on development of land use
context areas and road types overlays.
The Advisory Group held its latest meeting on November 20.
CURRENT WORK
The Advisory Group completed exercises in which they identified titles and
descriptions for land use context areas and road types for the MPO Complete
Streets program.
Land use context areas are areas that comprise of a unique combination of
building types, densities, and development form.
Road types better represent how a street functions within a neighborhood.
These overlays better represent the built environment and relate to the
Complete Streets elements that would be expected to be found in that area.
Land use context areas and road types will be matched for creating Complete
Streets design guidelines.
ANTICIPATED WORK
Finalize land use context areas and road types.
Approve titles and definitions for land use context areas and road types.
Overlay these zones onto existing development throughout the region to view
the interaction.
RECOMMENDATION
It is recommended that the Technical Committee receive a report on Complete
Streets.
DISCUSSION: Mr. Delmagori reported that progress continued on Complete Streets.
The Advisory Group continued to meet and the recent meetings have focused on
developing land use context areas and road types.
Mr. Delmagori explained that these were overlays to the traditional land use
categories and road classifications that are intended to better represent the built
environment as well as to what type of Complete Streets elements would be expected
or desired in a region. Mr. Delmagori said the final draft of titles and descriptions for
the land use context areas and road types developed by the Advisory Group were e-
mailed out to the Technical Committee members for their review. The Advisory Group
will meet again in January and hopefully finalize the land use context areas and road
types.
Mr. Delmagori said the Advisory Group has developed eight land use context areas:
• Rural & Agricultural
• Heavy Industrial
• Regional Commercial & Light Industrial
• City Commercial
• Suburban Neighborhood
• Traditional Neighborhood
• Local Neighborhood Commercial
• Central Business District/Downtown
The Advisory Group has also developed a draft list of nine road types:
Bypass/Limited Access
Principal Arterial
Community Arterial
Service Way
Commercial Collector
Neighborhood Collector
Neighborhood Local
Rural Local
Trail Way
Mr. Delmagori said there was a lot of discussion on mobility, access, driveway cuts,
and how to incorporate walking/biking/transit amenities into these different road
types. The Advisory Group agreed that the Bypass and Principal Arterial would be
designated for higher volumes and higher speeds. There was agreement that these are
necessary road types, but nevertheless there are still ways to incorporate walking and
biking measures into these road types.
The Service Way would serve heavy industrial sites and industrial parks. They would be
used for internal circulation for the industrial sites and provide access to the higher
road classifications. The Arterials would move traffic but would have more defined
walking and biking amenities. The Commercial Collector would primarily connect
commercial areas, retail, and downtown districts while the Neighborhood Collector
would primarily connect residential neighborhoods. The two Locals differentiate
between a more urban neighborhood and a more rural residential neighborhood. The
Trail Way would be a non-motorized pathway that would follow rivers and perhaps be
interspersed throughout a city’s street network.
ACTION: The report was received.
11. RECEIVE A REPORT ON THE REGIONAL TRAFFIC MODEL UPATE
Subject: Traffic Model Update
Prepared by: Duane Wakan, MPO Associate Planner
Date: December 11, 2013
BACKGROUND OR PREVIOUS WORK
Staff hired a consultant in August to complete the model calibration and
validation update.
The consultant is about halfway through the model update process.
Using approved population and employment data, the model update will better
represent projected traffic and congestion conditions in the mid-term (2025)
and long-term (2040).
The model update will be used for analyzing future road projects and
improvements as part of the development of the 2040 MTP.
CURRENT WORK
Staff assisted with the integration of bi-directional traffic counts to the link
(road) network.
A few of the tasks worked on by the consultant included adding procedures for
easier forecasting, performing an update to the trip generation, and creating
an inclusion of freight trucking into the model.
The consultant is performing on-going calibration and validations of the model.
ANTICIPATED WORK
Review and analyze results from the calibration process.
Receive ongoing tutorials from the consultant on the calibration and model
update process.
RECOMMENDATION
It is recommended that the Technical Committee receive a report on the
Regional Traffic Model update.
DISCUSSION: Mr. Wakan reported that the MPO has contracted with Mr. Bob Shull to
complete the traffic model calibration and validation update. Mr. Wakan presented a
PowerPoint to demonstrate some of the previous and current work being done by Mr.
Shull:
• Reviewed and finalized the TAZ boundaries
• Developed maps demonstrating intersection control (signal, stop sign) and
traffic count locations
• Running Network assignments
o Assigning where traffic will go from TAZ to TAZ based on the link
network
• Performing Quality Assurance/Quality Control
o The entire model was reviewed to ensure the speed limits were
accurate and corrections made where necessary
• Reviewing the Over/Under Delay
o The Over/Under of the traffic volumes on the links; areas noted in red
illustrate where traffic volumes are exceeding what they should be;
green shows areas where traffic volumes are too low
o Model is calibrated to adjust these volumes
o The delay nodes are reviewed and illustrated
The largest delays are at intersections with traffic waiting to
turn
The intersection with the largest delay is at 30th and Hutton
• Testing
o Sample showing visual GIS mapping of AM and PM volumes
Mr. Wakan has been working closely with Mr. Shull on the process and learning how to
best illustrate the data. All the updates to the FMPO model are provided to NMDOT to
update the statewide model. The work is expected to be completed in the next couple
of months and Staff can then begin running some different scenarios for the region for
the MTP update.
Ms. Lopez asked if Mr. Shull would make recommendations on how to improve the
over/under traffic link results and the traffic count process. Mr. Wakan said the first
step would probably be for the MPO to look at the traffic count database, but noted
that the over/under information is generally caused by school traffic with peak hour
traffic variations.
Mr. Wakan said that the truck routes in the region were also provided to Mr. Shull.
This information will help determine where the area wants the truck traffic to be
routed.
ACTION: The report was received.
12. INFORMATION ITEMS
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: December 10, 2013
INFORMATION ITEMS
a. Integrating Planning for Operations Workshop. Joe Delmagori attended
the Integrating Planning for Operations workshop in Albuquerque on
December 3. The workshop focused on developing objectives and
performance measures for planning documents and the MPO process.
b. NM Strategic Highway Safety Plan (SHSP) Safety Launch. Duane Wakan
attended the meeting of the New Mexico Strategic Highway Safety Plan
(SHSP) Safety Launch Meeting in Albuquerque on December 3. This initial
meeting brought together stakeholders statewide to discuss current safety
awareness programs and provide input as to future measures and efforts.
c. MPO Quarterly – Traffic Standards Review. Staff attended the MPO
Quarterly in Las Cruces on December 10. On December 9, staff also
attended the New Mexico State Traffic Monitoring Standards Review
meeting.
d. 2013 Fall Traffic Counts. Staff received the initial fall weekend/weekday
traffic count results. Staff is currently formatting documents for web-based
viewing, performing quality assurance measures, and preparing for
submittal to NMDOTs Traffic Bureau.
e. Other
DISCUSSION: Mr. Delmagori reported that he attended the Integrating Planning &
Performance Measures for Operations Workshop hosted by the Albuquerque MPO . He
showed a copy of the FHWA manual on performance measures as a reference.
Also on December 3, Mr. Wakan attended the NM Strategic Highway Safety Plan (SHSP)
Safety Launch meeting.
Mr. Delmagori and Mr. Wakan attended a Traffic Standards Review along with the MPO
Quarterly in Las Cruces on December 9 & 10.
Mr. Delmagori said the 2013 fall traffic count data has been provided and Staff is
assessing the information. Except for some street sweeper issues, overall the data
appears to be very good.
Comments from the Rail Plan meeting were provided to the Technical Committee
members for their review.
Mr. Delmagori said that at the November Technical Committee meeting, there was
discussion of holding a stakeholder meeting on the long-range plan to get some public
feedback. Plans are to target early February for this meeting followed by a work
session with the Technical Committee prior to the regular February meeting.
11. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Ms. Moojen introduced Joshua Hedgpeth as the City of Aztec’s new Planning
Technician in Community Development. Additionally the City of Aztec has hired a new
Engineer/Public Works Director, Bill Watson. Aztec’s City Manager has been notified
that Mr. Watson should now be officially named as the primary representative to the
MPO Technical Committee for the city.
There was no additional business from the Chairman, Members and Staff.
12. BUSINESS FROM THE FLOOR
There was no business from the Floor.
13. ADJOURNMENT
Ms. Lopez moved to adjourn the meeting. Ms. Moojen seconded the motion. Mr. Keck
adjourned the meeting at 11:10 a.m.
__________________________ ________________________________
Dave Keck, Chair June Markle, MPO Administrative Aide