Technical Members Present: Bill Watson, City of Aztec
Teresa Brevik, City of Bloomfield
Cynthia Lopez, City of Farmington
Nica J. Westerling, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: None
Staff Present: Mary Holton, MPO Officer
Joe Delmagori, MPO Planner
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Also Present: Brian Degani, NMDOT Planning Liaison
David Quintana, NMDOT District 5, via telephone
Larry Hathaway, San Juan County
WELCOME
Mr. Delmagori introduced Mr. William “Bill” Watson, the new Public Works Director for
the City of Aztec and the newest member of the Technical Committee. Participants
then introduced themselves and the organization they represented.
1. CALL TO ORDER
Mr. Dave Keck called the meeting to order at 10:03 a.m.
2. APPROVE THE MINUTES FROM THE DECEMBER 19, 2013 TECHNICAL COMMITTEE
MEETING
Ms. Lopez made a motion to approve the minutes from the December 19, 2013
Technical Committee meeting. Ms. Westerling seconded the motion. The motion to
approve the minutes was passed unanimously.
3. HOLD THE ANNUAL ELECTION OF OFFICERS
Subject: Annual Election of Officers
Prepared by: Joe Delmagori, MPO Planner
Date: January 14, 2014
BACKGROUND
At the first meeting of the new year, the Technical Committee selects the
Chair and Vice-Chair from their membership who will serve until the next
annual election.
The Chair presides over the meetings and is responsible for the other duties
outlined in the Committee Bylaws and Operating Procedures document.
The Vice-Chair presides over the meetings in the absence of the Chair.
ELECTION
Elections will take place to select a Chair and Vice-Chair for the Technical
Committee for 2014.
RECOMMENDATION
It is recommended that the Technical Committee accept nominations and
vote to elect the Chair and Vice-Chair for 2014.
DISCUSSION: Mr. Delmagori stated that during the first meeting of the new year, the
Technical Committee selects the Chair and Vice-Chair from their membership who will
serve until the next annual election. The current Chair is Dave Keck and the current
Vice-Chair is Cindy Lopez. He turned the election process over to the Technical
Committee.
ACTION: Ms. Westerling nominated Ms. Cindy Lopez as Chair of the Technical
Committee. There were no other nominations for the position. Ms. Lopez was
nominated and chosen as the Chair of the Technical Committee for the 2014 calendar
year.
Ms. Lopez nominated Mr. Dave Keck as Vice-Chair of the Technical Committee. There
were no other nominations for the position. Mr. Keck was nominated and chosen as the
Vice-Chair of the Technical Committee for the 2014 calendar year.
Ms. Lopez took over as Chair for the meeting.
Mr. Delmagori asked if Agenda Items #4 and #5 could be switched since Mr. David
Quintana with District 5 would be participating by phone. By taking Agenda Item #4
after #5, Mr. Quintana could participate in the discussion on the agenda for the
workshop with NMDOT upcoming on February 20 and then go directly into his District 5
report to the Technical Committee.
5. REVIEW AND DEVELOP THE LIST OF PROPOSED FUNCTIONAL CLASSIFICATION
CHANGES FOR THE FARMINGTON MPO
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: January 15, 2014
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
NMDOT and its consultant team are targeting February 2015 for completion of
the review and update.
Staff discussed the schedule and reviewed the list of proposed changes with the
Policy Committee on January 16.
CURRENT WORK
Staff provided the Functional Classification Guidance Manual to the Technical
Committee members.
Classification changes from 2011 are divided into four categories.
Staff will review and modify the 2011 functional classification proposals with
the members on January 23.
There is opportunity to identify other potential changes.
Staff will meet with the entities individually to further discuss classification
changes within their jurisdiction.
All of these potential changes will serve as the basis for recommended changes
by the MPO to NMDOT.
RECOMMENDATION
It is recommended that the Technical Committee review and develop the list of
proposed functional classification changes for the Farmington MPO.
DISCUSSION: Mr. Delmagori reported that NMDOT is working with a consultant to
complete an update of the statewide functional classification system. They have asked
the MPOs and RTPOs to assist by making recommendations for classification changes to
their regional roads.
Mr. Delmagori said that in 2011, the Farmington MPO reviewed the region and the
current classifications and developed a list of recommended changes. Due to some
staffing issues at NMDOT, the changes were not entered into their database nor
forwarded to FHWA. With the statewide functional classification update underway
now, the MPO can reconsider the list and see if those changes recommended in 2011
are still relevant and identify any other additions or changes that need to be
considered.
Mr. Delmagori said he wanted to briefly review the changes proposed in 2011 and
stated that Staff will then plan to meet individually with each Technical Committee
member and their staff to review that entity’s specific classification changes. All the
information would then be brought to the February Technical Committee meeting for
recommended approval and to the Policy Committee in March for final approval.
Mr. Delmagori reviewed Pages 5-7 of the Agenda to explain some of the proposed
classification changes from the 2011 list. The list shows roadways in four categories:
declassify, reclassify up, reclassify down, and add as new. He referenced a few
examples from the overall list to demonstrate the review process.
Ms. Westerling asked if the changes would then be taken back to the councils for
approval. Mr. Delmagori said he believed the city’s thoroughfare plan already shows
Lake and Park Streets as collectors on the local level. Ms. Lopez said that according to
the map she had, Lake was shown as a local street on the city’s plan. Mr. Delmagori
clarified that the recommended classifications do match the existing thoroughfare
plan and it was NMDOT’s database that was not in agreement.
Ms. Holton added that she remembered Lake Street being declassified to a collector on
the last thoroughfare plan iteration. She said the MPO’s Major T-Plan which reflects all
the entities information should be utilized for the purpose of determining functional
classifications.
Mr. Keck commented on CR 6500 which is recommended to be declassified to a
collector. He said that since CR 6500 is the outlet for Twin Peaks/CR 6480, which is
being proposed as a minor arterial, that CR 6500 have the same classifications as CR
6480.
Mr. Delmagori said the roads listed on Page 6 were those proposed to be reclassified
up. NMDOT currently shows CR 350 as a collector and the MPO is recommending that it
be reclassified up to a principal arterial as it is the primary road between US 64 and
NM 516 and serves the function of moving traffic through the Crouch Mesa area.
Additionally, the state’s functional class system shows Foothills as a collector,
however, the City of Farmington’s Major Thoroughfare Plan has this road as a minor
arterial.
Mr. Watson asked if the name of the entity where the roads were located could be
added to the listing. Mr. Delmagori said Staff could easily add that information.
Mr. Delmagori explained the list of new classifications shown on Page 7 of the Agenda.
These roads serve a regionally significant purpose for the area, are part of the
thoroughfare plan, and traffic counts are taken on these roads. The state map,
however, does not include these roads.
Mr. Delmagori said the list would be reviewed with each of the entities and they were
encouraged to consider other roads that they believe should be included on the list.
Ms. Holton said that the MPO’s Major T-Plan specifically reflected each city’s
thoroughfare plans.
Mr. Delmagori added that consideration may want to be given to adding all of the
proposed roads that have come out of the thoroughfare and long range planning
processes so that the state is aware of the future roads identified by the MPO (i.e.
Pinon Hills, CR 3900, East Arterial, and Highline Road). Even though the roads do not
currently exist, they have already been identified through the planning process.
Mr. Watson asked if the classifications were based on Average Daily Traffic (ADT)
volumes. Mr. Delmagori said volume did factor into the classification, but also speed,
and the purpose/function of the road. Mr. Delmagori said the MPO has a guiding
document from NMDOT which outlines the criteria for classifying road and he will
forward that to Mr. Watson.
Mr. Delmagori reported that a more thorough review of the list will be taken when
Staff meets with each entity and a final recommendation will then be compiled.
ACTION: The report was received.
Mr. David Quintana was contacted by telephone. The Technical Committee discussed
Agenda Item #4.
4. DISCUSS THE AGENDA AND STRUCTURE OF THE WORKSHOP WITH NMDOT TO
DISCUSS REGIONAL PRIORITIES, COMMUNICATIONS, AND MAINTENANCE CONCERNS
Subject: Workshop with NMDOT
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND
On August 22, the Technical Committee discussed the need to address several
community and regional concerns with NMDOT.
The concerns relate to interactions with NMDOT District 5 with regards to
regional priorities, communications, and maintenance.
A summary of these concerns was discussed with the Policy Committee on
September 19.
It was agreed that a workshop will be held to discuss the concerns and develop
solutions.
An update on the coordination of this workshop was provided to the Policy
Committee on January 16.
CURRENT WORK
This workshop will be a staff level discussion focusing on MPO involvement with
regional priorities, communications and project management, maintenance,
and inter-governmental agreements.
Although originally scheduled for February 26, District 5 cannot meet that day
and has suggested the workshop be held on February 20.
The draft agenda for the workshop has been developed.
To assist staff with preparations, the Technical Committee and NMDOT need to
determine the structure of the meeting as to who will present the material.
RECOMMENDATION
It is recommended that the Technical Committee discuss the agenda and
structure of the workshop with NMDOT to discuss regional priorities and
communications and maintenance concerns.
DISCUSSION: Mr. Delmagori reported that the workshop with NMDOT and District 5 had
been scheduled for February 20. Mr. Delmagori asked who from Mr. Quintana’s office
was planning to attend.
Mr. Quintana said Yolanda Roybal and Richard Pena from the District 5 staff are
planning to attend. Mr. Quintana had forwarded the invitation to the District 5
engineering staff, Miguel Gabaldon, Dave Martinez, Paul Brasher, and their project
development engineer, Chris Urioste, who also oversees the local government projects
when they reach District 5 for reimbursement. Mr. Quintana said that Mr. Urioste and
Mr. Brasher will attend. He is waiting to hear from Mr. Gabaldon and Mr. Martinez. He
expects that Mr. Martinez will be able to attend, but with the final day of the state
legislative session occurring that day, it is possible that Mr. Gabaldon will be unable to
participate.
Mr. Delmagori referred to Page 3 of the Agenda which showed the draft agenda for the
workshop. The agenda has been reviewed and all parties have agreed on the discussion
topics. Mr. Delmagori said Staff would now like to discuss the structure of the meeting
and who would be presenting, what would be presented, and how much time needed
to be allotted for discussion on each of the topics. Mr. Delmagori thought it would be
good to initially get some items out on the table and allow for discussion on those
topics rather than having open discussion on all the topics at once.
Mr. Delmagori asked Mr. Quintana if Mr. Gabaldon and Mr. Martinez would be willing to
speak for a few minutes first to explain their roles. Mr. Quintana said Mr. Martinez
could begin the afternoon maintenance discussion this way and, perhaps, Mr.
Gabaldon could say a few words to open the meeting in the morning. He thought they
would only need about five minutes each. Mr. Quintana said that he and Yolanda
would prepare their own or combine a presentation to discuss the overall flow of the
governmental procedures and what is required. He thought this presentation would
take approximately ten to fifteen minutes and could follow Mr. Gabaldon’s opening
remarks, following by a general group discussion.
Mr. Delmagori said this sounded good and encouraged the Technical Committee
members to also provide their thoughts and ideas for the agenda. Mr. Quintana added
that Mr. Gabaldon would probably want to open the meeting and introduce his staff
members and then Mr. Quintana would speak to the local government unit, what their
different roles are with respect to the north region and the general office, and how
they assist the local entities with project development. Mr. Quintana would also speak
to how District 5 assists with the project development process, and then how they
take over after the projects are authorized and when reimbursements for the projects
are requested. Although not yet finished, District 5 is working to compile their local
government agreement handbook and Mr. Quintana said he might also be able to
discuss some of the details in that handbook at the workshop.
Ms. Westerling said she believed it was important to discuss the change in dates to
have all project certifications in place. She stated that this change had created some
serious problems. Mr. Quintana agreed that the change to the March 15 date for this
first year would not be feasible for many projects and reiterated that District 5 was
allowing some flexibility with the dates for the first year or two. Going forward,
however, District 5 will be firm on the dates as they are being pressured by FHWA to
spread out their obligation requests for federal funding throughout the fiscal year. Mr.
Quintana stated that what has happened in the past is that approximately 90% of their
program is authorized during the last month of the fiscal year. The state-led projects
are also being mandated to meet this change along with the local government-led
projects that receive federal funds. The deadlines need to be moved up in order to
obligate grant funds in a timelier manner and more evenly spread out the funding out
during the fiscal year. Mr. Quintana said that meeting the new deadlines for the next
two years would be difficult and that is why District 5 is committed to providing some
flexibility with the deadlines. However, as new agreements are processed, the new
dates will be implemented in order to comply with FHWA requirements to spread out
the obligation requests throughout the fiscal year.
Ms. Westerling said that going forward that will not be an issue, but for two City of
Farmington projects this year the deadline would be impossible to meet. Mr. Quintana
reiterated that there would be flexibility with the deadlines this year and also some
for next year. The need for this flexibility has been explained to the local government
agreement unit. Mr. Quintana added that the project deadline for the recently
approved TAP projects would be August 15. He also noted that projects already under
agreement will also have some flexibility with the deadline. Ms. Westerling asked if
someone who dealt with contracts could attend the workshop. Mr. Quintana said he
would extend the workshop invitation to Mr. Shawn Sandoval who is part of the local
government agreement unit.
Mr. Degani commented that Mr. Sandoval had given a presentation of the project
deadlines at a recent MPO quarterly meeting. He recommended that perhaps Mr.
Sandoval could do something similar for this workshop.
Ms. Westerling asked if lunch would be provided. Mr. Delmagori said Staff would
arrange for that.
Mr. Quintana said that for the workshop topic of Regional Priorities, he thought that
he and Mr. Gabaldon would address this item. Mr. Quintana said that Mr. Gabaldon’s
opening remarks might also lead into this topic. Mr. Delmagori asked if some
information on the targets for the federal funding that District 5 receives could be
provided during discussion on this topic. He said this could provide some general
background about what the MPO can expect for its projects versus what the targets
are showing.
Mr. Delmagori said Staff would expand on the agenda and add the names of the
presenters. He added that the Technical Committee members were welcome to invite
any of their staff to also participate in the workshop.
ACTION: The report was received.
6. RECEIVE A REPORT FROM NMODT
Mr. Quintana reported that the intersection of US 64 and US 550 is nearly complete
and is expected to be fully open within a month’s time. There are still some concrete
panels that need to be installed and a traffic control plan was developed to keep
trucks moving through the intersection while the panels were installed. These panels
will be placed as soon as weather permits. Following this work the project will be
substantially complete with only some punch list items remaining.
Mr. Quintana said the next two-mile phase of the US 64 project has been awarded to
Mountain States Construction. The contractor has already begun setting up traffic
control signage. This phase is expected to go much smoother than the last section as
this contractor is better able to handle a construction project of this size. Mr.
Quintana stated that the project should be completed by the end of this construction
season.
The construction at the intersection of Light Plant Road and NM 516 was halted last
fall and will not begin again until after school lets out in May for the summer. Traffic
was disrupted significantly last fall when the project began, so District 5 chose to hold
off on any further construction until this summer. Mr. Quintana said the project is
expected to take six to eight weeks and should be completed before the summer is
over.
Mr. Quintana reported that a project was let last week for ADA improvements along
the stretch of NM 516 that was repaved last year. This project will be to update
existing ADA ramps to current standards and configurations at a cost of $700,000.
District 5 is looking to expedite the award of the contract and hopes to get a notice to
proceed in about four to six weeks following the award. Construction is expected to
begin at the end of February or first part of March. Mr. Keck asked if the project
included repaving the median breaks. Mr. Quintana said that this was part of the
planned project. District 5 does not expect too much disruption of traffic as the work
will be on the shoulders and medians.
District 5 is completing a signal warrant analysis for the intersection of NM 371 and
N36. Mr. Quintana said that a signal is warranted and was actually warranted prior to
the opening of the casino on N36. Mr. Quintana said that District 5 is working on a
developing a signalization project for the intersection for this year. He said that this
project would require a TIP amendment. Funding for the project may need to come
from contract maintenance state funds which would not be available until after July.
Ms. Westerling asked if the agreement for signal maintenance between the City of
Farmington and District 5 would need to be amended to include this new signal. She
said she brought this up because Mr. Steve Krest, the Traffic Engineering Administrator
is retiring on June 30. Mr. Quintana asked if the current maintenance agreement
allowed for additional signals to be included as they came on line. Ms. Westerling was
not sure if the agreement was written to cover all new signals or if it actually listed
the specific signals that were part of the agreement. Mr. Quintana asked if Ms.
Westerling would look at the agreement to see if the language was in that it included
all signals that came on line, or if the agreement would need to be amended to
include this specific new signal.
Mr. Quintana said the next phase of US 64 is currently under final design and is
programmed for FY2016 and FY2017. District 5 plans to acquire rights-of-way this
calendar year for this section of the project to have it ready to let in October 2016. He
stated that the design is almost complete and the priority now is to obtain the needed
rights-of-way. The project consultant is planning another public meeting to discuss
the project in the next several months. Significant attendance is anticipated for this
upcoming meeting.
District 5 has made a preliminary consultant selection to study NM 173. They plan to
use safety funds to reconstruct about a one and one-half mile section of this road. The
notice to proceed should be issued to the consultant within the next few months with
construction starting in 2016. The intersection of NM 173 and NM 575 will also be
reviewed as part of this project.
Ms. Westerling asked if Mr. Quintana would bring maps of the US 64 phases to the
workshop in February. Mr. Quintana clarified that the construction will continue by
two-mile sections from Bloomfield to Farmington. The phase that was just let is from
mile marker 62 to 60; the phase to be let in FY2016 and FY2017 is from mile marker 60
to 58; and then 58 to 56 in FY2019 and FY2020.
Mr. Quintana reported that District 5 had provided the legislature with a wish list of
projects for state funding. The US 64 corridor was identified on this list to receive
state funding should it become available. If additional funding was made available, the
upcoming phases of US 64 would be expedited. Mr. Quintana added that at the current
rate, the US 64 project should be completed in 2022.
Mr. Delmagori asked about the river trail TAP project for the City of Farmington and
the required PS&E meeting due by July 15. The Parks Department had asked how this
meeting was scheduled and who it was scheduled with. Mr. Quintana said this meeting
is for the final design review of all the contract documents including a complete set of
plans, the special provisions, the supplemental specifications, and the engineering
estimate. Those who would participate would be Ms. Yolanda Sandoval, Mr. Chris
Urioste and Mr. Quintana. Ms. Westerling said she would ask Mr. Chico Quintana, who
is very familiar with the process, to assist Mr. Roger Drayer who is the Parks Planner
overseeing the river trail TAP project.
Mr. Keck asked about a meeting that was to be held to discuss the Shiprock lighting
agreement. Mr. Quintana said the agreement is with the legal division for review. He
will follow up on the agreement and then get the meeting scheduled. Mr. Quintana
said he would also like to include some additional lighting projects in the discussions
and add generic language that would cover the addition of any future lighting
projects. Mr. Keck stated that Representative Clahchischilliage had asked to be
included in this meeting. Mr. Quintana said he hoped to get this meeting set up in
February.
Mr. Quintana reported that he was looking to amend Phase IB of the East Aztec
Arterial project soon and it would be amended into FY2015. He said that the City of
Aztec expected the project to be ready to go by July. He also plans to amend the
subsequent phases of the project into FY2016, FY2017, and FY2018 to get the rest of
the project into the STIP so the project can be completed. As long as all the phases
are programmed into the STIP, the project should be good to go as far as FHWA is
concerned. Mr. Quintana said there are ongoing calls on the first Friday of each month
with the City of Aztec and their consultant, Wilson & Company, to discuss the progress
of the project.
Mr. Delmagori asked Mr. Quintana to send Staff the information about Phase IB of the
East Arterial project so a TIP amendment could be processed. This project was
removed from the TIP a few months ago due to the problems with no logical terminus
for the project. Mr. Delmagori said the Policy Committee meets in March and April and
if their March meeting is targeted for final approval of the amendment, Staff will need
the details in the next few weeks in order to hold the public comment period and seek
recommended approval of the amendment by the Technical Committee at their
February meeting.
Mr. Quintana said he would plan to amend Phase IB for his next amendment cycle to
allow the MPO sufficient time to get the project into their TIP. He will provide the
necessary information to Staff by the end of the week, but the project description
remained the same at a cost of $3,500,000 and it would be amended into the STIP for
FY2015. Mr. Delmagori said Staff would begin working on the TIP amendment.
Mr. Quintana commented that during the Policy Committee meeting last week, he had
explained that updating the functional classifications was not only to provide for
certain levels of design criteria based on the functional classification, but it also
identified which roads were eligible for federal funding.
The conference call with Mr. Quintana was ended.
Mr. Brian Degani reported that the formation of the bicycle/pedestrian/equestrian
committee was awaiting final NMDOT approval by NMDOT Secretary Church. Ms. Rosa
Kozub will be the coordinator for the group that will be comprised of NMDOT staff and
some portions that will be open to the public.
Mr. Degani stated that comments received on the primary freight network have been
uploaded to the NMDOT website. He explained that NMDOT looks statewide to identify
the primary freight network on arterials throughout the state that carry the bulk of
primary freight. Mr. Delmagori said that FMPO did submit comments about the
importance of US 550, US 64, and US 491 for this region due to the lack of rail or other
opportunities for getting freight into and out of the area. He noted that I-25 and I-40
were already identified for the state, but Staff believed it was essential to note that
these other roads were just as important. Mr. Degani also said that proposed meeting
dates for the advisory group of the freight working group should be set this week.
Mr. Degani said that the Highway Safety Improvement Program is undergoing some
updates to the guidelines and the application process. He reported that Ms. Roshana
Moojen and he had begun working on some concerns for Aztec at the intersection of
NM 516 and US 550.
Mr. Degani said the long range plan cooperative round table meeting was held on
January 9. He said it was a productive meeting that discussed the project management
plan, the project work schedule, and the public participation framework. He said the
nine state-wide and seven regional working groups are in the process of being formed
and key participants identified.
Mr. Keck asked when the next call for safety projects could be expected. Mr.
Delmagori said he had not received any word on this yet although the call usually
happens around March each year.
Mr. Wakan asked about the importance of crash data in submitting a safety project.
Mr. Degani said that including crash data was essential when submitting a safety
project application and it should be part of the NMDOT database for that road
segment.
7. RECEIVE A REPORT ON THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Joe Delmagori, MPO Planner
Date: January 14, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning
document that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees.
CURRENT WORK
Overview presentations will be given to various groups in the coming month.
Staff is organizing a stakeholder workshop and public meetings in early
February.
These public meetings will seek to gather ideas on transportation projects that
can then be analyzed later in the MTP process.
The current MTP Vision, Goals, and Objectives will be discussed and reviewed.
RECOMMENDATION
It is recommended that the Technical Committee receive a status report on the
2040 Metropolitan Transportation Plan.
DISCUSSION: Mr. Delmagori said that Staff had set up several presentations and open
house-type public meetings to provide an overview of the MTP process. He noted that
the list of presentations shown on Page 9 of the Agenda should be corrected to show
the presentation to the San Juan County Commission on February 4 and had also been
expanded to include presentations and open house-type public meetings:
• January 13 – Farmington Chamber of Commerce Red Coats
• January 14 – San Juan Rotary
• January 21 – Farmington Chamber Young Professionals
• January 27 – Bloomfield City Council
• January 28 – Aztec City Commission
• January 30 – San Juan College (Open House – Student event)
• February 3 – Sycamore Center (Open House)
• February 4 – Farmington City Council
• February 4 – San Juan County Commission
• February 5 - Stakeholder Workshop
• February 6 – San Juan County Administrative Bldg. Lobby (Open House)
• February 11 – City of Bloomfield Multi-Cultural Center (Open House)
Mr. Delmagori stated that Staff will also be scheduling additional presentations for
other clubs and organizations during the next month or two. The intent of these
meetings will be to provide the MTP process overview, explain the projects and
priorities identified in the current MTP, and gather initial feedback from the public as
to other potential projects.
Also included on Pages 9 and 10 of the Agenda are the vision and mission statements
and the goals and objectives from the current 2035 MTP. Mr. Delmagori said he
anticipated these items would be reviewed in more detail in the coming months. He
noted that the vision statement has been in place since 2004 shortly after the MPO
was created and it may need to be revised and/or modified. The goals and objectives
are fairly encompassing and comprehensive, but Mr. Delmagori noted that work done
in the past few years, specifically in regard to Complete Streets, may require that this
list be changed. Additionally with the MAP-21 performance measures, some language
with regard to that may also need to be added.
Mr. Delmagori reminded the Technical Committee members of the MTP Stakeholder
Workshop on February 5 from 10:00 a.m. to 12:00 p.m. All the Technical Committee
members are invited to attend although a recap of the workshop will be provided to
the members at the regular meeting in February. The workshop will be a presentation
on the MTP explaining the current document followed by a brainstorming session on
what the participants would like to see as part of the process or what they would like
to see changed.
ACTION: The report was received.
8. RECEIVE A REVIEW OF 2013 RED APPLE TRANSIT RIDERSHIP
Subject: 2013 Red Apple Transit Ridership
Prepared by: Joe Delmagori, MPO Planner
Date: January 15, 2014
RED APPLE REPORT
Ridership in 2013 totaled 130,422; in 2012 ridership was 125,995, which is a
3.5% increase.
In 2013 there were 2,868 more rides on the Farmington routes than in 2012.
All of the regional routes had higher ridership in 2013 than in 2012: Aztec had
894 more rides, Bloomfield had 308 and Kirtland had 357.
Despite the ridership increases for the year, both the Farmington and regional
ridership has been declining since October.
In the past three years, 2011 had the highest ridership, 2012 had the lowest
ridership, and 2013 fell roughly within these two ranges.
ATTACHMENT
2013 monthly ridership summary for Red Apple Transit.
RECOMMENDATION
It is recommended that the Technical Committee receive a review of 2013 Red
Apple Transit ridership.
DISCUSSION: Mr. Wakan reported that with the close of 2013, Staff had created a
summary report of the total Red Apple ridership. There was a 3.5% increase in total
ridership throughout the region in 2013 compared to 2012.
Mr. Wakan referred to Page 12 of the Agenda which showed that overall ridership on
the Farmington routes increased in 2013 from 2012. Also illustrated was the month-to-
month percent change in ridership by route for 2012 and 2013.
Mr. Wakan stated that each of the three regional routes also saw an increase during
2013. There was a trailing off of ridership at the end of the year. Ridership from
January through March was stable, increased during April through September, and
then all route ridership trail off from October through December.
ACTION: The report was received.
9. INFORMATION ITEMS
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: January 13, 2014
INFORMATION ITEMS
a. Regional Traffic Model Update. A status report on the consultant’s recent
work will be provided at the meeting.
b. Complete Streets. The Advisory Group met on January 22. A recap of
their meeting will be provided.
c. Conferences in Denver. Joe Delmagori will be attending two conferences
in Denver on February 10-15. One will be walkability tours of Denver and
other cities led by Dan Burden. The other conference is being organized by
New Partners for Smart Growth.
d. Complete Streets Workshop. The MPO has coordinated to have Dan
Burden in Farmington on May 12-13 to give presentations and a workshop on
Complete Streets.
e. Other
DISCUSSION: Mr. Wakan reported that the regional traffic model consultant reported
that the traffic count parameters are falling well within range. The troubling traffic
count locations will be reviewed but the overall product is looking good. Once this
review has been completed, Mr. Bob Shull will begin work on the future years of 2025
and 2040. When the future scenarios are finished, the future road networks can be
categorized into those scenarios.
Mr. Wakan reported that the Complete Streets Advisory Group had met on January 22.
They gave their preliminary approval to the land use context areas and road typologies
developed at their meetings in October and November 2013.
Mr. Delmagori will be attending two conferences in Denver on February 10-15. One will
be walkability tours of Denver, Golden, and Fort Collins led by Mr. Dan Burden. The
other conference on February 13-15 is the 13th Annual New Partners for Smart Growth
which Ms. Lopez also plans to attend.
Mr. Wakan said the MPO would be bringing Mr. Dan Burden back to Farmington on May
12-13. He will be presenting to the local councils and commissions as well as giving a
technical workshop for the Complete Street Advisory Group. Ms. Holton noted that this
workshop would be open to the public, but it will be more focused toward the Advisory
Group and the Technical Committee members. Mr. Burden is bringing another member
of his staff who is involved with Safe Routes to School (SRTS). MPO Staff plan to
coordinate with a local elementary school currently not participating in SRTS and
assess their student arrival and dismissal. It is hoped that some good feedback can be
provided to the school on what is working and what could be improved upon. Mr.
Delmagori added that there would also be a public workshop on May 13. Once the
agenda for Mr. Burden’s visit is finalized it will be issued out.
10. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Delmagori welcomed Mr. Bill Watson to the Technical Committee.
There was no additional business from the Chairman, Members and Staff.
11. BUSINESS FROM THE FLOOR
There was no business from the Floor.
12. ADJOURNMENT
Ms. Westerling moved to adjourn the meeting. Ms. Brevik seconded the motion. Ms.
Lopez adjourned the meeting at 11:25 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide
Agenda
TECHNICAL COMMITTEE
AGENDA
Farmington Metropolitan Planning Organization
February 27, 2014
10:00 a.m.
Commission Chambers
Aztec City Hall
201 West Chaco Street
Aztec, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
February 27, 2014 10:00 AM
This meeting will be held in Commission Chambers at Aztec City Hall, 201 West Chaco Street,
Aztec, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the January 23, 2014 Technical Committee 16
meeting.
3. Amendment #5 to the FFY2014-2019 Transportation Improvement Program. 1
a. Review the project in Amendment #5.
b. Hold a public hearing on Amendment #5.
c. Consider recommending approval of Amendment #5.
4. Complete Streets. 3
a. Review titles and descriptions for the Land Use Context Areas and Road
Typologies.
b. Consider recommending approval of preliminary titles and descriptions
of Complete Streets Context Areas and Road Typologies.
c. Receive a presentation on guidelines for Complete Streets.
5. Review and consider recommending approval of the list of proposed functional 7
classification changes for the Farmington MPO.
6. Receive a report from NMDOT
a. District 5 (David Quintana)
b. Planning Division (Brian Degani)
7. 2040 Metropolitan Transportation Plan (MTP). 12
a. Receive a report on comments received during the Stakeholder
Workshop and public meetings.
b. Hold a discussion on addressing key questions for developing the 2040
MTP.
8. Information Items: 15
a. NMDOT/Technical Committee Workshop
b. NMDOT Safety Program and Application Process
c. Regional Traffic Model Update
d. Smart Growth conferences in Denver – February 10-15
e. Other
9. Business from Chairman, Members, and Staff
10. Business from the Floor
11. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FFY2014-2019 TIP Amendment #5
Prepared by: Joe Delmagori, MPO Planner
Date: February 18, 2014
BACKGROUND
On February 12, 2014 the Farmington MPO advertised Amendment #5 to the
FFY2014-2019 Transportation Improvement Program (TIP).
The amendment adds one project to the TIP as described in the attached
notice.
CURRENT WORK
The previous TIP amendment added Legion Rd to the TIP to be the logical
terminus for the East Arterial Phase 1B.
NMDOT has now programmed $3.5 million toward construction of the East
Arterial Phase 1B.
Upon completion of this phase, the middle section will be the remaining phase
of this project.
A public hearing on Amendment #5 will be held on February 27, 2014 during the
Technical Committee meeting.
ANTICIPATED WORK
Seek approval of the amendment at the March 20, 2014 Policy Committee
meeting.
Include the project revisions in the STIP.
ATTACHMENTS
Public Notice describing the project in Amendment #5.
RECOMMENDATION
It is recommended that the Technical Committee review the project in
Amendment #5, hold a public hearing, and recommend approval of Amendment
#5 to the FFY2014-2019 TIP.
1
PUBLIC NOTICE
The Farmington Metropolitan Planning Organization (FMPO) is the transportation
planning forum for the cities of Farmington, Aztec and Bloomfield and the surrounding
county area. The FMPO develops a Transportation Improvement Program (TIP), which is
a program of projects reasonably expected to be funded within the next six years. This
public comment period meets all of the applicable requirements of the federal
transportation bill MAP-21 and the federal transit requirements of Section 5307(c) (1-7).
The Farmington MPO is advertising Amendment #5 to the FFY2014-2019
Transportation Improvement Program which adds the following project:
Project Name: East Arterial project (Phase 1B)
Control Number: F100090
Project Description: Construct new road
Project Termini: From US 550 to Legion Rd
Lead Agency: City of Aztec
Functional Principal Arterial
Classification:
Funding Source Surface Transportation Program
Funding Amount: $2,990,400 in federal STP for Construction
$509,600 in required match for Construction
Fiscal Year FFY2015
Total Project Cost: $3,500,000
As required by federal law and the Farmington MPO Public Participation Plan, the
FMPO is holding a 30-day Public Comment period and Public Hearing on
Amendment #5. The 30-day comment period is from Wednesday, February 12,
2014 to Friday, March 14, 2014. The public may also make comments on the
proposed amendment at the following meeting:
Public Hearing: During the Farmington MPO Technical Committee meeting at 10:00
a.m. on Thursday, February 27, 2014 in the Commission Room at Aztec City Hall, 201
W Chaco, Aztec, New Mexico.
Written comments may be sent to the Farmington MPO at:
Fax: (505) 599-1299
Mail: Farmington MPO, 800 Municipal Drive, Farmington, New Mexico, 87401
Email: jdelmagori@fmtn.org
The public may view this amendment at www.farmingtonmpo.org. For more information
contact Joe Delmagori, MPO Planner, at (505) 599-1392.
2
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Associate Planner
Date: February 19, 2014
BACKGROUND or PREVIOUS WORK
Complete Streets is a means of designing a roadway so that it accommodates
all modes of travel, such as walking, biking, and transit.
Staff has worked with the Advisory Group on development of land use context
areas (LUCAs) and road typology overlays.
The Advisory Group recommended preliminary approval of the titles and
definitions for the road typologies and land use context areas at their January
22 meeting.
The Advisory Group held its latest meeting on February 19.
CURRENT WORK
The Advisory Group completed exercises in which they identified titles and
descriptions for land use context areas (LUCAs) and road types for the MPO
Complete Streets program.
The Road Typologies and LUCAs will be used to create the design guidelines for
the MPO road network.
Staff introduced four themes (Adoptability, Resourcefulness, Flexibility &
Simplicity) that will steer the development of design guidelines and the
Complete Streets document.
ANTICIPATED WORK
Develop Complete Streets design guidelines.
ATTACHMENTS
The list of preliminary land use context areas and road typologies developed by
the Advisory Group.
A PowerPoint illustrating design guideline themes will be presented at the
meeting.
RECOMMENDATION
It is recommended that the Technical Committee review and recommend
approval of the preliminary list of the titles and definitions for the road types
and land use context areas. It is further recommended that the Technical
Committee receive a presentation on Complete Streets design guidelines.
3
Preliminary Land Use Context Areas (as recommended by the CS Advisory Group on January 22, 2014)
Title Descriptions Examples
Rural and Predominately low density residential on large lots. Farmland and pastures are Kirtland
Agricultural common. Large land areas for regional recreational/ open space. Small commercial Crouch Mesa
and retail are also found. Glade Area
Heavy Industrial Primarily industrial parks and other places served by trucks such as coal mines, CR 350
refineries, and mineral extraction sites. Truck size would be large and volume would State highways outside
be frequent. the cities
Regional Commercial and retail that serves the region. Large sites include locations for malls, East Main St.
Commercial and big box stores, chain restaurants, auto dealers, and strip malls. Large parking lots US 64 near CR 6500 in
Light Industrial surround sites. Small industrial sites, such as warehouses and garages with storage Kirtland
yards, would be used for manufacturing and production but would be non-intrusive South of Pinon St in
to nearby properties. Truck size would vary and volume would be moderate. Farmington
City Commercial Smaller-scaled buildings with smaller parking lots that serve city-wide and 20th Street
surrounding communities. Grocery stores, pharmacies, offices, and civic facilities San Juan Blvd
are common. These destinations are often connected to residential collector streets.
Suburban Subdivisions within the three cities that have low density and larger lots. Minimal Neighborhoods in the
Neighborhood commercial and retail sites. Includes schools, churches, and parks. Foothills area and
northeast Farmington
Traditional Subdivisions with moderate density and smaller lots. Often use street grid networks. East side of Aztec, west
Neighborhood Commercial and retail sites, including schools, banks, parks, gas stations, and side of Bloomfield,
grocery stores, are either in close proximity or along perimeter of neighborhoods. central Farmington
There is good accessibility for all modes.
Local More localized commercial and retail buildings that are integrated into Area currently does not
Neighborhood neighborhoods and feature a mixed use of housing, office, and retail that are have
Commercial accessible by all modes. These areas may include studios for various artistic
talents. Features small public spaces for recreation.
Central Business Higher density and mixed use of residential, commercial, and retail. Highly Downtown Farmington
District/ accessible by all modes. Uniform building aesthetics and setbacks. On street Downtown Aztec
Downtown parking and wide sidewalks.
4
Preliminary Road Typologies (as recommended by the CS Advisory Group on January 22, 2014)
Title Descriptions Examples
Bypass/ High volume, wider roads with the highest levels of mobility and vehicle speeds. They can Pinon Hills Blvd
Limited Access serve as truck routes. Access to nearby properties is discouraged and intended to be Murray Dr.
handled by other intersecting roads in the network. Roads can have 2-4 lanes with non-
traversable medians. Shoulders, buffered on-street facilities, and separated paths are
encouraged for accommodating pedestrians, bicyclists, and equestrians.
Principal Arterial High volume, higher speed, and wider roads that serve regional travel between cities and East Main St.
through a city. Roads are typically 2-6 lanes with raised medians and turn lanes. Access to NM 516
nearby properties should still be limited but this road allows for more frequent access than US 64
the Bypass/Limited Access. Shoulders, buffered on-street facilities, and separated paths
are encouraged for accommodating pedestrians, bicyclists and equestrians. Transit stops
may be found.
Community Roads are 2-4 lanes with moderate volume and speeds and are primarily meant for travel Butler north of 30th
Arterial through a city and to serve commercial areas. Travel lanes are smaller in width to 20th Street between
accommodate the presence of medians, bike lanes, buffered sidewalks, on-street parking, Dustin and Main St
and transit stops. Large trucks are still present. These streets support the higher road
classifications and are connected with Collectors and fed by Service Ways. The frequency
of access should still be restrained to minimize conflicts with bicyclists and pedestrians.
Service Way Roads that are intended to serve heavy industrial sites and industrial parks. They are used Industrial roads
for internal circulation for the industrial sites and provide access to the higher road east of US 550 in
classifications. They are two lane roads with slower speeds and designed for heavy- Bloomfield
weighted traffic. While bicycle and pedestrian use is secondary, accommodations should Troy King north of
be focused on safety for these modes. US 64
Commercial Lower volume and lower speed roads with 2-3 lanes that primarily connect commercial Downtown Main St
Collector areas, retail, and downtown districts. Bike lanes, wide sidewalks, and transit stops are in Farmington &
more prevalent to enhance multi-modal travel. These roads distribute traffic between the Aztec
higher classifications and local streets. Medians and two-way left turn lanes are common. Chaco in Aztec
Driveways directly accessing these roads are discouraged. These roads may also have on-
street parking. Downtown areas include additional features and streetscaping that promote
multi-modal travel.
5
Neighborhood Lower volume and lower speed roads with 2-3 lanes that primarily connect residential West Blanco &
Collector neighborhoods. Bike lanes, wide sidewalks, and transit stops are present. These roads South 1st St in
distribute traffic between the higher classifications and local streets. Medians and two-way Bloomfield
left turn lanes are common. Driveways directly accessing these roads are discouraged. Fairview between
These roads may also have on-street parking. Main St and 20th St
Butler between
Apache and 20th St
Neighborhood Two lane roads with the lowest travel speeds that serve residential and commercial areas Knudsen
Local within the cities. Parking on the street is common but may be restricted in some places. Mesa Verde in
More frequent driveway access occurs. Medians may be present but not recommended. Aztec
Lower volumes and speeds allow for integrated bike use in the roadway and do not Church St in
necessarily require separate facilities. Sidewalks should be buffered from the street. Bloomfield
Streets typically
found in
subdivisions
Rural Local Two lane roads with the lowest travel speeds that serve low density residential and Rinconada in
commercial areas. Roads do not necessarily need to be paved. More frequent driveway Farmington
access occurs. Lower volumes and speeds allow for integrated bike use in the roadway CR 6444 in Kirtland
and do not necessarily require separate facilities. Sidewalks are encouraged but may not Streets typically
be necessary due to the surrounding density. found in
subdivisions
Trail Way Non-motorized pathways that provide travel options for pedestrians, bicyclists, and River walks in
equestrians. They connect neighborhoods, schools, parks, and commercial nodes found Farmington, Aztec,
along river systems and within city settings. These trail ways may be paved or unpaved and Bloomfield
and may or may not be connected to roadways.
6
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: February 19, 2014
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
Staff discussed the schedule and reviewed the list of proposed changes with the
Policy Committee on January 16 and with the Technical Committee on January
23.
In the past month, Staff met with the entities individually to discuss their
proposed classification changes.
CURRENT WORK
Classification changes are divided into four categories: declassify, classify up,
classify down, and add classification.
Staff has learned that current roads and proposed roads in the TIP-STIP are to
be included in the list; future roads beyond the near term cannot be included
in this functional class update.
Staff will conduct another review with the Technical Committee to identify
other potential changes on February 27.
All of these potential changes will serve as the basis for recommended changes
by the MPO to NMDOT.
ANTICIPATED WORK
Seek approval of the list of classification changes at the March 20 Policy
Committee meeting.
Submit the list to NMDOT.
ATTACHMENTS
The final draft list of proposed functional classification changes for the MPO
based on entity review and feedback.
RECOMMENDATION
It is recommended that the Technical Committee review and recommend
approval of the list of proposed functional classification changes for the
Farmington MPO.
7
Final Draft List of Proposed Functional Classification Changes
for the Farmington MPO
Current MPO MPO
Current Local Major T-Plan Current NMDOT Recommended
Keep? Name From To Area System Classification Classification Designation Classification* Action
Kirby US 64 E Blanco Bloomfield Urban N/A N/A Urban Collector N/A Declassify
CR 5569 US 64 CR 5580 County Rural N/A N/A Rural Minor Collector N/A Declassify
CR 3008 CR 3000 CR 3009 County Rural Local N/A Urban Collector N/A Declassify
CR 6500 US 64 CR 6480 County Urban Collector Urban Principal Arterial Minor Arterial Reclassify Down
CR 6480 CR 6200 CR 6500 County Rural Minor Arterial Urban Principal Arterial Minor Arterial Reclassify Down
Fairview 20th Cliffside Farmington Urban Local N/A Urban Collector Minor Collector Reclassify Down
Scott San Juan Blvd Main St Farmington Urban Minor Arterial Urban Principal Arterial Minor Arterial Reclassify Down
Proposed Minor
NM 574 CR 3095 CR 3072 Aztec Urban Collector Arterial Rural Minor Collector Minor Arterial Reclassify Up
Proposed Minor
NM 574 CR 3072 NM 516 Aztec Urban Collector Arterial Urban Collector Minor Arterial Reclassify Up
Proposed Minor
Oliver NM 516 McWilliams Aztec Urban Collector Arterial Urban Collector Minor Arterial Reclassify Up
Proposed Minor
NM 173 CR 2950 NM 575 County Rural Collector Arterial Rural Major Collector Minor Arterial Reclassify Up
Principal Arterial -
CR 350 US 64 CR 5580 County Rural Principal Arterial Rural Minor Collector Other Reclassify Up
Principal Arterial -
CR 350 CR 5580 CR 5030 County Rural Principal Arterial Rural Minor Collector Other Reclassify Up
Principal Arterial -
CR 350 CR 5030 CR 3000 County Rural Principal Arterial Rural Minor Collector Other Reclassify Up
Principal Arterial -
CR 350 CR 3000 NM 516 County Urban Principal Arterial Urban Collector Other Reclassify Up
Proposed Minor
CR 3535 NM 516 End of Road County Urban Collector Arterial Urban Collector Minor Arterial Reclassify Up
CR 390 Andrea Dr CR 350 County Urban Minor Arterial Rural Major Collector Minor Arterial Reclassify Up
Piedras End of Road La Plata Hwy Farmington Urban Local Proposed Collector Urban Collector Minor Collector Reclassify Up
Foothills Pinon Hills Blvd Crestwood Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
Foothills Crestwood Rinconada Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
Foothills Rinconada Hood Mesa Trail Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
Troy King US 64 CR 6480 Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
NM 516/ Wildflower Mesa
Wildflower Browning Dr Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
Wildflower Mesa
Wildflower Dr Andrea Dr Farmington Urban Minor Arterial Urban Collector Minor Arterial Reclassify Up
Church St Maple US 64 Bloomfield Urban Local Proposed Collector Urban Collector Minor Collector Reclassify Up
Church St US 64 W. Blanco Bloomfield Urban Local Proposed Collector Urban Collector Major Collector Reclassify Up
8
Current MPO MPO
Current Local Major T-Plan Current NMDOT Recommended
Keep? Name From To Area System Classification Classification Designation Classification* Action
Proposed Principal Principal Arterial -
East Arterial US 550 S NM 173 Aztec Rural N/A Arterial Other Add classification
Proposed Principal Principal Arterial -
* East Arterial NM 173 US 550 N Aztec Rural N/A Arterial Other Add classification
Ruins Rd NM 516 CR 2900 Aztec Urban Collector Major Collector Add classification
Proposed Minor
* McWilliams Oliver NM 574 Aztec Urban Local Arterial Minor Collector Add classification
Western Oliver Swire Aztec Urban Collector Minor Collector Add classification
Swire Western NM 516 Aztec Urban Collector Minor Collector Add classification
Ash Llano St NM 516 Aztec Urban Local Proposed Collector Major Collector Add classification
Church St US 550 S US 550 N Aztec Urban Local Proposed Collector Minor Collector Add classification
CR 2900 Ruins Rd US 550 County Urban Collector Major Collector Add classification
CR 6700 US 64 US 64 County Rural Collector Minor Collector Add classification
CR 6100 US 64 CR 6575 County Urban Collector Major Collector Add classification
CR 6100 CR 6575 CR 6400 County Urban Collector Major Collector Add classification
CR 6100 CR 6400 US 64 County Urban Collector Major Collector Add classification
CR 6200 US 64 CR 6480 County Urban Collector Minor Collector Add classification
CR 3050 CR 350 NM 516 County Rural Collector Major Collector Add classification
Proposed Minor
CR 3100 CR 350 CR 3000 County Rural Local Arterial Minor Arterial Add classification
Proposed Minor
CR 3150 CR 5030 CR 3100 County Rural Local Arterial Major Collector Add classification
CR 3900 CR 390 CR 3950 County Urban Minor Arterial Minor Arterial Add classification
Proposed Minor
CR 3900 CR 3950 CR 3000 County Rural Local Arterial Minor Arterial Add classification
CR 3950 CR 3000 CR 3900 County Urban Collector Major Collector Add classification
CR 5290 US 64 CR 5292 County Rural Local Proposed Collector Major Collector Add classification
Proposed Minor
CR 5290 CR 5292 CR 5030 County Rural Local Arterial Major Collector Add classification
CR 6675 San Juan River US 64 County Urban Local Proposed Collector Major Collector Add classification
9
Current MPO MPO
Current Local Major T-Plan Current NMDOT Recommended
Keep? Name From To Area System Classification Classification Designation Classification* Action
Proposed Minor
* Northern Route College East Road Farmington Rural N/A Arterial Minor Arterial Add classification
Proposed Minor
* Northern Route East Road US 550 County Rural N/A Arterial Minor Arterial Add classification
Proposed Principal Principal Arterial -
* Highline Rd CR 3100 US 550 County Rural N/A Arterial Other Add classification
CR 4990 US 550 CR 4450 County Rural N/A Proposed Collector Major Collector Add classification
Wildflower Mesa
Andrea US 64 Dr Farmington Urban Minor Arterial Minor Arterial Add classification
San Juan
Sunrise Butler College Farmington Urban Local Collector Major Collector Add classification
Dustin Apache Ute Farmington Urban Minor Arterial Major Collector Add classification
Dustin Ute 20th Farmington Urban Minor Arterial Major Collector Add classification
Dustin 20th 30th Farmington Urban Minor Arterial Major Collector Add classification
* Dustin Pinon Hills Blvd Cougar Trail Farmington Rural N/A Proposed Collector Minor Collector Add classification
Malta US 64 SSRR Farmington Urban Collector Minor Collector Add classification
Beckland Dr East Main Windsor Farmington Urban Collector Major Collector Add classification
* Beckland Dr Windsor Pinon Hills Farmington Urban N/A Proposed Collector Minor Collector Add classification
Gila St East Main English Farmington Urban Collector Major Collector Add classification
* Herrera Cliffside East Main Farmington Urban Local Proposed Collector Minor Collector Add classification
Herrera East Main End of Road Farmington Urban Collector Minor Collector Add classification
Panther Trail Piedra Vista HS Pinon Hills Farmington Urban Collector Minor Collector Add classification
English Chaparral Ave Red Rock Ct Farmington Urban Collector Major Collector Add classification
Sandalwood College English Farmington Urban Collector Major Collector Add classification
College Pinon Hills Blvd Piedra Vista HS Farmington Rural Minor Arterial Minor Arterial Add classification
College Piedra Vista HS Sandalwood Farmington Rural Minor Arterial Minor Arterial Add classification
College Sandalwood Hood Mesa Trail Farmington Rural Minor Arterial Minor Arterial Add classification
Proposed Minor
* College Hood Mesa Trail Northern Route Farmington Rural N/A Arterial Minor Arterial Add classification
Hood Mesa
Trail Pinon Hills Blvd College Farmington Rural Local Proposed Collector Minor Collector Add classification
Hood Mesa
Trail College Blvd Foothills Farmington Rural Collector Major Collector Add classification
Hood Mesa
* Trail Foothills East Road Farmington Rural N/A Proposed Collector Minor Collector Add classification
10
Current MPO MPO
Current Local Major T-Plan Current NMDOT Recommended
Keep? Name From To Area System Classification Classification Designation Classification* Action
Lakewood Hood Mesa Trail Foothills Farmington Rural Collector Major Collector Add classification
Lakewood Foothills High Point Dr Farmington Urban Collector Major Collector Add classification
* Lakewood High Point Dr East Road Farmington Urban N/A Proposed Collector Major Collector Add classification
* Marseille End of Road East Road Farmington Urban N/A Proposed Collector Major Collector Add classification
E. Pinon Hills Proposed Principal Principal Arterial -
Blvd E Main St CR 3000 Farmington Urban N/A Arterial Other Add classification
* Little Creek US 64 CR 6480 Farmington Urban N/A Proposed Collector Major Collector Add classification
* Viento US 64 Twin Peaks Farmington Urban N/A Proposed Collector Major Collector Add classification
* Piedras Little Creek Viento Farmington Urban Local Proposed Collector Major Collector Add classification
* Eagle Little Creek Viento Farmington Urban N/A Proposed Collector Minor Collector Add classification
* Spine Rd Pinon Hills Blvd NM 170 Farmington Urban N/A Proposed Collector Major Collector Add classification
* 35th St Pinon Hills Blvd Sunset Farmington Urban N/A Proposed Collector Minor Collector Add classification
* Cougar Trail Dustin Hood Mesa Trail Farmington Rural N/A Proposed Collector Minor Collector Add classification
* Cliffside Farmington Ave Fairview Farmington Urban N/A Proposed Collector Minor Collector Add classification
* English Pinon Hills Blvd Chaparral Ave Farmington Urban N/A Proposed Collector Major Collector Add classification
* English Red Rock Ct Lakewood Farmington Urban N/A Proposed Collector Major Collector Add classification
Wildflower
* Mesa Dr Mesa Vista Dr Andrea Dr Farmington Urban N/A Proposed Collector Major Collector Add classification
Arizona US 550 Saiz Bloomfield Urban Local Proposed Collector Major Collector Add classification
Proposed Minor
* Newby US 64 CR 5030 Bloomfield Urban Local Arterial Major Collector Add classification
Bergin US 64 W. Blanco Bloomfield Urban Local Proposed Collector Major Collector Add classification
Frontier US 64 W. Blanco Bloomfield Urban Local Proposed Collector Major Collector Add classification
Maple Church St US 550 Bloomfield Urban Local Proposed Collector Minor Collector Add classification
Mustang Blanco US 64 Bloomfield Urban Local Proposed Collector Major Collector Add classification
Saiz E Blanco CR 4900 Bloomfield Urban Local Proposed Collector Minor Arterial Add classification
* use new FC codes
11
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Duane Wakan, MPO Associate Planner
Date: February 18, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning
document that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees, Councils, and other organizations.
The Stakeholder Workshop was held on February 5.
CURRENT WORK
Overview presentations will continue to be provided to various groups in the
coming months.
Public meetings were held to gather ideas on transportation projects that can
then be analyzed later in the MTP process.
Staff will discuss key questions with the Technical Committee to assist with
development of the plan.
ANTICIPATED WORK
Continued to hold public meetings.
Identify proposed road, transit, and bicycle/pedestrian projects for analysis.
ATTACHMENT
List of presentations and open houses on the 2040 MTP.
Summary of comments made at the Stakeholder Workshop.
Questions to discuss for developing the 2040 MTP.
RECOMMENDATION
It is recommended that the Technical Committee receive a report on comments
received during the Stakeholder Workshop and public meetings and hold a
discussion on addressing key questions for developing the 2040 MTP.
12
List of 2040 MTP Presentations & Open Houses
• January 13 – Farmington Chamber of Commerce Red Coats
• January 14 – San Juan Rotary
• January 21 – Farmington Chamber Young Professionals
• January 27 – Bloomfield City Council
• January 28 – Aztec City Commission
• January 30 – San Juan College – Student Rush
• February 3 – Sycamore Center
• February 4 – San Juan County Commission
• February 5 – Stakeholder Workshop
• February 6 – San Juan County Administrative Lobby
• February 11 – Bloomfield Multi-Cultural Center
• February 20- Kiwinis Club
• March 6 – Rotary Club
• March 18 – Farmington City Council
• March 20 – Aztec Chamber
2040 Metropolitan Transportation Plan
Questions for Developing the Project Planning Process
• What aspects of the 2035 MTP do you like and want to repeat for the update?
• What aspects of the 2035 MTP should be changed or improved upon?
• List stakeholders, clubs, and other organizations that need to be involved in
the MTP update process.
• How can we better engage the public in this process?
• What areas of the MTP need additional focus?
• Identify planning elements that are not part of the current 2035 MTP that
should be part of the update.
• Provide initial thoughts on performance measures and targets? What data can
the MPO use? What should the performance measures be trying to improve?
13
Comments Received during the Stakeholder Workshop
ROADS
• Pedestrian hit on road by hospital because stop signs not visible.
• Slow down traffic to improve safety and economic vitality.
• Narrow roads to help businesses and slow speeds.
• North Dustin is good model for Complete Streets and for slowing traffic.
• Foothills – use Phoenix as a guide for separate walk/bike path. This path would lead to
Glade/BLM trails.
• Bottleneck on East Main between San Juan Plaza and Mall.
• $400,000 in trail easements purchased by COF in last year
BIKE/PED
• Bloomfield specific: Arroyo Drive; CR 4900; Broadway (US 64); South Bloomfield Blvd. (US
550); Mustang Lane.
• Look at sidewalks for Kirtland and Shiprock schools (SRTS?)
• Walkability – slow traffic for pedestrians and safety
• Fix sidewalk gaps
• Improve sidewalk safety
• Improve connectivity of sidewalks & trails
o SSRR Trail Project – TAP funds
o Bloomfield – river trails
o Aztec – pedestrian bridge/trails
• Connectivity of schools, trails, parks, and neighborhoods
• Sidewalk access and connectivity – fix gaps
• Include workout circuits/exercise facilities/recreational activities along trails
• More public/private partnerships
TRANSIT
• SJ Regional Medical Center – one community van for transport up to 20 mile radius
• Red Apple Transit expansion service SJRMC
• Map locations of medical facilities (30th Street, etc.)
• Service: Mall and San Juan Plaza
More routes
• More interaction between MPO interns and Red Apple riders
• Ensure bus stops are ADA compliant (dirt stops, school bus stops)
OTHER MODES
• MPO’s relationship with Navajo Nation & Jicarilla Apache
• Pavement issues into schools in Kirtland and Shiprock
• Provide transportation choices
• Partnerships – “be at the table”
• Access – ADA clearance, end of sidewalks (utility poles, etc.)
14
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #8
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: February 19, 2014
INFORMATION ITEMS
a. NMDOT/Technical Committee Workshop. The Workshop with NMDOT was
cancelled due to scheduling conflicts. A new date for the Workshop is being
coordinated with District 5.
b. NMDOT Safety Program. NMDOT has issued a call for applications for HSIP
funding. The application process will be discussed at the meeting.
c. Regional Traffic Model Update. The consultant is near completion of the
calibration process for the traffic model. A status report on the consultant’s recent
work will be provided at the meeting.
d. Conferences in Denver. Joe Delmagori attended two conferences in Denver on
February 10-15. One was walkability tours of Denver and other cities led by Dan
Burden. The other was the annual New Partners for Smart Growth conference. A
summary will be provided at the meeting.
e. Other
15
TC Draft Minutes
January 23, 2014
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
JANUARY 23, 2014
Technical Members Present: Bill Watson, City of Aztec
Teresa Brevik, City of Bloomfield
Cynthia Lopez, City of Farmington
Nica J. Westerling, City of Farmington
Dave Keck, San Juan County
Technical Members Absent: None
Staff Present: Mary Holton, MPO Officer
Joe Delmagori, MPO Planner
Duane Wakan, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Also Present: Brian Degani, NMDOT Planning Liaison
David Quintana, NMDOT District 5, via telephone
Larry Hathaway, San Juan County
WELCOME
Mr. Delmagori introduced Mr. William “Bill” Watson, the new Public Works Director for
the City of Aztec and the newest member of the Technical Committee. Participants
then introduced themselves and the organization they represented.
1. CALL TO ORDER
Mr. Dave Keck called the meeting to order at 10:03 a.m.
2. APPROVE THE MINUTES FROM THE DECEMBER 19, 2013 TECHNICAL COMMITTEE
MEETING
Ms. Lopez made a motion to approve the minutes from the December 19, 2013
Technical Committee meeting. Ms. Westerling seconded the motion. The motion to
approve the minutes was passed unanimously.
3. HOLD THE ANNUAL ELECTION OF OFFICERS
Subject: Annual Election of Officers
Prepared by: Joe Delmagori, MPO Planner
Date: January 14, 2014
16
TC Draft Minutes
January 23, 2014
BACKGROUND
At the first meeting of the new year, the Technical Committee selects the
Chair and Vice-Chair from their membership who will serve until the next
annual election.
The Chair presides over the meetings and is responsible for the other duties
outlined in the Committee Bylaws and Operating Procedures document.
The Vice-Chair presides over the meetings in the absence of the Chair.
ELECTION
Elections will take place to select a Chair and Vice-Chair for the Technical
Committee for 2014.
RECOMMENDATION
It is recommended that the Technical Committee accept nominations and
vote to elect the Chair and Vice-Chair for 2014.
DISCUSSION: Mr. Delmagori stated that during the first meeting of the new year, the
Technical Committee selects the Chair and Vice-Chair from their membership who will
serve until the next annual election. The current Chair is Dave Keck and the current
Vice-Chair is Cindy Lopez. He turned the election process over to the Technical
Committee.
ACTION: Ms. Westerling nominated Ms. Cindy Lopez as Chair of the Technical
Committee. There were no other nominations for the position. Ms. Lopez was
nominated and chosen as the Chair of the Technical Committee for the 2014 calendar
year.
Ms. Lopez nominated Mr. Dave Keck as Vice-Chair of the Technical Committee. There
were no other nominations for the position. Mr. Keck was nominated and chosen as the
Vice-Chair of the Technical Committee for the 2014 calendar year.
Ms. Lopez took over as Chair for the meeting.
Mr. Delmagori asked if Agenda Items #4 and #5 could be switched since Mr. David
Quintana with District 5 would be participating by phone. By taking Agenda Item #4
after #5, Mr. Quintana could participate in the discussion on the agenda for the
workshop with NMDOT upcoming on February 20 and then go directly into his District 5
report to the Technical Committee.
17
TC Draft Minutes
January 23, 2014
5. REVIEW AND DEVELOP THE LIST OF PROPOSED FUNCTIONAL CLASSIFICATION
CHANGES FOR THE FARMINGTON MPO
Subject: State Functional Classification Update
Prepared by: Joe Delmagori, MPO Planner
Date: January 15, 2014
BACKGROUND OR PREVIOUS WORK
The NMDOT Planning Bureau held a meeting in Albuquerque on November 5 to
discuss the statewide update of the functional classification system.
All of the MPOs and RTPOs will assist NMDOT by making recommendations for
classification changes to their regional roads.
NMDOT and its consultant team are targeting February 2015 for completion of
the review and update.
Staff discussed the schedule and reviewed the list of proposed changes with the
Policy Committee on January 16.
CURRENT WORK
Staff provided the Functional Classification Guidance Manual to the Technical
Committee members.
Classification changes from 2011 are divided into four categories.
Staff will review and modify the 2011 functional classification proposals with
the members on January 23.
There is opportunity to identify other potential changes.
Staff will meet with the entities individually to further discuss classification
changes within their jurisdiction.
All of these potential changes will serve as the basis for recommended changes
by the MPO to NMDOT.
RECOMMENDATION
It is recommended that the Technical Committee review and develop the list of
proposed functional classification changes for the Farmington MPO.
DISCUSSION: Mr. Delmagori reported that NMDOT is working with a consultant to
complete an update of the statewide functional classification system. They have asked
the MPOs and RTPOs to assist by making recommendations for classification changes to
their regional roads.
Mr. Delmagori said that in 2011, the Farmington MPO reviewed the region and the
current classifications and developed a list of recommended changes. Due to some
staffing issues at NMDOT, the changes were not entered into their database nor
forwarded to FHWA. With the statewide functional classification update underway
now, the MPO can reconsider the list and see if those changes recommended in 2011
18
TC Draft Minutes
January 23, 2014
are still relevant and identify any other additions or changes that need to be
considered.
Mr. Delmagori said he wanted to briefly review the changes proposed in 2011 and
stated that Staff will then plan to meet individually with each Technical Committee
member and their staff to review that entity’s specific classification changes. All the
information would then be brought to the February Technical Committee meeting for
recommended approval and to the Policy Committee in March for final approval.
Mr. Delmagori reviewed Pages 5-7 of the Agenda to explain some of the proposed
classification changes from the 2011 list. The list shows roadways in four categories:
declassify, reclassify up, reclassify down, and add as new. He referenced a few
examples from the overall list to demonstrate the review process.
Ms. Westerling asked if the changes would then be taken back to the councils for
approval. Mr. Delmagori said he believed the city’s thoroughfare plan already shows
Lake and Park Streets as collectors on the local level. Ms. Lopez said that according to
the map she had, Lake was shown as a local street on the city’s plan. Mr. Delmagori
clarified that the recommended classifications do match the existing thoroughfare
plan and it was NMDOT’s database that was not in agreement.
Ms. Holton added that she remembered Lake Street being declassified to a collector on
the last thoroughfare plan iteration. She said the MPO’s Major T-Plan which reflects all
the entities information should be utilized for the purpose of determining functional
classifications.
Mr. Keck commented on CR 6500 which is recommended to be declassified to a
collector. He said that since CR 6500 is the outlet for Twin Peaks/CR 6480, which is
being proposed as a minor arterial, that CR 6500 have the same classifications as CR
6480.
Mr. Delmagori said the roads listed on Page 6 were those proposed to be reclassified
up. NMDOT currently shows CR 350 as a collector and the MPO is recommending that it
be reclassified up to a principal arterial as it is the primary road between US 64 and
NM 516 and serves the function of moving traffic through the Crouch Mesa area.
Additionally, the state’s functional class system shows Foothills as a collector,
however, the City of Farmington’s Major Thoroughfare Plan has this road as a minor
arterial.
Mr. Watson asked if the name of the entity where the roads were located could be
added to the listing. Mr. Delmagori said Staff could easily add that information.
Mr. Delmagori explained the list of new classifications shown on Page 7 of the Agenda.
These roads serve a regionally significant purpose for the area, are part of the
thoroughfare plan, and traffic counts are taken on these roads. The state map,
however, does not include these roads.
Mr. Delmagori said the list would be reviewed with each of the entities and they were
encouraged to consider other roads that they believe should be included on the list.
19
TC Draft Minutes
January 23, 2014
Ms. Holton said that the MPO’s Major T-Plan specifically reflected each city’s
thoroughfare plans.
Mr. Delmagori added that consideration may want to be given to adding all of the
proposed roads that have come out of the thoroughfare and long range planning
processes so that the state is aware of the future roads identified by the MPO (i.e.
Pinon Hills, CR 3900, East Arterial, and Highline Road). Even though the roads do not
currently exist, they have already been identified through the planning process.
Mr. Watson asked if the classifications were based on Average Daily Traffic (ADT)
volumes. Mr. Delmagori said volume did factor into the classification, but also speed,
and the purpose/function of the road. Mr. Delmagori said the MPO has a guiding
document from NMDOT which outlines the criteria for classifying road and he will
forward that to Mr. Watson.
Mr. Delmagori reported that a more thorough review of the list will be taken when
Staff meets with each entity and a final recommendation will then be compiled.
ACTION: The report was received.
Mr. David Quintana was contacted by telephone. The Technical Committee discussed
Agenda Item #4.
4. DISCUSS THE AGENDA AND STRUCTURE OF THE WORKSHOP WITH NMDOT TO
DISCUSS REGIONAL PRIORITIES, COMMUNICATIONS, AND MAINTENANCE CONCERNS
Subject: Workshop with NMDOT
Prepared by: Joe Delmagori, MPO Planner
Date: December 11, 2013
BACKGROUND
On August 22, the Technical Committee discussed the need to address several
community and regional concerns with NMDOT.
The concerns relate to interactions with NMDOT District 5 with regards to
regional priorities, communications, and maintenance.
A summary of these concerns was discussed with the Policy Committee on
September 19.
It was agreed that a workshop will be held to discuss the concerns and develop
solutions.
An update on the coordination of this workshop was provided to the Policy
Committee on January 16.
CURRENT WORK
This workshop will be a staff level discussion focusing on MPO involvement with
regional priorities, communications and project management, maintenance,
20
TC Draft Minutes
January 23, 2014
and inter-governmental agreements.
Although originally scheduled for February 26, District 5 cannot meet that day
and has suggested the workshop be held on February 20.
The draft agenda for the workshop has been developed.
To assist staff with preparations, the Technical Committee and NMDOT need to
determine the structure of the meeting as to who will present the material.
RECOMMENDATION
It is recommended that the Technical Committee discuss the agenda and
structure of the workshop with NMDOT to discuss regional priorities and
communications and maintenance concerns.
DISCUSSION: Mr. Delmagori reported that the workshop with NMDOT and District 5 had
been scheduled for February 20. Mr. Delmagori asked who from Mr. Quintana’s office
was planning to attend.
Mr. Quintana said Yolanda Roybal and Richard Pena from the District 5 staff are
planning to attend. Mr. Quintana had forwarded the invitation to the District 5
engineering staff, Miguel Gabaldon, Dave Martinez, Paul Brasher, and their project
development engineer, Chris Urioste, who also oversees the local government projects
when they reach District 5 for reimbursement. Mr. Quintana said that Mr. Urioste and
Mr. Brasher will attend. He is waiting to hear from Mr. Gabaldon and Mr. Martinez. He
expects that Mr. Martinez will be able to attend, but with the final day of the state
legislative session occurring that day, it is possible that Mr. Gabaldon will be unable to
participate.
Mr. Delmagori referred to Page 3 of the Agenda which showed the draft agenda for the
workshop. The agenda has been reviewed and all parties have agreed on the discussion
topics. Mr. Delmagori said Staff would now like to discuss the structure of the meeting
and who would be presenting, what would be presented, and how much time needed
to be allotted for discussion on each of the topics. Mr. Delmagori thought it would be
good to initially get some items out on the table and allow for discussion on those
topics rather than having open discussion on all the topics at once.
Mr. Delmagori asked Mr. Quintana if Mr. Gabaldon and Mr. Martinez would be willing to
speak for a few minutes first to explain their roles. Mr. Quintana said Mr. Martinez
could begin the afternoon maintenance discussion this way and, perhaps, Mr.
Gabaldon could say a few words to open the meeting in the morning. He thought they
would only need about five minutes each. Mr. Quintana said that he and Yolanda
would prepare their own or combine a presentation to discuss the overall flow of the
governmental procedures and what is required. He thought this presentation would
take approximately ten to fifteen minutes and could follow Mr. Gabaldon’s opening
remarks, following by a general group discussion.
Mr. Delmagori said this sounded good and encouraged the Technical Committee
members to also provide their thoughts and ideas for the agenda. Mr. Quintana added
that Mr. Gabaldon would probably want to open the meeting and introduce his staff
21
TC Draft Minutes
January 23, 2014
members and then Mr. Quintana would speak to the local government unit, what their
different roles are with respect to the north region and the general office, and how
they assist the local entities with project development. Mr. Quintana would also speak
to how District 5 assists with the project development process, and then how they
take over after the projects are authorized and when reimbursements for the projects
are requested. Although not yet finished, District 5 is working to compile their local
government agreement handbook and Mr. Quintana said he might also be able to
discuss some of the details in that handbook at the workshop.
Ms. Westerling said she believed it was important to discuss the change in dates to
have all project certifications in place. She stated that this change had created some
serious problems. Mr. Quintana agreed that the change to the March 15 date for this
first year would not be feasible for many projects and reiterated that District 5 was
allowing some flexibility with the dates for the first year or two. Going forward,
however, District 5 will be firm on the dates as they are being pressured by FHWA to
spread out their obligation requests for federal funding throughout the fiscal year. Mr.
Quintana stated that what has happened in the past is that approximately 90% of their
program is authorized during the last month of the fiscal year. The state-led projects
are also being mandated to meet this change along with the local government-led
projects that receive federal funds. The deadlines need to be moved up in order to
obligate grant funds in a timelier manner and more evenly spread out the funding out
during the fiscal year. Mr. Quintana said that meeting the new deadlines for the next
two years would be difficult and that is why District 5 is committed to providing some
flexibility with the deadlines. However, as new agreements are processed, the new
dates will be implemented in order to comply with FHWA requirements to spread out
the obligation requests throughout the fiscal year.
Ms. Westerling said that going forward that will not be an issue, but for two City of
Farmington projects this year the deadline would be impossible to meet. Mr. Quintana
reiterated that there would be flexibility with the deadlines this year and also some
for next year. The need for this flexibility has been explained to the local government
agreement unit. Mr. Quintana added that the project deadline for the recently
approved TAP projects would be August 15. He also noted that projects already under
agreement will also have some flexibility with the deadline. Ms. Westerling asked if
someone who dealt with contracts could attend the workshop. Mr. Quintana said he
would extend the workshop invitation to Mr. Shawn Sandoval who is part of the local
government agreement unit.
Mr. Degani commented that Mr. Sandoval had given a presentation of the project
deadlines at a recent MPO quarterly meeting. He recommended that perhaps Mr.
Sandoval could do something similar for this workshop.
Ms. Westerling asked if lunch would be provided. Mr. Delmagori said Staff would
arrange for that.
Mr. Quintana said that for the workshop topic of Regional Priorities, he thought that
he and Mr. Gabaldon would address this item. Mr. Quintana said that Mr. Gabaldon’s
opening remarks might also lead into this topic. Mr. Delmagori asked if some
information on the targets for the federal funding that District 5 receives could be
provided during discussion on this topic. He said this could provide some general
22
TC Draft Minutes
January 23, 2014
background about what the MPO can expect for its projects versus what the targets
are showing.
Mr. Delmagori said Staff would expand on the agenda and add the names of the
presenters. He added that the Technical Committee members were welcome to invite
any of their staff to also participate in the workshop.
ACTION: The report was received.
6. RECEIVE A REPORT FROM NMODT
Mr. Quintana reported that the intersection of US 64 and US 550 is nearly complete
and is expected to be fully open within a month’s time. There are still some concrete
panels that need to be installed and a traffic control plan was developed to keep
trucks moving through the intersection while the panels were installed. These panels
will be placed as soon as weather permits. Following this work the project will be
substantially complete with only some punch list items remaining.
Mr. Quintana said the next two-mile phase of the US 64 project has been awarded to
Mountain States Construction. The contractor has already begun setting up traffic
control signage. This phase is expected to go much smoother than the last section as
this contractor is better able to handle a construction project of this size. Mr.
Quintana stated that the project should be completed by the end of this construction
season.
The construction at the intersection of Light Plant Road and NM 516 was halted last
fall and will not begin again until after school lets out in May for the summer. Traffic
was disrupted significantly last fall when the project began, so District 5 chose to hold
off on any further construction until this summer. Mr. Quintana said the project is
expected to take six to eight weeks and should be completed before the summer is
over.
Mr. Quintana reported that a project was let last week for ADA improvements along
the stretch of NM 516 that was repaved last year. This project will be to update
existing ADA ramps to current standards and configurations at a cost of $700,000.
District 5 is looking to expedite the award of the contract and hopes to get a notice to
proceed in about four to six weeks following the award. Construction is expected to
begin at the end of February or first part of March. Mr. Keck asked if the project
included repaving the median breaks. Mr. Quintana said that this was part of the
planned project. District 5 does not expect too much disruption of traffic as the work
will be on the shoulders and medians.
District 5 is completing a signal warrant analysis for the intersection of NM 371 and
N36. Mr. Quintana said that a signal is warranted and was actually warranted prior to
the opening of the casino on N36. Mr. Quintana said that District 5 is working on a
developing a signalization project for the intersection for this year. He said that this
project would require a TIP amendment. Funding for the project may need to come
from contract maintenance state funds which would not be available until after July.
23
TC Draft Minutes
January 23, 2014
Ms. Westerling asked if the agreement for signal maintenance between the City of
Farmington and District 5 would need to be amended to include this new signal. She
said she brought this up because Mr. Steve Krest, the Traffic Engineering Administrator
is retiring on June 30. Mr. Quintana asked if the current maintenance agreement
allowed for additional signals to be included as they came on line. Ms. Westerling was
not sure if the agreement was written to cover all new signals or if it actually listed
the specific signals that were part of the agreement. Mr. Quintana asked if Ms.
Westerling would look at the agreement to see if the language was in that it included
all signals that came on line, or if the agreement would need to be amended to
include this specific new signal.
Mr. Quintana said the next phase of US 64 is currently under final design and is
programmed for FY2016 and FY2017. District 5 plans to acquire rights-of-way this
calendar year for this section of the project to have it ready to let in October 2016. He
stated that the design is almost complete and the priority now is to obtain the needed
rights-of-way. The project consultant is planning another public meeting to discuss
the project in the next several months. Significant attendance is anticipated for this
upcoming meeting.
District 5 has made a preliminary consultant selection to study NM 173. They plan to
use safety funds to reconstruct about a one and one-half mile section of this road. The
notice to proceed should be issued to the consultant within the next few months with
construction starting in 2016. The intersection of NM 173 and NM 575 will also be
reviewed as part of this project.
Ms. Westerling asked if Mr. Quintana would bring maps of the US 64 phases to the
workshop in February. Mr. Quintana clarified that the construction will continue by
two-mile sections from Bloomfield to Farmington. The phase that was just let is from
mile marker 62 to 60; the phase to be let in FY2016 and FY2017 is from mile marker 60
to 58; and then 58 to 56 in FY2019 and FY2020.
Mr. Quintana reported that District 5 had provided the legislature with a wish list of
projects for state funding. The US 64 corridor was identified on this list to receive
state funding should it become available. If additional funding was made available, the
upcoming phases of US 64 would be expedited. Mr. Quintana added that at the current
rate, the US 64 project should be completed in 2022.
Mr. Delmagori asked about the river trail TAP project for the City of Farmington and
the required PS&E meeting due by July 15. The Parks Department had asked how this
meeting was scheduled and who it was scheduled with. Mr. Quintana said this meeting
is for the final design review of all the contract documents including a complete set of
plans, the special provisions, the supplemental specifications, and the engineering
estimate. Those who would participate would be Ms. Yolanda Sandoval, Mr. Chris
Urioste and Mr. Quintana. Ms. Westerling said she would ask Mr. Chico Quintana, who
is very familiar with the process, to assist Mr. Roger Drayer who is the Parks Planner
overseeing the river trail TAP project.
Mr. Keck asked about a meeting that was to be held to discuss the Shiprock lighting
agreement. Mr. Quintana said the agreement is with the legal division for review. He
will follow up on the agreement and then get the meeting scheduled. Mr. Quintana
24
TC Draft Minutes
January 23, 2014
said he would also like to include some additional lighting projects in the discussions
and add generic language that would cover the addition of any future lighting
projects. Mr. Keck stated that Representative Clahchischilliage had asked to be
included in this meeting. Mr. Quintana said he hoped to get this meeting set up in
February.
Mr. Quintana reported that he was looking to amend Phase IB of the East Aztec
Arterial project soon and it would be amended into FY2015. He said that the City of
Aztec expected the project to be ready to go by July. He also plans to amend the
subsequent phases of the project into FY2016, FY2017, and FY2018 to get the rest of
the project into the STIP so the project can be completed. As long as all the phases
are programmed into the STIP, the project should be good to go as far as FHWA is
concerned. Mr. Quintana said there are ongoing calls on the first Friday of each month
with the City of Aztec and their consultant, Wilson & Company, to discuss the progress
of the project.
Mr. Delmagori asked Mr. Quintana to send Staff the information about Phase IB of the
East Arterial project so a TIP amendment could be processed. This project was
removed from the TIP a few months ago due to the problems with no logical terminus
for the project. Mr. Delmagori said the Policy Committee meets in March and April and
if their March meeting is targeted for final approval of the amendment, Staff will need
the details in the next few weeks in order to hold the public comment period and seek
recommended approval of the amendment by the Technical Committee at their
February meeting.
Mr. Quintana said he would plan to amend Phase IB for his next amendment cycle to
allow the MPO sufficient time to get the project into their TIP. He will provide the
necessary information to Staff by the end of the week, but the project description
remained the same at a cost of $3,500,000 and it would be amended into the STIP for
FY2015. Mr. Delmagori said Staff would begin working on the TIP amendment.
Mr. Quintana commented that during the Policy Committee meeting last week, he had
explained that updating the functional classifications was not only to provide for
certain levels of design criteria based on the functional classification, but it also
identified which roads were eligible for federal funding.
The conference call with Mr. Quintana was ended.
Mr. Brian Degani reported that the formation of the bicycle/pedestrian/equestrian
committee was awaiting final NMDOT approval by NMDOT Secretary Church. Ms. Rosa
Kozub will be the coordinator for the group that will be comprised of NMDOT staff and
some portions that will be open to the public.
Mr. Degani stated that comments received on the primary freight network have been
uploaded to the NMDOT website. He explained that NMDOT looks statewide to identify
the primary freight network on arterials throughout the state that carry the bulk of
primary freight. Mr. Delmagori said that FMPO did submit comments about the
importance of US 550, US 64, and US 491 for this region due to the lack of rail or other
opportunities for getting freight into and out of the area. He noted that I-25 and I-40
were already identified for the state, but Staff believed it was essential to note that
25
TC Draft Minutes
January 23, 2014
these other roads were just as important. Mr. Degani also said that proposed meeting
dates for the advisory group of the freight working group should be set this week.
Mr. Degani said that the Highway Safety Improvement Program is undergoing some
updates to the guidelines and the application process. He reported that Ms. Roshana
Moojen and he had begun working on some concerns for Aztec at the intersection of
NM 516 and US 550.
Mr. Degani said the long range plan cooperative round table meeting was held on
January 9. He said it was a productive meeting that discussed the project management
plan, the project work schedule, and the public participation framework. He said the
nine state-wide and seven regional working groups are in the process of being formed
and key participants identified.
Mr. Keck asked when the next call for safety projects could be expected. Mr.
Delmagori said he had not received any word on this yet although the call usually
happens around March each year.
Mr. Wakan asked about the importance of crash data in submitting a safety project.
Mr. Degani said that including crash data was essential when submitting a safety
project application and it should be part of the NMDOT database for that road
segment.
7. RECEIVE A REPORT ON THE 2040 METROPOLITAN TRANSPORTATION PLAN (MTP)
Subject: 2040 Metropolitan Transportation Plan
Prepared by: Joe Delmagori, MPO Planner
Date: January 14, 2014
BACKGROUND OR PREVIOUS WORK
The Metropolitan Transportation Plan (MTP) is the long range planning
document that addresses transportation needs for the next twenty-five years.
The 2035 MTP was adopted in 2010.
Development of the 2040 MTP began in November 2013 and is expected to be
adopted in April 2015.
Overview presentations have been given to the Technical and Policy
Committees.
CURRENT WORK
Overview presentations will be given to various groups in the coming month.
Staff is organizing a stakeholder workshop and public meetings in early
February.
These public meetings will seek to gather ideas on transportation projects that
26
TC Draft Minutes
January 23, 2014
can then be analyzed later in the MTP process.
The current MTP Vision, Goals, and Objectives will be discussed and reviewed.
RECOMMENDATION
It is recommended that the Technical Committee receive a status report on the
2040 Metropolitan Transportation Plan.
DISCUSSION: Mr. Delmagori said that Staff had set up several presentations and open
house-type public meetings to provide an overview of the MTP process. He noted that
the list of presentations shown on Page 9 of the Agenda should be corrected to show
the presentation to the San Juan County Commission on February 4 and had also been
expanded to include presentations and open house-type public meetings:
• January 13 – Farmington Chamber of Commerce Red Coats
• January 14 – San Juan Rotary
• January 21 – Farmington Chamber Young Professionals
• January 27 – Bloomfield City Council
• January 28 – Aztec City Commission
• January 30 – San Juan College (Open House – Student event)
• February 3 – Sycamore Center (Open House)
• February 4 – Farmington City Council
• February 4 – San Juan County Commission
• February 5 - Stakeholder Workshop
• February 6 – San Juan County Administrative Bldg. Lobby (Open House)
• February 11 – City of Bloomfield Multi-Cultural Center (Open House)
Mr. Delmagori stated that Staff will also be scheduling additional presentations for
other clubs and organizations during the next month or two. The intent of these
meetings will be to provide the MTP process overview, explain the projects and
priorities identified in the current MTP, and gather initial feedback from the public as
to other potential projects.
Also included on Pages 9 and 10 of the Agenda are the vision and mission statements
and the goals and objectives from the current 2035 MTP. Mr. Delmagori said he
anticipated these items would be reviewed in more detail in the coming months. He
noted that the vision statement has been in place since 2004 shortly after the MPO
was created and it may need to be revised and/or modified. The goals and objectives
are fairly encompassing and comprehensive, but Mr. Delmagori noted that work done
in the past few years, specifically in regard to Complete Streets, may require that this
list be changed. Additionally with the MAP-21 performance measures, some language
with regard to that may also need to be added.
Mr. Delmagori reminded the Technical Committee members of the MTP Stakeholder
Workshop on February 5 from 10:00 a.m. to 12:00 p.m. All the Technical Committee
members are invited to attend although a recap of the workshop will be provided to
the members at the regular meeting in February. The workshop will be a presentation
27
TC Draft Minutes
January 23, 2014
on the MTP explaining the current document followed by a brainstorming session on
what the participants would like to see as part of the process or what they would like
to see changed.
ACTION: The report was received.
8. RECEIVE A REVIEW OF 2013 RED APPLE TRANSIT RIDERSHIP
Subject: 2013 Red Apple Transit Ridership
Prepared by: Joe Delmagori, MPO Planner
Date: January 15, 2014
RED APPLE REPORT
Ridership in 2013 totaled 130,422; in 2012 ridership was 125,995, which is a
3.5% increase.
In 2013 there were 2,868 more rides on the Farmington routes than in 2012.
All of the regional routes had higher ridership in 2013 than in 2012: Aztec had
894 more rides, Bloomfield had 308 and Kirtland had 357.
Despite the ridership increases for the year, both the Farmington and regional
ridership has been declining since October.
In the past three years, 2011 had the highest ridership, 2012 had the lowest
ridership, and 2013 fell roughly within these two ranges.
ATTACHMENT
2013 monthly ridership summary for Red Apple Transit.
RECOMMENDATION
It is recommended that the Technical Committee receive a review of 2013 Red
Apple Transit ridership.
DISCUSSION: Mr. Wakan reported that with the close of 2013, Staff had created a
summary report of the total Red Apple ridership. There was a 3.5% increase in total
ridership throughout the region in 2013 compared to 2012.
Mr. Wakan referred to Page 12 of the Agenda which showed that overall ridership on
the Farmington routes increased in 2013 from 2012. Also illustrated was the month-to-
month percent change in ridership by route for 2012 and 2013.
28
TC Draft Minutes
January 23, 2014
Mr. Wakan stated that each of the three regional routes also saw an increase during
2013. There was a trailing off of ridership at the end of the year. Ridership from
January through March was stable, increased during April through September, and
then all route ridership trail off from October through December.
ACTION: The report was received.
9. INFORMATION ITEMS
Subject: Information Items
Prepared by: Joe Delmagori, MPO Planner
Date: January 13, 2014
INFORMATION ITEMS
a. Regional Traffic Model Update. A status report on the consultant’s recent
work will be provided at the meeting.
b. Complete Streets. The Advisory Group met on January 22. A recap of
their meeting will be provided.
c. Conferences in Denver. Joe Delmagori will be attending two conferences
in Denver on February 10-15. One will be walkability tours of Denver and
other cities led by Dan Burden. The other conference is being organized by
New Partners for Smart Growth.
d. Complete Streets Workshop. The MPO has coordinated to have Dan
Burden in Farmington on May 12-13 to give presentations and a workshop on
Complete Streets.
e. Other
DISCUSSION: Mr. Wakan reported that the regional traffic model consultant reported that the
traffic count parameters are falling well within range. The troubling traffic count locations
will be reviewed but the overall product is looking good. Once this review has been
completed, Mr. Bob Shull will begin work on the future years of 2025 and 2040. When the
future scenarios are finished, the future road networks can be categorized into those
scenarios.
Mr. Wakan reported that the Complete Streets Advisory Group had met on January 22. They
gave their preliminary approval to the land use context areas and road typologies developed
at their meetings in October and November 2013.
29
TC Draft Minutes
January 23, 2014
Mr. Delmagori will be attending two conferences in Denver on February 10-15. One will be
walkability tours of Denver, Golden, and Fort Collins led by Mr. Dan Burden. The other
conference on February 13-15 is the 13th Annual New Partners for Smart Growth which Ms.
Lopez also plans to attend.
Mr. Wakan said the MPO would be bringing Mr. Dan Burden back to Farmington on May 12-13.
He will be presenting to the local councils and commissions as well as giving a technical
workshop for the Complete Street Advisory Group. Ms. Holton noted that this workshop would
be open to the public, but it will be more focused toward the Advisory Group and the
Technical Committee members. Mr. Burden is bringing another member of his staff who is
involved with Safe Routes to School (SRTS). MPO Staff plan to coordinate with a local
elementary school currently not participating in SRTS and assess their student arrival and
dismissal. It is hoped that some good feedback can be provided to the school on what is
working and what could be improved upon. Mr. Delmagori added that there would also be a
public workshop on May 13. Once the agenda for Mr. Burden’s visit is finalized it will be issued
out.
10. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Delmagori welcomed Mr. Bill Watson to the Technical Committee.
There was no additional business from the Chairman, Members and Staff.
11. BUSINESS FROM THE FLOOR
There was no business from the Floor.
12. ADJOURNMENT
Ms. Westerling moved to adjourn the meeting. Ms. Brevik seconded the motion. Ms. Lopez
adjourned the meeting at 11:25 a.m.
__________________________ ________________________________
Cynthia Lopez, Chair June Markle, MPO Administrative Aide