MPO Technical Committee
Regular MeetingFarmington, NM · February 10, 2016
Agenda
MPO TECHNICAL COMMITTEE
AGENDA
February 10, 2016
10:00 a.m.
Commission Chambers
Aztec City Hall
201 West Chaco Street
Aztec, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
February 10, 2016 10:00 AM
This meeting will be held in Commission Chambers at Aztec City Hall, 201 West Chaco Street,
Aztec, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the January 13, 2015 Technical Committee 16
meeting.
3. Review the TIP Status Update Report 1
Presented by: Duane Wakan
4. Receive a report on the development of a Citizens (Civic) Advisory Committee 4
(CAC)
Presented by: Fran Fillerup
5. Receive a Red Apple Transit update 12
Presented by: Duane Wakan
6. Reports from NMODT
a. District 5 (Paul Brasher)
b. Planning Division (Brian Degani and Robin Elkin)
7. Information Items: 15
a. Complete Streets Design Guidelines
b. Staff Changes
c. Other
Presented by: Fran Fillerup
8. Business from Chairman, Members, and Staff
9. Business from the Floor
10. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: February 3, 2016
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP. These monthly reviews help correct inconsistencies in the TIP,
STIP, the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle begins in January 2016.
There were no projects identified for a TIP amendment.
TRACKING INFORMATION (2016-2021 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90% - Deadlines -
Environmental Certification 1) April 15 Signed T/LPA agreements
Utilities Certification 2) June 15 Obligation deadline
Railroad Certification - Design- T/LPA agreement
Archeology Certification - Construction- 9 Day Letter
CURRENT WORK
Staff has learned that NMDOT Planning Division has decided to not fund the
English Rd- E. Main Street RSA
o Plans were already at 95%
o HSIP application process opens in the fall of 2016
The South Side River Road River Trail TAP project was put on hold due lacking
documentation
o Letter of Intent from the COF to NMDOT- expressing their intent to use
forces to construct trail
o Engineering Estimate & Labor Estimate (on file and submitted)
Ongoing ROW issues with the following projects
o East Arterial Route Phase II
o Pinon Hills Boulevard Bridge Phases I, II and III
HSIP Intersection issue- San Juan Blvd and Scott Ave (2014-2019 TIP)
Others?
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
1
Discussions from the January 13, 2016 TC Meeting
ROW Issues
1. Mr. Watson reported the City of Aztec is struggling with right-of-way that may
cause the project to be delayed by six to eight months. When the project right-
of-way was expanded, FHWA and BLM became involved and NMDOT again
changed their rules and requirements. Mr. Watson also said that the lack of
coordination and continuity within District 5 creates more difficulties. Mr.
Watson stated that he spoke with Aztec’s City Manager and asked for his
support in trying to get projects moving forward. City Manager Josh Ray
contacted Butch Mathews, this region’s Transportation Commissioner to seek
support and assistance from him.
2. Ms. Westerling stated that the City of Farmington is having similar right-of-way
issues with their Pinion Hills Boulevard project. A piece of the right-of-way
being questioned by NMDOT was deeded to the city in 1971 from the railroad
when they went defunct. She said the appraisals were conducted using
NMDOT’s format and an appraiser from their accepted list of appraisers back in
2001. NMODT still has not said whether the appraisals are adequate nor
addressed the numerous additional documents the city provided as historical
back-up. Ms. Westerling said this right-of-way problem has been ongoing for
three years with no definitive answer from NMDOT on whether the documents
submitted are acceptable. An affidavit submitted to NMDOT over four months
ago, and which was to have been discussed at a meeting with FHWA, was never
discussed with them as promised. Ms. Westerling said that even after attending
a meeting with Deputy Transportation Secretary Anthony Lujan, in which
NMDOT representatives were instructed by him to “get it done”, things still are
not getting done. Ms. Westerling now copies Mr. Lujan on all correspondence
and e-mails with NMDOT and there continues to be a lack of communication
and urgency.
3. After being told that two years of work on one of their projects was not
correct, San Juan County decided to spend an additional $125,000 to hire a
firm in Albuquerque that specializes in acquiring rights-of-way. Mr. Keck added
that an entire grant could be spent paying for the process of working with
NMDOT – not actually purchasing land or constructing the project.
East Pinon Hills Boulevard – Phases I and II
Ms. Westerling said the right-of-way plat would be presented to the Planning & Zoning
Commission this week and then to City Council on January 26.
Mr. Watson asked if NMDOT also has problems with their right-of-way division. Mr.
Keck said he has spoken with representatives from District 3 who have many of the
same issues. Ms. Lopez asked if NMDOT did not understand the issues with this
division. The other Technical Committee members thought NMDOT should know about
the issues since they deal with the same issues themselves even though their projects
take priority over other entity’s projects.
2
CR 350 & 390 Intersection
Mr. Keck said that construction is still planned for March.
Kirtland School Walk Path
The agreements were signed by San Juan County last week and sent on to NMDOT.
Red Apple Transit – Capital & Operating
No update.
Red Apple Transit – Bus Route Accessibility
Mr. Montoya said they are waiting on signatures to transfer this from FHWA funding
and oversight to FTA.
San Juan Boulevard and Scott Ave
Ms. Westerling said the bid came in over budget so the city has requested additional
funds from NMDOT. This project will be added back onto the Project Status
spreadsheet for future tracking.
3
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Development of a Citizens Advisory
Committee (CAC)
Prepared by: Fran Fillerup, MPO Associate Planner
Date: February 3, 2016
BACKGROUND
At the November 19, 2015 Policy Committee meeting, Staff presented
introductory information on Citizens Advisory Committees (CAC) as part of the
Public Participation Plan (PPP). The Policy Committee recommended the MPO
form a CAC to have broader input on transportation planning issues, and that
such input could be a benefit to the MPO and in their work on their respective
councils and commissions.
Membership of CAC’s are intended to be representative of the variety of
residences of an area with regard to race and ethnicity, age, sex, ability and the
many other interests and characteristics of a region.
A CAC is an advisory committee to the Policy Committee, similar to an MPO’s
Technical Committee. Development and amendment of the UPWP, MTP, and
TIP, along with other studies and reports, are presented to a CAC for their review
and recommendation.
MPO Staff would provide the staff support for this committee and
recommendations of the Citizens Advisory Committee would be provided to the
Policy Committee.
The Farmington MPO had a Citizen Action Committee during the development of
its first MTP in 2005. However, it appears to have been convened on a temporary
basis. (It was not a standing “advisory committee”.)
CURRENT WORK
Common Practices for CAC’s
Following is a summary list of research and a review of common practices of Citizen
Advisory Committees at other MPO’s.
FHWA published “Public Involvement Techniques for Transportation
Decisionmaking” which gives general guidance on many public engagement tools,
including CAC’s. An excerpt of the document is attached. It describes CAC’s as
including:
o Representation from interest groups throughout a region;
o Regularly-held meetings;
o Recorded comments and points of view of participants; and
o Consensus building, but consensus is not required.
o An important assigned role in the transportation planning process.
According to the Association of Metropolitan Planning Organizations (AMPO),
Citizen’s Advisory Committees:
o Act in an advisory capacity to MPO on public involvement strategies;
4
o Meet regularly to review and develop plans and also assists in organizing and
managing public meeting and comments; and
o Are comprised of members of the public, often appointed by localities and
MPO policy board, who may include representatives of interested parties.
Many MPO’s throughout the country have CAC’s. Some CAC’s have been
functioning for decades and in some states it is required and organized under
state law. Staff performed research of CAC’s across the country, and contacted
several by phone. Attached is a table of 6 such groups at MPO’s.
In New Mexico, only the Mid-Region MPO has a committee similar to a CAC – a
Public Involvement Committee, or PIC. This committee convenes on an as-
needed basis, does not provide recommendations to their Policy Board, and
currently sees very little participation.
Some MPO’s and other regional planning organizations convene citizen and
stakeholder groups on a temporary basis. Others call on a collection of
workgroups focused on a multitude of disciplines and interests (i.e., active
transportation, demographics, environmental, freight, and so on).
Some hold joint meetings with staff from government agencies to increase
interaction of stakeholder groups and government.
CAC’s from those surveyed vary in the way voting membership is set up. This is
typically set forth in bylaws.
Some CAC’s limit the number of total participants. Others are open-ended and
allow any organization or individual to achieve voting status. However, these
CAC’s have attendance requirements and can remove members who do not
participate.
Some are explicit about having representation from certain groups within a
community. For example, at the MPO in Tampa, Florida, seats are designated for
a person of Hispanic ethnicity, a person of African-American descent, a woman, a
person under age 30, a representative of a neighborhood and a representative of
the business community.
CAC’s also vary in the frequency of meetings, but these typically match the
frequency of other committees.
The time of day of the meetings is also a factor to be considered. Some hold their
meetings during the day and others in the evening.
Next Steps
Creation of a CAC within the Farmington MPO involves at least the following next steps:
At the direction of the Policy Committee, Staff would prepare amendments of the
Bylaws, UPWP, and PPP.
The Bylaws would contain details about the responsibilities, procedures and
membership of the CAC. The Policy Committee would decide the composition
and means of forming the CAC, plus its procedures and other details.
The UPWP would need to reflect the CAC in tasks relating to administration and
public outreach, and note that certain projects would be reviewed by the CAC in
addition to the other committees.
The PPP would outline the CAC as a means for public involvement in the MPO’s
work.
Based on the amendments to the above documents, Staff would handle the
details for forming the CAC.
The Farmington MPO has contact with and active participation from many
representatives of stakeholders groups and individual citizens. For example, the
MPO maintains a list of contacts with interested groups. Members could come
5
from contacts made during the MTP outreach and from the Complete Streets
Advisory Group. General advertisements could also be used to invite groups or
individuals to join the CAC. Many MPO’s have success finding participants
through referrals and word-of-mouth.
ATTACHMENTS
An excerpt from a FHWA publication entitled Public Involvement Techniques for
Transportation Decisionmaking (2015 Update) is attached.
A comparison of select MPO Citizens Advisory Committees will be sent as a
separate attachment.
INFORMATION ITEM
This is an information item and discussion by Technical Committee will be
forwarded to the Policy Committee. At the direction of the Policy Committee, more
information or amendments to the Bylaws, UPWP and PPP will be presented in
the future for recommendation.
6
Public Involvement Techniques for
Transportation Decisionmaking
2015 Update
Civic Advisory Committees
What is a civic advisory committee?
A civic advisory committee (CAC) is a representative group of stakeholders that meets
regularly to discuss issues of common concern. While these groups are often called citizens'
advisory committees, the term civic is used here because citizenship is not a requirement
for participation. CACs have been used for many years and are not in themselves
innovative, yet they can be used very creatively. For example, a CAC was used in Louisiana
to find consensus on environmental issues for input to public agencies. In Florida a CAC
provided input on designs for deployment of a traffic information system.
It is very useful to have agencies represented on a CAC as a way for local residents to interact
with their government. For example, in Portland, ME, a 35-member CAC developed a long-
range transportation plan with agency assistance. Because it can be used either alone or in
conjunction with other techniques, a CAC is widely used to achieve a basic level of local input
for transportation planning and development.
A CAC has the following basic features:
• Representation from interest groups throughout a State or region.
• Regularly-held meetings.
• Recorded comments and points of view of participants.
• Consensus building, but consensus is not required.
• An important assigned role in the transportation planning process.
Why is a CAC useful?
A CAC is a forum for hearing ideas. It is a place where agencies and groups present goals and
proposed programs. It provides a continuing forum for bringing the public’s ideas directly
into the planning decisionmaking process. In the San Francisco Bay area, special efforts have
been made to include representatives of traditionally underserved populations.
A CAC molds participants into a working group. It is democratic and representative of opposing
points of view, with equal status for each participant in presenting and deliberating views and
in being heard. It is a place for finding out where participants stand on issues. It is a place
where people become educated on technical issues, over several meetings if necessary. It
gives a better understanding of the effort and milestones of public agency progress. Its
7
members feel freer to ask agencies for assistance, clarification of points, and follow-up on
questions.
A CAC demonstrates commitment to participation. Its existence demonstrates progress toward
involving people in projects and programs. It helps find common ground for consensus about a
solution. If consensus cannot be reached, a CAC provides a forum for identifying positions,
exploring them in depth and reporting the divergences of opinion to the agencies.
A CAC is flexible. It can be part of regional or State planning or part of a single project—either
way it garners assistance from the community in anticipating construction and identifying
measures to reduce potential disruption. It can be subdivided. In the St. Louis area, three CACs
were formed to develop the regional long-range plan.
Who participates in a CAC?
Representatives of community groups or stakeholders are selected in one of two ways. Either
an agency carefully identifies all stakeholders, including the general public, or the public self-
selects CAC memberships—those who are interested attend. If membership is not fully
representative, an agency should encourage unrepresented groups to attend or seek their
input in some other way. The San Francisco County Transit Authority appoints 11 CAC
members, drawing upon a pool of self-selected candidates who submit resumes. People who
attend meetings are asked if they would like to be considered for CAC membership. The
Authority proactively seeks diversity and balance of
representation by race, gender, neighborhood activists, business interests, the disability
community, bicycle proponents, and others. The Authority uses the CAC as a sounding
board on a variety of transportation issues.
Though no special training is required, attendees typically have a broad, long-term view in
discussing issues within a geographic area—not a specific, single project. In many areas, such
as the San Francisco Bay area, agencies make targeted efforts to involve freight interests.
People participate by examining and discussing issues with others. Mailings prior to a meeting
help participants understand issues and form questions. Major points of discussion are
typically recorded. On some issues the agency and the public may desire substantial detail.
How do agencies use the output?
A CAC helps monitor community reactions to agency policy, proposals, and progress. By
observing interactions during CAC meetings, agencies become aware of opinions and
stances at an early point in the process—often before these opinions become solidified.
Working with a CAC, an agency crafts compromise positions through give-and-take over a
relatively short period of time. For example, in Pennsylvania a CAC helped determine the
extent to which a highway project would affect a rapidly developing area in the Pocono
Mountains.
8
Who leads a CAC?
A CAC elects its own leader. Dynamic and firm community leadership can enliven a CAC. In
Chatham County, GA, which includes Savannah, a charismatic leader strengthened the
CAC's role in planning. Typically, CAC members select a leader who interacts with agencies
in an open and friendly manner, who is sensitive to group dynamics, and can effectively
lead the discussion by drawing opinions and
positions from participants.
What does a CAC cost?
A CAC requires support staff within an agency, and the work can be substantial. Meeting
minutes must be taken. Background information, minutes, and agendas must be sent out
before meetings. A site for the meeting must be selected. Agency representatives must
attend to provide resources for CAC questions and response preparation. A CAC may want to
sponsor a special meeting on transportation's role in the community, as was done in
Pittsburgh. Additional assistance may be required in some instances. For example, in
Washington State a CAC led by a facilitator helped plan a highway bypass on the Olympic
peninsula.
Material needs are minimal, but a quiet meeting room is essential. Written materials may be
needed to supplement meeting notes, and these materials should be distributed before the
meeting. In many cases, an agency needs to carefully explain its position or analysis, which
may require detailed materials and staff time.
How is a CAC organized?
Ideally, a CAC will have a limited number of members, to allow for in-depth discussion.
However, flexibility is needed. Rigid rules may discourage future participation by excluding
people who might be able to provide valuable input. If there is no cap on the number of
members of a CAC, a large CAC can be divided into subgroups. However, subgroups may
curtail interaction among diverse interests. A CAC and its sponsoring agency should explore
how to overcome limitations. For example, CAC members can attend conferences where they
can learn about ideas and interests that are not represented on the CAC.
A CAC usually has officers, with a chairperson or director, an assistant director to chair
meetings in the absence of the chairperson, and a secretary who may be an agency staff
person. Elected officers may serve for a year or more.
CAC meetings are managed by the elected officers with assistance from agency staff. Formal
parliamentary procedures, if oriented toward voting, are less useful than informal rules and
consensus- building techniques. Meetings are usually held on a regular basis.
Pre-meetings help plan the regular sessions and draft policy goals. CAC officers and agency
staff work together to bring substantive issues before the larger group. Subcommittees are
9
established to explore details of issues, with meetings held between the regular sessions of
the CAC.
A typical CAC agenda will cover the following items:
• Introductions, if attendees vary each time.
• Welcome newcomers.
• Discussion of agenda, seeking changes or additions.
• Discussion of items on agenda in order, unless a change is requested.
• Presentations of information as necessary for clarification.
• Determination of whether a consensus on each issue exists.
How is a CAC used with other techniques?
An established CAC can be a forum to incorporate many public involvement techniques. A
CAC leader can use brainstorming to establish consensus on a project. Facilitation by an
outside specialist is used within a CAC to establish or resolve a particular or pressing
problem. Visioning techniques are used during CAC meetings to establish long-range policy
goals. Discussions should consider special issues related to Americans with disabilities.
Video techniques can illustrate specific points during CAC meetings.
What are the drawbacks of a CAC?
A CAC may become inactive if the public perceives that it is being manipulated by a
transportation agency. CAC members may feel overwhelmed by technical information if
agency staff do not explain essential facts. Transparency can avoid a perception that a CAC
is being manipulated by an agency.
A CAC is most useful on a project or regional scale. A statewide CAC or one for a very large
region can be unwieldy when a large number of people are involved and travel is required of
both staff and participants. Effective leadership is essential. A CAC’s success depends on
participants feeling that they are being heard and have a stake in decisionmaking, in an
efficient and fair manner.
A CAC does not encompass all points of view. By virtue of being representative, a CAC is
never all- inclusive. A CAC's voice may be skewed if it does not represent all stakeholders and
the general public, accordingly it may be difficult to represent minority interests.
Opponents may refuse to consider each other's ideas. People who feel they are being
controlled or patronized may withdraw. When Agency staff feel that the process is leading
nowhere, they may not respond appropriately to questions from participants.
10
Decision and Policy Boards
Who serves on MPO decision and policy boards?
People who serve on MPO decision and policy boards are drawn from many sources. They
include transit representation, State department of transportation, representatives of
major modes of transportation, community and business leaders, leaders from special
interest groups, and interested individuals. Length of tenure varies, depending on tasks, but
is generally one to five years. They represent groups organized around civic,
environmental, business, or community interests; specific geographic areas; or they serve
as individual experts in a field. They need not be elected officials or agency staff. The
Connecticut Department of Transportation (ConnDOT) appointed a community committee
to develop and recommend alternatives for reconstruction of a large Interstate bridge.
These boards are established by statute, regulation, or political decision. Ad hoc committees
are set up by legislative acts or executive decision to investigate specific subjects. They may
be temporary or permanent. In Portland, OR, a committee of community members works
with MPO staff to develop scopes of service for projects and to review and select consultants.
For the U.S. 301 corridor study,
11
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: Red Apple Transit Update
Prepared by: Duane Wakan, MPO Planner
Date: February 2, 2016
BACKGROUND or PREVIOUS WORK
Staff will need to collect transit data on an ongoing basis to comply with MAP-
21 performance measurement requirements.
New ridership collection methods have been in place since March 2015 using
tablets which can also collect basic demographic data.
Red Apple Transit recently released a Transit Trip Planner interface which can
be accessed on the Red Apple Transit and MPO websites.
CURRENT WORK
Several route changes were implemented in August 2015 as a way to: (1)
remove non-revenue miles; (2) add service to concentrated areas; (3) get
workers into the COF by 8 am; (4) get students to San Juan College by 8 am;
and, (5) provide a link with Navajo Transit.
2015 Ridership volumes decreased by 4.54 percent compared to 2014 volumes.
Revenue during the same period went up by 9.69 percent*
Farmington routes decreased by -4.08 percent while the regional routes
decreased by -7.55 percent.
ANTICIPATED WORK
The MPO will hire an intern in the early spring to help tabulate and map
boarding and alightment data.
Staff will analyze gaps in the transit system, the walkable catchment areas of
each transit stop as well as demographic mapping for the Title VI Plan.
INFORMATION ITEM
This is an information report requesting feedback from Policy Committee
members.
12
2015 Regional Ridership
800
700
600
500
400
300
200
100
-
Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15
Tiger (Aztec) Bobcat (Bloomfield) Bronco (Kirtland)
2015 Farmington Ridership by Route
4,000
Red Green Purple Yellow Blue
2,000
0
Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15
13
Red Apple Transit - Annual Total Ridership (All Routes)
160,000 150,446
139,467
140,000 132,534 130,422
125,995 131,263
125,299
120,000 111,356
101,955
100,000
80,000 71,985
60,000
48,087
44,554
40,000 32,869
20,000
-
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Red Apple Transit: Total Ridership Comparison
16,000
14,000
12,000
10,000
8,000 2015 Route
Changes
6,000
4,000
2011 2012 2013 2014 2015
2,000
-
Jan Feb March April May June July Aug Sep Oct Nov Dec
14
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: February 2, 2016
INFORMATION ITEMS
a. Complete Streets Design Guidelines. The Technical Committee will meet
on Wednesday, January 24, 2016 to review and offer edits to the draft
Complete Streets Design Guidelines. This meeting is scheduled for 9:30
a.m. to 12:00 p.m. at the MPO Office.
b. Fran Fillerup. Staff would like to extend an appreciation to Fran Fillerup
for his dedicated service and professionalism while working as the MPO
Associate Planner. He has accepted a position with San Juan County.
15
TC Draft Meeting Minutes
January 13, 2016
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
January 13, 2016
Technical Members Present: Bill Watson, City of Aztec
Cindy Lopez, City of Farmington
Nica Westerling, Alternate, City of Farmington
Andrew Montoya, Red Apple Transit
Dave Keck, San Juan County
Technical Members Absent: Teresa Brevik, City of Bloomfield
David Sypher, City of Farmington
NMDOT Representative
Staff Present: Mary Holton, MPO Officer
Fran Fillerup, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: Duane Wakan, MPO Planner
Others Present: Brian Degani, Planning Liaison, NMDOT (via phone)
Larry Hathaway, San Juan County
1. CALL TO ORDER
Mr. Keck called the meeting to order at 10:02 a.m.
2. APPROVE THE MINUTES FROM THE DECEMBER 10, 2015 JOINT TECHNICAL
COMMITTEE & NMDOT MEETING
Ms. Lopez moved to approve the minutes from the December 10, 2015 Joint Technical
Committee and NMDOT meeting. Mr. Watson seconded the motion. The motion was
passed unanimously.
3. ANNUAL ELECTION OF OFFICERS
Subject: Annual Election of Officers
Prepared by: Fran Fillerup, MPO Associate Planner
Date: January 6, 2016
BACKGROUND
At the first meeting of the New Year, the Technical Committee selects the
Chair and Vice-Chair from their membership who will serve until the next
16
TC Draft Meeting Minutes
January 13, 2016
annual election.
The Chair presides over the meetings and is responsible for the other duties
outlined in the Committee Bylaws and Operating Procedures document.
The Vice-Chair presides over the meetings in the absence of the Chair.
Current Chair (David Sypher), current Vice-Chair (Dave Keck).
ELECTION
Elections will take place to select a Chair and Vice-Chair for the Technical
Committee for 2016.
RECOMMENDATION
It is recommended that the Technical Committee accept nominations and
vote to elect the Chair and Vice-Chair for 2016.
DISCUSSION: Mr. Fillerup explained that the annual of election of officers is held at
this first meeting of the New Year. He noted that Mr. Sypher has been Chair during
2015 and Mr. Keck was Vice-Chair.
Ms. Lopez nominated Dave Keck for Technical Committee Chair for 2016 and Ms.
Westerling seconded the nomination. There were no other nominations for Chair. The
vote to elect Mr. Keck as Chair was unanimous.
Ms. Lopez nominated David Sypher for Technical Committee Vice-Chair and Mr. Watson
seconded the nomination. There were no other nominations for Vice Chair. The vote to
elect Mr. Sypher as Chair was unanimous.
4. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: Fran Fillerup, MPO Associate Planner
Date: January 5, 2016
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP. These monthly reviews help correct inconsistencies in the TIP,
STIP, the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle begins in January 2016.
TRACKING INFORMATION
Local Agreement Status (ARF)
ROW Certification
Design Completion 30 – 60 – 90%
17
TC Draft Meeting Minutes
January 13, 2016
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
ITS/Sys ENG Certification
Public Involvement Certification
CURRENT WORK
Staff will continue the monthly review of project status for projects in the TIP.
This includes updates on NMDOT and local lead projects. Staff will work from
the latest 2016-2021 TIP at the meeting.
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
DISCUSSION: Mr. Fillerup stated that this agenda item was to review the current
projects in the TIP or those that have moved out of the TIP and are in the process of
construction. This report provides a current status of project and benchmarks
reached.
East Arterial Route – Phase II
Mr. Watson reported the City of Aztec is struggling with right-of-way that may cause
the project to be delayed by six to eight months. When the project right-of-way was
expanded, FHWA and BLM became involved and NMDOT again changed their rules and
requirements. Mr. Watson also said that the lack of coordination and continuity within
District 5 creates more difficulties.
Mr. Watson asked if a replacement for David Quintana had been named. Mr. Fillerup
said the technical support engineer position has not been named yet. The new Acting
District 5 Engineer, Paul Brasher, has not officially told the MPO who will be replacing
David Quintana. He did indicate that he plans to attend FMPO committee meetings and
will attend the Policy Committee meeting on January 28. Mr. Watson expressed his
frustration on the lack of participation in committee meetings by District 5
representatives. This absence, along with the continuous rotating personnel at District
5 results in a loss of continuity and coordination in moving forward on local projects.
Ms. Westerling stated that the City of Farmington is having similar right-of-way issues
with their Pinion Hills Boulevard project. A piece of the right-of-way being questioned
by NMDOT was deeded to the city in 1971 from the railroad when they went defunct.
She said the appraisals were conducted using NMDOT’s format and an appraiser from
their accepted list of appraisers back in 2001. NMODT still has not said whether the
appraisals are adequate nor addressed the numerous additional documents the city
provided as historical back-up. Ms. Westerling said this right-of-way problem has been
ongoing for three years with no definitive answer from NMDOT on whether the
documents submitted are acceptable. An affidavit submitted to NMDOT over four
months ago, and which was to have been discussed at a meeting with FHWA, was
never discussed with them as promised. Ms. Westerling said that even after attending
18
TC Draft Meeting Minutes
January 13, 2016
a meeting with Deputy Transportation Secretary Anthony Lujan, in which NMDOT
representatives were instructed by him to “get it done”, things still are not getting
done. Ms. Westerling now copies Mr. Lujan on all correspondence and e-mails with
NMDOT and there continues to be a lack of communication and urgency.
Mr. Keck added his annoyance with the right-of-way division at NMDOT. After being
told that two years of work on one of their projects was not correct, San Juan County
decided to spend an additional $125,000 to hire a firm in Albuquerque that specializes
in acquiring rights-of-way. Mr. Keck commented that a lot of time and federal funds
were wasted up to this point.
The three entity representatives present at the meeting all expressed their frustration
with the ongoing run-around and continuing lack of support and coordination from
NMDOT. Mr. Watson stated that he spoke with Aztec’s City Manager and asked for his
support in trying to get projects moving forward. City Manager Josh Ray contacted
Butch Mathews, this region’s Transportation Commissioner to seek support and
assistance from him.
Ms. Westerling said the City of Farmington has invested the staff time of three
employees for a year to get a project grant of $200,000 that has still not been
finalized. The right-of-way division of NMDOT keeps asking for more and additional
forms to be completed and submitted, all of which require going back in time six
months or longer. Ms. Westerling reported that a completed sidewalk project took
NMDOT over a year to look over and the city still has not been reimbursed for the
project.
Mr. Keck added that an entire grant could be spent paying for the process of working
with NMDOT – not actually purchasing land or constructing the project.
Ms. Westerling added that 100% plans for the Pinon Hills Boulevard projects have been
completed for two years and have been with NMDOT for two years. The project
remains stuck in NMDOT’s right-of-way division over seven pieces purchased prior to
2001.
East Pinon Hills Boulevard – Phases I and II
Ms. Westerling said the right-of-way plat would be presented to the Planning & Zoning
Commission this week and then to City Council on January 26.
Mr. Watson asked if NMDOT also has problems with their right-of-way division. Mr.
Keck said he has spoken with representatives from District 3 who have many of the
same issues. Ms. Lopez asked if NMDOT did not understand the issues with this
division. The other Technical Committee members thought NMDOT should know about
the issues since they deal with the same issues themselves even though their projects
take priority over other entity’s projects.
CR 350 & 390 Intersection
Mr. Keck said that construction is still planned for March.
19
TC Draft Meeting Minutes
January 13, 2016
Kirtland School Walk Path
The agreements were signed by San Juan County last week and sent on to NMDOT.
Red Apple Transit – Capital & Operating
No update.
Red Apple Transit – Bus Route Accessibility
Mr. Montoya said they are waiting on signatures to transfer this from FHWA funding
and oversight to FTA.
Ms. Westerling asked about the intersection project at Scott Avenue and San Juan
Boulevard. Mr. Fillerup said it had been moved off the TIP. Ms. Westerling said the bid
came in over budget so the city has requested additional funds from NMDOT. This
project will be added back onto the Project Status spreadsheet for future tracking.
ACTION: The projects were updated.
5. FFY2015-2016 UPWP AMENDMENT
Subject: FFY2015-2016 UPWP Amendment
Prepared by: Fran Fillerup, MPO Associate Planner
Date: January 6, 2016
BACKGROUND
The MPO maintains a Unified Planning Work Program (UPWP) document which
sets forth the tasks the MPO will undertake in a fiscal year.
In November, staff presented changes to tasks within the UPWP based on the
2040 MTP and direction from FHWA.
In December, staff presented a summary of carry over requests and new total
budget amounts for the FHWA PL grant and the FT 5303 grant.
According to Appendix A of the document, the total MPO budget amount for
FFY 2016 is $369,168.97. The previous MPO budget amount for FFY2016 was
$302,458. Increases are due to new award letters and requested carryover in
the FHWA PL and FTA 5303 grants.
The total estimated expenses are $367,000. Details are also provided in the
second table of Appendix A.
CURRENT WORK
MPO staff will present the Draft Amendment to the FFY2015-2016 UPWP.
ACTION
The Draft Amendment to the FFY 2015-2016 UPWP is presented for
recommendation by the Technical Committee. The document would then be
presented to the Policy Committee for consideration and final action.
20
TC Draft Meeting Minutes
January 13, 2016
DISCUSSION: Mr. Fillerup explained that the Unified Planning Work Program document
details the tasks that the MPO undertakes each year. This has been presented in two
parts in November and December. The first presented the outlined changes to text
within the document based on the MTP and performance measures. In December, the
carryover amounts requested and the budget were reviewed.
Mr. Fillerup reviewed some of the budget details that reflected the carryover amounts
with a $369,000 new estimated MPO budget. Due to the sizeable FTA grant carryover,
additional spending has been identified for a follow-up to the transit hub study for
design concepts and other possible transit studies.
ACTION: Mr. Watson moved to recommend approval of the FFY2015-2016 UPWP
Amendment. Ms. Westerling seconded the motion. The motion was passed
unanimously.
6. PUBLIC PARTICIPATION PLAN AMENDMENT
Subject: Public Participation Plan Amendment
Prepared by: Fran FIllerup, MPO Associate Planner
Date: January 4, 2016
BACKGROUND
The current Public Participation Plan (PPP) was adopted on January 19, 2012.
The PPP needs to be reviewed and amended at least every five years.
An overview of amendments are as follows:
o The public comment period is proposed to be 15 days instead of 30
days. (See page 14). NMDOT has recommended, and the other MPOs
throughout the state have already adopted this change for most
documents including TIP amendments. A new TIP adoption would
continue to have a 30-day comment period.
o At their November 19 meeting, the Policy Committee recommended the
use of social media in MPO outreach efforts and this is reflected in this
amendment. (See pages 8 and 9).
o Representation by NMDOT on the Policy Committee, and by NMDOT and
Red Apple Transit on the Technical Committee, are updated. (See page
2.)
o Newsletters will be published at least three times per year (previously,
four newsletters have been published). (See page 8.)
o Planning factors of MAP-21 have been clarified and are included. (These
may again be updated as similar federal guidance is provided as part of
FAST Act, the new multi-year transportation bill.) (See page 2.)
o A series of demographic maps will be produced to help comply with
Title VI of the Civil Rights and issues of environmental justice. (See
page 7.)
o Amendments related to these and other minor changes are shown as
track changes in the Draft Amendment of the PPP.
21
TC Draft Meeting Minutes
January 13, 2016
o In November, the Policy Committee also recommended developing a
Citizens (Civic) Advisory Committee. Staff will present on this topic in
February, and several documents may be amended in the future.
The 45-day public noticing requirement for the Public Participation Plan began
on November 29, 2015.
CURRENT WORK
Staff will review the proposed amendments to the PPP.
ACTION ITEM
Staff recommends that the Technical Committee recommend approval of
amendments to the Public Participation Plan. This recommendation would be
forwarded to the Policy Committee for consideration and final action.
DISCUSSION: Mr. Fillerup reported that the Public Participation Plan (PPP) is up for
review and the 45-day public notice began on November 29, 2015. No public comments
have been received to date. This document outlines how the MPO conducts business in
an open manner and how we reach out to stakeholders and the general public.
Mr. Fillerup highlighted some of the proposed changes to the PPP:
- Update the RAT representative under the committee structure section;
- Text added to the reflect MAP-21 goals, but note that these will also
eventually be updated with guidance from the FAST Act;
- For the new TIP development there will remain a 30-day comment period;
however, for TIP amendments, the MPO is proposing changing to a 15-day
comment period. This is recommended by NMDOT and what is also used by the
other MPOs in the state. This change will allow amendments to happen in a
shorter time frame and potentially reduce the need to hold special meetings to
meet the noticing requirements;
- Changes to the environmental justice section to say “underserved
areas/communities” rather than “environmental justice” areas;
- Create a social media presence. The Policy Committee recommended this be
done to ensure good public outreach through this type of widely-used media.
ACTION: Ms. Lopez moved to recommend approval of the amendments to the Public
Participation Plan. Ms. Westerling seconded the motion. The motion was passed
unanimously.
22
TC Draft Meeting Minutes
January 13, 2016
7. GRANT WRITING BY MPOs
Subject: Grant Writing by MPOs
Prepared by: Fran Fillerup, MPO Associate Planner
Date: January 6, 2016
BACKGROUND
At the December 2015 Technical Committee meeting, Committee Members
asked Staff to investigate the possibility of additional funding being acquired
and being used for grant writing on behalf of local entities.
Currently, FMPO staff presents on opportunities for federal and state grants to
fund project design, project construction, planning studies, and other similar
programs. FMPO staff also offers data, maps and other analysis in support of
grant applications, and to review application content.
Federal and State regulations with regards to 5303 & PL funds need to be
considered when making decisions regarding planning activities in the UPWP.
CURRENT WORK
Review of grant writing efforts at other MPO’s in New Mexico:
Mesilla Valley MPO, Santa Fe MPO, Mid-Region MPO and El Paso MPO each
provide assistance to local entities similar to the help offered by the FMPO
staff. They produce data made available generally, write letters of support, and
review application content.
Mid-Region Council of Governments and the Northwest New Mexico Council of
Governments offer grant writing to local governments, but indicated this is
more of a function of their council of governments.
A member of the Technical Committee gave the example of the Cowlitz
Wahkiakum Council of Governments in Kelso, Washington for its grant writing.
The transportation planner at that office indicated that they have done grant
writing in the past, but have lost staff in the past three years and do not
currently offer grant writing.
INFORMATION ITEM
This is an information item only.
DISCUSSION: Mr. Fillerup reported that during the December Technical Committee
meeting, the question was asked if the MPO was able to obtain more funding for
additional staff, could they consider doing grant writing for the entities.
The MPO currently provides the entities with support material, tries to enhance any
grant that the local governments are seeking, and tries to help align applications with
the goals and scoring processes.
23
TC Draft Meeting Minutes
January 13, 2016
Mr. Fillerup stated that Staff queried the other MPOs in the state and this is the same
approach they take. They do not try to take on grant writing or pursuing grants as MPO
staff.
Mr. Fillerup said that Staff had been referred to a council of governments (COG) in
Washington State that had provided grant writing in the past. They reported that in
the past they had offered grant writing, but this was more a function of their COG
rather than just the MPO. With the loss of staff over the years, they do not currently
offer grant writing. The Northwest Regional Transportation Planning Organization
(NWRTPO) reported that grant writing is a function of their COG and is offered where
the local community does not have professional staff.
Staff asked Mr. Degani if grant writing and pursuing grants to the benefit of the local
governments would be reimbursable for the MPO. Mr. Degani wants to first be able to
review the new FAST Act legislation to see what it says about the policy of using PL
funds for grant writing efforts.
Mr. Fillerup concluded that what Staff offers now is consistent with the other MPOs.
Others doing grant writing do so as a function of a COG that they offer to the small
communities.
ACTION: The report was received.
8. REPORTS FROM NMDOT
District 5 Update
No representative from District 5 was present at the meeting.
Planning Division Update – Brian Degani
Mr. Degani offered the following written update for the meeting and attended by
phone with additional comments:
Fixing America’s Surface Transportation (FAST) Act Transportation Bill
Both the U.S. House and Senate passed the Fixing America’s Surface Transportation
(FAST) Act, which is five-year legislation for improving the Nation’s surface
transportation infrastructure, including roads, bridges, transit systems, and rail
transportation network. The bill is intended to provide the following: reform and
strengthen transportation programs, refocuses on national priorities, provide long-
term certainty and more flexibility for states and local governments, streamline the
project approval processes, and maintain a strong commitment to safety. The bill,
once signed into law by President Obama, will be the first long-term transportation
authorization legislation (1,300 pages) in the United States to be passed in a decade
since SAFETEA-LU in 2005. More information on the FAST Act can be found on-line. It
is anticipated that the roll-out of the proposed regulations would occur in early 2016.
MPO Workshop on Performance Measures occurred on 12/16/15 in Las Cruces. The
Required Performance Measures (Final Rule May 23, 2016) on the NHS Pavement
24
TC Draft Meeting Minutes
January 13, 2016
Condition, NHS Bridge Condition and Safety were discussed. Overviews were provided
by FHWA-NM and NMDOT on coordinated performance measures and data
requirements. A framework for future discussions on coordination, data and modeling,
plan consistency integration, project selection/evaluation criteria/methodology and
on-going discussions and topics were presented. More information will be discussed
by FMPO staff at the TC meeting.
T/LPA Project Updates
Please provide Tribal Local Planning (TLPA) project updates at each meeting on the
status of your local projects to the FMPO staff so they can continually update the
spreadsheet so local entities, NMDOT District 5, TLPA Coordinator, and the NMDOT
Planner Liaison can work in a concerted effort towards keeping all of the projects on-
track.
Upcoming Meetings/Trainings/Timelines
National Highway Institute Trainings
• Federal-Aid Highways 101 – three two-day sessions scheduled week of 2/22/16 and
2/29/16 in Las Cruces, Albuquerque and Santa Fe. This class is mandatory for all MPO
and RTPO Planners/Planning Program Managers.
• Highway Program Financing –Sessions are scheduled for 3/15/16-3/16/16 in Santa
Fe, 3/29/16-3/30/16 in Albuquerque and 4/5/16-4/6/16 in Las Cruces. If you already
registered, please contact Cecilia Romero, Continuing Education/Workforce
Development Coordinator, Northern NM College, by email at cromero@nnmc.edu or
phone at (575) 581-4117, to change or confirm your registration. This class is
mandatory for all MPO and RTPO Planners/Planning Program Managers
Mr. Degani added that there is preliminary information available on the FAST Act, but
the proposed regulations should be rolled out in April 2016. This will provide more
information about the eligibility of activities and other requirements of the new
legislation and answer the question of whether PL funds can be used for grant writing
purposes.
The MPO workshop on performance measures occurred at the MPO Quarterly in
December. The Final Rule will be made available on May 23, 2016 on the National
Highway (NHS) Pavement Condition, NHS Bridge Condition, and Safety. Mr. Degani
reported that some of this will impact US 64 through Farmington.
The T/LPA project updates provided at each meeting allows MPO Staff to continually
update so all agencies can work in a concerted effort in keeping the projects on track.
The National Highway Institute has two upcoming trainings:
- Federal-Aid Highways 101: Three two-day session the week of 2/22 and
2/29/16 in Las Cruces, Albuquerque, and Santa Fe;
- Highway Program Financing: 3/15-16 in Santa Fe; 3/29-30 in Albuquerque, and;
4/5-6 in Las Cruces.
25
TC Draft Meeting Minutes
January 13, 2016
Mr. Degani asked to be kept in the loop on any issues with District 5 along with Mr.
Brasher. Mr. Degani said he has heard that Mr. Steven Lopez is expected to be the
acting technical support engineer from District 5, but that no final determination has
been made. Mr. Degani said he would make Mr. Brasher and Mr. Lopez aware of the
MPO concerns expressed today.
9. INFORMATION ITEMS
Subject: Information Items
Prepared by: Fran Fillerup, MPO Associate Planner
Date: January 5, 2016
INFORMATION ITEMS
a. Complete Streets Design Guidelines. The Complete Streets draft edits are
now available for review on the MPO website. We need to set a date for a
review of these edits by the Technical Committee’s Complete Streets Sub-
committee.
b. TIP Call for Projects. Staff will send out a Call for Projects for the FFY
2016-2021 TIP Amendment cycle. New projects to be added to the TIP are
due to Staff by February 3.
c. Transportation Acronym List. The MPO has an acronym list on its website
under the heading of MPO Documents. (See www.farmingtonmpo.org.)
Please note other terms which may need to be added.
d. MPO/NMDOT Meeting on Performance Measures. On December 16, 2015,
staff of FHWA, NMDOT and MPOs throughout the state met in Las Cruces to
coordinate performance measurement in the state’s NM Transportation Plan
and MPO MTP’s.
e. Transportation Research Board Annual Conference. MPO staff will be
attending the Transportation Research Board Annual Conference the week
of January 10.
f. Other
DISCUSSION: a. The Complete Streets Design Guidelines draft document has been sent
out for review and is also available on the MPO website.
Mr. Watson said he had recommended a section or information on capacity be added.
Mr. Keck said this had also been a recommendation from Mr. Sypher. Mr. Fillerup said
he did not think that had been included.
26
TC Draft Meeting Minutes
January 13, 2016
Ms. Holton stated that the draft, as well as a later revision that addressed updates to
only Page 27, were provided. MPO Staff would like to know how much time the
Technical Committee members need to review the document before scheduling the
special workshop to discuss the document. Ms. Westerling said Mr. Sypher asked for a
month’s time to review the document before holding the workshop. Ms. Holton said
the MPO would send out a follow-up e-mail in a month to set a date for the workshop.
b. A call for projects will be issued by the MPO for the next quarterly TIP amendment
cycle. February 3 will be the deadline to provide project information to the MPO.
Mr. Fillerup said this was just an amendment to the existing TIP and that Staff would
provide the forms needed with the call for projects e-mail. Ms. Lopez asked about
adding a project to the TIP. The City of Farmington is seeking funding for construction
drawings for the complete streets design for downtown Farmington.
Ms. Westerling said that the February 3 deadline would be difficult to meeting since
projects may need to be delayed. Mr. Watson also asked if the new projects would be
seeking funding and put through the vetting process or would they be added to a wish
list. Mr. Fillerup said the new projects would be scored and then reviewed by the
Technical Committee. Mr. Keck added that he liked the process whereby MPO Staff
would meet with each entity individually and review the potential projects. Mr.
Fillerup said Staff could meet with the entities individually, but they would still ask
them to use the same form as well.
Ms. Westerling asked if this was the only amendment cycle before July. Mr. Fillerup
stated that there would be another amendment cycle in April.
c. The transportation acronym list has been updated and a copy provided to the
Technical Committee members. If additional changes are required please let Staff
know.
d. The discussion at the MPO Quarterly on performance measures related to mainly
three topics: safety (related to injuries and fatalities); NHS pavement condition, and;
NHS bridge condition.
Mr. Fillerup reported that in December, Mr. Sypher had asked for a draft of the
performance measures. Mr. Fillerup said that there is not a draft yet available of what
the performance measures will be. The discussion held at the MPO Quarterly was
preliminary and more information will be forthcoming.
e. Duane Wakan is attending the Transportation Research Board (TRB) conference in
Washington, DC.
f. The next TAP and RTP call for projects is expected this summer with applications
due in August 2016. These two programs will be detailed in one guidebook, but remain
as two separate funding accounts.
27
TC Draft Meeting Minutes
January 13, 2016
10. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
There was no additional business from the Floor.
11. BUSINESS FROM THE FLOOR
Mr. Hathaway reported that San Juan County had passed a new business registration
ordinance. He said that with the county’s volunteer fire department, many volunteers
want to know what is in a business when responding to a fire call. For the safety and
health of the volunteer firefighters, plus the public frequenting the businesses, the
county believed this ruling was necessary.
Mr. Hathaway stated another reason for the ordinance was to ensure businesses were
signed up with the state to operate their business. The county also believed this ruling
was good from an economic development standpoint and that it might add some
credibility to local businesses.
There was no additional business from the Floor.
12. ADJOURNMENT
Mr. Keck adjourned the meeting at 11:00 a.m.
___________________________ ___________________________
Dave Keck, Vice Chair June Markle, Administrative Aide
28