MPO Technical Committee
Regular MeetingFarmington, NM · July 13, 2016
Agenda
MPO TECHNICAL COMMITTEE
AGENDA
July 13, 2016
10:00 a.m.
Commission Chambers
Aztec City Hall
201 West Chaco Street
Aztec, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
July 13, 2016 10:00 AM
This meeting will be held in Commission Chambers at Aztec City Hall, 201 West Chaco Street,
Aztec, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the June 22, 2016 Technical Committee meeting. 10
3. Review the final draft Complete Streets Design Guidelines 1
Presented by: Duane Wakan
4. Receive an update on TAP/RTP Projects 2
Presented by Derrick Garcia
5. Receive a report on the 2016 Spring Traffic Counts 3
Presented by: Derrick Garcia
6. Receive a report on Crash Analysis 7
Presented by: Duane Wakan
7. Receive a TIP Project Update 8
Presented by: Duane Wakan
8. Reports from NMDOT
a. District 5 (Paul Brasher)
b. Planning Division (Robin Elkin)
9. Information Items 9
a. Shiprock Youth Conference
b. FFY2017-2018 UPWP
c. Other
Presented by: Derrick Garcia
10. Business from Chairman, Members, and Staff
11. Business from the Floor
12. Adjournment
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Aide at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Aide if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Planner
Date: June 29, 2016
BACKGROUND or PREVIOUS WORK
Complete Streets are a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Complete Streets Advisory Group (CSAG) on content,
and design guidelines for the FMPO planning area.
The Advisory Group held its last meeting on September 3, 2015 and reviewed
the draft Complete Streets Design Guidelines document.
Technical Committee Workshops were held on February 24, March 16, and April
26 to review and provide edits to the draft Design Guidelines document.
The Technical Committee reviewed the Intersection section on June 22, 2016
and their recommendations have been included.
CURRENT WORK
The revised Intersection section of the Design Guidelines document has been
updated.
Minor revisions to the section on equity now include references to
environmental justice.
ANTICIPATED WORK
Provide final editorial updates per recommendations from the Technical
Committee.
Seek recommended approval by the Technical Committee on July 13 or August
10, 2016.
Seek approval by the Policy Committee on August 24, 2016.
Publish final document and distribute to entities
Create a regional Complete Streets resolution for regional consideration and
adoption.
ATTACHMENTS
The intersection and equity sections will be sent as separate attachments.
INFORMATION ITEM
For Technical Committee review and comments.
1
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: TAP/RTP Projects
Prepared by: Derrick Garcia, MPO Associate Planner
Date: July 6, 2016
BACKGROUND
The MPO issued the call for projects for TAP and RTP funding in FFY2018 and
2019 on May 12, 2016.
All Project Feasibility Forms (PFF) must be received by the MPO by 5:00 p.m. on
July 14, 2016.
A PFF meeting will be scheduled following the July 14 deadline and will include
the sponsoring agency, MPO staff, and NMDOT representatives.
If the project is deemed feasible at this meeting, the sponsoring agency will be
invited to prepare the final application packet that will be due to the MPO in
November 2016 (deadline to be announced later).
All applications must be submitted to NMDOT before November 30, 2016.
The FMPOs Website provides links to other related information, such as the
updated TAP/RTP application, a sample resolution of sponsorship, the Project
Feasibility Form (PFF), and the Project Identification Form (PIF).
Considerations for projects:
o FAST Act, the Federal transportation legislation enacted in December 2015, further
TAP and RTP programs.
o Projects may include pedestrian and bicycle facilities; safe routes to school projects;
infrastructure improvements that provide non-drivers better access to transit;
environmental mitigation; and, other improvements to the transportation system.
o The minimum amount an agency can apply for is $75,000.
o The maximum amount an agency can apply for is $2 Million.
o TAP projects must be consistent with the New Mexico Transportation Plan and the
MPO’s 2040 Metropolitan Transportation Plan (MTP), as well as with other locally
adopted plans.
o Both TAP and RTP are cost reimbursement programs, which require a 14.56% local
match.
CURRENT WORK
PFFs must be submitted to the MPO by July 14, 2016 at 5:00 p.m.
PFF meeting will be scheduled following the July 14 deadline.
ANTICIPATED WORK
Present projects deemed feasible following the PFF meeting.
Those projects deemed feasible will need to prepare the final application
packet.
INFORMATION ITEM
This item is presented for information purposes only.
2
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: 2016 Spring Traffic Counts
Prepared by: Derrick Garcia, MPO Associate Planner
Date: July 13, 2016
BACKGROUND
The MPO maintains traffic counts for over 220 locations throughout the MPO
area.
Locations are counted according to a three-year cycle and change periodically.
Staff split the administration of the annual traffic count calendar into spring
and fall iterations which began 2013.
NMDOT Traffic Count Division has asked the FMPO to count an additional 15
locations which have been spread out over the spring and fall schedule.
CURRENT WORK
The MPO scheduled 47 weekday volume counts (~21 Speed & Class) to take
place on the week of April 25th.
The consultant team is contracted to conduct traffic counts in the Fall of 2016.
Aggregating data for trend analysis.
Interactive traffic count map now available on FMPO website.
(www.fmtn.org/375/MPO-Traffic-Counts)
ANTICIPATED WORK
Working on scheduling fall 2016 counts.
Work flow development with consultants.
Traffic count data mapping and analysis.
INFORMATION ITEM
Staff will present a report on the 2016 Spring Weekday Traffic Counts.
3
SITE ON_ROAD FROM TO FUNCTIONAL Area Class 2012 2013 2014 2015 2016
AZ_124 Oliver/NM 282 NM 516 Aztec Airport Collector Aztec 681 - - - 930
AZ_220 NM 516 Chaco St US 550 Principal Arterial Aztec Y 18,535 - - - 19,192
BL_155 US 550 Sullivan Rd US 64 Principal Arterial Bloomfield Y 11,327 12,657 13,879 14,136 7,952
BL_156 US 550 US 64 W Blanco Blvd Principal Arterial Bloomfield 11,918 - - - 11,461
BL_157 US 550 W Blanco Blvd CR 4900 Principal Arterial Bloomfield 11,292 - - - 10,971
BL_176 US 64/Broadway US 550 S US 550 N (First St) Principal Arterial Bloomfield 18,211 - - - 17,809
FM_112 NM 516 Morningstar E Main St Principal Arterial Farmington Y 22,798 22,965 23,977 24,423 24,089
FM_113 NM 516 Main St 20th Principal Arterial Farmington Y 37,487 - - - 32,272
FM_114 NM 516 20th 30th Principal Arterial Farmington 39,698 - - - 38,092
FM_128 Pinon Hills Blvd Butler College Principal Arterial Farmington Y 17,676 - 15,540 - 14,535
FM_13 30th Sullivan Hutton Minor Arterial Farmington Y 15,402 - - - 14,916
FM_133 Pinon St Orchard S Miller Minor Arterial Farmington 7,540 - - - 7,796
FM_134 Pinon St Miller US 64/Broadway Minor Arterial Farmington Y 7,826 - - - 6,511
FM_14 30th College NM 516/E Main St Minor Arterial Farmington 13,396 - - 12,982 12,581
FM_140 San Juan Blvd Scott Main St Minor Arterial Farmington Y 13,625 - - - 13,073
FM_142 Sandstone US 64 So Side River Rd Collector Farmington 1,062 - - - 850
FM_143 Scott US64/Broadway San Juan Blvd Minor Arterial Farmington Y 14,941 - - - 13,460
FM_144 Scott San Juan Blvd Main St Minor Arterial Farmington 5,216 - - - 4,527
FM_145 So Side River Rd US 64/Broadway Sandstone Minor Arterial Farmington Y 6,674 - - - 6,484
FM_146 So Side River Rd Sandstone NM 516/Browning Minor Arterial Farmington 8,142 - - - 7,801
4
FM_147 Sullivan Main St 15th Minor Arterial Farmington Y 5,968 - - - 6,160
FM_167 US 64/Broadway Murray Dr/NM 5001 W Main St Principal Arterial Farmington 18,000 - - - 20,463
FM_168 US 64/Broadway W Main St Butler/Pinon St Principal Arterial Farmington Y 13,702 - - 13,020 13,092
FM_170 US 64/Broadway Scott Murray Dr/NM 5001 Principal Arterial Farmington 21,316 20,261 20,942 14,174 20,148
FM_171 US 64/Broadway Murray Dr/NM 5001 Browning Pkwy Principal Arterial Farmington Y 19,902 - - - 19,218
FM_18 Airport Apache Municipal Minor Arterial Farmington Y 6,446 - - - 6,132
FM_183 Wildflower Mesa Dr Wildflower Pkwy Mesa View Jr High Collector Farmington Y 3,217 - - - 2,985
FM_184 Wildflower Pkwy NM 516/Browning Wildflower Mesa Dr Minor Arterial Farmington Y - - 10,660 - 10,443
FM_185 Wildflower Pkwy Wildflower Mesa Dr Andrea Dr Minor Arterial Farmington - 2,977 6,593 - 6,098
FM_188 30th Hutton College Blvd Minor Arterial Farmington Y 16,350 - - - 9,945
FM_190 Behrend Main St Apache Collector Farmington 1,186 - - - 1,022
FM_191 College Blvd 30th Windsor Minor Arterial Farmington Y 11,486 - 10,969 - 12,012
FM_192 College Blvd Pinon Hills Blvd Piedra Vista HS Entrance Collector Farmington 6,207 - - - 5,405
FM_193 College Blvd Piedra Vista HS Entrance Sandalwood Collector Farmington 3,929 - - - 3,206
FM_194 CR 3000 Browning Pkwy CR 3950 Minor Arterial Farmington 3,594 - - - 3,490
FM_206 Dustin 20th 30th Minor Arterial Farmington 7,579 - - - 5,957
FM_207 Dustin 30th 38th Minor Arterial Farmington 2,739 - - - 2,781
FM_224 Butler 30th Carlton Ave Minor Arterial Farmington 14,990 - - - 14,375
FM_226 Butler Sunrise Pkwy Pinon Hills Blvd Minor Arterial Farmington 9,306 - - - 8,519
FM_229 Miller Pinon St US 64/Broadway Collector Farmington - - - - 3,763
FM_7 24th Glade Sunset Collector Farmington - - -
5
276 321
FM_70 Gila St NM 516/E Main St English Collector Farmington 1,360 - - - 1,333
FM_79 Largo St NM 516/E Main St English Collector Farmington Y - - 4,698 - 4,253
FM_83 Main St US 64/Broadway Airport Principal Arterial Farmington - - 9,406 - 9,727
FM_84 Main St Airport Lake St Principal Arterial Farmington - 10,186 11,018 - 10,844
FM_96 Miller Murray Pinon St Collector Farmington Y 4,522 4,364 - 4,532 4,424
SJ_111 NM 371 Old Fruitland Hwy/NR 36 Murray Dr/NM 5001 Minor Arterial County Y 16,203 - 17,595 15,971 15,674
6
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Crash Analysis
Prepared by: Duane Wakan, MPO Planner
Date: July 7, 2016
BACKGROUND OR PREVIOUS WORK
The MPO needs to develop a Safety Plan for use in evaluating needs and
targeting safety related projects throughout the MPO area.
Staff was able to get access to 2013 and 2014 crash data sets provided from the
University of New Mexico Crash and Safety Division via the State of New Mexico
DOT.
Staff now has aggregated five years of crash data (2010-2014) which will be
much richer and useful when applying for Highway Safety Improvement
Program funds.
More recent crash data sets lack apple to apple details and require geo-coding
work in order to be consistent with data sets provided by NMDOT.
CURRENT WORK
Update a series of crash data maps for the MPO planning area as well as for
each entity within the MPO from 2010-2014.
Using GIS mapping techniques staff is creating hot spot maps for vehicular and
pedestrian hazard areas.
Staff is working on before/after studies on US 64 using access management
controls as designed and constructed in the City of Bloomfield as a case study
for the Access Management Plan (AMP).
Integrate historic crash data with the MPOs travel demand model (Bob Shull).
ANTICIPATED WORK
Integrate maps and narratives in the MPOs safety plan.
Work with E-911 on data collection and methodological approaches to improve
the efficiency and accuracy of crash data throughout SJ County.
ATTACHMENTS
A PowerPoint will be presented at the meeting illustrating the analysis
techniques and results from the data provided by NMDOT.
INFORMATION ITEM
This is an informational item requesting feedback from the Technical
Committee members.
7
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: July 6, 2016
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP. These monthly reviews help correct inconsistencies in the TIP,
STIP, the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle begins in April 2016.
NMDOT has requested a change for F100112 which will require a TIP
amendment.
NMDOT has issued a call for TAP/RTP projects. Click a link to the guidelines-
http://dot.state.nm.us/content/dam/nmdot/planning/FFY18-19_TAP-
RTP_Guide.pdf
TRACKING INFORMATION (2016-2021 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II- Meeting results with NMDOT ROW and
Environmental Division- New mapping- Land-Fill issue updates?
o Pinon Hills Boulevard Bridge Phases I & II
Surface Transportation Program Funds (STP)- funds can be used to repair
structurally deficient bridges.
Projects being specified in the 2040 MTP and added to the TIP require scoring
committee review
o One TC member, one PC member and MPO Staff
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
8
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #9
Subject: Information Items
Prepared by: Derrick Garcia, MPO Associate Planner
Date: July 5, 2016
INFORMATION ITEMS
a. Shiprock Youth Conference. Staff participated in the Shiprock Youth
Conference on June 29, 2016 and had adults and children design Complete
Streets concepts.
b. FFY2017-2018 UPWP. The budget tables for 2017 and 2018 have been
adjusted slightly to reflect distribution formulas agreed upon by NMDOT and
the MPOs.
c. Other.
9
Draft TC Minutes
June 22, 2016
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
June 22, 2016
Technical Members Present: Teresa Brevik, City of Bloomfield
Cindy Lopez, City of Farmington
David Sypher, City of Farmington
Paul Brasher, NMDOT District 5
Andrew Montoya, Red Apple Transit
Fran Fillerup, San Juan County
Technical Members Absent: Bill Watson, City of Aztec
Staff Present: Mary Holton, MPO Officer
Duane Wakan, MPO Planner
Derrick Garcia, MPO Associate Planner
June Markle, MPO Administrative Aide
Staff Absent: None
Others Present: Jason Thomas, City of Bloomfield
Steven Saavedra, City of Farmington
Mary Gardocki, PRCA, City of Farmington
Terri Kennedy, Citizen & Place Matters
Representative
Robin Elkin, Planning Liaison, NMDOT
Larry Hathaway, Policy Committee Alternate, San
Juan County
1. CALL TO ORDER
Mr. Fillerup called the meeting to order at 10:03 a.m.
2. APPROVE THE MINUTES FROM THE MAY 11, 2016 TECHNICAL COMMITTEE
MEETING
Ms. Lopez moved to approve the minutes from the May 11, 2016 Technical Committee
meeting. Ms. Brevik seconded the motion. The motion was passed unanimously.
The new MPO Associate Planner, Derrick Garcia, was introduced. Mr. Garcia earned his
Master degree in Community & Regional Planning and was working for Texas DOT prior
to accepting the FMPO Associate Planner position.
Also introduced was the new Technical Committee member for the City of Bloomfield,
Jason Thomas. Mr. Thomas is their City Engineer & Public Works Director and will be
taking over the seat being vacated by Teresa Brevik. Ms. Brevik has taken a position
with the New Mexico Rural Water Association.
10
Draft TC Minutes
June 22, 2016
3. FFY2017-2018 UNIFIED PLANNING WORK PROGRAM
Subject: FFY2017-2018 Unified Planning Work Program
Prepared by: Duane Wakan, MPO Planner
Date: June 14, 2015
BACKGROUND
The Unified Planning Work Program (UPWP) is the fiscal year work plan for the
MPO.
The FFY2017-2018 UPWP will cover planning activities and work products to be
completed from October 1, 2016 to September 30, 2018.
Based on the Planning Procedures Manual (PPM), the MPO needs to provide a draft
UPWP to NMDOT in April with final approval in June.
Review the final draft of the FFY2017-2018 Unified Planning Work Program.
CURRENT WORK
Annual activities will include reporting and budgeting, the traffic count program,
TIP maintenance, GIS activities, and Safe Routes to School activities, transit data
collection and mapping.
Major activities will include land-use and transportation scenario planning, transit
studies, travel demand modeling updates, and completion of the safety plan.
Staff estimates base federal PL funds of $207,125 and base federal 5303 funds of
$57,119 for both FFY2017 and FFY2018.
Staff consolidated sections and deleted several sections based on
recommendations from the Technical Committee.
The boilerplate is used by all the MPOs in the state.
Consider recommending approval of the FFY2017-2018 UPWP to the Policy
Committee.
ACTION ITEM
It is recommended that the Technical Committee consider recommending
approval of the FFY2017-2018 UPWP.
DISCUSSION: Mr. Wakan presented the final draft of the FFY2017-2018 Unified
Planning Work Program (UPWP). The UPWP is the work plan for the MPO. By law the
MPO must document the work activities they plan to perform during the time frame of
the UPWP and prepare a budget for those activities.
Mr. Wakan reported that following the Technical Committee meeting in May, members
provided their comments and the draft document was updated with those changes.
Based on advice provided by NMDOT, the UPWP was consolidated and, where possible,
tasks were combined.
Task 3 – General Development and Data Collection/Analysis
This section had listed a host of different data that is collected: Safe Routes to School,
transit, crash data, some performance measures, population/employment, as well as
11
Draft TC Minutes
June 22, 2016
some demographic basis collected on an ongoing basis. These were consolidated into a
new activity #3.6 that will encompass all the data collection activities.
Mr. Wakan said that Staff also looked at tasks that were irrelevant for the next two
years:
Highway Functional Classification Review & Update
This task is worked on with NMDOT once every ten years and this does not need to be
included in this new UPWP.
Intelligent Transportation Systems (ITS) Planning
The ITS Plan was updated last year with the assistance of a consultant. This will not be
done as a major planning activity over the next two years. NMDOT did want some
reference to ITS, so some language has been added to Task 2 under the TIP.
Access Management Plan (AMP)
Mr. Wakan said there had been no indication from the entities that this needed to be
updated. The turning standards in the Plan are current for the regional priorities.
Mr. Sypher said that the draft UPWP showed the MPO reviewing the access
management plan over the next two years and he thought this would be a good
activity. Mr. Wakan explained that the access management plan has been in the UPWP
for several years. The AMP was produced by the MPO and adopted in 2009. The
entities can reference the document, but do not have to adopt the plan.
Ms. Holton provided some background on the AMP. The plan was presented to each of
the entities with some success. There was initial success with the City of Farmington
until a developer protested the plan and the City Council then rejected the plan. The
previous Assistant City Manager thought that Staff should bring back the plan for
revisions and then presentations to the entities for adoption consideration.
Mr. Sypher asked if any entity had ever adopted the plan. Ms. Holton said MPO records
would need to be reviewed to see what the outcomes had been. It was found that they
only entity not to adopt the plan was the City of Farmington. Mr. Sypher thought that
there would have been discussions and feedback when the AMP was first presented
which would have resulted in changes and compromises. From that he thought the
process would have been completed and a plan presented that would have encouraged
the entities to adopt the plan. Ms. Holton said the process had been modeled from the
“top down” and no consensus had been built. Mr. Sypher stated that an access
management plan is a basic and fundamental plan and thought it was important to
keep in the UPWP and finalize the process.
Mr. Fillerup said the AMP had been adopted by San Juan County. He agreed that
keeping the access management plan as an activity in the new UPWP was appropriate.
He thought it was important to find what the points of contention were and then bring
it up to date. Ms. Holton said that MPO Staff had done a lot of work on the AMP and
taking it to the entities’ councils/commissions for consideration and minutes on those
meetings should be available at the MPO office. She recommended that perhaps a sub-
committee could review the AMP and then bring back their findings to the entire
Technical Committee.
12
Draft TC Minutes
June 22, 2016
There was no further discussion on this item. It will be kept as a task in the FFY2017-
2018 UPWP.
Special Studies & Activities
- Storm Water Management – FAST Act guidelines are not specific on the
allowable tasks. Staff needs to become more knowledgeable about storm water
issues and future goals and plans could be more specific.
Mr. Sypher stated that the regional group, MS4 Committee, is already addressing storm
water management issues and thought it would be a duplication of effort for the MPO
to take on this task. Ms. Brevik said the MPO could be at the table to offer comments
and suggestions.
Mr. Elkin said this is referenced in the FAST Act, but there was no specific storm water
management planning tasks detailed in the Act. There are many regional differences
in the MPOs, locations, and geographic issues, but a regional approach to the issue
could be considered and he thought it was important for the MPO to be at the table
and participate in discussions. Mr. Elkin noted that complete streets are part of the
storm water system. Work on this would have to be a transportation planning process
and could not involve elements of work outside of the street elements. Mr. Fillerup
added that keeping this in the UPWP would not have the MPO leading a regional group
as this has already been organized and the best management practices identified.
The Technical Committee discussed this further:
• Encourage MPO Staff to join the MS4 discussion and provide input;
• Including storm water management as part of the UPWP is a duplication of
effort. All the aspects are already addressed with work being done by MS4;
• MPO is already inundated with activities and Staff time and effort should not be
spent on storm water management when this is already being done on a
regional level elsewhere;
• Spending Planning funds on storm water management planning is not well
defined;
• Implementation of complete streets aesthetics guidelines could be implements
with establishing storm water practices;
• Reference MS4’s best practices; MPO can help coordinate opportunities and
projects early in the process and begin accomplishing complete streets goals of
aesthetics;
• Since this activity is already in progress, note that these studies/activities are
already actively being addressed regionally and the MPO will be sitting at the
table and participating in discussions;
• Add phrase: “pending FHWA direction and not duplicating efforts of others
already addressing storm water management”. The UPWP could be amended
based on the direction provided by FHWA.
Travel & Tourism
Staff has periodically been asked to participate in the regional branding campaigns.
This task will be done, as needed, by providing visuals that will help the campaign to
stimulate tourism.
13
Draft TC Minutes
June 22, 2016
Regional Models of Cooperation
FHWA has requested that all MPOs include language to this work activity. MPO Staff
has currently undertaken some of this already in working with Shiprock and in other
parts of the county.
Mr. Sypher said these offered resources were a great service to the community. He
asked if there were tools that could augment this task and help Staff improve what is
offered, or additional areas that Staff would like to work on. Mr. Wakan commented
that Staff would continue to look at activities outside the MPO boundary area that deal
with regional planning activities for trail connections, transportation facilities that
need upgraded, or transit system improvements. Mr. Wakan noted that the TIGER
grants are designed for multi-modal projects that bridge or connect the region
together which would otherwise not be possible under TAP/RTP or other State or
Federal programs. These types of regional projects can be sought after and Staff can
work to coordinate these with the entities.
Mr. Wakan also said that NMDOT also had some recommendations that have already
been incorporated into the document:
- Add wording to in the travel demand model maintenance to coordinate with
NMDOT’s statewide model;
- Add wording to the regional safety plan development to include NMDOT in a
complete scope of work specifically on state facilities;
- Public health as listed in Task 5 -Special Studies & Activities to reference
specific goals identified in the MTP.
Mr. Fillerup opened the public hearing. There were no public comments received.
The public hearing was closed.
ACTION: Ms. Lopez moved to recommend approval of the FFY2017-2018 Unified
Planning Work Program (UPWP) with amendments discussed during the meeting. Mr.
Sypher seconded the motion. The motion was passed unanimously.
4. COMPLETE STREETS
Subject: Complete Streets
Prepared by: Duane Wakan, MPO Planner
Date: June 14, 2016
BACKGROUND or PREVIOUS WORK
Complete Streets are a means of designing a roadway so that it accommodates
all modes of travel, including driving, walking, biking, and transit.
Staff has worked with the Complete Streets Advisory Group (CSAG) on content,
and design guidelines for the FMPO planning area.
The Advisory Group held its last meeting on September 3, 2015 and reviewed
14
Draft TC Minutes
June 22, 2016
the draft Complete Streets Design Guidelines document.
Staff made editorial revisions based on input from CSAG members. Works cited
and minor grammatical errors will be corrected or updated on an ongoing basis.
A Technical Committee Workshop was held on February 24, March 16, and April
26 to review and provide edits to the draft Design Guidelines document.
CURRENT WORK
Complete the Technical Committee review of the Intersection section of the
Design Guidelines document at the June 22 meeting.
INFORMATION ITEM
Complete the review of the draft Design Guidelines document.
DISCUSSION: Mr. Wakan stated that all the comments provided have been
incorporated into this second draft of the Intersection chapter. The Technical
Committee reviewed the document:
Page 1 - Intersections
Add the words “multi-modal” to the heading since the emphasis is on pedestrians and
bicyclists.
The last sentence on this page is awkward; consider rewording to read. …”a few of the
many possibilities being applied across the country and being proposed for this
regional application”.
Page 2 - Pedestrians
The Technical Committee discussed the two schools of thought regarding corner radii
(shown in the 3rd paragraph): it radii is large, vehicles tend to go faster around the
corner; if radii too short, vehicles clip the corner and ADA ramps are impacted.
Additional discussion included:
- Use of compound curve;
- Size of intersection impacts the platting of corner lots;
- Consider dedicating right-of-way when corner lots platted so do not have to go
back later and acquire the needed intersection right-of-way;
- Avoid too much detail in this section; need to be more general in language and
do not make specific recommendations;
- Impact of smaller radii on larger vehicles: trucks/RVs/fire vehicles/buses;
- The ranges shown in the paragraph were quoted from National Association of
City Transportation Officials (NACTO);
- These are guidelines – delete the specifics, let the designers do what is
needed, but tell them what the safety concerns are and what is expected;
- Delete the last 2 sentences in this paragraph;
- Delete the intersection picture from NACTO as well for clarification.
15
Draft TC Minutes
June 22, 2016
Page 3 – Cyclists
- Add the word “bicycle” to the last sentence of the 2nd paragraph): “These have
proven to reduce “bicycle” accidents by 10% and injuries by 19% (2).”
- This sentence is a cited quote and, as such, it needs to be accurate. The
reduction of 10% in accidents was implied for all modes and not just bicycles.
This needs to be verified before the meaning is altered;
- Change it to say “involving bicycles”;
- Consider saying, “in one study”;
- Confirm the intent of the statement.
Page 4- Vehicles
- 1st paragraph: several times in this one paragraph refer to “ pedestrian safety”;
consider rewriting;
- 2nd paragraph, 2nd second: “The design vehicle helps determines the size and
scale of the intersection.” Delete the “s” on “determine”;
Conclusions
- 3rd sentence: “Where possible, the intersection should be designed for the most
vulnerable street user rather…”; the street is not designed for one mode or
group over another, it is designed for all modes. Delete the sentence.
- The last sentence in the paragraph clarifies that the design is for all modes.
Mr. Fillerup asked Staff to make Bill Watson aware of the changes made to this section
today especially those that address his comments/revisions provided in an earlier e-
mail to all. Additionally that the revisions discussed today will become part of the
final draft of the Design Guidelines that will be reviewed at the July Technical
Committee meeting.
ACTION: The review was completed.
5. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: Duane Wakan, MPO Planner
Date: June 15, 2016
BACKGROUND
The STIP Protocols, finalized in early 2014, indicate that each MPO shall develop
a process to monitor the progress and status of each project in the first two
years of the TIP. These monthly reviews help correct inconsistencies in the TIP,
STIP, the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next scheduled TIP Amendment cycle begins in April 2016.
NMDOT has requested a change for F100112 which will require a TIP
amendment.
16
Draft TC Minutes
June 22, 2016
NMDOT has issued a call for TAP/RTP projects. Click a link to the guidelines-
http://dot.state.nm.us/content/dam/nmdot/planning/FFY18-19_TAP-
RTP_Guide.pdf
TRACKING INFORMATION (2016-2021 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90% - Deadlines -
Environmental Certification 1) June 15 Obligation deadline
Utilities Certification - Design- T/LPA agreement
Railroad Certification - Construction- 9 Day Letter
Archeology Certification
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II- Meeting results with NMDOT ROW and
Environmental Division- New mapping- Land-Fill issue updates?
o Pinon Hills Boulevard Bridge Phases I & II
o CR 350-390 intersection HSIP ROW issues with TCPs
Red Apple Transit Bus Route Accessibility TAP project TF00010
o NMDOT FTA Transfer approved
o Design and engineering plans went through RFQ, TIP Modification to
move some construction funds to PE.
Vereda de Rio San Juan Trails phases II & III- GRT Declines
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity
to provide feedback regarding TIP project status and details.
DISCUSSION: Mr. Wakan reported that TIP modifications will be forthcoming from San
Juan County and Red Apple Transit requesting to move their project funding from one
year to another.
Pinon Hills Boulevard – Phase II
Mr. Sypher said that he wanted to discuss some ongoing issues with this project with
Mr. Brasher before discussing the particulars, but he did state that NMDOT had made a
proposal to City of Farmington to look at phasing Phase II of the Pinon Hills Boulevard
project and how that might be done. The City of Farmington acted on this proposal
and provided a resolution that was approved by City Council. Mr. Sypher said it was
mentioned that perhaps the City should have gotten an Agreement Request Form (ARF)
from NMDOT, but NMDOT does not provide contracts until all the plans are done. The
City of Farmington has not been able to get several contracts and the entire process
has been long and protracted.
17
Draft TC Minutes
June 22, 2016
East Arterial Route
Mr. Watson was not in attendance to provide an update to Phase II of the East Arterial
Route project. Mr. Wakan said there were issues with an expanded right-of-way that
was encroaching on an old landfill. Mr. Brasher said the project design has had some
snags and there is a meeting this afternoon to discuss the design in more detail, what
to do about the landfill, and how to dedicate the right-of-way.
CR 350/CR 390 Intersection
There will be a TIP modification completed for this project.
Red Apple Transit
There will be a TIP modification completed for this project.
Vereda de Rio San Juan Trail
The gross receipts tax (GRT) for the City of Bloomfield are on the decline and the city
will be unable to provide the required local match for this project. The City of
Bloomfield has made an arrangement with NMDOT to suspend any construction. Ms.
Brevik stated that they did receive the PIF letter and all the project certifications
were approved.
Mr. Wakan said this meeting between NMDOT and the City of Bloomfield provided
some new information. If an entity needs additional TAP funds to complete a project,
they can always ask for that additional funding. Tamara Haas, the Asset Management
& Planning Division Director, stated that this opportunity is available because from
time to time extra funds do become available. Case in point is the recent decision by
the City of Bloomfield not to proceed with the Vereda de Rio project.
Mr. Sypher said the City of Farmington will be requesting amendments during the fall
amendment cycle for the Foothills project and also for Phase III of the 20th Street
project to get them included onto the TIP. Ms. Holton added that these projects would
also need to be listed in the MPO’s Metropolitan Transportation Plan (MTP) which
could also necessitate an amendment to the MTP.
ACTION: The report was received.
6. REPORTS FROM NMDOT
Paul Brasher – District 5
Mr. Brasher reported on the following projects:
• US 64 construction is continuing and is on schedule. He said that although
complaints have arisen during the construction phases (detours and driveway
access difficulties), NMDOT has received favorable comments on the increased
width of the roadway as the phases are completed;
• Emphasis in the coming years will be on pavement preservation:
o NM 170 near the Colorado border. The road will likely not be widened,
but there is expected increased truck traffic using the road to come into
Farmington;
18
Draft TC Minutes
June 22, 2016
o US 550 between Aztec and Colorado boarder. Two-lane stretch in
Colorado that they plan to widen which would increase truck traffic on
the New Mexico road sections and require some additional maintenance
on those sections;
• Bridge on US 550 approaching Bloomfield (along with others in the region) that
will undergo preservation work;
• Reconstruction of the La Plata Bridge on CR 564 is expected to go to
construction in late 2017 or early 2018. NMDOT is currently working on the
design and right-of-way issues, as well as the expected detour difficulties once
construction begins.
Mr. Wakan said he had been fielding numerous calls from the attorney for the
Northern Edge Casino regarding the planned intersection work on NM 371 and N 36. Mr.
Brasher said he has spoken with several people on this project. The difficulty with this
project is a lighting agreement. NMDOT has no global lighting agreement so whenever
a project like this is planned a new lighting agreement has to be generated. NMDOT is
awaiting the project review and approval from the Navajo Nation’s justice
department.
Robin Elkin – Planning Division
Mr. Elkin asked if the storm water management group, MS4, dealt only within the City
of Farmington limits. Mr. Sypher said this was a regional compact required by EPA. Mr.
Elkin said that if this group generally covered the same region as the MPO, was there
still actual work that could be done by MPO staff or could they provide additional
ability to implement projects. This capacity could be useful. Mr. Sypher asked if there
was a separate stream of funding for this type of work or would it be in competition
with the other transportation funding needs. Mr. Elkin said this was correct.
Mr. Fillerup said that Steven Morgenstern is the NMDOT state representative who has
been contacting the MS4 permittees in this area.
7. INFORMATION ITEMS
Subject: Information Items
Prepared by: Duane Wakan, MPO Planner
Date: June 15, 2016
(INFORMATION ITEMS
a. MPO Quarterly. The Farmington MPO hosted the MPO Quarterly on June 13
and 14.
b. TAP & RTP. All relevant information regarding the FFY2018 & 2019 TAP &
RTP programs is available on the MPO website:
http://www.fmtn.org/363/Farmington-Metropolitan-Planning-Organiz
19
Draft TC Minutes
June 22, 2016
c. 30th Street & Hutton Pedestrian Boulevard. Presentation by Anngela
Wakan, Safe Routes to School Coordinator.
d. Other
DISCUSSION: a. Mr. Wakan reported that the FMPO had hosted the MPO quarterly on
June 13 and 14. During the first half-day, the group took a tour along US 64 and on US
550. They looked at one of the new intersections along US 64 that no one cared to
walk due to safety concerns.
Several other intersections presented design flaws that make the intersection difficult
for pedestrians to navigate or provided no refuge islands or ones that were impossible
to navigate in a wheelchair.
Mr. Maurice Williams with UNM’s Center for Injury Prevention Research & Education
(CIPRE) also participated in the tour. The Center does pedestrian and bicycle safety
awareness campaigns and was responsible for NMDOT’s “Look For Me” campaign. Mr.
Williams came up with some ideas for Bloomfield and Staff plans to meet with him
again in the future.
Day two of the MPO Quarterly saw presentations from NMDOT and the MPOs. Mr.
Anthony Lujan participated in this meeting as well as numerous other NMDOT
representatives.
b. Information regarding the FFY2018-2019 TAP/RTP programs is posted on the MPO
website.
c. Mrs. Anngela Wakan, the Safe Routes to School Coordinator (SRTS), gave a
presentation on a proposed pedestrian boulevard along 30th Streets. The following is a
summary of her presentation (see visual below):
- Possible TAP project; will need to meet July deadline to apply; ask City of
Farmington to consider making application for this project;
- 8/80 city – if it works for an eight-year old and it works for an eighty-year old,
it will work for everyone in between. Would like to make Farmington an 8/80
city; encourage other cities to consider changes for their community;
- Walking and biking are the only individual mode of mobility for youth;
additional health aspects for all;
- Need physical separation of pedestrians/bicycles from vehicles;
- Proposing to start pedestrian boulevard with the use of paint and bollards;
- Impatiens (something done quickly and inexpensively to show progress and
what can be achieved) vs. orchids (long-term, more expensive changes);
- Take outside lanes of 30th Street from Sunset to Hutton (and then down Hutton
to Main Street) and turn them into a bike/ped facility; roughly three miles;
- Roads are public and not just meant for vehicles; need to be creative in how
roadways are used;
- Average daily peak traffic count in single-lane sections of 30th Street is 16,000
vehicles; one lane roads can easily handle 18,000-25,000 cars per day; other
vehicle travel options are Pinon Hills Boulevard, 20th Street, and Main Street;
20
Draft TC Minutes
June 22, 2016
- Offer connections for seven local schools (Farmington has 16 total schools) plus
could eventually connect with parks, library, aquatic center, recreation center,
Boys & Girls Club, baseball/soccer fields, and be designed in a way to access
the downtown area;
- Add specialized crosswalk on 30th Street between Knudsen and Carlton;
- Eventually take the pedestrian boulevard down Hutton to address equity issues
and help balance low income neighborhoods near Animas Elementary and
Heights Jr. High;
- Possibly consider secondary future phases to expand down Dustin and Sullivan
Avenues;
- San Juan County Partnership is planning to hire a county-wide SRTS coordinator
who could help with these types of designs for Aztec and Bloomfield.
Mrs. Wakan said that she has also identified some pedestrian safety projects that she
asked to be considered for possible 2018 TAP funding:
- Speed Indicator Flashing Beacons
- Pedestrian Activated Flashing Beacons
- Sidewalks
- Crosswalks
- Bollards for secondary phases of Pedestrian Boulevard
There are two school zone flashing beacons missing for Bluffview Elementary and along
20th Street near Hutton Avenue for Animas Elementary.
Mrs. Wakan also noted where some solar-powered pedestrian activated flashing
beacons ($8,000 each) could be used because there is no (or absent) crossing guard
that would assist pedestrians to cross busy streets:
• Butler: McKinley Elementary crosswalk
• Dustin: McKinley Elementary crosswalk
• Apache: Apache Elementary crosswalk
21
Draft TC Minutes
June 22, 2016
• 30th Street: Between Knudsen and Carlton (see below) crosswalk for Hermosa
and Northeast
• Sullivan and Cliffside
• Hutton and Cliffside (see new crosswalk)
• Veterans Park: Cross Butler (see new crosswalk section)
• Foothills: Country Club crosswalk
• Sunset: FHS crosswalk
Missing sidewalk sections:
• 30th Street between Butler and Knudsen
• 30th Street on northwest corner of Sullivan
• East side of Hutton between 20th and 30th Streets
Proposed new areas for crosswalks:
• Special paint or treat crosswalk and move from 30th Street and Knudsen to
between Knudsen and Carlton
• Across Butler near North Carlton: connects bus line and Veterans Park
• Across Hutton near Cliffside
In conclusion, Mrs. Wakan said she would like to encourage making Farmington a place
for everyone and also encouraged Aztec and Bloomfield to consider similar changes
and improvements to their communities.
Mr. Sypher complimented Mrs. Wakan’s research and for providing some good options.
He asked to meet with her to get her list of proposed crosswalk areas so that the
Traffic Division can get a study started to see if crosswalks are indeed warranted.
Mr. Sypher asked if there was adequate existing asphalt width on the proposed future
pedestrian boulevard routes. Mrs. Wakan said there was for sure on 20th, 30th, and
Sullivan because all were currently four lanes wide. She said she had not measured
Dustin.
Mr. Sypher asked for clarification that the school district was eligible to submit a TAP
application. Mr. Wakan said they are aware that they can request a grant, but actually
writing the grant request has not been discussed. Mr. Sypher recommended speaking
with Corey Styron to get the name of a school district employee who might be more
receptive to the idea than the maintenance supervisor, Ted Lasiewicz.
Mrs. Wakan said she spoke with Councilor Duckett who is in favor of the proposal and
suggested she also speak with the MPO Technical Committee and representatives of
PRCA. Mrs. Wakan also spoke with the Farmington High School principal who is also in
favor of the proposal. Mr. Sypher thought this was a great beginning, but was
concerned with mixing bikes and pedestrians along one path. He said as long as the
traffic volumes are low and the proposed changes are low cost, he thought the
proposal would receive good feedback.
Mr. Sypher stated that the flashing school zone signs were very effective and
recommended getting the school district interested in applying for grants, the city
would maintain them once they were initially installed.
22
Draft TC Minutes
June 22, 2016
Mr. Brasher asked Mrs. Wakan if she had spoken with law enforcement and included
them in the discussion since they provide a unique take on traffic control. Mrs. Wakan
said that Officer Paquin, one of the School Resource Officers (SRO) has been involved
in the conversation.
Mr. Hathaway recommended that Mrs. Wakan add the word “stay” in her presentation:
“Together we can make Farmington a great place to live, work and play for all of its
citizens.” By adding the word “stay” this presentation will tie into the City of
Farmington’s branding initiative.
8. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Mr. Fillerup reported that Mayor Duncan of Kirtland wanted to express his appreciation
to District 5 for the attention they gave to the ponding issue Kirtland was experiencing
along US 64 and CR 6500. The re-grading done by District 5 directed and moved the
standing water to where it needed to go.
Ms. Brevik announced that today was her last day with the City of Bloomfield. Mr.
Jason Thomas will be her replacement on the Technical Committee. Everyone wished
her well in her new position and thanked her for her contribution to the Technical
Committee.
There was no additional business from the Chairman, Members and Staff.
9. BUSINESS FROM THE FLOOR
There was no business from the Floor.
10. ADJOURNMENT
Ms. Lopez moved to adjourn the meeting. Mr. Sypher seconded the motion. Mr.
Fillerup adjourned the meeting at 12:10 p.m.
___________________________ ___________________________
Fran Fillerup, Chair June Markle, MPO Administrative Aide
23
Get email alerts for Farmington
A daily email when new agendas and minutes are posted.