MPO Technical Committee
Regular MeetingFarmington, NM · July 11, 2018
Agenda
MPO TECHNICAL COMMITTEE
AGENDA
July 11, 2018
10:00 a.m.
Council Chambers
Bloomfield City Hall
915 North First Street
Bloomfield, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
July 11, 2018 10:00 AM
This regular meeting will be held in Council Chambers in Bloomfield City Hall, 915 North First
Street, Bloomfield, New Mexico.
ITEM PAGE
1. Call meeting to order
2. Approve the minutes from the June 13, 2018 Technical Committee Meeting. 38-55
3. Report on the FMPO Bicycle & Pedestrian Plan 1
Presented by: Nancy Lauro, AICP, Russell Planning & Engineering
4. Presentation on the completion of the Red Apple Transit Operational Analysis 2
Study
Presented by: Andrew Montoya, Red Apple Transit Manager
5. TIP Project Updates from Technical Committee members 3-4
Presented by: Mary Holton
6. Call for TIP Amendment #4 to the FFY2018-2023 TIP 5-10
Presented by: Mary Holton
7. Training Presentation – The 2017 Transportation Planning Process Briefing 11-15
Book
Presented by: Mary Holton
8. Reports from NMDOT
a. Update from District 5 (Paul Brasher)
b. Update from the Planning Bureau (Shannon Glendenning)
9. Committee Member Discussion Item(s) 16
No additional discussion items were presented for inclusion on the Agenda
10. Information Items 17-36
a. FFY2020-21 Transportation Alternatives Program (TAP) & Recreation
Trails Program (RTP) Call for Applications.
b. Upcoming Performance Measures.
Presented by: Mary Holton
11. Business from Chairman, Members, and Staff
12. Public Comment on Any Issues Not on the Agenda
13. Adjournment
The public body may only take action on an item if it is
listed for action on the publicly noticed agenda.
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of
a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Assistant at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can be
provided in various accessible formats. Please contact the MPO Administrative Assistant if a summary or
other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Report on the FMPO Bicycle & Pedestrian Plan
Update
Date: July 11, 2018
MONTHLY REPORT
Ms. Nancy Lauro, AICP and Senior Planner with Russell Planning & Engineering will call-
in monthly with a report on the FMPO Bicycle & Pedestrian Plan Update.
1
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Update - Red Apple Transit Operational
Analysis Study
Date: July 11, 2018
PRESENTATION - UPDATE
Mr. Andrew Montoya, Transit Manager will present on the Operational Analysis study
for the Red Apple Transit hub relocation. This study is complete and has been
presented to the Farmington City Council.
In 2017, the FMPO approved the allocation of up to $30,000 of its FTA 5303 funds for
this project. The project was approved for funding under Section 4.4 of the MPO’s
current UPWP.
Mr. Montoya has managed the project and has provided monthly reports to the
Technical Committee. The consultant presented this report to the Policy Committee
on June 28, 2018. This will be the project’s final presentation to the MPO.
2
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: Status of TIP Projects
Prepared by: Mary L Holton, AICP
Date: July 11, 2018
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next call for amendments (TIP Amendment #4) is due to MPO Staff by August
1. They are scheduled to be considered by the Technical Committee on August 8
and the Policy Committee on August 23.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS CURRENTLY ON FMPO TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
F100221 – Anesi Trail and Pedestrian Bridge
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100270 – Kirtland Schools Walk Path System
F100290 – CR 5500 Bridge Replacement
NMDOT
F100112 – US64 Phase V
F100113 – US64 Phase VI
3
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II-
o Pinon Hills Boulevard Bridge Phases I & II
o Kirtland School Walk Path System
Surface Transportation Program Funds (STP) - funds can be used to repair
structurally deficient bridges.
Integration of all FMPO TIP projects on to new eSTIP website.
Public eSTIP website can be viewed at https://estip.dot.state.nm.us/
INFORMATION ITEM
This is an information item only. Committee members will have an
opportunity to provide feedback regarding TIP project status and details.
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Call for FFY2018-2023 TIP Amendment #4
Prepared by: Mary L Holton, AICP
Date: July 11, 2018
BACKGROUND
The deadline to submit TIP Amendments for TIP Amendment #4 to MPO Staff
is August 1, 2018. Please see the attached procedures and use the fillable
Changes Request Form downloaded from the MPO’s website -
http://www.fmtn.org/DocumentCenter/View/11056/TIP-Change-Request-
Form-2017?bidId=
On August 8, 2018, the 15-day public comment period for Amendment #4 to
the FFY2018-2023 Transportation Improvement Program (TIP) will begin.
The proposed amendment will be published on the MPO’s website and
advertised with the Daily Times on August 8, 2018.
ANTICIPATED WORK
Hold a public hearing on TIP Amendment #4 during the August 8, 2018
Technical Committee meeting.
Seek approval of the amendment at the August 23, 2018, Policy Committee
meeting.
INFORMATION ITEM
No action will be sought for Amendment #4 until August.
APPLICABLE CITATIONS
§ 450.328 TIP revisions and relationship to the STIP.
(a) An MPO(s) may revise the TIP at any time under procedures agreed to by
the cooperating parties consistent with the procedures established in this
part for its development and approval. In nonattainment or maintenance
areas for transportation-related pollutants, if a TIP amendment involves non-
exempt projects (per 40 CFR part 93), or is replaced with an updated TIP,
the MPO(s) and the FHWA and the FTA must make a new conformity
determination. In all areas, changes that affect fiscal constraint must take
place by amendment of the TIP. The MPO(s) shall use public participation
procedures consistent with § 450.316(a) in revising the TIP, except that these
procedures are not required for administrative modifications.) After approval
by the MPO(s) and the Governor, the State shall include the TIP without
change, directly or by reference, in the STIP required under 23 U.S.C. 135. In
nonattainment and maintenance areas, the FHWA and the FTA must make a
conformity finding on the TIP before it is included in the STIP. A copy of the
approved TIP shall be provided to the FHWA and the FTA.
5
(c) The State shall notify the MPO(s) and Federal land management agencies
when it has included a TIP including projects under the jurisdiction of these
agencies in the STIP.
6
7
Farmington MPO TIP Amendment Procedures
This document serves to help FMPO Member Entities in submitting an amendment or requesting an administrative
modification to a project in the Transportation Improvement Program (TIP). The goal of this document is to synthesize
information, requirements, and procedure from multiple sources and consolidate it in one easy to read form.
Amendments & Administrative Modifications
TIP Amendments are major revisions which require public review and comments, re-demonstration of fiscal constraint,
or a conformity determination, as well as official approval by the FMPO Policy Committee. After approval, these
amendments are submitted to the NMDOT Secretary for approval and subsequently submitted for approval by the
FHWA and FTA.
TIP Administrative Modifications are minor revisions which can be made by the STIP Coordinator and MPO staff after
proper notification and verification that the change(s) falls into this category.
Amendments:
Addition or deletion of any project (except as noted in the Administrative Modifications section below).
Substantial changes to the scope of the project (e.g. changing the number of through traffic lanes, changing the
type of project such as from rehabilitation to reconstruction).
Changes to any project that would affect air quality conformity.
Moving a project into or out of the first four federal fiscal years of the TIP (fiscally constrained years).
Changes in a project’s total programmed amount greater than 20% or an amount greater than $2,000,000 and
projects with adjustments less than 20% or less than $2,000,000 that are not scheduled for production before
the next quarterly amendment.
Changes in a project’s fund source(s) from non-federal to federal.
Changes in the termini of a capacity project beyond its limits presented to the public during the public
involvement process.
Secondary routes being added.
Administrative Modifications:
Administrative Modifications/Adjustments are required for any revisions that do not meet the amendment criteria listed
above. All Administrative Modifications/Adjustments need to be approved by the STIP Staff at the NMDOT General
Office prior to being processed.
Changes in a federally funded project amount less than 20% (up to $2,000,000) only ONE adjustment per project
in an active TIP (the adjustment should only be used as part of the federal authorization process to increase the
programmed amount if the final estimate exceeds the current programmed amount).
Minor changes to the scope of a project (e.g. change to a project that does not require any certification).
Minor changes to the termini (up to a half-mile on each side) of a non-capacity or capacity project which falls
within the termini approved on the environmental document and does not extend beyond the limits of what
was presented to the public during the public involvement process.
1
8
Administrative Modifications (Continued):
Adding or deleting a project development phase of a project (Env., Doc, PE, Design, ROW, Constr., or Other)
without major changes to the scope of the project and the total cost of the project does not change.
Moving projects within any of the first four years of the TIP due to close-out or a project is taking the place of a
project going to production may be advanced in place of another project in the first four years of the TIP and to
include the movement of those funds to another federal fiscal year provided they are not being moved into or
out of the first four years of the TIP and show fiscal constraint. .
Minor changes to funding sources of a project in the TIP (including switching federal funding categories).
Changes in a project’s fund source(s) from federal to non-federal with no changes to the project’s scope and
only if the funds have not been obligated.
Changing in a project’s lead agency when agreed upon by the two agencies affected.
Changes made to an existing project’s amount of non-federal funded projects, as long as the project is not
regionally significant.
Changes made to an existing project’s programed FTA funds, Federal Lands Highway Program funds, Federal
Land Access Program, Tribal Transportation, Emergency Relief, and Federal Recreational Trail funds in order to
reflect the actual amount awarded by the federal agency and the corresponding required amount of matching
funds.
adding a project to the TIP which utilizes ONLY the following type of funds and no other Federal FHWA funds are
programmed on the project and if the project is programmed in the current year of the TIP, otherwise it must
follow the amendment procedures: FTA funds, Federal Lands Highway Program funds (FLAP or FL), Tribal
Transportation (TTP), Emergency Relief (ER), Federal Recreational Trail funds (RTP), TIGER Grant funds (TGER), or
100% state and/or local funds, provided the total project amount is $2,000,000 or less, and the project is
consistent with the MTP having minor impact on the overall metropolitan transportation system and it will not
add or reduce through-travel lanes on any roadway functionally classified as an urban collector or rural major
collector or higher.
Adding, combining, removing, or revising an existing project to the TIP which is split from a “parent project”
provided the cumulative, total amount of federal funding in each funding category in the parent and split
projects remains intact and the overall scope of work intended to be accomplished does not change or affect
NEPA.
Steps for Requesting an Amendment or Modification/Adjustment
First, it is important to distinguish if an Amendment or Modification is required. FMPO Staff can assist in making that
determination. Once the determination has been made, the attached ‘TIP Change Request Form” will need to be filled
out and submitted via email to the FMPO Planner.
2
9
FFY 2018 – 2023 Transportation Improvement Program Change Request Form
Date:
Entity:
Contact Name & Email:
Amendment #:
(FFY/Quarter)
Control #:
Amendment Type (Administrative/Formal) Explanation
Item Being
Federal Current Current Revised
Changed Revised
Fiscal Year Budgeted Local/State Local/State
(Funding Type, Amount (If
(If (If Match (If Match (If
Scope, Work Applicable)
Applicable) Applicable) Applicable) Applicable) Brief Description of Change
Type, etc.)
Review Committee Date Approved
Technical Committee
Policy Committee
3
10
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Presentation: The 2017 Transportation
Planning Process Briefing Book
Prepared by: Mary L Holton, AICP
Date: July 11, 2018
PRESENTATION
Mary Holton will present on the 2017 Transportation Planning Process Briefing Book.
Copies of the book will be distributed at the meeting.
11
5/16/2018
Part I discusses transportation planning
and its relationship to decisionmaking.
This section is general and provides a
broad introduction to the planning
process.
12
1
5/16/2018
Transportation planning typically follows
these steps:
• Engaging the public & stakeholders to establish
shared goals and visions
• Monitoring existing conditions
• Forecasting future growth, including assessing land
uses
• Identifying transportation needs
• Analyzing strategies
• Developing plans, programs
• Estimating impacts
• Developing a financial plan
What is a Metropolitan Planning Organization?
(pages 4-6)
What is a State Department of Transportation?
(pages 7-8)
What are the Key Products of the Transportation
Planning Process? (pages 9-12)
Federal Funding (pages 12-14)
Part II presents short descriptions of the
key products that are prepared as part of
the transportation planning process.
13
2
5/16/2018
Major Policy and Planning
Considerations/Issues
(Statutory Requirements)
Air Quality
Congestion Management Process
Transportation Equity
Financial Planning & Programming
Performance-Based Planning
Planning Data & Tools (Models, GIS, Visualization,
Forecasting)
Public Involvement
Safety
Security
Transportation Asset Management
Transportation System Management & Operations
Other Policy and Planning
Considerations/Issues
Climate Change
Freight Movement
Land Use and Transportation
Planning and Environmental Linkages – Sustainability
Scenario Planning
Travel Model Improvement Program
Performance-Based Planning and
Programming (PBPP)
Performance Measures, Performance Targets
To address Major Policy and Planning
Considerations/Issues
Initiated with MAP-21 and continued with the
FAST Act.
The intent is to guide decisionmaking so that
transportation agency goals and public
expectations are ensured.
State DOTs and MPOs are required by
FHWA/FTA to set measures/targets on an
ongoing basis.
14
3
5/16/2018
Performance-Based Planning and
Programming (PBPP)
Other Kinds of Performance Measures,
Performance Targets:
• Accessibility, including population proximity to
employment sites, as well as ADA compliance
• Mobility, including travel time, travel length, time lost to
congestion, percent of on-time performance
• Economic Development, including jobs created, new
housing starts, new businesses
• Quality of Life, including environmental issues, fuel
consumption per vehicle mile traveled
• Safety, including the number of traffic fatalities,
serious injuries
15
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #9
Subject: Committee Member Discussion Items
Date: July 11, 2018
DISCUSSION ITEMS
Technical Committee members provided no additional discussion items to be included
in the Agenda.
16
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #10
Subject: Information Items
Prepared by: Mary L Holton, AICP
Date: July 11, 2018
INFORMATION ITEMS
a. FFY2020-21 Transportation Alternatives Program (TAP) & Recreation Trails
Program (RTP) Call for Applications.
Monday June 11, 2018 – Release of Call for Projects/Applications
Wednesday August 01, 2018 – Deadline to Submit Project Feasibility Form
Electronically to MPO Staff (5:00PM)
Monday August 13, - Friday August 17, 2018 – Technical Review & Support of
submitted PFFs with MPO & NMDOT staff – Meeting(s) will be set up and
scheduled by the MPO
Friday October 26, 2018 – Deadline for Agencies to Submit TAP/RTP Project
Application Electronically to MPO Staff (5:00PM)
Friday November 30, 2018 – Deadline for the Farmington MPO to Submit
TAP/RTP Project Applications to the NMDOT TAP/RTP Coordinator (5:00PM)
b. Upcoming Performance Measures. DRAFT from NMDOT: The USDOT
establishes national performance measures via final rules and State DOTs, MPOs,
and Providers of Public Transportation establish performance targets based on
those rules.
The final rules outline the performance requirements for States and MPOs under
the Transportation Performance Management (TPM) program. The NMDOT,
MPOs and public transportation providers must jointly agree upon and develop
specific written provisions for cooperatively developing and sharing information
related to transportation performance data, including:
Gathering data for national performance measures;
Performance target setting at state and MPO level;
Coordination between States and MPOs;
Reporting on performance at regular intervals; and
Collecting data for the State asset management plan for the National Highway
System (NHS).
State DOTs have one year from the effective date of each final rule to set two-and
four-year performance targets (450.206[c][2]), for 2020 and 2022.
17
The deadline for MPOs to set performance targets is no later than 180 days after
the State DOT or Public Transportation Provider establishes performance targets
(450.306[d][3]).
Performance Area CFR FHWA/ Final Rule Final Rule State DOT MPO Target-
FTA Publication Effective Date Target-Setting Setting
Date Deadline Deadline*
Transit Asset 49 CFR FTA July 26, 2016 October 1,2016 Transit Providers: June 30, 2017
Management – TAM 625 and January 1, 2017
Plan 630
PM1 - Safety 23 CFR FHWA March 15, 2016 April 14, 2016 August 31, 2017 February 27, 2018
Performance Measures 490
Statewide & Metropolitan 23 CFR FHWA & May 27, 2016 June 27, 2016 June 27, 2017 December 27, 2017
Planning; Non- 450 FTA
Metropolitan Planning
Highway Asset 23 CFR FHWA October 24, 2016 October 2, 2016; April 30, 2018 N/A
Management Plan 515 and Part 667 effective (draft); June 30,
667 November 23, 2016 2019 (final)
PM2 - Pavement & 23 CFR FHWA January 18, 2017 May 20, 2017 May 20, 2018 November 20, 2018
Bridge Perf. Measures 490
PM3 - NHS, Freight, & 23 CFR FHWA January 18, 2017 May 20, 2017 May 20, 2018 November 20, 2018
CMAQ Performance 490
Measures
*MPO must set targets within 180 days of NMDOT setting its targets; these dates represent the latest possible date for establishment.
Additional information related to the performance measures final rule can be found at
https://www.fhwa.dot.gov/tpm/rule.cfm.
18
Transportation Performance Management:
A New Era of Accountability and Reporting
19
Keith Hoernschemeyer
Performance Management Team Leader
FHWA - Indiana
2
Transportation Performance Management
Transportation Performance Management is...
20
Transportation Performance Management
Manage
21
Expand
Performance
Management
Program Oversight
Build Oversight &
Eligibility
Project
Oversight &
Eligibility
3
Pre MAP-21 (Program Oversight & Eligibility)
• HBRRP
• Goal: Reduce ft^2 deficient bridges (On/Off)
• Rehab/Replacement
22
• Eligibility criteria
• Funding only for bridges
Post MAP-21 (PM Oversight)
• Goal: Maintain bridges in state of good repair
• Focus on the NHS
• Measures: % Good; % Poor; minimum condition level
• New/Rehab/Replacement/PM – BMS
• NHPP: Funding is flexible between all asset classes
4
5
Transportation Performance Management
The MAP-21 Charge (23 USC 150(a) - Declaration of Policy)
Performance Management
Will:
• transform the Federal-aid highway program
• provide a means to the most efficient investment of funds
23
By:
• refocusing on national transportation goals,
• increasing accountability & transparency, and
• improving project decision making
6
24
• Safety
• Infrastructure condition
• Congestion reduction
25
• System reliability
• Freight movement and economic vitality
• Environmental sustainability
• Reduced project delivery delays
7
TPM-Related Rulemakings Rule Effective Date Regulatory Chapter
Safety Performance Measures 23 CFR 490
April 14, 2016
(PM1) (Subpart B)
Highway Safety Improvement
April 14, 2016 23 CFR 924
Program (HSIP)
26
Statewide and Non-Metropolitan
June 27, 2016 23 CFR 450
Planning; Metropolitan Planning
Highway Asset Management Plans
October 2, 2017 23 CFR 515 & 667
for NHS
Pavement and Bridge Condition 23 CFR 490
May 20, 2017
Measures (PM2) (Subpart C & D)
Performance of the NHS, Freight, 23 CFR 490
May 20, 2017
and CMAQ Measures (PM3) (Subpart E, F, G, H)
8
Measure Area Performance Measures
Safety • Number of fatalities
• Fatalities per million vehicle miles
traveled
27
• Number of serious injuries
• Serious injuries per million vehicle miles
traveled
• Number of non-motorized fatalities and
non-motorized serious injuries
The Office of Safety has a website dedicated to this rule:
https://safety.fhwa.dot.gov/hsip/spm/
9
Measure Area Performance Measures
National Performance • Percentage of pavements of the Interstate System
Management Measures to in Good condition
Assess Pavement Condition • Percentage of pavements of the Interstate System
in Poor condition
28 • Percentage of pavements of the non-Interstate
NHS in Good condition
• Percentage of pavements of the non-Interstate
NHS in Poor condition
National Performance • Percentage of NHS bridges classified as in Good
Management Measures to condition
Assess Bridge Condition • Percentage of NHS bridges classified as in Poor
condition
10
Measure Area Performance Measures
Performance of the • Interstate Travel Time Reliability Measure:
National Highway System Percent of person-miles traveled on the
(NHS) Interstate that are reliable
29
(System Performance) • Non-Interstate Travel Time Reliability
Measure: Percent of person-miles traveled on
the non-Interstate NHS that are reliable
Freight Movement on • Freight Reliability Measure: Truck Travel Time
the Interstate System Reliability (TTTR) Index
11
Measure Area Performance Measures
Measures to Assess the • Peak Hour Excessive Delay(PHED) Measure:
CMAQ Program: Traffic Annual Hours of Peak Hour Excessive Delay
Congestion (PHED) Per Capita
30
• Non-Single Occupancy Vehicle Travel (SOV)
Measure: Percent of Non-Single Occupancy
Vehicle (SOV) Travel
Measure to Assess the
CMAQ Program: On-
Road Mobile Source • Emissions Measure: Total Emission Reductions
Emissions
12
Performance Reporting
Performance System
Storytelling Performance
31
13
• PM1 via Annual HSIP Report
• PM2 & PM3 via Biennial Reports
o Baseline/2-year/4-year (Performance Period Report)
32
• State and MPO reports on performance
targets through planning process
14
15
33
• Initial plan due April 30, 2018
• 10-year period
• Bridge and Pavement assets on
34
the NHS
• Relies on Pavement and Bridge
Management Systems
o Meet minimum requirements and
o Must be used to develop the asset
management plan
16
• USDOT: Establish Target Setting Rules
o Establish measures; identify data sources; define metrics
o Report to Congress/others
o Stewardship and oversight
35
• States and MPOs: Implement Target Setting
Rules
o Establish and report on targets
o Support national goals in the planning process and consider
measures and targets in long range plans and programs
17
Your Go-To Resource for TPM
Visit http://www.fhwa.dot.gov/tpm/
36
18
The minutes from the
June 13, 2018
Technical Committee meeting
are on the following pages.
37
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
June 13, 2018
Technical Members Present: Steven Saavedra, City of Aztec
Jason Thomas, City of Bloomfield
Virginia King, City of Farmington
Cindy Lopez, City of Farmington
Andrew Montoya, City of Farmington, Red Apple
Paul Brasher, District 5, NMDOT
Fran Fillerup, San Juan County
Technical Members Absent: None
Staff Present: Mary Holton, MPO Officer
Derrick Garcia, MPO Associate Planner
June Markle, MPO Administrative Assistant
Staff Absent: None
Others Present: Nancy Lauro, Russell Planning & Engineering (via
phone)
Dan Flack, Town of Kirtland
Larry Hathaway, San Juan County
Rosa Kozub, Planning Bureau NMDOT
1. CALL TO ORDER
Cindy Lopez called the meeting to order at 10:02 a.m.
2. APPROVE THE MINUTES FROM THE MAY 9, 2018 TECHNICAL COMMITTEE MEETING
Mr. Fillerup moved to approve the minutes from the May 9, 2018 Technical Committee
meeting. Mr. Saavedra seconded the motion. The motion to approve the minutes ws
passed unanimously.
3. REPORT ON THE FMPO BICYCLE & PEDESTRIAN PLAN UPDATE
Subject: Report on the FMPO Bicycle & Pedestrian Plan
Update
Date: June 13, 2018
38
MONTHLY REPORT
Ms. Nancy Lauro, AICP and Senior Planner with Russell Planning & Engineering will call-
in monthly with a report on the FMPO Bicycle & Pedestrian Plan Update.
This report was tabled until Ms. Lauro was available by phone.
Following discussion of Agenda Item #5 when Ms. Lauro provided her update to the
Technical Committee on the Bike/Ped Plan progress and work done to date.
Ms. Lauro stated that the Bike/Ped Plan Update website was on line along with the
survey and interactive map. She hoped there would be more public involvement and
participation with the survey and encouraged everyone to participate and to spread
the word about the survey and the website.
Andrew Arnold, Planning Intern with Russell Planning & Engineering, met with and
toured the area with Mr. Garcia yesterday. This was a great introduction to the MPO
for someone unfamiliar with this part of the country.
Ms. Lauro said she would like to set up some individual meetings with entity staffs
next week. Additionally, she wanted to get some feedback on when to set up the July
kick off. This could possibly be in conjunction with the National Night Out (July 17) or
we could establish our own event.
Ms. Holton recommended to begin with the stakeholder meetings and to arrange those
initially with each of the Technical Committee members in order to provide as much
regional coverage as possible. They would also be able to assist Ms. Lauro with any
additional invitations. Ms. Holton noted that the National Night Out and other events
throughout the summer were identified as potential public outreach events. She
thought it was important to get the word out now and to begin holding the community
meetings.
Ms. Holton asked the Technical Committee members to help promote the Plan with
the flyers and the website. The Facebook connections are providing good exposure and
Ms. Holton is planning some advertising in the newspaper as well. There have only
been a few surveys completed to date, so the Technical Committee members were
also encouraged to take the survey if they had not already done so.
Ms. Lauro has been trying to work with local trails and open space groups as well as
local bike shops. They e-mailed information to the bike shops, but have not had any
responses. She thought if Technical Committee members could get contact names for
her she could reach out directly to an individual rather than cold calling. Mr. Fillerup
noted that Nick Porell with San Juan County had taken flyers to several of the area’s
bike shops. Ms. Holton reported that RiverFest and the Art Walk on Friday went well
using only the flyer as the outreach. Ms. C. Lopez commented that Complete Streets
used a postcard for their survey with just three questions on it, which made it fast and
easy for people to fill out. Ms. Holton said more ideas from Technical Committee
members or entity staffs would be great.
39
Mr. Garcia toured the bike/ped website and highlighted the interactive map and the
survey. Everyone was again encouraged to provide their feedback and offer any
recommendations.
4. FTA REQUIREMENT FOR THE MPO TO ANNUALLY ADOPT TRANSIT PERFORMANCE
TARGETS FOR RED APPLE AND POLICY COMMITTEE RESOLTUION 2018-2 TO ADOPT
THOSE PERFORMANCE TARGETS
Subject: FTA Requirement for the MPO to Annually
Adopt Transit Performance Targets for Red
Apple and Policy Committee Resolution 2018-2
to Adopt those Performance Targets
Prepared by: Mary L Holton, AICP, MPO Officer
Date: June 13, 2018
BACKGROUND
In January 2017, the Federal Transit Administration and David Harris/NMDOT
informed FMPO of requirements of the Transit Asset Management (TAM) Final Rule
and the Metropolitan and Statewide and Nonmetropolitan Transportation Planning
Final Rule published in 2016.
The TAM Final Rule required transit providers to set performance targets for state
of good repair by January 1, 2017. The Planning Rule required each MPO to
establish targets no later than 180 days (June 30, 2017) after the date on which
the relevant state or provider of public transportation established its performance
targets. The FTA requires MPOs to adopt Performance Targets annually.
The FMPO Policy Committee adopted the original TAM Performance Measures on
June 14, 2017.
The Technical Committee will consider recommending approval of proposed PC
Resolution 2018-2 on June 13, 2018.
Andrew Montoya/Red Apple advises that there were no changes to the targets
from last year. You are referred to him regarding Red Apple’s current Transit
Asset Management (TAM) Plan.
ACTION ITEM
Hold a public hearing on proposed PC Resolution 2018-2.
MPO Staff recommends that the Technical Committee forward a recommendation
of approval to the Policy Committee for Policy Committee Resolution 2018-2.
The adoption of the Transit Performance Targets is due to NMDOT on June 30,
2018.
APPLICABLE CITATIONS
49 CFR Parts 625 and 630.
40
DISCUSSION: Ms. Holton reported that this target is required to be adopted annually
by the MPO. Last year, Mr. Montoya and the Red Apple Transit developed their transit
targets with the Federal Transit Administration (FTA). Staff has conferred with Mr.
Montoya who advised that the targets remained the same as last year. The Technical
Committee is being asked to review PC Resolution 2018-2, hold a public hearing, and
consider recommending approval of the resolution to the Policy Committee. Per
requirements, this resolution has been noticed in the Daily Times and on the MPO
website. In addition, Staff recommends approval of the Technical Committee
recommendation.
Ms. Holton provided her copy of the resolution to Mr. Fillerup for review.
Mr. Saavedra said he has noticed that on resolutions presented for consideration, the
City of Farmington legal team reviewed them. He asked if any other entities’ legal
departments reviewed the resolutions. Ms. Holton stated that the City of Farmington
legal department is the MPO’s legal counsel of record and no other legal review is
done. Ms. C. Lopez concurred that the only legal review required was that of the MPO
legal counsel which is the City of Farmington. Mr. Montoya replied that the Transit
Asset Management (TAM) Plan itself was reviewed by NMDOT and they have found it
satisfactory.
Ms. C. Lopez opened the public hearing. No comments were received. The public
hearing was closed.
Mr. Fillerup asked if the targets in the TAM from the previous year had been met. Mr.
Montoya replied that the TAM Plan has been followed and, per the Plan, the required
buses have been replaced.
ACTION: Mr. Fillerup moved to recommend approval of Policy Committee Resolution
2018-2 and adoption of the proposed TAM Plan as outlined. Mr. Montoya seconded the
motion. The motion was approved unanimously.
5. FFY2019-2020 PROPOSED UNIFIED PLANNING WORK PROGRAM (UPWP)
Subject: FFY2019-2020 Proposed Unified Planning Work
Program (UPWP)
Prepared by: Mary Holton, AICP, MPO Officer
Date: June 13, 2018
BACKGROUND
The Unified Planning Work Program (UPWP) is the MPO’s work plan for two
federal fiscal years. The UPWP pairs the MPO’s required work tasks/products with
the MPO’s available funding.
The FFY2019-2020 UPWP will cover planning activities and work products to be
completed from October 1, 2018 to September 30, 2020.
41
Based on the Planning Procedures Manual (PPM), the MPO needs to provide a draft
UPWP to NMDOT in late April, receive input/corrections from NMDOT by June 1
(NMDOT had no comments), and obtain the approvals by the Committees in June,
before submitting the final version to NMDOT before July 1.
Both the Committees reviewed the proposed FFY2019-2020 UPWP during their May
2018 meetings.
A 30-day public comment period was noticed from April 22, 2018 to May 21, 2018,
which was extended to June 26, 2018.
On page 9 of the document, there are five (5) major work program tasks listed as
headings. These headings are pretty much standardized amongst MPOs. Subtasks
are listed below. You should be aware that the same numbering system is utilized
in the MPO’s invoicing system and in our financial reports, including the Annual
Performance & Expenditure Report (APER), which we submit at the end of the
FFY.
CURRENT WORK
Annual activities will include administering the MPO’s programs, TIP development
and management, development of performance measures, GIS activities, Safe
Routes to School activities, transit data collection and mapping.
Major activities will include the preparation and completion of the 2045 MTP
Update, completion of the Bike & Ped Update, land-use and transportation
scenario planning activities, and travel demand modeling updates.
Per NMDOT direction, staff projects that PL funds of $228,637 and FTA 5303 funds
of $72,856 (both including local matches) for each of the two (2) federal fiscal
years will be available.
The proposed UPWP anticipates the transition from the City of Farmington to the
NWNMCOG for the management of the MPO, expected changes in personnel, as
well as changes currently proposed in the JPA to the local matches.
ACTION ITEM
It is recommended that the Technical Committee forward a recommendation of
approval of the FFY2019-2020 UPWP to the Policy Committee.
DISCUSSION: Ms. Holton reported that the proposed FFY2029-2020 Unified Planning
Work Program (UPWP) in the meeting agenda was the same proposal as that presented
at the May meeting. NMDOT reviewed the document and provided no additional
comments. The MPO’s counsel of record reviewed the resolution and Staff is
recommending approval of proposed PC Resolution 2018-3 and the FFY2019-2020
UPWP.
Ms. Holton noted that the budgeted dollars are simply placeholders using the same
amounts as last year without any carryover shown. Once NMDOT can provide the exact
funding amount, an amendment to the UPWP will be likely.
Ms. C. Lopez opened the public hearing. No comments were received. The public
hearing was closed.
42
Mr. Fillerup said he had concerns about the work being done by the sub-committee on
the project prioritization methodology and its potential impact on the work shown in
UPWP. Unfortunately, the work on the project prioritization process is not developed
enough yet to slow down approval of the new UPWP.
ACTION: Mr. Fillerup moved to recommend approval of PC Resolution 2018-3 and the
FFY2019-2020 UPWP. Mr. Brasher seconded the motion. The motion was approved
unanimously.
Ms. C. Lopez went back to Agenda Item #3 and the Bike/Ped Plan Update from Ms.
Nancy Lauro with Russell Planning & Engineering.
6. REVIEW AND CONSIDER A RECOMMENDATION TO THE POLICY COMMITTEE
REGARDING APPROVAL OF THE JOINT POWERS AGREEMENT (JPA) AND COMMITTEE
BYLAWS & PROCEDURES PROPOSALS, WHICH HAVE BEEN REVISED TO ADD THE
TOWN OF KIRTLAND TO THE FMPO
Subject: Review and consider a recommendation to the
Policy Committee regarding approval of the
Joint Powers Agreement (JPA) and Committee
Bylaws and Operating Procedures proposals,
which have been revised to add the Town of
Kirtland to the FMPO
Prepared by: Mary L Holton, AICP, MPO Officer
Date: June 13, 2018
BACKGROUND
The cities of Aztec, Bloomfield, and Farmington, and San Juan County formed
and have participated in the Metropolitan Planning Organization through the
Joint Powers Agreement (JPA) since 2003.
As discussed previously, MPO Staff have been coordinating to add the Town
of Kirtland to the MPO beginning last year.
The Kirtland Board of Trustees voted on December 12, 2017, to join the MPO.
Proposed revisions to the JPA and Committee Bylaws documents to include
Kirtland were prepared starting in July 2017.
The proposed documents were finalized by the Policy Committee in May 2018
after considering them at the following meetings: In 2017: Aug; Sept; and, Oct.
In 2018: Feb and May.
Note that many of the proposed revisions in both documents, including
changes to the local match funding formula and the increase in representation
on the MPO committees, were included in the proposals reviewed by the
Policy Committee since August 2017.
43
NMDOT Staff have continually reviewed the proposed documents and have
provided MPO Staff with input.
CURRENT WORK
The Town of Kirtland is being invited to attend all MPO Meetings, and is
included in all MPO emails.
However, a Designated Kirtland representative cannot be seated on the MPO
committees until the adoption/approval process is complete, which is currently
anticipated in late July or early August.
The 30-day public review period has been noticed.
ACTION ITEM
Review the proposed JPA and Committee Bylaws documents, which were
finalized by the Policy Committee last month.
Members of the Tech Committee are encouraged to discuss the proposals with
their managers and Policy Committee members.
MPO Staff recommends approval of the documents.
It is anticipated that the final JPA and Committee Bylaws will be considered for
approval by the MPO Policy Committee on June 28, 2018. If approved then,
consideration of the proposed JPA by the boards, councils, or commissions of
the individual member entities will be scheduled in July. Upon completion of
the adoption process, the JPA will be sent to the NM Department of Finance
and Administration for State Review/Approval.
APPLICABLE CITATIONS
23 U.S. Code § 134 - Metropolitan transportation planning
23 CFR 450.310 - Metropolitan planning organization designation and re-
designation
23 CFR 450.314 - Metropolitan planning agreements
23 U.S. Code § 134 - Metropolitan transportation planning
Joint Powers Agreement Act, being Sections 11-1-1 et. Seq., NMSA 1978, as
amended.
NMDOT Planning Procedures Manual, Metropolitan Planning Organizations,
Internal Structure, pages 46-48
DISCUSSION: The Technical Committee discussed the proposed JPA and Committee
Bylaws. Below is a summary of the discussion, recommendations, and questions:
Page 1 of the JPA (Page 9 of the Agenda) – a typo in the first paragraph under
WITNESSETH, the fifth sentence: the word “though” should be “through”;
Page 7 of the JPA (Page 15 of the Agenda) – the MPA is the Metropolitan
Planning Area;
An “appointed” Policy Committee member would typically be a department
head within the entity they are represented;
44
The additional proposed members for the Technical and Policy Committees is
based on per capita. See Page 9 of the JPA (Page 17 of the Agenda) for the
budgeting and cost allocation based on estimated population for each entity;
Changes to the membership numbers as well as the re-distribution of required
local matches has been in discussion with and ongoing review by the Policy
Committee since July of 2017. The current JPA proposal was finalized to bring
forward by the Policy Committee at their meeting in May;
Some changes made following discussion at the MPO Quarterly held on June 4-5
and with the NMDOT:
o Page 2 (Page 10 of the Agenda) – addition in Section Three-Fiscal Agent:
…necessary to operate the MPO, “including co-signing the MPO’s
cooperative agreements with the NMDOT”.
The financial responsibility will be with the fiscal agent, so along
with the MPO Officer, the fiscal agent will sign the cooperative
agreement.
o Page 8 (Page 16 of the Agenda) – addition under E1: “e. Co-signing the
MPO’s cooperative agreements with the NMDOT”.
The MPO Officer will also be responsible for signing the
cooperative agreement.
Ms. Holton stated that once the proposed JPA is approved, it would be taken before
each of the entities’ councils/commissions for review and approval. Following the
completion of this process, the JPA will be sent to the Department of Finance and
Administration (DFA) for the State of New Mexico for their review and approval. Once
the final approval is received, it is hoped that a Kirtland representative can be seated
in August.
Ms. Holton also reviewed an addition to the Committee Bylaws to give authority to the
Policy Committee to consider issuing a proclamation:
Page 7 (Page 32 of the Agenda): “The Policy Committee reserves the right to
issue a proclamation upon a majority vote of the committee and after the
proposal has been place on the agenda as an action item in accordance with
the New Mexico Open Meetings Act.”
This would allow anyone to propose a proclamation to be considered by the
Policy Committee as long as the proposal meets the Open Meetings Act (i.e.:
National Bike Month).
Ms. C. Lopez opened the public hearing. There were no comments received. The
public hearing was closed.
ACTION: Mr. Brasher moved to recommend approval of the proposed JPA and
Committee Bylaws with the changes as noted. Mr. Fillerup seconded the motion. The
motion was approved unanimously.
45
7. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: Derrick Garcia, MPO Associate Planner
Date: June 13, 2018
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc.
The next call for amendments (TIP Amendment #4) will go out in Mid-July for
Technical Committee review on August 8th and Policy Committee Adoption on
August 23rd.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS CURRENTLY ON FMPO TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
F100221 – Anesi Trail and Pedestrian Bridge
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100270 – Kirtland Schools Walk Path System
F100290 – CR 5500 Bridge Replacement
NMDOT
F100112 – US64 Phase V
F100113 – US64 Phase VI
46
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II-
o Pinon Hills Boulevard Bridge Phases I & II
o Kirtland School Walk Path System
Surface Transportation Program Funds (STP) - funds can be used to repair
structurally deficient bridges.
Integration of all FMPO TIP projects on to new eSTIP website.
Public eSTIP website can be viewed at https://estip.dot.state.nm.us/
INFORMATION ITEM
This is an information item only. Committee members will have an
opportunity to provide feedback regarding TIP project status and details.
DISCUSSION: Mr. Garcia reported that the next call for amendments is expected to go
out for call in mid-July. Recommended action will be sought by the Technical
Committee on August 8 and approval sought by the Policy Committee on August 23.
Mr. Garcia referred to Page 44 of the Agenda to explain how to read and understand
the project titles:
F100091 (Ver 3) 18-00:
F100091 is the project control number
18-00 – this number will either be 4 or 5 digits based on when the last action was
taken on the project; for this project the last action taken was when the FFY2018-
2023 TIP was adopted; there have been no administrative modifications or
amendments made on this project.
On Page 45 of the Agenda, the project is the East Blanco Bridge, F100300 (Ver 3) 18-
02:
F100300 is the project control number
18-02 – this number denotes an amendment to this project during the TIP Amendment
#2 process.
An example of an administrative modification is shown on Page 47 of the Agenda. This
is the 20th Street sidewalk project, F100132 (Ver 3) 18-05.2:
F1001323 is the project control number
18-05.2 – any project with a decimal indicates an administrative modification has been
made and the number preceding the decimal indicates the month in which the
modification was made.
Mr. Garcia asked for project updates from the Technical Committee members:
East Aztec Arterial
Mr. Saavedra stated the City of Aztec continues to work with the North Regional
Design Center. He thanked the NMDOT representatives for working hard to get this
47
project through the process. The City of Aztec is working on finalizing the right-of-way
appraisals and then it will go to PS&E.
East Blanco Bridge
Mr. Thomas reported that the right-of-way mapping is in process by the consultant.
The next step will be to get title commitments on the four rights-of-way parcels.
Foothills Drive Enhancement
Ms. King stated that the City of Farmington is working on updating the appraisal in
order to continue with the acquisition.
20th Street-Phase III
This project is coming along. The kick-off meeting was held on June 1.
Pinon Hills Boulevard
The City of Farmington and San Juan County are planning to submit a joint application
for a BUILD grant for this project. Mr. Fillerup added that the right-of-way mapping for
Phase III of the Pinon Hills Boulevard project is being revised due to design changes.
Anesi Trail
No update available
Glade Run Recreation Area
The advertising for design and construction on this project closes on June 18.
Kirtland Schools Walk Path
Mr. Fillerup reported that advertising for the construction of this project would begin
on June 17.
CR 5500 Bridge Replacement
This project is still early in the design phase with elevations being gathered.
US 64 – Phases V and VI
Mr. Brasher reported that the last two phases of this project were set to be let in
August, but that has been delayed due to a signal/lighting agreement on two
intersections. FHWA will not authorize a project until these types of agreements are
signed. The project is expected to get back on schedule soon with construction in 2019
and completion in 2020.
8. PROJECT PRIORITIZATION METHODOLOGY-CHAPTER 4 OF THE CURRENT 2040
MTP
Subject: Project Prioritization Methodology-Chapter 4 of
the Current 2040 MTP
Prepared by: Derrick Garcia, Associate Planner
Date: June 13, 2018
48
BACKGROUND
Direction was given during the February 14, 2018 Technical Committee
meeting to organize a subcommittee to review the FMPO’s Project
Prioritization Methodology in Chapter 4 of the MTP.
Fran Fillerup, Steven Saavedra, and Paul Brasher volunteered to be part of the
subcommittee along with Derrick Garcia.
The subcommittee’s first meeting was on March 19, 2018 with Fran Fillerup,
Steven Saavedra, and Derrick Garcia participating.
The second meeting of the subcommittee was on April 16, 2018 with all
volunteer members in attendance – an additional meeting was held on May 1,
2018 with Fran Fillerup, Steven Saavedra, and Derrick Garcia participating.
An additional meeting was held on 5/7/2018 in Aztec and all members of the
subcommittee were present.
HIGHLIGHTS OF DISCUSSION FROM April 16th and May 1st Meetings
The April 16 meeting focused largely on NMDOT District 5’s prioritization
process and how the FMPO could best coordinate its TIP and MTP
development with NMDOT’s STIP project planning process.
o How can the FMPO and its member entities best convey the need for
funding assistance on a local facility? A: Articulate the need with
statistics and a remedy.
The May 1 meeting focused on the recently adopted NMDOT Transportation
Asset Management Plan (TAMP) and how it relies heavily on data to set
priorities.
o It was discussed that in order to make data-driven decisions similar to
NMDOT’s TAMP that the MPO will have to produce more data-driven
reports and plans (Safety corridor mapping, travel demand model
updates, and routine traffic count data collection).
o Due to time constraints, the subcommittee agreed to meet again on
Monday, May 7.
May 7 meeting focused on the project application screening process and how
th
the PPM should interact with the MPO’s transportation planning work.
o One issue with project screening process is turnover: every two years
when there is a call for projects there are usually new TC/PC board
members that have not scored projects.
o Following SFMPO and MRMPO models, one way to improve the process
and make it more efficient is to allow Staff to conduct a preliminary
review of all projects and report their suggestions to TC for
approval/recommendation to PC. MPO Staff should be regarded as
unbiased subject matter experts in regards to the MPO’s MTP and
project ranking process.
o MPO Planning work and the project prioritization process: Another
concept discussed was using the MPO’s planning work (Bike/Ped Plan,
Travel Demand Model, Safety Plan, etc.) to set regional priorities.
During each MTP update every 5 years, priorities would be reevaluated
and updated based on top recommendations from each plan.
49
NMDOT’s Project Prioritization Process Update
NMDOT is also in the process of updating their project prioritization process.
On May 31, Staff attended a presentation in Albuquerque given by consultants
working for NMDOT.
Multi-Objective Decision Analysis (MODA) is a method that Jacobs Group is
working on establishing for NMDOT.
MODA Approach:
o Select projects that provide the most value for the monies spent by:
Establishing goals
Develop project concepts based on goals
Establish criteria
Develop performance measures to screen projects against
established criteria.
Weigh, normalize, calculate value of scores, and prioritize
using value/cost ratio.
Optimize list based on funding.
INFORMATION ITEM
This is an information item only. Committee members will have an
opportunity to provide feedback to the discussion points presented.
DISCUSSION: Mr. Garcia reported that direction was given during the February 14
Technical Committee meeting to organize a subcommittee to review the FMPO’s
Project Prioritization Methodology in Chapter 4 of the MTP. The subcommittee made
up of Mr. Brasher, Mr. Fillerup, Mr. Saavedra, and Mr. Garcia have met several times
and shown below is a brief update on discussion from each meeting:
The April 16 meeting focused largely on NMDOT District 5’s prioritization
process and how the FMPO could best coordinate its TIP and MTP development
with NMDOT’s STIP project planning process.
o How can the FMPO and its member entities best convey the need for
funding assistance on a local facility? A: Articulate the need with
statistics and a remedy.
The May 1 meeting focused on the recently adopted NMDOT Transportation
Asset Management Plan (TAMP) and how it relies heavily on data to set
priorities.
o It was discussed that in order to make data-driven decisions similar to
NMDOT’s TAMP that the MPO will have to produce more data-driven
reports and plans (Safety corridor mapping, travel demand model
updates, and routine traffic count data collection).
o Due to time constraints, the subcommittee agreed to meet again on
Monday, May 7.
May 7th meeting focused on the project application screening process and how
the PPM should interact with the MPO’s transportation planning work.
o One issue with project screening process is turnover: every two years
when there is a call for projects there are usually new TC/PC board
members that have not scored projects.
50
o Following SFMPO and MRMPO models, one way to improve the process
and make it more efficient is to allow Staff to conduct a preliminary
review of all projects and report their suggestions to TC for
approval/recommendation to PC. MPO Staff should be regarded as
unbiased subject matter experts in regards to the MPO’s MTP and
project ranking process.
o MPO Planning work and the project prioritization process: Another
concept discussed was using the MPO’s planning work (Bike/Ped Plan,
Travel Demand Model, Safety Plan, etc.) to set regional priorities.
During each MTP update every 5 years, priorities would be reevaluated
and updated based on top recommendations from each plan.
The Technical Committee discussion is highlighted below:
Planning process is ongoing; always some planning functions ongoing;
Planning contributes to the MTP and they come together;
Use annual budget for planning work in support of the MPO and to give lead
agencies better information about their portion of the transportation network;
help them make choices and understand the regional priorities;
Do not leave plans sitting on the shelf;
Communicate MPO needs to the NMDOT to provide a clear picture of the
regional priorities and;
Similar to a community comprehensive plan with the setting of objectives,
goals, and priorities; how does a project then meet these criteria.
Ms. Lopez would like to see the work of the subcommittee continue to provide a
clearer vision for this chapter in the MTP.
Mr. Garcia stated that he and Ms. Holton had attended a meeting on May 31 presented
by NMDOT’s consultant working on updating the state’s project prioritization process.
The consultant is working on establishing a method known as Multi-Objective Decision
Analysis (MODA). This approach looks at selecting projects that provide the most value
for the monies spent by:
Establishing goals
Develop project concepts based on goals
Establish criteria
Develop performance measures to screen projects against
established criteria.
Weigh, normalize, calculate value of scores, and prioritize using
value/cost ratio.
Optimize list based on funding.
Mr. Garcia said this scoring is very thorough, but also very sophisticated. The
consultants presented an Excel chart with different weights based on any qualitative
and quantitative data available. They recommend not leaving the scoring up to the
policy makers, but go to the subject matter experts and have them weigh in on the
scoring factors. Ms. Holton stated that in establishing goals and basic scoring, the
approach wants to involve as many stakeholders as possible. Mr. Garcia added that
MODA may not be the solution for the MPO, but other similar models could provide
some desired framework. This is still under development, but Staff will share the
information as more becomes available. Ms. Holton said she thought there was value in
51
this approach but wanted to wait until it has been thoroughly vetted by NMDOT before
having the consultant or others present this to the Technical Committee.
Ms. Holton stated that with Mr. Garcia’s resignation, Staff would not be available to
continue with the subcommittee until the NWNMCOG takes over the management of
the MPO later this year.
9. REPORTS FROM NMDOT
District 5 – Paul Brasher
Mr. Brasher reported that the pavement project on NM 170 (from MP 2.1 to
approximately MP 8.2) is to be let this year. This is a mill and overlay project with the
addition of shoulders.
Another project expected to be let in July is the replacement of the wood-framed La
Plata Bridge on NM 574. Mr. Brasher said there would be no detour while this
construction is underway as there is no parallel road available for use. NMDOT will see
if half the bridge can be built at a time, which would allow one-way traffic across the
bridge during construction.
Mr. Fillerup asked if emergency responders have been notified of the possibility that
this road will be closed entirely during construction. Mr. Brasher said this is part of the
design process and options on keeping part of the road open during construction
should be known in approximately two to three weeks.
Planning Bureau – Rosa Kozub
Ms. Kozub reported on the following:
Performance measures – NMDOT has set their performance targets and now the
MPOs have 180 days in which to set theirs. Transit Asset Management and
Safety performance targets are annual targets and will be coming back for
Committee review and recommended adoption.
There are also the asset management targets for all NMDOT assets. The
pavement management system shows all the data for all the roads in the state
and NMDOT will now set performance measures to determine where they want
to go with these.
Performance Measure 3 relates to air quality, congestion, and travel time
reliability. New Mexico typically performs well in this area.
The setting of performance measures relates directly to MODA. NMDOT is
mandated to establish performance measures and federal funding received has
to go to meet those measures. MODA will help to spend the money in a way
necessary to achieve the required performance measures. Ms. Kozub noted that
this MODA is a long-term discussion for NMDOT to determine how to change
their entire structure.
Performance based planning and programming, setting, and meeting targets is
new to NMDOT. They are grappling on how to get there. Updates will be
52
provided as available to assist the MPOs with establishing their targets. Ms.
Kozub stated that there is currently little guidance from FHWA and all states
are struggling with how to meet these requirements.
Public Involvement Plan – how to improve public involvement with NMDOT
projects. They are working to create a user-friendly document to outline
specific strategies to give insight on how to best gather input.
The State Bike Plan is in its final stages. Some documents remain on NMDOT’s
website for public comment until June 22.
Ms. Kozub is working on drafting an update on the Cooperative Agreements for
the MPOs for the next four years.
The call for projects for TAP/RTP funds is currently open.
10. COMMITTEE MEMBER DISCUSSION ITEMS
Subject: Committee Member Discussion Items
Date: June 13, 2018
DISCUSSION ITEMS
Technical Committee members provided no additional discussion items for inclusion on
the Agenda.
11. INFORMATION ITEMS
Subject: Information Items
Prepared by: Mary L Holton, AICP, MPO Officer and Derrick
Garcia, MPO Associate Planner
Date: June 13, 2018
INFORMATION ITEMS
a. Update on the Red Apple Transit Operational Analysis Study. Mr. Andrew
Montoya will provide an update on the Red Apple Transit operation analysis
study.
b. MPO Quarterly Meeting. The Farmington MPO hosted the MPO Quarterly on
June 4 and 5, 2018. A copy of the agenda is attached.
c. Upcoming Performance Measures.
d. Committee Input on Future Technical Committee Trainings.
53
e. New MPO Banner for Outdoor Public Events. MPO Staff purchased a new
banner for use during public outreach events. It will be displayed in the
MPO office when not being used for events.
f. FFY2020-21 Transportation Alternatives Program (TAP) & Recreation
Trails Program (RTP) Call for Applications.
DISCUSSION: a. Andrew Montoya reported that KFH has completed the Red Apple
Transit operational analysis study. The findings will be presented to the Policy
Committee on June 28 and to the Technical Committee in July. All five of the
objectives requested of the study have been answered.
b. MPO Quarterly. The agenda for the MPO Quarterly is on Page 57 of the Agenda. The
meeting was held the afternoon on June 4 and the morning of June 5. There was a lot
of discussion on performance measures.
c. Performance Measures. Over the next 180 days, the MPO will need to update and
adopt new performance measures. The first two will need to be considered for
adoption in October.
d. Future Trainings. Upcoming in July, Ms. Holton will be presenting on ECFRs. Please
submit any training suggestions to Staff.
Once NMDOT has updated their Planning & Procedures Manual (PPM), this will be a
good training resource. The section on the MPOs and RTPOs is being enlarged to better
describe the interaction between NMDOT and the MPOs.
e. Banner. A new 6’ wide banner with an updated logo and all member entities
identified has been purchased. The banner will be used primarily for outreach events,
but will hang in the MPO Office the rest of the time.
f.Call for RTP/TAP Applications was sent out on June 11. There are links to the
TAP/RTP Guide and additional material in the e-mail. The timeline for the applications
will be:
o August 1 – entity deadline to submit their project feasibility forms (PFF);
o Week of August 13-17 the technical review of the PFFs needs to be held with
MPO and NMDOT staff (traditionally held at the District 5 office);
o October 26 is the deadline for agencies to submit their Project Application;
o November 30 is the deadline for the MPO to submit the project applications to
NMDOT.
Mr. Garcia added that entities must provide an adopted resolution from each
council/commission along with the project application by the October 26, 2018
deadline.
12. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Ms. C. Lopez announced that she would be retiring from the City of Farmington on
August 17. She said she has learned a lot from being on the Technical Committee even
though transportation planning is not something she deals with on a daily basis.
54
Mr. Thomas thanked Mr. Stephen Lopez with District 5 for his work in getting some old
LGRF agreements closed out and new ones opened.
Ms. Holton announced that this was Mr. Garcia’s last Technical Committee meeting.
She wanted to recognize his hard work and diligence and he will be missed. A going-
away get-together will be on June 20 at 3:00 p.m. at the Community Development
Office. Mr. Garcia said he accepted a position with the Santa Fe MPO and will be
starting work there on June 25. He thanked everyone for his time with the MPO.
All the Technical Committee members wished the best for Ms. C. Lopez and Mr. Garcia
and thanked them for their work with the MPO over the years.
There was no additional business from the Chairman, Members and Staff.
13. PUBLIC COMMENT ON ANY ISSUES NOT ON THE AGENDA
Mr. Hathaway added his thanks to Mr. Garcia for all the work he had done for the MPO.
He said he would see Ms. C. Lopez at a future meeting.
There was no additional public comment on any issues not on the agenda.
14. ADJOURNMENT
Mr. Fillerup moved to adjourn the meeting. Mr. Saavedra seconded the motion. The
motion passed unanimously and Ms. Lopez adjourned the meeting at 11:45 a.m.
___________________________ ___________________________
Cynthia Lopez, Technical Committee June Markle, Administrative Assistant
Chair
55