Regular MeetingFarmington, NM · June 12, 2019
Agenda
MPO TECHNICAL COMMITTEE
AGENDA
June 12, 2019
10:00 a.m.
Council Chambers
Farmington City Hall
800 Municipal Drive
Farmington, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
June 12, 2019 10:00 AM
This regular meeting will be held in Council Chambers at Farmington City Hall, 800 Municipal
Drive, Farmington, New Mexico.
ITEM PAGE
1. Call to Order: Call meeting to order
2. Minutes: Approve the minutes from the May 8, 2019 Technical Committee 59-71
Meeting.
3. Consider Annual Adoption of Transit Performance Targets for Red Apple and 1-4
proposed Policy Committee Resolution 2019-5 to Adopt those Targets
a. Review the Red Apple’s Transit Performance Targets and proposed
Policy Committee Resolution 2019-5;
b. Hold a public hearing on proposed Policy Committee Resolution 2019-5;
c. Consider recommending adoption of the Red Apple’s Transit
Performance Targets and proposed Policy Committee Resolution 2019-
5.
ACTION ITEM
Presented by: Mary L. Holton, AICP
4. Consider Policy Committee Resolution 2019-6 Encouraging NMDOT to Repair 5-22
and Rebuild NM State 173
ACTION ITEM
Presented by: Mary L. Holton, AICP
5. TIP Project Updates from Technical Committee Members: Members will 23-24
provide updates on their TIP projects.
6. Review of Projects to be Listed on the New FFY2020-2025 Transportation 25-42
Improvement Program (TIP)
Presented by: Mary L. Holton, AICP
7. Reports from NMDOT
a. Update from the Planning Bureau (Joseph Moriarty)
b. Update from District 5 (David Quintana)
8. Committee Member Discussion Item(s) 43
No additional discussion items were presented by Technical Committee members
9. Information Items 44-57
a. NMDOT’s State Call for Projects
b. Annual FMPO’s Quality Assurance Review (QAR)
c. MPO’s Public Participation Plan (PPP)
d. MPO Quarterly
e. New Mexico LTAP Center Advisory Committee Meeting
f. FMPO & NWRTPO Introductions and Opportunities for Future Collaboration
Presented by: Mary L Holton, AICP
10. Business from Chairman, Members, and Staff
11. Public Comment on Any Issues Not on the Agenda
12. Adjournment
The public body may only take action on an item if it is
listed for action on the publicly noticed agenda.
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in need of a
reader, amplifier, qualified sign language interpreter, or any other form of auxiliary aid or service to
attend or participate in the hearing or meeting, please contact the MPO Administrative Assistant at the
Downtown Center, 100 W Broadway, Farmington, New Mexico or at 505-599-1466 at least one week
prior to the meeting or as soon as possible. Public documents, including the agenda and minutes, can
be provided in various accessible formats. Please contact the MPO Administrative Assistant if a
summary or other type of accessible format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: FTA Requirement for the MPO to Annually
Adopt Transit Performance Targets for Red
Apple and Policy Committee Resolution 2019-5
to Adopt those Performance Targets
Prepared by: Mary L Holton, AICP, MPO Officer
Date: June 12, 2019
BACKGROUND
In January 2017, the Federal Transit Administration and David Harris/NMDOT
informed FMPO of requirements of the Transit Asset Management (TAM) Final Rule
and the Metropolitan and Statewide and Nonmetropolitan Transportation Planning
Final Rule published in 2016.
The TAM Final Rule required transit providers to set performance targets for state
of good repair by January 1, 2017. The Planning Rule required each MPO to
establish targets no later than 180 days (June 30, 2017) after the date on which
the relevant state or provider of public transportation established its performance
targets. The FTA requires MPOs to adopt Performance Targets annually.
The FMPO Policy Committee adopted the original TAM Performance Measures on
June 14, 2017.
The Technical Committee will consider recommending approval of proposed PC
Resolution 2019-5 on June 12, 2019 to re-adopt the targets.
Andrew Montoya/Red Apple advises that there were no changes to the targets
from last year. You are referred to him regarding Red Apple’s current Transit
Asset Management (TAM) Plan.
ANTICIPATED WORK
Seek final approval of the proposed Policy Committee Resolution 2019-5 by the
Policy Committee on June 27, 2019.
ATTACHMENTS
The Policy Committee Resolution 2019-5 can be downloaded by clicking the
following link: https://www.fmtn.org/DocumentCenter/View/19576/PC-Reso-2019-
5-TAM-Plan_Legal-Reviewed
ACTION ITEM
Hold a public hearing on proposed PC Resolution 2019-5.
MPO Staff recommends that the Technical Committee forward a recommendation
of approval to the Policy Committee for proposed Policy Committee Resolution
2019-5.
The adoption of the Transit Performance Targets is due to NMDOT on June 30,
2019.
1
APPLICABLE CITATIONS
49 CFR Part 625
2
3
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Policy Committee Resolution 2019-6 –
Encourage NMDOT to Repair and Rebuild New
Mexico State Highway 173
Prepared by: Mary L Holton, AICP, MPO Officer
Date: June 12, 2019
BACKGROUND
At the Technical Committee meeting on May 8, 2019, residents and members of
the community came forward to present their safety concerns with NM 173.
A 15-page petition signed by community members and visitors was presented
requesting that the State Engineer and NMDOT investigate and resolve their safety
concerns on NM 173.
The Technical Committee recommended drafting a Policy Committee Resolution
in support of safety improvements to NM 173.
The Technical Committee will consider recommending approval of proposed PC
Resolution 2019-6 on June 12, 2019 to encourage action on NM 173 by NMDOT.
ANTICIPATED WORK
Seek final approval of the proposed Policy Committee Resolution 2019-6 by the
Policy Committee on June 27, 2019.
ATTACHMENTS
A copy of Policy Committee Resolution 2019-6 and the petition are attached.
ACTION ITEM
MPO Staff recommends that the Technical Committee forward a recommendation
of approval to the Policy Committee for proposed Policy Committee Resolution
2019-6.
The adoption of proposed Policy Committee Resolution 2019-6 will then be
forwarded to NMDOT.
APPLICABLE CITATIONS
23 CFR Part 450.316
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #5
Subject: Status of TIP Projects
Prepared by: MPO Staff
Date: June 12, 2019
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS ON FMPO CURRENT FFY2018-2023 TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
F100221 – Anesi Trail and Pedestrian Bridge
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100270 – Kirtland Schools Walk Path System
F100290 – CR 5500 Bridge Replacement
NMDOT
F100112 – US64 Phase V
F100113 – US64 Phase VI
F100170 – NM 173
F100310 – NM 170
23
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II-
o Pinon Hills Boulevard Bridge Phases I & II
o Kirtland School Walk Path System
Surface Transportation Program Funds (STP) - funds can be used to repair
structurally deficient bridges.
Integration of all FMPO TIP projects on to new eSTIP website.
Public eSTIP website can be viewed at https://estip.dot.state.nm.us/
INFORMATION ITEM
This is an information item only. Committee members will have an
opportunity to provide feedback regarding TIP project status and details.
24
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: FFY2020-2025 Transportation Improvement
Program (TIP) Development
Prepared by: Mary L Holton, AICP, MPO Officer
Date: June 12, 2019
BACKGROUND
The TIP is a short-term program of projects expected to be completed in the next
four (4) years.
Projects included in the TIP must be regionally significant and fiscally
constrained.
The TIP adoption process includes updating project information, adding new
projects, and developing a TIP priority list.
A Call for Projects was issued on May 20, 2019 to start the new TIP adoption
process.
New projects being added to the TIP need to submit a TIP Project Change Form
and NMDOT’s A-1340 Initial Cost Estimate and Control Number Request Form no
later than June 7, 2019.
CURRENT WORK
Staff continues to discuss updates to current projects and/or new projects with
the entities, Red Apple Transit, and NMDOT.
The draft TIP has been developed based on this input.
The STIP is scheduled to be updated in August 2019.
The new TIP needs to be submitted to NMDOT by August 9, 2019.
A 30-day public comment period on the new TIP will open on June 23. Public
hearings will be held during the July 10 Technical Committee meeting and a
Special Policy Committee meeting on July 25, 2019.
FUNDING AND FISCAL CONSTRAINT
The TIP is required to be fiscally constrained. The projects listed have identified
detailed funding sources as required.
ANTICIPATED WORK
The PPM Review is required for any new project submitted for the new TIP. To
date, only three (3) new projects have been added. The projects are those that
were recently awarded TAP/RTP funding.
The PPM/Project Scoring Committee is scheduled to meet between June 17-29 to
rank new projects. Two (2) members of the Tech Committee and one (1) member
of the Policy Committee have made up this scoring committee in the past. We are
asking for volunteers at this time.
The report of the scoring committee will be included in the July Agenda.
Finalize any project revisions with the entities.
Work with NMDOT on submitting/implementing the new TIP.
25
Seek adoption of the FFY2020-2025 TIP.
Develop “TIP Amendment Procedures” schedule/guidelines specific to FMPO.
ATTACHMENTS
A list of current projects in the FFY2018-FFY2023 TIP.
A list of projects that the MPO Staff have been moved into the new FFY2020-
FFY2025 TIP with details for each project. As of June 3, this list is pending
direction regarding Informational Project #F100221 and District 5’s actions on
their NM 170 (#F100310) and two US 64 (#F100112, #F100113) projects. Project
#F100170 (NM 173) is included in the new TIP as it underwent an administrative
modification recently in May.
INFORMATION ITEM
MPO Staff recommends that the Technical Committee review the projects in their
agenda.
The final draft FFY2020-2025 TIP will be on the July agenda for the Technical
Committee to consider forwarding a recommendation of approval to the Policy
Committee for their adoption on July 25, 2019.
APPLICABLE CITATIONS
23 CFR Part 450-326.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #8
Subject: Committee Member Discussion Items
Date: June 12, 2019
DISCUSSION ITEMS
There were no additional discussion items provided by Technical Committee members for
inclusion in the Agenda.
43
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #9
Subject: Information Items
Prepared by: MPO Staff
Date: June 12, 2019
INFORMATION ITEMS
a. NMDOT’s State Call for Projects. A total of seven (7) projects were submitted before the
May 24 deadline. The Feasibility Meeting is scheduled for Thursday, June 6. A report on
that meeting will be provided at your meeting.
b. Annual FMPO Quality Assurance Review (QAR). The MPO’s Annual Quality Assurance
Review (QAR) was held on April 10. A copy of the written evaluation is attached for your
review.
c. PPP Status. The draft is nearing completion. A 45-day public comment review period is
required,
d. MPO Quarterly. The MPO Quarterly was held in Farmington on June 5. A copy of the final
draft agenda is attached. A report on that meeting will be provided at your meeting.
e. New Mexico LTAP Center Advisory Committee Meeting. MPO Staff will attend this
meeting via phone conference. A report on that meeting will be provided at your meeting.
f. FMPO & NWNM RTPO Introductions and Opportunities for Future Collaboration. At your
July meeting, Robert Kuipers, the NWNM RTPO Program Manager, has asked to present on
“Opportunities for Future Collaboration between FMPO and NWNM RTPO”.
44
NMDOT Asset Management and Planning Division
Statewide Planning Bureau – Government to Government Unit
Annual Quality Assurance Review of MPOs
Checklist and Report
Initial QAR Meeting:
Entity (MPO): Farmington MPO Reviewer: Joseph Moriarty
Review date: 4/10/19
Personnel interviewed (list names and positions):
Mary Holton, MPO Officer
June Markle, Administrative Assistant
QAR Follow-Up Meeting (if applicable):
Entity (MPO): Reviewer:
Review date:
Personnel interviewed (list names and positions):
1. Summarize results of agency audit, including any findings for the year ending June 30, 2018.
Provide context for any quotes, indicating the audit section in which the finding is found.
Additionally, review the Single Audit Section and highlight any findings related to the PL grant.
The City of Farmington’s Comprehensive Annual Financial Report (CAFR) for FY 2018 was
released on 12/17/18. The independent auditors’ report was conducted by Clifton Larson
Allen, LLP. In preparation of the QAR process the CAFR was submitted by the MPO Officer
to the GTG Planning Liaison on 2/13/19.
The City of Farmington’s CAFR identified two findings. The first finding (2018-001) related to
controls surrounding cash receipt processing. This finding has limited applicability to the PL
grant. However, the second finding (2018-002) relates to the controls surrounding the
procurement process. The audit noted the City lacked a complete understanding of the
procurement process and adherence to all requirements. The audit also, “recommended
that the City document the reasons for, and appropriate approval of, exceptions to its policy
of obtaining competitive bids and the basis for, and appropriate approval of, the selection of
a particular vendor.” City of Farmington management indicated they addressed this finding
with staff trainings on November 2, 2018 and will continue to address this finding by re-
emphasizing the importance of due diligence with staff.
The audit did not note any federal award findings and questioned costs. In addition, two
prior year findings were resolved: finding 2017-001 (Preparation of the Schedule of
Expenditures of Federal Awards) and 2017-002 Equipment and Real Property Management.
Additionally, the audit is: Current On file Posted to the website
General summary: The City of Farmington’s Fiscal Year 2018 CAFR was received on 2/13/19
and identified two findings. The most applicable finding from the perspective of the PL
grant relates to controls and requirements surrounding the procurement process. The
audit did not identify any findings related to federal awards and costs. Two findings from
the previous year (2017-001 and 2017-002) were also resolved.
45
Concerns/Issues: The finding that relates to the procurement process is a concern since the
City of Farmington is the fiscal agent for the MPO and therefore the MPO uses the City’s
procurement process. From the FHWA PL program perspective, the City of Farmington
needs to establish consistent internal procedures, controls, and oversight to ensure that all
federal requirements related to an open and competitive procurement process are met. All
federal grants must comply with 2 CFR 200. Additionally, the Federal Aid Highway Program
funds, which include the funds used for the MPO, must comply with 23 CFR. Federal
procurement regulations “pass-through” to grantees (City of Farmington), to sub-grantees
(NWNMCOG), and any potential vendors or consultants where federal funding is used.
Best Practices: Procurement training conducted for City staff is a positive step.
Follow-Up Needed On: Keep NMDOT informed on City’s resolution of the audit finding
related to the City’s procurement processes.
Notes from Follow-Up QAR:
2. Planning Products – are the following current, on file and posted to the website (PDF)?
Current On file 1 Posted to the website
Metropolitan Transportation Plan (MTP)
Transportation Improvement Program (TIP)
Unified Planning Work Program (UPWP)
Public Participation Plan (PPP) (update in conjunction with MTP)
Title VI Plan with contact person identified (update every 3 yrs) 2
Annual Performance and Expenditure Report (APER)
Annual Listing of Obligated Projects
N/A N/A N/A Air Quality Conformity letter (for EPMPO)
N/A N/A N/A Congestion Management Plans (for applicable MPOs)
Other plans (list below)
FMPO 2019 Bicycle and Pedestrian Plan
General summary: The above FMPO Planning Products were visually inspected by the
Planning Liaison and confirmed to be current, on file, and posted on the FMPO website
http://fmtn.org/364/Farmington-MPO. The internal files are filed logically and are well
organized. The Planning Products posted on the FMPO website are available as links from
the main webpage, organized by Planning Product themes.
Concerns/Issues: The Title VI Plan does not have a specific contact person identified, but
directs the reader to the Human Resources Director at the City of Farmington. This is
acceptable, provided the contact information listed is consistent even during staff turnover
(i.e. a generic email address or main desk phone number). The Planning Liaison asked for a
“cleaned-up” version of the Annual Performance and Expenditure Report (APER) be posted
on the web-site. Current version is a low resolution scanned version of the document.
FMPO staff to create and post a pdf file of the APER document on the website. Ensure that
documents posted to the website are available in sufficient resolution so they are legible
and accessible to the public. Post documents in a final pdf format. Once a new document is
posted FMPO staff perform a “user test” of the document to confirm legibility and
1
‘On file’ assumes an electronic copy; hard copies are optional.
2
Title VI Contact should be a specific person that works at the entity; ideally the contact information should be
stable (e.g. ADA.TitleVI@xxcog.org or a general phone number) so that even if the person leaves, the contact
information stays active.
46
accessibility. Recommend a regular check to make sure all the documents on the web site
are current as part of best MPO management practices. (See discussion below regarding
project management process.)
Best Practices: Continue to use TIP Amendment Schedule as part of standard MPO
management procedures to guide future amendments per 2/11/19 Corrective Action Plan.
Follow-Up Needed On: Confirm that email and/or phone number provided for the Title VI
contact is permanent and stable, so even in times of staff transition Title VI information
received is still actively monitored.
Notes from Follow-Up QAR:
3. Boards/Committees - are the following current, on file and posted to the website for all
boards and committees?
Current On File Posted to the website
Bylaws
Members, including Chair and Vice Chair
Schedule of meetings
Agendas (posted to website 72 hours prior to meeting)
Meeting minutes (for the past 2 years)
Approved documents (i.e. signed resolutions)
General summary: The above Board and Committee materials are current and posted to the
website. Current bylaws posted on website on 4/16/19. Agendas are posted a week in
advance and meeting minutes are available for the past 2 years.
Concerns/Issues: Concerned about the standing of the alternate that has been appointed to
the Policy Committee by the Town of Kirtland. FMPO staff indicated that this individual is
under contract to the Town of Kirtland to provide engineering services. NMDOT is unclear
whether this person is also an elected or appointed official of the Town. The June 28, 2018
Farmington MPO Committee Bylaws and Operating Procedures indicate that Policy
Committee alternates must also be either an elected official or an appointed government
official of the governing body, except for the NMDOT member. It is also recommend that
the FMPO staff consider establishing a consolidated project management process to
monitor items related to both long term Planning Products and short term Board and
Committee items so the most up-to-date and current documents are posted on the web site.
(A Gantt Chart is a useful project management tools in this regard.) This would help staff
visualize the lead time that is necessary for regular occurring Planning Products to be
completed within their mandatory deadlines.
Follow-Up Needed On: Research and determine official standing of Kirtland Policy
Committee alternate. Compare official standing to the Bylaws to determine appropriateness
of appointment. Communicate the outcome to NMDOT.
Notes from Follow-Up QAR:
4. Financials - Reporting and Documentation
Reimbursement Packets consistently submitted in a timely, complete, and accurate
fashion?
47
Reimbursement Packets include cover letters, Quarterly Reports, Budget Reports,
Expenditure Summary, Invoices and supporting documentation? Are these provided
with the Reimbursement Packets and maintained on file?
1. Budget Report: track expenditures by line-item as defined by task in the UPWP budget
2. Expenditure Summary: provide a summary of federal funds expended plus local match
paid, by quarter.
Is the documentation on file, well-organized, and accessible?
3. Security: what measures does the MPO take to ensure their IT systems are secure?
General summary: Financial reporting and documentation submitted in a timely manner per
the PPM. Documentation is complete and accurate. City of Farmington IT Department
responsible for FMPO IT security. The MPO uses the City of Farmington’s servers to store
and backup data. Rigorous IT procedures and protocols put in place by the City of
Farmington since January 2018 ransom ware attack of system, i.e. no thumb or external
drives allowed on any City of Farmington PC’s. Access is strictly monitored by IT staff.
FMPO data backed-up on a regular basis to the City of Farmington server. Data residing on
the FMPO website is also a built-in redundancy.
Concerns/Issues: How the NWNMCOG contractor accounts for time and expenses remains a
concern. Reimbursements requests cannot cross-over Federal program years. (For
example, expenses that occurred during FFY18 are not eligible for payment with FFY19
funds.)
Best Practices: MPO fiscal agent (City of Farmington) requiring monthly reimbursement
packets from NWNMCOG rather than on a quarterly basis. As the MPO’s fiscal agent the
City of Farmington needs to continue to scrutinize NWNMCOG reimbursement packets to
ensure only allowable costs are included per 2 CFR 200 and PPM requirements.
Follow-Up Needed On: N/A
Notes from Follow-Up QAR:
A. Timesheets and Timesheet Summary - All MPO staff who charge time to a federally funded
task are required to maintain internal, accurate, and current time records using database
and spreadsheets comparable to the MPO Time Tracking workbook provided in the Planning
Procedures Manual. GTG Liaison must randomly test a week to ensure the timesheets are
on file and that they match what was included in that reimbursement packet.
Is the MPO able to provide access to timesheets?
Is supporting documentation available to track activities?
Is the amount of time spent on MPO duties and billed to FHWA or FTA funds clearly
indicated?
N/A In the event that work hours involve multi-tasking among several federally-funded tasks,
does the MPO have a Cost Allocation Plan or Indirect Cost Agreement in place to
address the specifics of each situation?
General summary: Timesheets and time tracking records maintained by the FMPO were
available for Planning Liaison review. City of Farmington uses Executime software to track
time, attendance and job codes (PL or FTA) of COF employees that work for the MPO.
Timesheets for MPO staff members working for the City of Farmington were found to be
consistent with reimbursement packets.
48
Concerns/Issues: Time record keeping related to the NWNMCOG remain a concern. MPO
fiscal agent (City of Farmington) needs to continue to monitor NWNMCOG time record
keeping to ensure only eligible time and expenses related to MPO duties are reimbursed.
Best Practices: N/A
Follow-Up Needed On: N/A
Notes from Follow-Up QAR:
B. Contract Awards
☐ No Contractor Awards during the time period covered by this QAR
OR:
Published Notice in Newspaper for Invitation for Bid or Request for Proposals (RFP)
(advertisement), copy of ad
Bidder’s list at bid opening: Company(s) and quotation sheet(s); or copies of proposals
received
Award Letter, “NOTICE OF AWARD”/”NOTICE TO PROCEED” Forms
All subsequent notices: starts, suspends, resumes, and completions
Copy of fully executed Contract on file
All invoicing (copies) for contractors, vendors, suppliers
General summary: The only contract that was awarded by the MPO was to Russel Planning
and Engineering to complete the FMPO 2019 Bicycle and Pedestrian. This contract started
on March 14, 2018 and ended on March 13, 2019. The contract and invoices were inspected
by the Planning Liaison during the QAR site review.
Concerns/Issues: The Russel Engineering and Planning invoices where unclear regarding the
time period that the invoice spanned. Russel Engineering and Planning numbered their
invoices but did not indicate the period of time that the invoice covered. This is important
so that services are not inadvertently billed and paid twice. It is recommended that the
FMPO require consultants to provide a specific invoice number as well as identify the time
period of service (beginning date and ending date) of the work on the invoice cover page. It
is also a best practice to require consultants (and sub-consultants) to include time sheets in
the invoice package for the period of service invoiced. This is a good check to make sure the
hours billed in the invoice align with the actual time sheet records of the consultant. This is
especially good management practice for consultants that have limited experience working
on federally funded projects.
Best Practices: N/A
Follow-Up Needed On: N/A
Notes from Follow-Up QAR:
C. Inventory of capital assets acquired with Federal Aid Highway Program funds valued at
$5,000 and greater
☐ Not applicable
OR:
Are there property records that include a description of the property, serial or other
identification number, source of property, who holds title, acquisition date, cost of
property, percentage of Federal participation, location, use and condition of property
and ultimate disposition data including date of disposal and sale price?
49
Is there a physical inventory of the property with results reconciled with property
records (at least once every 2 years)?
Is there a control system developed to ensure adequate safeguards to prevent loss,
damage or theft of property? If there was an occurrence did NMDOT investigate and
what were the results of that investigation?
Are there adequate maintenance procedures developed to keep property in good
condition?
Note: Disposition of items of equipment at current, per-unit, fair market value in excess of
$5,000 may be retained or sold and the awarding agency (FHWA) has the right to an amount
calculated by multiplying the current market value or proceeds from sale by awarding agency’s
share of the equipment.
General summary: MPO staff indicated that a 2014 Ford Explorer 4x4 model was the only
capital asset purchased by Federal Highway Program funds by the MPO. It was purchased
for $23,892 and received by the City of Farmington on 5/7/14, VIN#1FM5K8B88EGB774619.
MPO staff provided a printed copy of an email to the Planning Liaison from Joey Roadhouse
(City of Farmington) to Shannon Glendenning (NMDOT) “Re: Information on the MPO
Explorer (Unit #10407) Requested by NMDOT” dated April 11, 2018 detailing the capital
asset purchased by Federal Highway Program funds by the MPO.
Concerns/Issues: A capital asset inventory of all assets acquired with Federal Aid Highway
Program funds valued at $5,000 and greater that meets requirements of 2 CFR 200.313(e)
must be maintained and updated. This capital asset inventory needs to be available for
inspection by NMDOT and/or FHWA. Update inventory annually in advance of the QAR Site
Reviews. This inventory was not available for annual QAR Site Review, conducted on
4/10/19.
Best Practices: N/A
Follow-Up Needed On: FMPO must have capital asset inventory of all assets acquired with
Federal Aid Highway Program funds valued at $5,000 and greater available for annual QAR
Site Review. FMPO did not have this inventory available at the QAR Site Review. Once
obtained from the City of Farmington, FMPO staff should email it to the FMPO Planning
Liaison.
Notes from Follow-Up QAR:
5. Structure/Intergovernmental & Other Agreements
Current On file
Is the Cooperative Agreement with NMDOT current and on file?
Is the JPA or MOA establishing the MPO current and on file?
Other (list)
Intergovernmental Services Agreement: Farmington Metropolitan
Planning Organization (FMPO): Administrative and Management
Services
General summary:
Cooperative Agreement with NMDOT (Contract Number D16019) dated 8/9/18 is current
and on file and posted on the FMPO website. Cooperative Agreement term: August 9, 2018
through September 30, 2022.
50
Joint Powers Agreement (approved on 8/17/18) is also current and on file and posted on the
FMPO website. Joint Powers Agreement term: October 1, 2018 through September 30,
2020.
Intergovernmental Services Agreement (ISA): Farmington Metropolitan Planning
Organization (FMPO): Administrative and Management Services (dated 9/18/19) is current
and is on file at the MPO. ISA term: August 15, 2018 through August 14, 2019. This ISA is
between the City of Farmington and the Northwest New Mexico Council of Governments to
provide Administrative and Management Services to the Farmington Metropolitan Planning
Organization.
Concerns/Issues: N/A
Best Practices: Continue to keep on file and post on website as appropriate.
Follow-Up Needed On: N/A
Notes from Follow-Up QAR:
6. MPOs: Traffic Counts and Other Roadway Data
Is the MPO’s traffic count program aligned with NMDOT?
Are traffic flow maps available and posted on the MPO’s website?
Are Functional System maps available and posted on the MPO’s website?
Has the MPO worked with NMDOT to maintain Functional and NHS designations?
General summary: The NMDOT Data Management Bureau (Traffic Monitoring Program) is
leading and coordinating traffic counts for the Farmington MPO, (as well as other smaller
MPOs across the state). The FMPO is currently waiting on calibrated 2018 AADT counts
from NMDOT for the Farmington region. The Farmington MPO is still maintaining their
Midwestern Software Solutions (MS2) license, a web-based Transportation Data
Management System that is used by the FMPO to compile and analyze traffic data. FMPO
staff indicated that traffic flow maps and functional system maps are posted on the FMPO
website, but they are dated. FMPO staff also indicted that they coordinate with NMDOT to
maintain Functional and NHS designations.
Concerns/Issues: How the FMPO MS2 license relates to the NMDOT Traffic Monitoring
Program remains a concern. The NMDOT Traffic Monitoring Unit is not coordinating with
FMPO on how to best utilize the MS2 license that FMPO is maintaining. FMPO may elect to
discontinue the MS2 license, unless it determines that the features offered by maintaining
the license are beneficial to FMPO. The NMDOT Planning Bureau recognizes the challenges
FMPO faces in updating their traffic flow and functional system maps. The foundational data
that is necessary to produce these maps is contingent on the cooperation of the NMDOT
Traffic Monitoring Unit.
Best Practices:
Follow-Up Needed On: FMPO needs to update their traffic flow and functional system maps.
Notes from Follow-Up QAR:
7. Staff & Board/Committee Member Training and Professional Development
51
Is there a training/professional development plan for MPO staff and how is it being
implemented?
Have all MPO staff attended the basic NHI courses when offered [e.g. Federal-Aid
Highways 101 (last offered spring 2014), Highway Program Funding (last offered winter
2016)]?
Has an MPO Planner attended a NM Open Meetings Act training?
Is the MPO following the UPWP training plan for Board/Committee Members? Are
additional resources needed to implement the training plan?
• What is the outreach to non-participating members? (Detail below)
General summary: FMPO staff indicated that there are ongoing training and professional
opportunities for staff. Specifically, FMPO staff will be participating in the 2 CFR 200
Trainings (May 14 and 15, 2019) as well as eSTIP trainings at NMDOT. FMPO staff also
indicated that they have participated in National Highway Institute (NHI) courses. FMPO
staff have also attended the NM Open Meetings Act training. FMPO staff have instituted
quarterly trainings for Technical Committee and Policy Committee members at TC and PC
meetings. FMPO staff indicated that the meeting agendas for both the Technical Committee
and Policy Committee meetings includes opportunities for input by members (under the
Business from Chairman, Members, and Staff standard agenda item) and from the public
(Public Comment on Any Issues Not on the Agenda standard agenda item).
Concerns/Issues: N/A
Best Practices: In the last year and since the last QAR, FMPO added the Town of Kirtland to
the MPO via the JPA. FMPO staff also indicated that the recent change in the JPA that
increased the membership of the committees resulted increased participation at TC and PC
meetings
Follow-Up Needed On: N/A
Notes from Follow-up QAR:
8. Public Involvement & Outreach/Environmental Justice/Title VI
Is public attendance at meetings encouraged and tracked?
Is public input received, addressed, and documented?
Is there outreach to Environmental Justice/minority communities?
Do meetings comply with the NM Open Meetings Act?
Are Environmental Justice and Title VI complaints documented, addressed and tracked?
Is NMDOT GTG Liaison informed of all complaints and resolution in a timely manner?
General summary: FMPO staff indicated the public attendance is tracked through a sign-in
sheet available at each TC and PC meetings. Public attendance is also tracked through the
minutes of each meeting. Emails received from the public are included as public comments
as part of the TC and PC agenda packets for committee members.
Concerns/Issues: Outreach to Environmental Justice/minority communities is recognized as
an issue by FMPO staff. The City of Farmington participates in other Federally funded
programs where outreach to Environmental Justice/minority communities has been flagged.
The City of Farmington and FMPO are coordinating to address these concerns. The FMPO
intends to address improved outreach to Environmental Justice/minority communities
through a revised Public Participation Plan. Recommend exploring low cost methods to
improve outreach to the public that may not have internet access and/or Environmental
52
Justice/minority communities. Possible outreach methods include: community based
bulletin boards, public service announcements, and public access TV/Radio.
Best Practices: FMPO TC and PC meetings comply with NM Open Meeting Act. Public
attendance encouraged. Opportunity for public comment included as a regular agenda item
for all meeting
Follow-Up Needed On: Improve outreach to the public that may not have internet access
and/or Environmental Justice/minority communities.
Notes from Follow-up QAR:
9. Tracking all TIP projects – how is the MPO Planner doing this?
General summary: FMPO staff indicated that MPO tracks TIP projects through the monthly
Technical Committee meeting updates that the TC members provide. FMPO staff also
monitors the eSTIP to make sure that the local public agencies within the MPO enter their
amendments in the eSTIP correctly.
Concerns/Issues: Updates for TIP projects are sometimes not provided at the Technical
Committee meetings. A good approach to improve the monthly TIP project updates is to
have TC committee members prepare and communicate their updates to MPO staff 2 to 3
days in advance of the TC meeting. A brief written update would suffice. Using these brief
written monthly TIP updates, a consolidated table would be compiled by MPO staff.
Ultimately this consolidated table of TIP Updates would be made available and/or displayed
during the TCC meetings. This way other committee members, MPO staff, and the public in
attendance can better follow and comprehend the updates. TC members would continue to
provide their TIP project update verbally at the meeting and be available to answer
questions or clarify issues regarding the project. This more systematic approach would also
serve as an early warning system to avoid any future programming issues related to design
and engineering schedules, ROW/Environmental certifications, lapsing funding, etc.
Best Practices: N/A
Follow-Up Needed On: N/A
Notes from Follow-up QAR:
10. Nonconformance issues during the time period since the last QAR:
Have there been nonconformance issues (per PPM) since the last QAR?
If so, is there a Corrective Action Plan underway?
The FMPO Corrective Action Plan (CAP) spanned the 2017 to 2019 time frame. The FMPO
CAP amendment finalized on February 11, 2019 was closed on April 12, 2019. NMDOT and
FMPO agreed to the previous CAP on 2/23/17 and amended it on 10/27/17. All FMPO CAP
findings are considered closed as of April 12, 2019.
11. Overall organization:
Are files organized, easy to find, and backed up?
Does MPO have a shared drive everyone uses or are files stored on separate PCs?
(Multiple employees need to have access to all files reviewed in this QAR.)
• How are files/documents archived? (Detail below)
53
General summary: File structure visually inspected by Planning Liaison. Files where logically
organized and easy to find. Per the 9/18/18 City of Farmington/NWNMCOG
Intergovernmental agreement (ISA) the City of Farmington IT Department, including its GIS
Division will provide services to the FMPO, including the purchase and maintenance of
personal computers, peripherals, networks, telephones and software. The FMPO’s website
will continue as an extension of the City’s website. City of Farmington uses a shared drive
network system. Network data is backed up on a regular basis. Network use is restricted to
authorized personnel only. Authorization from Departmental Head to get access to network
is required. All MPO employees have access to the MPO drive and data. Access is provided
to NWNMCOG Executive Director. All IT resources under Fiscal Agent (City of Farmington)
control.
Concerns/Issues: N/A
Best Practices: Since January 2018 ransom ware attack of Farmington’s network system
access is strictly monitored by IT staff. Robust IT procedures put in place by the City of
Farmington.
Follow-Up Needed On: N/A
Notes from Follow-Up QAR:
12. Additional notes and comments:
The Farmington MPO website is an effective tool to disseminate information to the public
about MPO activities. Consider refreshing the website as updated data (traffic counts,
maps, and plans) become available. MPO physical and digital files are maintained in an
efficient and logical manner. MPO Officer and Administrative Assistant very responsive
during QAR Site Review.
13. GTG Liaison: Please provide a summary of the review, including issues/findings and follow up
needed, along with a timeline for MPO to address any findings.
The most applicable findings from Farmington’s 2018 financial audit relates to controls and
requirements surrounding the procurement process. The City of Farmington as the MPO’s
fiscal agent needs to acknowledge and understand that Federal regulations pass-through to
grantees, sub-grantees, and to any vendors or consultants when federal funding is used.
Therefore, it is important for City and MPO staff to participate in training opportunities that
address federal procurement and 2 CFR 200 requirements.
The following specific items need to be addressed by the FMPO:
1. MPO Officer to provide a progress report regarding the City’s resolution of the audit
finding related to the City’s procurement processes.
2. MPO Officer to confirm that email and/or phone number provided for the Title VI
contact is permanent and stable.
3. FMPO staff to research and determine official standing of Kirtland Policy Committee
alternate per the current MPO Committee Bylaws and Operating Procedures.
54
4. Capital asset inventory of all assets acquired by the FMPO with Federal Aid Highway
Program funds valued at $5,000 and greater to be made available at annual QAR Site
Reviews. FMPO must send the current inventory to GTG Liaison.
5. MPO Officer to provide progress report regarding updates to FMPO traffic flow and
functional system maps.
6. MPO staff to identify methods to improve outreach to the public that may not have
internet access and/or Environmental Justice/minority communities.
NMDOT GTG Planning Liaison will check in with MPO staff at six months from the date this
QAR was emailed to the FMPO (noted below) to review progress on follow-up items included
above.
Follow-up Recommendations for next QAR:
Review and Sign-off
Final Submitted to GTG Supervisor on (DATE) Joseph Moriarty (5/22/19)
Reviewed and Approved by (NAME) on (DATE) Rosa Kozub (5/29/19)
Final Report (pdf) emailed to MPO on (DATE) 5/29/19
55
Meeting of the NM MPOs and NMDOT
Farmington MPO
Downtown Center
100 W Broadway, Farmington, NM 87401
Second Floor Conference Room
Wednesday, June 5, 2019 (8:30 am – 5:00 pm)
Agenda
Please join my meeting from your computer, tablet or smartphone.
https://global.gotomeeting.com/join/248795853
You can also dial in using your phone.
United States: +1 (571) 317‐3122
Access Code: 248‐795‐853
New to GoToMeeting? Get the app now and be ready when your first meeting starts:
https://global.gotomeeting.com/install/248795853
Free Wi‐Fi at the Downtown Center:
FMTN_Guest
Password: Public@800
8:30 am
Welcome, Introductions
Review of the MPO Quarterly Meeting notes from the March meeting in Albuquerque – Dave Pennella, MRMPO
Safety Targets ‐ Rosa Kozub, Government to Government (GTG) Unit Supervisor
HSIP Annual Highway Safety Plan and FFY 2020 Safety Targets
Date of tribal safety summit (fall 2019)
Date of the Annual Highway Safety Plan meeting (May 21, 2019)
Update on state's pedestrian safety plan – Requested by MRMPO
Network Screening Report ‐ Rosa Kozub
Update on LRSTP – Rosa Kozub
Indirect Costs – de minimus rate ‐ Rosa Kozub
Follow up to the May 14‐15 FAHP Grants Management Training – Requested by MVMPO
56
Bike Counter Program ‐ Shannon Glendenning, Active Transportation Programs Supervisor / BPE Coordinator
Award/TIP timelines – Shannon Glendenning
Lunch
1:00 pm
TLPA handbook training for MPO staff – Jolene Herrera, STIP Staff Manager (via call‐in)
Review of Process for State Funded Projects (Call for Projects dated April 30, 2019) – Jolene Herrera (via call‐in)
eSTIP Training ‐ Jolene Herrera (via call‐in)
Status of TIP/STIP documentation regarding PM requirements (ref. FHWA/FTA March 13, 2019 letter to Mike
Sandoval). This is required to be in place all TIPs/STIP as of May 20 – Jolene Herrera (via call‐in)
QA/QC 30%/60%90% plan completion for inclusion in the current FFY's TIP/STIP – Jolene Herrera (via call‐in)
Update to the Coordinated Public Transit Human Services Transportation Plans for the State ‐ Kevin E. Olinger,
Transit Bureau Chief
Uniform Traffic Reporting – Requested by MRMPO
Date of NM Traffic Monitoring Standards Meeting
NMDOT map of WIM sites, continuous count stations, etc.
Status of the remaining discrepancies in MPOs' and NMDOT's databases
(Sean Noonen, Manager, Traffic Monitoring Program: “If you have questions let me know and I can put something
together that can be shared with the group.”)
(Yolanda Duran, Chief, Data Management Bureau: “I think we need to have a separate meeting for the status of
the remaining discrepancies in the MPO’s and NMDOT’s Database. We can give an update to the outcome of the
meeting.)
Schedule next MPO Quarterly (location, date)
Refreshments provided by the Farmington MPO
57
The minutes from the
May 8, 2019
Technical Committee meeting
are on the following pages.
58
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
May 8, 2019
Technical Members Present: Steven Saavedra, City of Aztec
Jason Thomas, City of Bloomfield
Helen Landaverde (Alt), City of Farmington
Virginia King, City of Farmington
Dan Flack, Town of Kirtland
David Quintana, District 5, NMDOT
Andrew Montoya, Red Apple Transit
Fran Fillerup, San Juan County
Nick Porell, San Juan County
Technical Members Absent: None
Staff Present: Mary Holton, MPO Officer
Karen Walker, CD Administrative Assistant
Staff Absent: June Markle, MPO Administrative Assistant
Others Present: Joseph Moriarty, Liaison, NMDOT Planning Bureau
Maggie Moore, NMDOT Planning Bureau
Larry Hathaway, San Juan County
Scott Martin, San Juan County
Names of citizens in attendance are attached in a
separate list
1. CALL TO ORDER
Chair Nick Porell called the meeting to order at 10:04 a.m.
Chair Porell acknowledged the citizens in the audience who were there to speak about issues
on NM 173 (under Agenda Item #9). He stated they would be given an opportunity at the end
of the business meeting to provide their comments.
2. APPROVE THE MINUTES FROM THE APRIL 10, 2019 TECHNICAL COMMITTEE MEETING
Mr. Fillerup moved to approve the minutes from the April 10, 2019 Technical Committee
meeting. Ms. King seconded the motion. The motion to approve the minutes passed 8-0 (Mr.
Quintana had not yet arrived).
59
3. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: MPO Staff
Date: May 8, 2019
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS CURRENTLY ON FMPO TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
F100221 – Anesi Trail and Pedestrian Bridge
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100270 – Kirtland Schools Walk Path System
F100290 – CR 5500 Bridge Replacement
NMDOT
F100112 – US64 Phase V
F100113 – US64 Phase VI
CURRENT WORK
Top Regional Priority Projects
o East Arterial Route Phase II-
o Pinon Hills Boulevard Bridge Phases I & II
o Kirtland School Walk Path System
60
Surface Transportation Program Funds (STP) - funds can be used to repair
structurally deficient bridges.
Integration of all FMPO TIP projects on to new eSTIP website.
Public eSTIP website can be viewed at https://estip.dot.state.nm.us/
INFORMATION ITEM
This is an information item only. Committee members will have an
opportunity to provide feedback regarding TIP project status and details.
DISCUSSION: The Technical Committee members provided their project updates:
City of Aztec – Steven Saavedra
The City of Aztec continues to work through the right-of-way and acquisition process for the
Aztec East Arterial.
City of Bloomfield – Jason Thomas
The City of Bloomfield is working on right-of-way acquisition for the East Blanco Bridge.
City of Farmington – Virginia King
Foothills Drive Enhancement – right-of-way acquisition nearly completed with 90% review
expected soon.
20th Street – Phase III – working towards the 90% review. Right-of-way mappings for the
temporary construction permits have been submitted to NMDOT.
San Juan County – Nick Porell
Pinon Hills Boulevard Extension – Phase III – continues in the right-of-way phase with the right-
of-way submission at NMDOT.
Glade Run Trails – an environmental submission has been made to NMDOT and the design is
ongoing.
Kirtland Schools Walk Path – a “notice of substantial completion” was issued to the contractor
last week. Only a few minor items on the punch list to be addressed. Project should be
completed and closed out within the next month.
CR 5500 Bridge – a right-of-way submission was made to NMDOT on April 29. A 90% design
from the consultant is expected on May 10. An environmental review submittal to NMDOT is
expected by the end of next week.
NMDOT-District 5 – David Quintana
US 64 – construction on US 64 is continuing with expected completion of the last four-mile
stretch expected next year.
Mr. Quintana also reported that the bridge replacement in La Plata is ongoing.
61
The Navajo Gaming Authority was awarded approximately $3,000,000 for a new signalized
intersection at NM 371 and N36. NMDOT will be working with Navajo DOT on design and be
ready for construction next summer pending rights-of-way.
4. QUARTERLY EDUCATIONAL PRESENTATION – CRITICAL ISSUES IN TRANSPORTATION 2019
Subject: Quarterly Educational Presentation –
Critical Issues in Transportation 2019
Prepared by: Mary L Holton, AICP, MPO Officer
Date: May 8, 2019
PRESENTATION
A copy of the Transportation Research Board (TRB) publication “Critical Issues in
Transportation 2019” was included within the email for your agenda. This reading was
selected as it “poses a series of challenging questions about potential critical issues that may
arise 10 to 20 years into the future.” This subject is especial important as the MPO begins
preparing for the development of its 2045 MTP.
The authors advise that “Changes are coming at transportation from all directions, including
potentially revolutionary technologies such as drones and automated vehicles, rapid
innovations in urban transportation services, unreliable funding for infrastructure and
operations, and possible changes in national policies affecting trade, climate, environmental
protection, and sources of energy. The potential consequences of these changes could make
future congestion, fuel consumption, and emissions either markedly better or markedly
worse. Correspondingly, these potential changes could positively or adversely affect
commercial truck, rail, aviation, and waterborne networks, with significant implications for
the delivery of goods and services, personal travel, and the economy.”
Sections in the reading include Transformational Technologies and Services; Serving a Growing
and Shifting Population; Energy and Sustainability; Resilience and Security; Safety and Public
Health; Equity; Governance; System Performance and Asset Management; Funding and
Finance; Goods Movement; Institutional and Workforce Capacity; and, Research and
Innovation.
MPO Staff invites you to read the publication noting what the MPO will most likely need to
address in the development of the new MTP. Please come to the meeting prepared to discuss
the issues you believe will challenge the MPO in the future.
DISCUSSION: Ms. Holton encouraged the Technical Committee to read the publication and
offer any comments or input on recommendations that should be incorporated into the MPO’s
2045 MTP. The article spoke about many different technologies and how some might work in a
heavily populated area, but not necessarily in a rural setting. It also referenced the timing of
the different technologies. The population shift information was important to consider and
the changes in demographics for our own region will need to be considered when developing
the MPO’s 2045 MTP.
62
Ms. Holton asked the members to offer any input that they believe is important to be used in
developing the 2045 MTP.
Mr. Fillerup said that during the development of the 2040 MTP, many topics were only
covered lightly, so a publication like this that looks at critical issues when preparing for the
future is valuable. He recommended keeping the ideas in mind and consider how the FMPO
might be able to use them.
5. REPORTS FROM NMDOT
District 5 – David Quintana
Mr. Quintana invited Mr. Joaquim and his wife to attend the meeting as they expressed
concerns with the condition of NM173. NMDOT does have a safety project for NM 173. The
design is almost completed and they are working to get the utilities relocated in order to
begin the project. Coordination of moving of the utilities is an ongoing effort. Mr. Quintana
had advised Mr. Joaquim to attend the MPO meeting and express their concerns so the project
could be identified in the MPO’s MTP.
Ms. Holton asked if Mr. Quintana was interested in putting this project on the TIP. She said
the MPO would be making the call for projects for the new TIP on May 20. Getting it into the
TIP would depend on available funding in order to ensure it was fiscally constrained. Although
this would be an NMDOT project, Mr. Quintana said he wanted the MPO to be aware of the
local concerns so the project could be identified as a regionally significant project and be
included in the MTP. There was discussion on whether NM 173 is outside of the MPO area and
if, possibly, the project was part of the Northwest RTPO’s RTIPR. It was believed that part of
NM 173 is within the MPO boundaries and part is in the RTPO area.
New projects will be prioritized as the new FFY2020-2025 TIP is developed, but the entity
that is sponsoring a project needs to submit the application and provide the funding
information to the MPO. Mr. Quintana agreed and said NMDOT would be providing that
information. Mr. Fillerup asked if the construction for NM 173 has been funded. Mr. Quintana
said safety funding had been identified for construction from mile marker 2 to 3.7.
Planning Bureau – Joseph Moriarty
Mr. Moriarty congratulated San Juan County and the City of Farmington for their TAP and RTP
funding awards. There was $1,300,000 in federal funding awarded. There will be an upcoming
call for projects for TAP and RTP for future years.
NMDOT has just issued a call for projects for local and tribal governments using state funds.
The intent of this call is to provide more flexibility for local governments to fund
transportation project needs. Additional information on this call for projects is included in
Secretary Sandoval’s letter (pages 10-13 of the Agenda). NMDOT also distributed a FAQ sheet
to the MPOs throughout the state to help streamline the application process. The deadlines
for application submittal are tight, but this is a unique funding opportunity for local
governments and NMDOT is encouraging everyone to apply.
There will be an upcoming free pedestrian safety action plan training in Santa Fe. NMDOT is
partnering with the North Carolina Highway Safety Research Center to bring this training to
63
New Mexico on how to develop a pedestrian safety plan to address pedestrian safety issues.
Please let Mr. Moriarty know if you would be interesting.
Maggie Moore announced that NMDOT had acquired non-motorized bicycle counting
equipment that can be loaned out free of charge to the MPOs, RTPOs, and tribal/local
agencies. There is a concise application and guide to let NMDOT know how, where and when
the equipment is to be used. The counters are similar to vehicles counters and can count bike
use on facilities. The data collected will also be gathered by NMDOT from around the state to
have that information in their database. Detailed information should be available on the
NMDOT website in the next week or so.
6. COMMITTEE MEMBER DISCUSSION ITEMS
Subject: Committee Member Discussion Items
Date: May 8, 2019
DISCUSSION ITEMS
There were no additional discussion items provided by Technical Committee members for
inclusion in the Agenda.
7. INFORMATION ITEMS
Subject: Information Items
Prepared by: MPO Staff
Date: May 8, 2019
INFORMATION ITEMS
g. TIP Amendment #7, New FFY2020-2025 Transportation Improvement Program (TIP). It
is noted that there were no project change forms received by FMPO for the formal TIP
Amendment #7 to the FFY2018-2023 TIP.
The remaining amendment cycles (#8 and #9) for the FFY2018-2023 TIP have been
cancelled so that we can start the FFY2020-2025 TIP Adoption Process, which will begin in
late May with the Call for Projects and will end with the final consideration by both the
Technical and Policy Committees in August 2019. A schedule for this TIP Adoption is
attached for your review.
h. Annual FMPO Quality Assurance Review (QAR). The MPO’s Annual Quality Assurance
Review (QAR) was held on April 10. We are expecting Joseph Moriarty’s written evaluation
soon.
64
i. MTP Report. MPO Staff continues to work on the draft PPP and the MTP Scope of Work.
The Draft PPP will be distributed as soon as possible.
j. NMDOT Traffic Counts. Staff advised last month “the NMDOT Traffic Monitoring section is
in the process of annualizing all of the 2018 traffic counts. During then March MPO
Quarterly, Sean Noonen/NMDOT reported that FMPO’s data is expected to be released in
April, and that the 2019 locations will be coordinated with the MPO (including the Tech
Committee) very soon.” Staff asked for an update from Sean and he responded, “Our
Roadway Inventory Program is putting together a geodatabase that will include the 2018
traffic count data that includes our traffic section ID, our route naming convention and
the local street names. In the meantime I have attached a shape file and kmz file for your
service area with 2018 traffic data. The shape file does not include the local street
names.” The files were forwarded to you in case you wanted the data quicker and your
entity has GIS capabilities, and to the GIS Division with the City of Farmington so that they
can provide that assistance to the MPO.
k. TAP/RTP/CMAQ Application Update. Please congratulate San Juan County and the City of
Farmington on their recent Transportation Alternatives Program (TAP) and Recreational
Trails Program (RTP) grant awards for the following projects: Glade Run Recreation Area
Trails, Kirtland School Multi-Use Trail, and Foothills Drive Enhancement Phase II! The
federal funding for the three FMPO projects totals more than $1.3M. Way to go Fran,
Nick, and Virginia! A copy of Selection Process and Feedback from NMDOT is attached. We
have not yet received any information on the CMAQ application.
l. TAM Plan Transit Performance Targets Adoption. This item will return next month, as
the FTA requires that the MPO adopt these targets annually by June 30. Andrew has
advised that the Red Apple’s Targets have not changed.
m. Call for Projects. NMDOT has announced its call for projects. Local and tribal
governments in New Mexico are eligible to apply for state funded grants. Applications are
due to NMDTO by June 14, 2019 and require a number of steps prior to submittal. See the
attached letter for details.
n. Staff Training. MPO Staff will travel to Santa Fe for FHWA Grants Management Training (2
CFR 200) and NMDOT eSTIP training May 14-16. A representative from the MPO’s fiscal
agent will also attend the FHWA training.
DISCUSSION: Ms. Holton reported on the Information Items:
a. No projects were received for TIP Amendment #7. In light of preparing for the new
FFY2020-2025 TIP and following discussions with the STIP Coordinator, Manuel Chavez, the
remaining proposed amendment cycles #8 and #9 for the 2018-2023 TIP will be canceled.
A copy of the proposed schedule for the new FFY2020-2025 TIP is included on Page 7 of
the Agenda. The first Call for Projects will be on May 20.
Ms. Holton plans to meet with each Technical Committee member to ensure their projects
are moved properly from the old TIP into the new TIP. Mr. Chavez has confirmed that the
three projects currently in the informational years of the old TIP can again be placed in
the informational of the FFY2020-2025 TIP. If a project is now in the informational or
65
outer years of the current TIP (2022 and 2023), simply rolling them over into the new TIP
would place them in a year that requires a project to be fiscally constrained. No project
can be accepted into the new TIP that is not fiscally constrained.
b. FMPO’s Annual QAR. The annual Quality Assurance Review was conducted by Mr. Moriarty
on April 10 and his evaluation is expected soon.
c. MTP. The RFP proposed scope of work for the 2045 MTP has been completed and
reviewed. Ms. Holton has begun working on the Public Participation Plan document.
d. NMDOT Traffic Counts. Some preliminary information was distributed to the Technical
Committee members. The City of Farmington’s GIS Division said they should be able to
provide the information in a GIS format in the next month or so. Once it is available, it
will be posted on the MPO website.
e. TAP/RTP/CMAQ. Ms. Holton reported that San Juan County received funding for two of
their projects and the City of Farmington also received a TAP award. The area did not
receive a CMAQ award.
Mr. Porell advised that although their CMAQ application to purchase a diesel vehicle was
deemed feasible, it did not comply with “buy America” and thus was ineligible for an
award. Mr. Fillerup visited with Sky Tallman and posed the questions about how the
federal government buys vehicles if it cannot be certified as “buy America”. Mr. Moriarty
confirmed that the state uses only state funding when buying a vehicle and said he would
have to see if he could find an answer to the question of how the federal government buys
their vehicles.
f. TAM Plan Adoption. The Transit Asset Management (TAM) Plan performance targets are
due for adoption in June. Mr. Montoya reported that nothing has changed and the targets
will remain the same as last year. This will be an Action Item on the June meeting
agenda.
g. NMDOT Call for Projects for State Funded Grants. The due date for the MPO to submit
the final application packages to NMDOT is June 14. Ms. Holton sent an email to the
Technical Committee members on May 8 asking that they review the NMDOT timeline for
application submittal (including PPFs and PFFs, feasibility meetings, resolutions of
sponsorship).
Most projects can be considered, but NMDOT would like to see prioritized projects (find
that list in Section 4.5 of the 2040 MTP). Projects can also be selected from the TIP, but
many of those will already have funding. NMDOT is looking for regional projects that
would meet TIP requirements and they want a large list of projects for the Transportation
Commission to choose from. Applications submitted previously cannot be used again. An
updated cost estimate and maps must be provided along with a resolution from the
entity’s decision-making body or a letter from the department manager verifying that
funding for the project is in place.
66
Ms. Holton asked the members for suggested regional projects that could be deemed
feasible and are prioritized. Some of the ideas discussed included:
- Bloomfield’s bridge project;
- Town/highway signage (check on eligibility; state highway signs are state-owned;
concentrate on signage for local roads);
- Bridge maintenance on Broadway, Animas, and Miller;
- Resurfacing project;
- Foothills-Phase III;
- San Juan Boulevard;
- Bridge on CR 5500
Ms. Holton said she would develop a more definite timeline for project submittal in the
next few days.
h. Staff Training. Ms. Holton will be leaving for Santa Fe on Monday for eSTIP training with
Jolene Herrera, the new STIP Staff Manager. Following that on Tuesday and Wednesday
will be the FHWA training on grant management.
8. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Chair Porell introduced Scott Martin a newly hired Public Works Engineer for San Juan County.
Mr. Thomas requested some assistance from NMDOT to clean out Bridge #9286 on US 64 in
Bloomfield. The clearance should be 10’ but is now reduced to 4’ and this has caused flooding
downstream in the past on the south side of the highway. Mr. Thomas had tried to get this
started last year, but NMDOT said they first needed to get an environmental clearance before
the maintenance work began, and he was hoping some progress had been made on getting
that taken care of. Mr. Quintana said he would take care of this.
Mr. Saavedra said that the City of Aztec had appropriated $3,000,000 during a recent
legislative session to complete the East Arterial project. He asked Mr. Quintana how that
additional funding might impact funding from FHWA and was the City still on track with the
project’s funding. Mr. Quintana said that the additional monies should just be amended into
the existing funding agreement and incorporated with the federal and state funds for the
project. He said Mr. Saavedra could speak with Ms. Clarissa Martinez for further clarification
on funding and would make her contact information available. With the departure of Brad
Fisher, the new contacts for local government projects are Lawrence Lopez or Manuel
Maestas.
Mr. Thomas asked if the new District 5 Transportation Commissioner had been named. Mr.
Quintana said he did not believe that announcement had been made.
There was no additional business from the Chairman, Members and Staff.
With both NMDOT representatives present, Chair Porell returned to Agenda Item #5 – Reports
from NMDOT.
9. PUBLIC COMMENT ON ANY ISSUES NOT ON THE AGENDA
67
The following is a summary of comments from the residents and concerned citizens about the
state of repair on NM 173:
-Dennis Joaquim and Anna Padilla, Navajo Dam – thanks to NMDOT and Mr. Quintana
for safety project by Gobernador Wash (cement barriers by cliff). Expressed concerns
over safety of NM 173. Submitted 15-page petition of signatures (copy of petition to
be included with meeting minutes) for NMDOT to investigate and resolve the items
listed in the petition:
1) pedestrian walkway attached to existing bridge enabling community
members and tourists from around New Mexico and across the country to cross
the river safely;
2) hill at mile marker 4 on NM 173 needs to be leveled off so there is a line of
sight from both lanes of traffic. This particular junction has been the scene of
numerous auto accidents and fatalities not related to speeding, but to lack of
visual clarity from oncoming traffic;
3) there are no shoulders on NM 173. Along with poor visibility caused by hills
there are few places a driver can safely pull over to avoid oncoming traffic.
Also from the petition: “Although some of the recent and sometimes deep and
dangerous pot holes have been filled; it is an ongoing problem. Drivers have to
swerve to avoid the deeper holes. We are constantly having to realign our
vehicles caused by pot holes. Navajo Dam and the San Juan River Service
tourists from throughout the United States along with other countries. This
area generates hundreds of thousands of dollars to our New Mexico economy
yet the access roads to reach these destinations are deplorable.”
Ms. Padilla wanted to make sure the issues with NM 173 were known.
Chair Porell asked if the MPO have ever issued a resolution regarding NM 173. Ms. Holton said
no, but that it could be put included on the June meeting agenda. She noted that, more
importantly, was to get the project on the TIP which is the responsibility of the sponsoring
agency. Ms. Holton asked for either District 5 or someone from NMDOT’s STIP Unit to initiate
the application. It is a regionally significant project and, as long as its fiscally constrained,
will certainly be included in the TIP. There was discussion on projects first being planned and
identified in the MPO’s MTP, new MTP not due for updating until later this year with adoption
not until September 2020, can projects be amended into TIP and STIP if not identified in MTP,
seek clarifying answers from STIP Unit, and include NM 173 in the new 2045 MTP.
Chair Porell suggested considering a Policy Committee Resolution to support the need for
repairs and improvements to NM 173. He also stated that he is San Juan County’s
representative to the RTPO and would make them aware of the concerns on NM 173 at their
next meeting. Ms. Holton will draft a resolution in support of improvements to NM 173 for
Policy Committee consideration in June.
Ms. Padilla wanted to add that she had lived in Navajo Dam, New Mexico for 42 years
and thought that NM 173 had been resurfaced maybe only once in all those years.
-Cheryl Kolls, 1002 Rio Brazos, Aztec, NM - NW Region Manager of NM State Parks-
Here to support a project to improve NM 173. State park visitation in 2018 was
68
557,547 visitors. There is commercial activity on the San Juan River portion that last
year consisted of 5,252 trips that serviced 10,197 clients such as 53 guide companies
with over 100 guide permits issued for that three miles of river. Those companies
and individuals are traveling on these roads. The county receives a lot of income
from visitors and outside people whose stay is typically 5-8 days on average. The
better experience they have they will come back.
-Jarrett Johnson, 7399 CR 502, Bayfield, CO 81122 - owner and operator of Navajo
Lake Marina. NM 173 is a vital road to the community. New Mexico economy heavily
based on oil and gas with tourism growing. Last year there were over 500,000 visitors
to the state park and we did over $3,000,000 in revenue last year. There are wineries
and the Quality Waters are accessible from NM 173. Followers on the marina’s
Facebook page promotes tourism with over 131 countries contributing. He is
concerned about safety of NM 173. Co-worker lost his wife on that road about a year
ago. Many employees that work for me and I worry about their safety.
- Thaddeus Cono, 33 CR 4267, Navajo Dam, NM – Co-owner of Fisheads San Juan River
Lodge and former Parks Advisory Board member. Tax revenue generated from the
area is huge. Visitation is over half million a year. His company has employees from
Farmington, Bloomfield and Aztec. RV and boat traffic, as well as oilfield traffic on
NM 173 is huge. Recreation revenue is a vital staple for New Mexico and local
economy. People stop and buy groceries and gas in Aztec area before going out to
Navajo Lake. Believe revenue generated from increased visitors would increase if
road was better and tax revenue for Aztec could increase. Believes there has been
some adversity with the City of Aztec and NMDOT so thought Chair’s suggest to seek a
resolution from the MPO would help bring everything together.
-Tim Jimerson, resident at Navajo Dam since 1986 - had a guide service for 35 years.
Was pulled over once by State Police and accused of drunk driving, but was simply
driving and swerving to avoid potholes. Road cold patching does not last. Bouncing
over road hurts vehicle and body. Safety is the #1 issue.
-Jay and Joyce Dykstra, Navajo Dam resident for 20 years - owner of Angler’s Hearth
B&B. Basic infrastructure is badly needed on that road. It’s a dangerous road and is
aware of four deaths. Cattle guards are sinking and some are paved over. Potholes
filled in, but with heavy traffic, the repairs don’t last. The road is a disaster for
people who live there and others who visit.
-Jerry Richards, Navajo Dam resident – NM 173 is dangerous and a safety issue.
-Fernando Gil, Farmington resident since 1996. Worked oilfield for many years and
traveled that road often. Oilfield pays road tax, but it is not being used to fix this
road. When the road has washed out sections, trucks barely fit on the roadway.
Patching work is done poorly.
- Craig Pilley, 21 Road 4267, Navajo Dam, NM – has lost friends and family on that
road. Believes there’s actually more traffic that uses the road due to all the service
vehicles. Something needs to be done.
69
Chair Porell asked if traffic counts on conducted on NM 173. Ms. Holton said she was not sure,
but could make sure it gets added to the traffic count schedule for 2019 being prepared by
Sean Noonen, Manager, Traffic Monitoring Program with NMDOT’s Data Management Bureau.
Mr. Quintana thought those counts should be available through the traffic safety section.
-Peggy Mascarenes, used to live Navajo Dam, NM - remember when the dam built and
thought a large portion of the dam was built by many Aztec residents; it was not the
state highway department. Most infrastructure for dam built by individuals, not
state, not city, not county. Oil and gas brings in 1/3 of revenue for New Mexico.
Safety programs for oil and gas are stringent, but they can do nothing about the
condition of the road. Drives the roads on the reservation for work and they are
better than 173. Appreciate if something can be done with road.
Chair Porell said he wanted to clarify the purpose of the FMPO Technical Committee. This
committee is made up of engineers and planners from respected municipalities. The function
of the MPO is transportation planning for local area roadways. NMDOT is a voting member on
the committee, but their planning objectives for the MPO are in an oversight and support
capacity. NMDOT planning division is responsible for planning improvement to state roads.
The FMPO Technical Committee may recommend to its Policy Committee the need for
improvements, but the FMPO cannot allocate any funds to NM 173. Neither the FMPO
Technical Committee nor the FMPO Policy Committee are decision-making boards for state
projects or funding. The Technical Committee appreciates the community input and will
ensure NM 173 is included in the MPO’s MTP.
Mr. Fillerup agreed with Chair Porell on the limitations on the Technical Committee to issue
recommendations, but added the community input was valuable to getting issues on the radar
of the MPO. The information is also valuable to Mr. Quintana who represents NMDOT. He
noted the four items mentioned by Ms. Padilla and specified in the petition were the key
takeaways. Mr. Quintana also thanked the attendees for their participation and said he would
take this information to District 5 and begin working on the areas of concerns expressed and
would work with the MPO to see about getting projects programmed.
10. ADJOURNMENT
Mr. Fillerup moved to adjourn the meeting. Mr. Quintana seconded the motion. The motion
passed unanimously and Mr. Porell adjourned the meeting at 11:22 a.m.
___________________________ ___________________________
Nick Porell, Technical Committee Chair June Markle, Administrative Assistant
70