MPO Technical Committee
Regular MeetingFarmington, NM · March 11, 2020
Agenda
MPO TECHNICAL COMMITTEE
AGENDA
March 11, 2020
10:00 a.m.
Council Chambers
Bloomfield City Hall
915 North First Street
Bloomfield, New Mexico
AGENDA
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
March 11, 2020 10:00 AM
This regular meeting will be held in Council Chambers at Bloomfield City Hall, 915
North First Street, Bloomfield, New Mexico.
ITEM PAGE
1. Call to Order: Call meeting to order
2. Minutes: Approve the minutes from the February 12, 2020 Technical 8-16
Committee Meeting.
3. MTP Update. Presentation on the development of the MTP 1
Presented by: Aaron Sussman, Planner, Bohannan Huston
4. TIP Project Updates from Technical Committee Members: Members will 2-3
provide updates on their TIP projects.
5. Reports from NMDOT
a. Update from the Planning Bureau (Joseph Moriarty)
b. Update from District 5 (Javier Martinez)
6. Committee Member Discussion Item(s) 4
No discussion items were presented for inclusion on the Agenda.
7. Information Items 5-6
a. UPWP Administrative Amendment #5
b. TIP Administrative Modifications for February
c. Local Government Transportation Project Fund (LGTPF) Update
d. STEP Workshops for MPOs
Presented by: Beth Escobar, AICP
8. Business from Chairman, Members, and Staff
9. Public Comment on Any Issues Not on the Agenda
10. Adjournment
The public body may only take action on an item if it is
listed for action on the publicly noticed agenda.
ATTENTION PERSONS WITH DISABILITIES: If you are an individual with a disability who is in
need of a reader, amplifier, qualified sign language interpreter, or any other form of auxiliary
aid or service to attend or participate in the hearing or meeting, please contact the MPO
Administrative Assistant at the Downtown Center, 100 W Broadway, Farmington, New Mexico or
at 505-599-1466 at least one week prior to the meeting or as soon as possible. Public
documents, including the agenda and minutes, can be provided in various accessible formats.
Please contact the MPO Administrative Assistant if a summary or other type of accessible
format is needed.
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #3
Subject: Report on the 2045 Metropolitan Transportation
Plan (MTP) Update
Date: March 11, 2020
MONTHLY REPORT
Mr. Aaron Sussman, Planner with Bohannan Huston (BHI) will call-in monthly with a
report on the Metropolitan Transportation Plan (MTP) Update.
1
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #4
Subject: Status of TIP Projects
Prepared by: MPO Staff
Date: March 11, 2020
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
The Policy Committee approved the new FFY2020-2025 TIP during a Special
meeting on July 25, 2019.
The projects currently on the FFY2020-2025 TIP are listed below.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS ON FMPO FFY2020-2025 TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100290 – CR 5500 Bridge Replacement
F100320 – Kirtland Schools Walk Path Extension
F100330 – Glade Run Recreation Area Trails Extension
NMDOT
F100170 - NM 173 Safety Improvements
F100340 – US 550 Pavement Rehab
F100350 – NM 371/N36 (PE)
F100351 – NM 371/N36 (Const)
2
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity to
provide any needed feedback/updates regarding current TIP projects status and
details.
3
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Committee Member Discussion Items
Date: March 11, 2020
DISCUSSION ITEMS
There were no additional discussion items provided by Technical Committee members
for inclusion in the Agenda.
4
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #7
Subject: Information Items
Prepared by: MPO Staff
Date: March 11, 2020
INFORMATION ITEMS
a. UPWP Amendment #5. Administrative Amendment #5 to the Unified Planning
Work Program was approved by NMDOT on February 14. The amendment was
necessary to reflect the MPO’s actual awards from FHWA and FTA for FFY2020.
Previous amounts reported were estimates.
b. TIP Administrative Modifications for February. No change to projects. Fifteen
administrative modifications were approved.
c. Local Government Transportation Project Fund (LGTPF). NMDOT has
notified the MPOs and the RTPOs of the presumed upcoming application
process for the Local Government Transportation Project fund in anticipation of
its funding in the State’s FY2021. NMDOT has rescheduled the meeting to
discuss statewide selection/prioritization criteria for the Fund for Friday, February
21. Information learned from this discussion will be shared with the Technical
Committee at their meeting on March 11.
d. STEP Workshops for MPOs. FHWA has offered to conduct free, full-day
MPO/RTPO workshops on the seven (7) pedestrian safety countermeasures
included in its Safe Transportation for Every Pedestrian (STEP) program (see
attached flyer). The workshop is intended for Technical Committees and staff of
MPOs or RTPOs. Is there interest by the FMPO in hosting a STEP workshop?
Deadline for expressing interest is March 13.
5
Safe Transportation for Every Pedestrian ‐ MPO Workshop
According to the NHTSA, pedestrian fatalities have increased by 53 percent between 2009 and 2018, while all
traffic fatalities have only increased by 2 percent. In 2018, over 72 percent of pedestrian fatalities occurred away
from intersections. Metropolitan Planning Organizations (MPOs) can be an integral part of prioritizing and
programming improvements to address pedestrian safety.
This free, full day (7‐ to 8‐hour) workshop introduces MPO and local agency representatives to the Safe
Transportation for Every Pedestrian (STEP) program, including strategies for supporting improved pedestrian
safety at the local and regional scale. Workshop instructors will lead attendees through an exercise to develop
an “action plan” for identifying and prioritizing needs for improving pedestrian safety. The workshop also
includes a brief field visit exercise where participants will evaluate a site for opportunities to improve pedestrian
safety. The workshop will discuss how MPOs and local agencies set and monitor safety targets, inventory
pedestrian crossings, leverage funding for implementing pedestrian safety projects, and integrate safety data
and analysis tools in the transportation planning process. The workshop will highlight the “Spectacular 7”
countermeasures promoted by the STEP program:
Rectangular rapid flashing beacons (RRFBs) are active (user‐actuated) or passive (automated detection)
amber LEDs that use an irregular flash pattern at mid‐block or uncontrolled crossing locations. They
significantly increase driver yielding behavior.
Leading pedestrian intervals (LPIs) at signalized intersections allow pedestrians to walk, usually 3 to 4
seconds, before vehicles get a green signal to turn left or right. The LPI increases visibility, reduces conflicts,
and improves yielding.
Crosswalk visibility enhancements, such as crosswalk lighting and enhanced signage and markings, help
drivers detect pedestrians–particularly at night.
Raised crosswalks can serve as a traffic calming measure and reduce vehicle speeds.
Pedestrian crossing/refuge islands allow pedestrians a safer place to stop at the midpoint of the roadway
before crossing the remaining distance. This is particularly helpful for pedestrians with limited mobility.
Pedestrian hybrid beacons (PHBs) provide positive stop control for higher‐speed, multilane roadways with
high vehicular volumes. The PHB is an intermediate option between a flashing beacon and a full pedestrian
signal.
Road Diets can reduce vehicle speeds and the number of lanes pedestrians cross, and they can create space
to add new pedestrian facilities such as pedestrian crossing/refuge islands.
Learning Objectives
Describe local, State and national pedestrian safety trends
Discuss applications of safety data to pedestrian planning and policy
Identify common pedestrian safety issues and how to apply the STEP countermeasures
Learn about best practices to develop projects including STEP countermeasures
Apply workshop concepts to local conditions during a group field visit
Develop an action plan for improving pedestrian safety
6
The minutes from the
February 12, 2020
Technical Committee meeting
are on the following pages.
7
MINUTES
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
TECHNICAL COMMITTEE MEETING
February 12, 2020
Technical Members Present: Steven Saavedra, City of Aztec
Jason Thomas, City of Bloomfield
Beth Escobar, City of Farmington
Virginia King, City of Farmington
Andrew Montoya, Red Apple Transit
Nick Porell, San Juan County
Fran Fillerup, San Juan County
Dan Flack, Town of Kirtland
Technical Members Absent: Matt Grush, NMDOT District 5
Staff Present: Mary Holton, MPO Officer
June Markle, Administrative Assistant
Staff Absent: None
Others Present: Aaron Sussman, Bohannan Huston (phone)
Maggie Moore, NMDOT Planning Bureau
Joseph Moriarty, Planning Liaison, NMDOT
Sharon Cruz, North Region Design Center (phone)
Manuel Maestas, North Region Design Center (phone)
Larry Hathaway, San Juan County
1. CALL TO ORDER
Chair Nick Porell called the meeting to order at 10:03 am.
2. APPROVE THE MINUTES FROM THE JANUARY 8, 2020 TECHNICAL COMMITTEE
MEETING
Ms. Escobar moved to approve the minutes from the January 8, 2020 Technical
Committee meeting. Mr. Thomas seconded the motion. The motion to approve the
minutes passed unanimously.
3. REPORT ON THE 2045 METROPOLITAN
Subject: Report on the 2045 Metropolitan Transportation
Plan (MTP) Update
Date: November 6, 2019
8
MONTHLY REPORT
Mr. Aaron Sussman, Planner with Bohannan Huston (BHI) will call-in monthly with a
report on the Metropolitan Transportation Plan (MTP) Update.
DISCUSSION: Mr. Aaron Sussman thanked all of the Technical Committee members for
spending time with him while he was in town on January 30 and 31. He also thanked
Ms. Escobar and the City of Farmington for providing a setting for him to present
information about the 2045 MTP and to collect public input.
Mr. Sussman advised that Phase I of the MTP outreach is being completed with one last
advertising effort to get as much public feedback on the transit issues and concerns in
the region as possible. Ads in both the Daily Times and the San Juan Sun were
published on February 12. The results of all the outreach will be shared in the coming
months. To begin transitioning, Mr. Sussman provided the Committee members with
the BHI schedule for completion of the 2045 MTP which includes their key actions as
well as the timeline for development of the chapters that will be shared with the
Technical Committee for their review. He is planning a trip to the region and an in-
person presentation to the Technical Committee on April 8. More chapters will be
provided in the meantime along with initial information on the travel demand model.
The first MTP chapter on transit was distributed to the Technical Committee for their
feedback to help in shaping the direction of the plan. Mr. Sussman reviewed some of
the policy recommendations included in this first draft of the chapter: the proposed
downtown transit hub, a regional connection (i.e.: Durango and southwest Colorado
area), a regional transit action plan to look at improving efficiency for users and
expanding services that can be accomplished logically and strategically. Additional
considerations are for data collection and supporting policies from a land use
perspective and the regional perspective to bring people and destinations closer
together, as well as reviewing stops in the region.
A recent presentation by Ms. Holton to the San Juan County Management Group on the
MPO and the current work on the MTP brought questions from the County’s Behavioral
Health Services Director on transit needs affecting the population she serves. Ms.
Holton said that she had been in contact with Ms. Hodgman yesterday and had
provided her with the draft transit chapter.
The Technical Committee also discussed recent studies identifying gender gap issues in
transit (women with children and strollers, serving all riders, safety concerns). It was
noted that much of the research is focused on larger, urban areas and not all
recommendations would be appropriate for a system the size of Red Apple Transit. Mr.
Montoya commented that most of the buses are not fully occupied (except for the
morning buses to the college that are filled with students and not families) and do
allow space for strollers, etc. One section in the draft transit chapter addresses safety
in having the downtown hub corresponding with a police substation.
The Committee also asked about looking at the existing conditions on freight and rail.
A number of entities have asked for $500,000 for a rail feasibility study and economic
development component from Farmington to somewhere along the I-40 corridor
(Thoreau or Gallup). Four Corners Economic Development has a study from a few years
9
ago that will be analyzed again and updated. The Technical Committee thought this
study should be noted in the 2045 MTP and referred Mr. Sussman to the Four Corners
Economic Development group.
4. MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN RED APPLE TRANSIT AND
FMPO
Subject: Memorandum of Understanding (MOU)
Between Red Apple Transit and FMPO
Prepared by: Mary L. Holton, MPO Officer
Date: February 12, 2020
BACKGROUND
This MOU is required of Red Apple Transit by the FTA per Gabrielle Chavez,
Transit Planning & Service Coordination Manager/NMDOT.
CURRENT ISSUES & RECOMMENDATIONS
This item will be presented to both committees in February 2020 for their
consideration and approval.
Staff recommends that the MOU be approved.
FMPO Policy Committee action is scheduled for February 27, 2020.
ACTION ITEM
Staff recommends that the Technical Committee consider recommending
approval to the Policy Committee. If approved, the PC Chair would sign the
MOU on behalf of the MPO.
APPLICABLE CITATIONS
23 USC Section 134 and 135 and 49 USC 5303, et seq. and 43-1 Part 11,
C.R.S.
DISCUSSION: Ms. Holton reported that this Memorandum of Understanding (MOU)
(pages 3-6 of the Agenda) was brought to the MPO’s attention by the FTA liaison,
Gabrielle Chavez. The MOU is required of Red Apple Transit as well as all transit
providers. If the Technical Committee recommends approval, it will be presented to
the Policy Committee for their considered approval on February 27. If approved at
that time, the Policy Committee Chair will sign the MOU on behalf of the MPO.
Mr. Montoya summarized the MOU:
Red Apple Transit and the FMPO will have a written agreement to work
together in transportation related plans and the sharing of transportation
related data;
Red Apple Transit and the FMPO to conduct transportation related planning
together within the MPO boundaries;
10
Roles and responsibilities of Red Apple Transit and the FMPO to work together
to identify transit needs, projects, set priorities, provide assistance where
needed, and conduct studies;
Red Apple Transit to provide the FMPO with updates on any projects being done
within the MPO boundaries and seek FMPO assistance as needed.
o Red Apple Transit is currently working to submit for an FTA grant to
fund a transit hub. Funding awarded will be announced in the summer
and should funding be awarded to Red Apple Transit, the FMPO will be
included all aspects of the project.
ACTION: Mr. Fillerup moved to recommend approval of the MOU between the Red
Apple Transit and the FMPO to the Policy Committee. Mr. Saavedra seconded the
motion. The motion to recommend approval was unanimous.
5. STATUS OF TIP PROJECTS
Subject: Status of TIP Projects
Prepared by: MPO Staff
Date: February 12, 2020
BACKGROUND
The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
The Policy Committee approved the new FFY2020-2025 TIP during a Special
meeting on July 25, 2019.
The projects currently on the FFY2020-2025 TIP are listed below.
TRACKING INFORMATION (2018-2023 TIP)
Local Agreement Status (ARF) ITS/Sys ENG Certification
ROW Certification Public Involvement Certification
Design Completion 30 – 60 – 90%
Environmental Certification
Utilities Certification
Railroad Certification
Archeology Certification
PROJECTS ON FMPO FFY2020-2025 TIP
Aztec
F100091 – East Aztec Arterial Phase II
Bloomfield
F100300 – East Blanco Bridge
11
Farmington
F100099 – Foothills Drive Enhancement Phase II
F100100 – East Pinon Hills Blvd Extension Phase I
F100101 – East Pinon Hills Blvd Extension Phase II
F100132 – 20th Street Phase III
TF00001 – Red Apple Transit
San Juan County
F100021 – East Pinon Hills Blvd Extension Phase III
F100240 – Glade Run Recreation Area Trails
F100290 – CR 5500 Bridge Replacement
F100320 – Kirtland Schools Walk Path Extension
F100330 – Glade Run Recreation Area Trails Extension
NMDOT
F100170 - NM 173 Safety Improvements
F100340 – US 550 Pavement Rehab
F100350 – NM 371/N36 (PE)
F100351 – NM 371/N36 (Const)
INFORMATION ITEM
This is an information item only. Committee members will have an opportunity to
provide any needed feedback/updates regarding current TIP projects status and
details.
DISCUSSION:
City of Aztec – Steven Saavedra
East Aztec Arterial
All the required documents have been re-submitted to the title company for
acquisition of the required property.
City of Bloomfield – Jason Thomas
East Blanco Bridge
The City of Bloomfield is waiting to schedule the PS&E on Phase I of the project. He
mentioned that District 5 has hired Javier Martinez as the new Assistant District
Engineer for Engineering Support and the scheduling of the PS&E will be coordinated
with him.
City of Farmington
Foothills Drive Enhancement
Ms. King had no update on this project as the design is still being updated.
Pinon Hills Boulevard – Phase I and II
Both phases are on hold pending funding. The City of Farmington and San Juan County
are partnering on a BUILD grant request for all three Phases of the project. A meeting
with NMDOT’s North Region Design Center, FHWA, and District 5 will be scheduled in
March following position transition at NMDOT and FHWA as well as with the closing of
the legislative session. Mr. Fillerup added that because San Juan County has Phase III
12
of this project, he asked that they be included and allowed to participate in any
meetings scheduled to discuss this project.
20th Street – Phase III
No updates on this project.
San Juan County – Nick Porell
Pinon Hills Boulevard
As mentioned above, San Juan County and the City of Farmington are cooperatively
preparing a BUILD grant application for the construction phase of this project.
Glad Run Recreation Area Trails
The determination of NEPA adequacy from BLM was received earlier in the week which
should constitute the final environmental review and allow the project to proceed
with construction this spring.
CR 5500 Bridge Replacement
Appraisals are ongoing. Design remains at 95% complete.
Kirtland Schools Walk Path Extension
County Commission signed the agreement with NMDOT at their meeting last week.
Glade Run Recreation Area Trails Extension
Waiting on the agreement from NMDOT which is expected soon.
NMDOT
Matt Grush was not in attendance and no project updates were provided.
6. REPORTS FROM NMDOT
Planning Bureau – Joseph Moriarty
Mr. Moriarty reported on the following:
Local Government Transportation Project Fund (LGTPF). New feasibility forms
(PFF) tailored for this program have been distributed to the MPOs in
anticipation of this program receiving legislative funding;
Maps from the last year’s Local Government Transportation Project Fund are
available and were distributed to all MPOs;
NMDOT Long Range Transportation Plan. NMDOT’s consultant is working to
schedule a stakeholder meeting in the Farmington area in March/April as one of
the four meetings to be held statewide;
Crash data reports for 2018 are available on line. Mr. Moriarty will provide the
URL to the MPO for distribution to those interested;
Safe Routes to School summit to be held in Albuquerque this spring;
New Mexico Outdoor Economics Conference to be hosted by Farmington. More
information can be found at: outdooreconomicsnm.com
Chair Porell asked about the anticipated turnaround time for submitting applications
for the Local Government Transportation Project Fund. Mr. Moriarty responded that
13
the Planning Bureau is working to get all the background materials readied and hoping
to streamline the process to make it easier for the local communities.
Mr. Fillerup commented that he is still interested in being involved in helping to
facilitate one of the stakeholder meetings here in this area. Ms. Holton commented
that Erin Dean did send an email to Mr. Fillerup, but used his old City of Farmington
email address. She was copied on the email so she will forward it to both Mr. Fillerup
and Ms. Escobar for follow-up on a meeting location.
Maggie Moore, NMDOT Planning Bureau stated that the agreement for the Glade Run
Recreation Area Trails Extension was mailed to San Juan County on Monday.
District 5 – Matt Grush
Mr. Grush was not in attendance. No report was provided.
7. COMMITTEE MEMBER DISCUSSION ITEMS
Subject: Committee Member Discussion Items
Date: February 12, 2020
DISCUSSION ITEMS
Mr. Thomas asked if there was any information on whether the NWNMCOG would
continue to manage the MPO going forward. Ms. Escobar reported that the COG has
declined to continue managing the MPO so administration of the MPO will be returning
to the City of Farmington. The City posted for both an MPO Officer/Planner and an
MPO Associate Planner and three initial Skype interviews were completed. Two
candidates have been invited for in-person interviews on February 21. Ms. Escobar will
be the Interim MPO Officer until that position is filled.
There were no additional discussion items provided by Technical Committee members
for inclusion in the Agenda.
8. INFORMATION ITEMS
Subject: Information Items
Prepared by: Mary L. Holton, AICP, MPO Officer
Date: February 12, 2020
INFORMATION ITEMS
e. TIP Amendment #2. No formal amendment was submitted. TIP Amendment #3
is scheduled to begin with the first call for projects on March 24.
14
f. TIP Administrative Modifications for January. An administrative modification
was processed for F10009 (East Aztec Arterial) to update funding sources. See
attached.
g. Local Government Transportation Project Fund (LGTPF). NMDOT has notified
the MPOs and the RTPOs of the presumed upcoming application process for the
Local Government Transportation Project fund in anticipation of its funding in
the State’s FY2021. An email providing additional information, a projected
timeline, and a Project Feasibility Form (PFF) designed specifically for the
program are attached. Additional information learned from the February 11
meeting between the NMDOT and the MPOs and RTPOs will be shared with you
at your TC Meeting on February 12.
DISCUSSION: a. Ms. Holton reported there were no new projects received nor changes
to existing projects for TIP Amendment #2. The initial call for TIP Amendment #3 will
start on March 24.
b. TIP Administrative Modifications for January included processing an administrative
modification for the East Aztec Arterial (F100091) (see details on pages 11 and 12 of
the Agenda) to update the funding sources. Ms. Holton reported that Staff is currently
working with the STIP group on two administrative modifications for February although
there may be more before the end of the month.
c.The conference call scheduled for February 11 to discuss the proposed PFF and the
projected timeline for the Local Government Transportation Project Fund (LGTPF) was
cancelled to inclement weather in Santa Fe. Ms. Holton noted that the proposed PFF is
shown on Pgs. 16-19 of the Agenda as well as an email update and the proposed
timeline/calendar on Pages 13-14. If the funding is approved, feasibility meetings with
NMDOT will need to be held and following that, FMPO will need to prioritize the
projects before they are submitted for the funding and this would require the PPM
sub-committee to meet to consider the prioritization. Entity resolutions will also likely
be required again. However, since the projects will not be selected until November,
some leeway in the April 31 deadline may be possible for providing resolutions.
9. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
With Ms. Holton’s upcoming retirement, the Technical Committee recognized her
efforts and thanked her for her work as the MPO Officer over the years. Everyone
wished her well in her retirement.
There was no additional business from the Chairman, Members and Staff.
10. PUBLIC COMMENT ON ANY ISSUES NOT ON THE AGENDA
There was no public comment on any issues not on the agenda.
15
11. ADJOURNMENT
Mr. Flack moved to adjourn the meeting. Chair Porell seconded the motion. The
motion passed unanimously and Chair Porell adjourned the meeting at 10:49 a.m.
___________________________ ___________________________
Nick Porell, Technical Committee Chair June Markle, Administrative Assistant
16
Get email alerts for Farmington
A daily email when new agendas and minutes are posted.