Technical Members Present: Beth Escobar, City of Farmington
Javier Martinez, NMDOT District 5
Andrew Montoya, Red Apple Transit
Nick Porell, San Juan County
Steven Saavedra, City of Aztec
Dan Flack, Town of Kirtland
Jason Thomas, City of Bloomfield
Virginia King, City of Farmington
Lisa Hale-BlueEyes, San Juan County
Technical Members Absent: None
Staff Present: Peter Koeppel, MPO Officer
Kathryn Leys, MPO Associate Planner
Staff Absent: None
Others Present: John Neunuebel, Planning Liaison, NMDOT
Rosa Kozub, NMDOT
Sgt. Jonathan Jenson, Farmington PD
Lt. Joshua Laino, Farmington PD
1. CALL TO ORDER
Chair Porell called the meeting to order at 10:00.
2. APPROVE THE MINUTES FROM THE MARCH 9, 2022 TECHNICAL COMMITTEE
MEETING
Ms. Escobar moved to approve the minutes from the March 9, 2022 Technical
Committee meeting. Mr. Saavedra seconded the motion. The motion to approve the
minutes passed unopposed.
3. AMENDMENT #3 TO THE FFY2022-2027 TIP
Subject: Amendment #3 to the FFY2022-2027 TIP
Prepared by: Peter Koeppel, MPO Officer
Date: April 13, 2022
BACKGROUND
▪ The Public Notice for Amendment #3 to the FFY2022-2027 TIP was published
on the MPO’s website and in the Daily Times on April 10, 2022.
▪ The amendment includes the modification of two projects:
o Aztec Arterial
o US-550 pavement rehabilitation from MP 168.3 to 174.5
▪ The Technical Committee will consider recommending approval of proposed
Amendment #3 and the Self-Certification for Amendment #3 to the Policy
Committee on April 13
AMENDED TIP PROJECT(S)
▪ Aztec Arterial
o Reflecting additional funding received to complete project
o Estimated cost $17.8 million
▪ US-550 pavement rehabilitation from MP 168.3-174.5 in federal fiscal year
2026
o Estimated cost $20 million
o New project phase
ACTION ITEM
▪ Staff recommends that the Technical Committee consider recommending
approval to the Policy Committee of proposed Amendment #3 and the Self-
Certification for Amendment #3 to the FFY2022-2027 TIP.
APPLICABLE CITATIONS
▪ § 450.328 TIP revisions and relationship to the STIP.
▪ (a) An MPO(s) may revise the TIP at any time under procedures agreed to by
the cooperating parties consistent with the procedures established in this
part for its development and approval. In nonattainment or maintenance
areas for transportation-related pollutants, if a TIP amendment involves non-
exempt projects (per 40 CFR part 93), or is replaced with an updated TIP,
the MPO(s) and the FHWA and the FTA must make a new conformity
determination. In all areas, changes that affect fiscal constraint must take
place by amendment of the TIP. The MPO(s) shall use public participation
procedures consistent with § 450.316(a) in revising the TIP, except that these
procedures are not required for administrative modifications.) After approval
by the MPO(s) and the Governor, the State shall include the TIP without
change, directly or by reference, in the STIP required under 23 U.S.C. 135. In
nonattainment and maintenance areas, the FHWA and the FTA must make a
conformity finding on the TIP before it is included in the STIP. A copy of the
approved TIP shall be provided to the FHWA and the FTA.
▪ (c) The State shall notify the MPO(s) and Federal land management agencies
when it has included a TIP including projects under the jurisdiction of these
agencies in the STIP.
Mr. Koeppel introduced TIP amendment #3. There are three (3) projects being
recommended for amendments. Mr. Koeppel informed the committee the while TIP
amendments usually occurs on a quarterly basis, however, due to time constraints, TIP
amendment #3 from the FFY2022-2027 TIP is an out-of-cycle amendment.
The first project to be amended is the F100091 – East Aztec Arterial Phase II. The
amendment will reflect additional funding received from NMDOT. The second project
being amended is the Pinon Hills Boulevard Extension. With this amendment, the City
of Farmington will break the project into two (2) construction phases (F100101 &
F100102) and one (1) design phase (F100100). The counties portion of the project
(F100021) will not be amended. The third project being amended is the northern
section of NMDOT’s Pavement Rehab project on US550 (F100341).
Mr. Koeppel stated that staff recommended the Technical Committee recommend
approval of Amendment #3 to the FFY2022-2027 TIP to the Policy Committee.
DISCUSSION:
There was no discussion by the committee.
Chair Porell opened a public hearing on the proposed TIP Amendment #2. There were
no public comments. Chair Porell closed the public hearing.
ACTION:
Ms. Escobar motioned to recommend approval of the proposed TIP Amendment #3 to
the 2022-2027 TIP to the Policy Committee. Mr. Martinez seconded the motion. The
motion passed with no opposition.
4. FFY2023-2024 DRAFT UNIFIED WORK PLANNING PREOGRAM (UPWP)
Subject: FFY2023-2024 Draft Unified Planning Work
Program (UPWP)
Prepared by: Peter Koeppel MPO Officer
Date: April 13, 2022
BACKGROUND
▪ The Unified Planning Work Program (UPWP) is the MPO’s work plan for two
federal fiscal years. The UPWP pairs the MPO’s required work tasks/products with
the MPO’s anticipated funding.
▪ The FFY2023-2024 UPWP will cover planning activities and work products to be
completed from October 1, 2022 to September 30, 2024.
▪ This month, we are asking both Committees to review the draft of the FFY2023-
2024 Unified Planning Work Program, providing us with input. A copy of the most
current draft is attached.
▪ A 30-day public comment period will be noticed and begin on April 24, 2022
▪ Page 9 of the document outlines the five major work program tasks for the MPO;
these tasks are based on a format provided by NMDOT. Subtasks are listed below.
You should be aware that the same numbering system is utilized in the MPO’s
quarterly invoicing system and in our financial reports, including the Annual
Performance & Expenditure Report (APER), which we prepare and submit at the
end of every FFY.
CURRENT WORK
▪ Annual activities in the UPWP include administering the MPO’s programs, TIP
development and management, development of performance measures, GIS
activities, bicycle/pedestrian planning, transit data collection and mapping.
▪ Major activities for the FFY2023-2024 UPWP will include the implementing the
policies of the 2045 Metropolitan Transportation Plan, an update to the MPO
bicycle/pedestrian plan, land-use and transportation planning support activities,
transportation performance management, and travel demand modeling updates.
▪ Per NMDOT, staff estimates available FHWA PL funds of $269,488 and FTA 5303
funds of $74,386.25 (both including local matches) for each of the two (2) federal
fiscal years. Those numbers are subject to change before the final UPWP is
presented.
INFORMATION ITEM
▪ It is recommended that the Technical Committee provide staff with input on the
proposed.
Mr. Koeppel gave a brief presentation on the draft of FMPO’s 2023-2024 UPWP, the bi-
annual budget and work program for the MPO. The UPWP identifies planning priorities
and activities that will be carried out within the MPO area and includes what work the
MPO will complete, who will be doing the work, on what timeframe will the work be
completed, anticipated costs, and where our funding will come from.
Mr. Koeppel briefly described the five categories in the UPWP and highlighted any
significant changes. The UPWP is organized into five main tasks. These tasks have not
changed significantly since the 2020-2022 UPWP. The primary changes include
cleaning up the language in the document and simplifying a number of the sub-tasks to
allow for greater flexibility. These tasks include Program Administration,
Transportation Improvement Program, Data Collection & Analysis, Transportation
Planning & Implemention of the Long-Range Transportation Plan, and Special Studies
and Activities. It is in the last task, Special Studies & Activities, where the MPO has
added a new sub-task for coordinating with housing, an new emphasis of the federal
transportation bill.
Mr. Koeppel displayed the draft budget for the 2023-2024 UPWP. He informed the
committee that these number are subject to change as the extra amounts of federal
funding the MPO will receive is still unknown. At the time of the meeting, Mr. Koeppel
expected PL funding to increase slightly and FTA funding to remain at similar levels as
the past two years.
Mr. Koeppel asked the committee for comments or questions. He also explained the
next step forward, including bringing the draft to the Policy Committee in April. He
also stated that once the MPO receives their budget numbers from the federal
government, the MPO will send of the final UPWP document, hopefully at the May
committee meetings, or the June meeting at the latest.
DISCUSSION:
Ms. Escobar asked if there were any specifics on the housing coordination components
included in the draft UPWP. Mr. Koeppel explained that there are some specifics
regarding hosing coordination in the document, however this language is essentially
identical the language in the Infrastructure, Investment, and Jobs Act (IIJA). Mr.
Koeppel the quoted from the draft UPWP the section about the housing coordination
component.
The MPO “consults with local official responsible for housing as part of the
planning process, promoting consistency between transportation improvements
and local housing patterns, as well as planned growth a economic development
patterns, and providing affordable housing organizations the opportunity to
comment on our planning products.”
Mr. Koeppel acknowledged that this may sound overly general, but because the IIJA
bill is relatively new and there aren’t a lot of specific details available to the MPO.
This looseness in the description in the UPWP is to make sure we acknowledge this
new component and meet any criteria from FHWA but also will leave the UMPO with
enough flexibility to adapt and adjust their work as more details are released.
Ms. Escobar thanked Mr. Koeppel for his answer and added the when the City of
Farmington’s Public Works department does their Community Development Block
Grant budget, they will be asking for funding for a housing plan and she identified an
this as an opportunity to coordinate with the MPO. Mr. Koeppel agreed and said he
thought this was FHWA’s intent when they including housing coordination as a
responsibility of the MPO.
Mr. Saavedra asked a question about Task 3.1 – Traffic Counting and Reporting.
Because NMDOT conducts the regions traffic counts, Mr. Saavedra wanted to know if
the MPO region was missing out traffic counts for collectors and local streets. He also
asked about the coordination between the MPO and NMDOT regarding traffic counts
and their timeline so the street sweepers or other road users don’t remove the
counters or disrupt the count.
Mr. Leys displayed the current traffic count maps on the FMPO website to show all the
roads the NMDOT collects traffic counts on. She explained that while some local roads
may be missed with NMDOT traffic counts, there is a pretty even distribution amount
collectors and above. She also explained that NMDOT does have a traffic count
collection schedule, and FMPO traffic counts are typically taken in June, July, and
August. In the past, FMPO has coordinated with DOT on the exact dates of their traffic
counts, to prevent any damage or errors due to construction or street sweeping,
however, because of staffing changes at DOT, the MPO is currently unaware of who
would be the person to collaborate with at DOT. Chair Porell added that, while he
was unsure exactly how DOT conducts their counts, typically ropes are not used for
traffic counts any more. Chair Porell noted that all of the counties traffic counters all
use RADAR beams to collect this data, therefore sweeping pay not be as big of an
insure when it comes to traffic counts as it may have been in the past. Ms. Kozub
added historically NMDOT has contracted out their traffic count collections and
sometimes there are delays or limits in communications as all communication goes
through NMDOT. She also added that the traffic count contact person within NMDOT is
Dan Watts. Chair Porell also added that the county owns their own traffic counting
equipment, and that is was not very expensive. Chair Porell offered that if there are
roads that are not captured by NMDOT, the public works crew within the City of Aztec
can reach out to him and work with the County to share traffic counting equipment.
Mr. Saavedra went on to comment that Santa Fe collects pedestrian and bike counts.
As the region starts to put is focus on trails and other similar types of projects, he
wanted to know if the members of FMPO’s Technical Committee had any intertest in
pursuing an effort like this. Chair Porell responded by saying there is interest in this.
He asked if the Santa Fe MPO had purchased a counter or if they were available from
DOT. Ms. Kozub stated that NMDOT does have JAMAR tube bicycle counters available
for loan to any MPO or local agency. The reason they are tube counters is to allow for
on-road bicycle counts, however, this also means they are unable to count pedestrians
but can differentiate between a motor vehicle and a bike. Shannon Glendenning is the
appropriate contact and NMDOT for more information.
There was no further discussion.
5. LOCAL ROAD SAFETY PLAN UPDATE
Subject: Local Road Safety Plan Update
Prepared by: MPO Staff
Date: April 13, 2022
PRESENTATION
Staff will provide a brief update on the Local Road Safety Plan for the Farmington MPO
region.
DISCUSSION:
Mr. Koeppel gave a brief update on the Local Road Safety Plan (LSRP) the MPO is
developing in coordination with FHWA and their consultant. Mr. Koeppel also introduce
Sgt. Jenson and Lt. Laino from the Farmington Police Department. Sgt. Jenson and Lt.
Laino are attending the meeting to provide additional information on traffic incident
from the law enforcement perspective of traffic safety.
Mr. Koeppel explained to the committee that the LSRP was developed using the Safe
Systems Approach, which take a more holistic view of traffic safety. He displayed the
following graphic briefly describing the elements of this approach.
This approach recognizes that we cannot engineer or arrest our way out of unsafe
transportation systems and we cannot eliminate human error, so it relies on
redundancy and emphasizes shared responsibility for the safety of our transportation
systems and mitigating the worst outcomes, which are death and serious injury.
Mr. Koeppel went on to discuss the following Development Process of the LRSP:
At the time of the meeting, Step 4 was just completed and the MPO has received the
summary report from the second Stakeholder Workshop. Mr. Koeppel explained that
first, the consultant collected and analyzed our regional safety data (Step 2), held the
first Stakeholder Workshop in December and emphasis areas for the region were
decided upon, which are identified below (Step 3).
The second Stakeholder Workshop (Step 4) was help the month prior to this meeting.
The consultant worked with NMDOT, the MPO, and the entities to identify Safe System
Approach strategies improve roadway safety in the region.
Mr. Koeppel also briefly described the steps moving forward on the LRSP. Step 5 is
that the MPO and the local entities will incorporate the identified strategies into their
planning processes. Mr. Koeppel said he would like to use this plan and these identifies
strategies to support the MPO and its entities in applying for funding for some of the
safety programs in the IIJA. Mr. Koeppel also specifically mentioned the Safe Streets
and Roads for All Program, which has a requirement that, in order to apply, there
needs to be a safety plan in place. The LRSP should meet that requirement.
Mr. Koeppel highlighted a few key topics the consultants have been looking at while
creating the LRSP. He started by displaying a map identifying the high injury network
with fatal and suspected serious injury crashes. This map showed that the majority of
the major roads in the MPO were identified as High Injury Roads. He also displayed a
Equity Map of the region, overlaying areas with higher EJ percentiles and serious
crashes. Both of these maps are shown below:
Mr. Koeppel displayed an example of one of the many strategy pages provided by the
consultant. For each strategy to create safer roads these pages provide an action, and
responsible lead agency, and partners for that lead agency, the priority level and
timeline of the strategy, cost levels of the strategies (Low, medium, high) and
potential funding sources, and which previously identified emphasis areas these
strategies might help mitigate.
Mr. Koeppel stated that because of the diversity in the strategies provided by the
consultant, it is help for the MPO to partner with others outside of the planning and
engineering world, which is why the Farmington Police Department was at this
meeting, he explained. In fact, one of the strongest recommendations made by the
consultants was the formation of a regional safety committee. This would be a place
to holistically discuss the safety of our roads. This would allow the region to move
beyond simple issues like intersection improvements and address larger issues like
speed enforcement and DWIs. This group would meet periodically to address safety in
our region.
Mr. Koeppel asked the committee at large if there was any interest in forming this
committee. Chair Porell expressed interest but commented that the MPO would need
to ensure the right people are involved, stating that planners and engineers would
need to partner with law enforcement, school districts, etc. Chair Porell said he
would be interested in seeing what kind of participation groups like these may show.
Mr. Koeppel introduced Sgt. Jensen and Lt. Laino from the Farmington Police
Department. Sgt. Jensen and Lt. Laino were at the meeting to discuss any insights
they may have on traffic safety from the law enforcement perspective. Lt. Laino
explained that traffic incident with injuries are up in Farmington, and this is a national
trend that has been occurring for the past two years in a row. He explained that this
is mostly likely due to law enforcement agencies ramped down the level of contact
officers have with citizens, as a result of COVID and the pandemic. This, Lt. Laino
believed, caused people to increase speeding and erratic driving behaviors. However,
he also stated that this cannot be the only cause for the increase in fatality trends
because as the law enforcement agencies return to pre-COVID levels of officer
contact, the trend of increasing fatalities has continued. He also noted that traffic
incident without injury have remained relatively stable, meaning there isn’t
necessarily a correlation between overall accidents and accident with fatalities or
serious injury. Sgt. Jensen commented that in Farmington the police have noticed
some new trends or anomalies in crash type. For Example, last year (2021) the
majority of serious crashes were airborne crashes. This year (2022), the majority of
serious crashes have involved pedestrians. Sgt. Jensen believed that the pedestrian
was at fault for 90% of these incidents.
Mr. Koeppel asked if, as law enforcement officers, are the engineering solutions to
these problems? Is there any type of design that could reduce any of the traffic
incidents they are observing? Sgt. Jensen responded by saying that the Farmington
Police Department does work very closely with the cities engineers and continue to
have discussion to identify engineering solutions to some of the issues. Sgt. Jensen
does believe that human error is to blame for most of the incident. The police
department is looking for way to better control where and how the pedestrians use
the transportation system and remove them from the streets, but as Sgt. Jensen
suggested that the best solution to reduce pedestrian errors is to make contact with
the individual, issue citations, and place them into custody, if necessary. He did
suggest to increase the lighting in areas with above average pedestrians use, to
increase visibility. Lt. Laino said, from his experience, engineering solution do not
always work, for example, when roundabouts were installed on 30th Street, people did
not slow down. Lt. Laino also pointed out that a lot of the roadway design features
that law enforcement believe will prevent traffic incident do not fit the criteria for
roadway design set up by the DOT. Both officers stated that if police want to continue
to support safer transportation systems, they need additional funding to increase
patrol efforts.
Mr. Koeppel thanked the officers for attending the meeting and expressed the MPO
desire to keep in contact with their organization and continue the discussion on traffic
safety. The MPO does anticipate funding for safety-oriented projects and any
information that can be learned from law enforcement will only help make our roads
safer.
Mr. Saavedra asked the officers if there has been any significant increase in the
number of incidents involving the use of cannabis? Sgt. Jensen said at this time there
have been no observed uptick in this type of incident, however it is still relatively
earlier, it has only been legal in New Mexico for 12 days, and time will tell if this will
impact traffic safety.
6. TRANSPORTATION PROJECT FUND DISCUSSION
Subject: Transportation Project Fund Discussion
Prepared by: MPO Staff
Date: April 13, 2022
PRESENTATION
Discussion of potential submittals and evaluation process for the 2023 New Mexico
Transportation Project Fund.
DISCUSSION:
Mr. Koeppel informed the committee that TPF application are due to NMDOT May 31,
2022. The MPO will serve as a pass-though for those applications, meaning the entities
should submit any applications to the FMPO. The MPO will meet with DOT and the
entities to complete the Project Feasibility Form (PFF) signed and the FMPO will
submit those to the DOT. At this meeting, Mr. Koeppel wanted to discuss who is
planning on submitting an application and how the MPO should go about evaluating
them, as DOT has tasked the MPO with evaluate and rank projects before submission.
Mr. Koeppel also wanted this discussion to give the committee an idea on how much,
in terms of dollars, the region is asking for and how does that compare to what is
available.
Mr. Martinez informed the committee that the FMPO is expected to be eligible for
around $5-9 million in awards.
Chair Porell said San Juan County is planning to submit a resurfacing project for CR
6480, similar to the one they submitted the previous year. This project is about 5
miles and would be a self-executed with a purchase of asphalt material and milling
service. The current estimate requested is $1.3 million. Chair Porell also added that
this application is almost complete, he is waiting on a resolution from the County
Commissioners, which he hopes will happen on May 2nd, 2022. He will submit it to the
MPO shortly after.
Mr. Saavedra said the City of Aztec is looking to apply. Mr. Saavedra estimated that
on the high-end the dollar amount to request from the TPF would be $800,000.
However, the City of Aztec recently hired Bohannan Huston Inc. (BHI) to provide an
actual cost-estimate for a road diet along Main Avenue or US550. He acknowledged
this project would have to be in coordination with NMDOT. Mr. Saavedra mentioned
that in conversations with Amanda Knight from Mosaics Academy, due to the timing of
the grant, the City of Aztec will not be applying on their behalf.
Mr. Thomas said the City of Bloomfield applied for a $300,000 project on the design of
Bergin Lane. Mr. Thomas also acknowledged that because Bergin Lane touches US64,
he will need DOT to sign off on the project. Mr. Thomas said he uploaded his
application directly to NMDOT’s site. Chair Porell asked if this was the correct way to
submit their applications. Mr. Koeppel said the applications should be submitted to
the MPO, not DOT. MPO staff will package the documents in the appropriate format
and send them to DOT.
Ms. King was experiencing some audio issues at first so Mr. Koeppel explained, to his
knowledge, the City of Farmington intended to submit two projects. Ms. King was able
to get audio and filled in the detail. The first Project is Wildflower Parkway, from
Browning Parkway to Yarrow Trail, and is estimated at $1.658 million. The second
project the City of Farmington is submitting is for West Main Street, from Murry Drive
to West Lake Street, where West Main turns into Broadway. This project is estimated
as $2.342 million. This application is almost complete, they are only waiting on
resolutions from the City Council, which Ms. King hopes to get on May 26, 2022. Both
of these projects intersect with an NMDOT right-of-way and would require DOT to sign
off on the applications. Ms. King said she will be submitting both applications. Chair
Porell said, moneywise, there is $2.3 million potentially available for the West Main
Street project and the MPO would remain under the $5 million estimate from DOT.
This would still allow for the funding of projects from all entities.
Chair Porell estimated that with the three projects discussed, not including the City of
Farmington’s projects, the total dollar amount requested from the MPO region is about
$2.4 million. Assuming Mr. Flack had nothing to add for the Town of Kirtland, this
number is right on track for the region to receive the most funding from the TPF.
Chari Porell stated he would like to see the region submit at least $5 million in
projects. Mr. Koeppel stated with the City of Farmington’s projects, the region will be
applying for right around that $5 million-dollar mark.
Mr. Koeppel asked the committee if they were okay with MPO staff using the same
procedures as last year for project recommendation and submittal based on the
criteria outlined in the Call for Projects. Chair Porell and Ms. Escobar said yes and
there was not opposition.
Mr. Koeppel requested that committee members submit their applications as close to
the end of April as possible. This is to ensure enough time to set up meeting with DOT
to complete the PFFs. The committee agreed on this.
There was no further discussion.
7. STATUS OF ENTITY PROJECTS
FARMINGTON METROPOLITAN PLANNING ORGANIZATION
Agenda Item #6
Subject: Status of Entity Projects
Prepared by: MPO Staff & Technical Committee Members
Date: April 13, 2022
BACKGROUND
▪ The STIP Protocols, finalized in early 2014, require that each MPO shall develop a
process to monitor the progress and status of each project in the first two years
of the TIP. These monthly reviews help correct inconsistencies in the TIP, STIP,
the MPO’s MTP, Agreement Request Forms (ARFs), etc. and provide for discussion
among the members and NMDOT representatives.
▪ Listed below are current entity projects some of which are part of the FFY2022-
2027 TIP.
▪ The Policy Committee approved the new FFY2022-2027 TIP on May 27, 2021,
which became effective on October 1, 2021.
INFORMATION ITEM
▪ This is an information item only. Committee members will have an opportunity to
provide any needed feedback/updates/details regarding the status of current
projects.
DISCUSSION:
Aztec – Steven Saavedra
F100091 – East Aztec Arterial Phase III: The City of Aztec is happy that the
TIP amendment was approved and the additional funds from DOT and the New
Mexico Secretary of Transportation were incorporated into the East Arterial
Bypass project. Current the City is working to obtain a utility certificate from
Enterprise Field Services. As of now, the City will have to relocate a gas
pipeline. Once this is complete, the project will move forward towards PS&E.
Bloomfield – Jason Thomas
F100300 – East Blanco Bridge: The City of Bloomfield is still working on the 3
certifications. The utility certification is near completion.
Mr. Thomas also noted that the next transportation project from City of
Bloomfield will be Bergin Lane. The city has already used their own funds for
survey and preliminary engineering work and this work is already underway.
Farmington – Virginia King
F100099 – Foothills Drive Enhancement Phase II: This project has been in
suspension; however, it is planned to resume April 18th, 2022. Ms. King thinks
there are 13 contract days left on this project. The project should be
completed by the end of April 2022. Chair Porell asked if there was a section
that would need to have a second lift of asphalt put down. Ms. King said yes, a
section that didn’t turn out as expected. This will have to be milled out and
repaved.
F100100 – East Pinon Hills Boulevard Extension Phase I: Isaac BlueEyes, from
the City of Farmington, is completing some Agreement Request Forms (ARFs)
for DOT. Ms. King said this only means the project is moving but she has very
little control over the project at this time.
F100132 – 20th Street Phase III: TRC was selected as the contractor for this
project. They plan to start construction May 2, 2022.
F100390 – Foothills Drive Phase III: The right-of-way maps has been revised.
There are a few land acquisitions that need to happen, however, the project is
moving forward and hopefully the acquisitions will go quickly. Tierra Right-Of-
Way is working on the right-of-way acquisitions. Construction is planned for
2024.
TF00001 – Red Apple Transit (Andrew Montoya): All 16 new bus shelters have
been installed with the final shelter installed in Bloomfield. This was
completed about 3 weeks prior to the meeting.
Kirtland – Dan Flack
Mr. Flack left the meeting early and had no project updates.
San Juan County – Nick Porell
F100021 – Eat Pinon Hills Blvd Extension Phase III: This project now has
some funding by way of the TIP amendment that the Technical Committee is
recommending the Policy Committee approve. The county will be immediately
pursuing a right-of-way acquisition and finalizing the deign on the project.
Chair Porell expected that is probably 2 years away from actual start of
construction, but the project now has some funding.
F100290 – CR5500 Bridge Replacement: The County did a substantial
completion with the contractor on April 11th, 2022. The county is waiting for
the barrier wall to cure before installing an anti0graffitti coating and the
bridge is expected to open the week of May 2nd.
F100320 – Kirtland School Walk Path Extensions: A pre-construction meeting
with the contractor and DOT will be held April 18th, 2022.
F100360 & F100370 – CR3000 & CR3500 Bridge Replacements: The County
is in the process of awarding a design contract for these two projects.
F100380 – CR6100 Pavement Rehab: This is a TPF project. Milling will begin
May 9th, 2022. Completion is expected by the end of summer 2022.
NMDOT – Javier Martinez
F100170 – NM 173: The contractor is on board and ready to start June 1st,
2022.
F100350 & F100351– NM371/Navajo 36: Comments from the Navajo Nation on
the agreement have been received. DOT is in the process of amending the
agreement and once this is signed the project will go out to bid in the next few
months.
F100341 – US550 Pavement Rehab: The new estimate came in at $18 million.
DOT is deciding if they will shorten the project or if they will be able to
identify additional funding for it. There may be an additional STIP amendment
for this project. DOT is having to amend a lot of their projects because bid
pricing are coming in at levels much above estimated.
8. REPORTS FROM NMDOT
Planning Bureau – John Neunuebel & Rosa Kozub
Mr. Neunuebel introduced himself as the new planning liaison.
Ms. Kozub announced to the committee the New Mexico Cabinet Secretary of
Transportation, Mike Sandoval, will be retiring as of May 1, 2022. DOT does not
know who will replace him at the time or what the outlook is.
DOT had no further updates.
District 5 – Javier Martinez
Mr. Martinez added the Local Government Road Fund (LGRF), including MAP,
CAP, SRTS, application have been received and DOT is reviewing those.
Mr. Martinez also stated that NMDOT will have no issue with any TPF project
applications that tough NMDOT roads and will be able to sign any letters of
support.
DISCUSSION:
There was no further discussion form the committee.
9. INFORMATION ITEMS
Subject: Information Items
Prepared by: MPO Staff
Date: April 13, 2022
INFORMATION ITEMS
a. Update on MPO Quarterly held on March 7th. -
b. RTP, TAP, & CMAQ Awards Delayed
DISCUSSION:
Mr. Koeppel informed the committee that the MPO quarterly was held on March 7,
2022. This was a chance for the five MPO’s in the state, NMDOT, and FHWA Division
Offices to collaborate. Issues that were discussed included safety issues, and update
on the NMDOT bridge program, updates of the planning process, and the new highway
bill. The FMPO is planning to host the next MPO quarterly in person in Farmington in
June.
Mr. Koeppel also informed the committee that RTP, TAP, and CMAQ funding has been
delayed. DOT is waiting to see how much funding is available before awarding those
projects. Ms. Kozub added that the funding targets have been received from the STIP
unit and Shannon Glendenning and her team are in the process of fitting the already
ranked projects into the funding targets. Ms. Kozub hopes by the end of April the
awards should be received.
There was no further discussion.
10. BUSINESS FROM THE CHAIRMAN, MEMBERS AND STAFF
Chair Porell informed the committee that the City of Aztec, the City of Farmington,
and the County have collectively prepared an application for the NM Economic
Development Department’s Outdoor Recreation Division Trails+ Grant to fund the
design for $2.5 million. Last summer the Lower Animas Valley Recreation Trail was
added to the TIP. This is a non-motorized multi-use trail from Farmington to Aztec
and follow the former Rio Grande-Denver Western rail line. The right-of-way was
donated to the county in 1971. The City of Farmington is expected to present this to
their city council April 26th, Aztec is expected to go to their commission with this on
April 26th, and the county will be presenting it to their commission April 19th. Chair
Get email alerts for Farmington
A daily email when new agendas and minutes are posted.