Public Utility Commission
Regular MeetingFarmington, NM · January 8, 2014
Minutes
BOARD OF PUBLIC UTILITY COMMISSIONERS
The regular meeting of the CITY OF FARMINGTON BOARD OF PUBLIC UTILITY
COMMISSIONERS was held Wednesday, January 8, 2014 at 3:00 p.m., in the Executive Conference
Room at City Hall, 800 Municipal Dr., Farmington, New Mexico, in full conformity with the laws and
ordinances of the Municipality.
I. GENERAL
1. Commission members present: James Spence
Jeff Parkes
Carol Cloer
Marty Johnson
Bill Hall
Chris Hunter
Tory Larsen
Bill Standley
Vic Eicker
Keith Johns
Commission members absent: Amanda Weese
Mayor and City Council:
Mayor Tommy Roberts
City personnel present:
Water/Wastewater JeffSmaka
Public Works Director David Sypher
CH2MHill OMI Ron Rosen
PUC Secretary Amy McKinley
Accounting Sheree Wilson
Utility Business Operations Susan Nipper
Customer Service Nicki Parks
Electric Utility Director Michael Sims
Electric Transmission & Distribution Rodney Romero
Electric Generation Jim McNicol
Electric Generation Jim Eargle
Electric Engineering John Armenta
Legal Jay Burnham
City Manager Rob Mayes
2. Vice Chair Spence called the meeting to order with a quorum present to conduct the
business of the Commission.
3. A motion was made by Commissioner Hunter to approve the Minutes of the December
11, 2013 meeting. Commissioner Parkes seconded the motion and the motion carried.
II. BUSINESS
1. Water/Wastewater Report:
Mr. Smaka reported that design firm Cheney-Waiters-Echols (CWE) has been hired to
design the pump station on Wildflower Parkway.
Commissioner Larsen asked where the Wildflower pump station will be positioned.
Mr. Smaka stated the pump station will be located along Wildflower Parkway.
Mr. Smaka reported the City Council approved the amendment to the CH2MHill-OMI
contract for the installation of the water meters for the Meter Replacement project.
Mr. Smaka stated the process of purchasing the meters and reading system will begin
soon.
- 1
Commissioner Parkes asked when the Replacement project will begin. Mr.
Smaka stated that he anticipates the project will begin in March or April.
Commissioner Hunter noted in the report that an annual utilities contract was awarded
to TRC Construction and asked how an annual utility contract is done. Mr. Smaka
stated an annual utilities contract encompasses over 200 different bid items and covers
a myriad of different things that can be done in water, sewer and storm sewer.
Smaka stated the department goes out to bid for these types of contracts.
2. Water/Wastewater Operations Report:
Mr. Rosen presented the Water/Wastewater Operations Report for the month
December. Mr. Rosen stated there were 67 water breaks through the end of December,
2013. Mr. Rosen stated some of the breaks are due to the reluctance of property
owners to allow faucets to drip water to help prevent freezing pipes.
'l
.). Report:
and year to date Electric Report.
Customer
Parks styles of newsletters and the associated costs related to
producing
Commissioner Johns asked if there had been a request for a newsletter by the
Mr. Sims stated this request came from the City
Commissioner Hunter made a motion to advance the idea of an e-newsletter
would be sent out via e-mail. Commissioner Standley seconded the motion.
Commissioner Cloer commented that she preferred a hard copy newsletter.
further discussion, the Commissioner Hunter's motion to advance the idea
newsletter carried.
5. Director's Report:
Mr. Sims presented the Electric Report for the month of December.
Mr. Sims reported the Utility continues to work with GE on the final installation of a
permanent heating system at the Bluffview Power Plant. Mr. Sims stated staff is also
pursuing reimbursement from GE for heater rental charges.
Mr. Sims stated the Navajo Dam Hydro Plant remains off-line due to low river flows.
ADJOURNMENT
There being no business to come before the Commission, upon motion duly
seconded, meeting was adjourned.
meenng was at 4:39 p.m.
Approved 12th day of February, 2014.
c~
Dr.Jam~
Vice-Chair
-2
Agenda
Cit,.1 01 F#"'",;"yto"
I"t.ter/lV••ste•.,,.ter
AG DA
......for the regular meeting of "the Public Utility Commission of the City of Farmington,
Wednesday. January 8. 2014. at 3:00 pm in the Executive Conference Room at City Hall, 800
Municipal Dr., Farmington, New Mexico.
I. GENERAL
A. Roll Call
B. Convening of Meeting by Amanda Weese, Chair
C. Minutes of December 11, 2013 regular meeting submitted for approval
II. BUSINESS
A. Water/Wastewater Report - Jeff Smaka (5 min) ................................................. 2
B. Water/Wastewater Operations Report - Ron Rosen (5 min) ............................... 3
C. Electric Utility Report- Sue Nipper (20 min) ..........................................................4
D. Customer Service Newsletter Update - Nicki Parks (10 min) .............................. 5
E. Director's Report - Mike Sims (10 min) ..................................................................... 6
III. ADJOURNMENT
The next regular meeting will be on February 12. 201 4
The City of Farmington will make every effort to provide reasonable accommodations for people with disabilities who wish to attend a
public meeting. If you need to request that an accommodation be made, please notify the Electric Administration office (599-1160) at
least 24 hours prior to the meeting.
BOARD OF PUBLIC UTILITY COMMISSIONERS
The regular meeting of the CITY OF FARMINGTON BOARD OF PUBLIC UTILITY
COMMISSIONERS was held Wednesday, December 11,2013 at 3:00 p.m., in the Executive Conference
Room at City Hall, 800 Municipal Dr., Farmington, New Mexico, in full conformity with the laws and
ordinances of the Municipality.
I. GENERAL
1. Commission members present: Amanda Weese
James Spence
Jeff Parkes
Carol Cloer
Marty Johnson
Bill Hall
Chris Hunter
Tory Larsen
Commission members absent: Vic Eicker
Bill Standley
Keith Johns
Mayor and City Council:
Mayor Tommy Robel1s
City personnel present:
W aterlW astewater Ruben Sa.lcido
CH2MHiliOMI Monica Peterson
PUC Secretary Amy McKinley
Accounting Sheree Wilson
Administrative Services Director Andy Mason
Utility Business Operations Susan Nipper
Customer Service Nicki Parks
Electric Utility Director Michael Sims
Electric Transmission & Distribution Rodney Romero
Electric Generation Jim McNicol
Customer Service Nicki Parks
2. Chailman Weese called the meeting to order with a quorum present to conduct the
business of the Commission.
3. Minutes of the November 13,2013 meeting were approved as published.
II. BUSINESS
1. WaterlWastewater Repoli:
Mr. Salcido presented the Water/Wastewater Report for the month of November. Mr.
Salcido reported on the status of the design phase of the Waste Water Treatment Plant
improvements. Mr. Salcido reviewed the status of the Meter Replacement project. Mr.
Salcido stated staff is reworking this project to purchase water meters only and is
working with CH2MHill-OMI for a cost to perfOlm the water meter installation. Mr.
Salcido reviewed the ongoing water line installation and repairs throughout the city.
2. Water/Wastewater Operations Report:
Ms. Monica Peterson of CH2MHill-OMI presented the Water/Wastewater Operations
Report for the month of November. Ms. Peterson reported that there were various
water line breaks due to the cold weather. Ms. Peterson repolied that CH2MHill-OMI
is continuing to work on reducing the amount of salt being discharged into the system
by working with commercial customers to encourage reduction of the use of salt.
- 1
Commissioner Hunter pointed out that two new car washes are being built and asked if
these businesses are being held to a higher standard with regard to the use of salt. Ms.
Peterson stated no.
Commissioner Cloer asked what the worst case scenario is and how long does the city
have before the City gets fined by the EPA. Ms. Peterson stated that City is under an
administrative order from the EPA and that on a monthly basis the department submits
a report to the EPA detailing the levels of salt discharged into the system. Ms.
Peterson stated that under the administrative order, the department has been tasked
with a variety of ways to make efforts to reduce the salt discharge levels. Ms. Peterson
stated these effolis have been made and reports of these efforts have been reported to
the EPA.
Commissioner Cloer asked if the EPA has recommendations or comparisons of how
other communities are handling this issue. Ms. Peterson stated the salt discharge issue
is specific to the Colorado River and how much salt is being disbursed downstream to
Mexico, so a national study is not likely.
3. Electric Utility Dividend Policy Calculation:
At the request of the Commission, Ms. Nipper presented the Electric Utility Dividend
Policy calculation. Ms. Nipper stated the Dividend Policy Calculation was adopted by
the City Council through Resolution No. 2011-1392. Ms. Nipper stated this dividend
is a retUI11 on the city's investment in the Electric Utility.
Mayor Roberts commented that the Electric Utility dividend is a critical component of
revenue flow into the city's general fund.
Ms. Nipper stated the Electric Utility also pays a 5% franchise fee to the city. Ms.
Nipper stated this fee is also a part of Resolution No. 2011-1392. Ms. Nipper stated
the utility also pays franchise fees to the other jurisdictions the utility serves.
Ms. Nipper presented the Electric Utility Report which details the year to date
financial information.
4. System Operations Report:
Mr. Romero reported on the progress ofthe construction projects at the Municipal
Operations Center. Mr. Romero stated that construction in the System Operations
Control Center has been completed. Mr. Romero stated new computer hardware has
arrived and the software engineers will be onsite the week of December 16,2013 to
program the system. Mr. Romero stated the goal is to have the new system up and
running at the end of that week. Mr. Romero presented photos of the ongoing
construction of the Transmission and Distribution office remodeling project.
Commissioner Hunter asked about the recent extended power outages. Mr. Romero
reported there were three power outages within a week's time involving the
Bloomfield substation. Mr. Romero stated one of these outages involved a private
individual using some heavy equipment and this equipment pulled down the power
line. Mr. Romero stated that due to some repair work by the utility coincidentally
taking place a bit fllliher down the line the private heavy equipment operator was
spared injury. Mr. Romero stated another outage involved a weak line that was
discovered while crews were performing other utility repair work. Mr. Romero stated
the other large outage involved the Sullivan substation. Mr. Romero stated the cause
of this outage was the result of a Pine tree that had grown and fully encased the whole
3 Phase line. Mr. Romero stated that while these tree/power line situations do still
occur the utility has been aggressive this year with its vegetation management
program.
Commissioner Hall asked if the heavy equipment operator will be held financially
liable for the damage that caused the outage. Mr. Sims stated yes.
Commissioner Hall asked if there will be an ongoing maintenance contract with the
new SCADA equipment provider and ifthe utility has personnel on staff with
expertise with this equipment. Mr. Romero stated that an ongoing maintenance
contract is in place and the utility has three members of staff that maintain the SCADA
system.
-2
5. Director's Report:
Mr. Sims presented the Electric Report for the month of November which was
submitted to the City Manager. Mr. Sims pointed out the NMMEA annual
distribution of $1 ,311 ,699.14 for last year. Mr. Sims stated that NMMEAA is the gas
pre-pay the utility participates in along with other communities within the state of
New Mexico. Mr. Sims stated that as a part of this gas pre-pay the utility gets a
discount off the natural gas the utility buys.
Mr. Sims stated Nicki Parks, Customer Care Manager, is spearheading the creation of
an Electric Util ity newsletter and will be bringing some newsletter options before the
Commission at the next meeting. Mr. Sims stated this action is at the request of the
City Council.
Vice Chair Spence asked if the newsletter will include information from the other city
utilities. Mr. Sims stated that as of this time this newsletter would be for the Electric
Utility only.
Mr. Sims reported that General Electric continues work on making the anti-icing
system they installed at the Bluffview plant work. Mr. Sims stated staff in Generation
has devised a temporary work-around to bring the Bluffview plant back online and the
plant is presently operating.
III. ADJOURNMENT
There being no further business to come before the Commission, upon motion duly
made and seconded, the meeting was adjourned.
The meeting was adjourned at 4:39 p.m.
Approved this 8th day of January, 2014.
Amanda Weese, Commission Chair
-3
CITY OF FARMINGTON - Pl)BLlC WORKS OEPARTMENT(PW)
Division: Water-Wastewater I Program: Water & Wastewater
Report Prepared by: Jeff Smaka I Title: Public Works Director
Reporting Period: Dec 1, 2013 through Dec 31, 2013 I PUC Meeting Date: 8 January 14
'. ,." ACCOMPLISHMENTS ", ..,.
; ." L'
.' • '" " , ; ' .,J , ., '
• Waste Water Treatment Plant. Phase III Design - HDR Engineering has submitted the design
drawings for the plant upgrades. Staff is reviewing the layout and design flow capacity of the
proposed improvements. Construction of Medium Rate Activated Sludge (MRAS) basin in 2014
budget to provide redundancy at the WWTP and maintain compliance with EPA permit. NMED
approved funding the waste water treatment plant upgrade through the Clean Water State
Revolving Loan Fund (CWSRF) program.
• 0& M Contract. The current 8 year Operation and Maintenance Contract with CH2MHILL OMI
expires on Dec 31, 2015. Staff is preparing a contract amendment for the installation of the water
meters by CH2MHILL for City Council approval in 2014.
• Utility Rates. Red Oak Consulting working on the rate study.
• On-Call Engineering Service Contract.
o 2P Waterline Project - HDR has submitted 90% design drawings. City Council included
this project in the City's Infrastructure Capital Improvement Plan submitted to the state -
estimated cost six million dollars.
o LaPlata Highway - Project design for water line replacement completed by City staff.
Awaiting permit approval; will be scheduled pending approval of NMDOT permit.
• Capital Project Review.
o Capital Improvement Project
• Meter Replacement - NMED: Drinking Water State Revolving Loan Fund
Program. Loan amount $5,959,000 . The plans and specifications approved by
NMFA and NMED. Staff is reworking project to purchase water meters only and
we are working with CH2MHill-OMI for a cost to do water meter installation.
o Renewal and Replacement
rd
• 23 Street Project
th
• Phase 4 - Santiago - 23 rd St to 25 St - Summer 2014
• Wildflower Parkway - 4P Pump Station - Cheney-Walters-Echols (CWE) is
designing pump station along with survey for acquiring property for pump station.
Budgeting for the construction of new pump station FY14.
• Blake St - Main to Apache - Replace existing 6" CI waterline with an 8"PVC
waterline - Spring 2014
th
• 20 St - Municipal to Sunset - Replace existing 24" and 16" steel waterline Street
with a 24" PVC and 16" PVC waterline. - Summer 2014
• Foothills Dr. - Main to Hill N Dale Replace Existing 16" steel waterline - design
in process
•
o Pressure Reducing Valve (PRV)
• PRV installation at Main Street and Gila Street - Construction 2014
• PRV installation at Main Street and Red Lobster - Construction 2014
•
o Sewer Main Extension
• Lift Station 5 Improvements - RMCI of Albuquerque - Rehab of the existing lift
station which includes the mechanical, pumping equipment and electrical systems
of lift station 5. Notice to Proceed for July 22 - Phase 1 of the project is the
reconstruction of the wet well, replacement of the piping and mechanical system.
Phase 1 is 98% complete, Lift Station is back in operation :: Phase 2 - Electrical
submittals are being reviewed by HDR Engineering Inc. - Notice to Proceed will
be issued once submittals are approved.
• Lift Station 3 Improvements - HDR Engineering is designing the rehab of the
existing lift station which includes the mechanical , pumping equipment and
electrical systems . Design to be completed spring 2014. Construction summer
2014.
-2
•
• Operational Review.
• Human Resource Issues. Job evaluations .
• Positions none
• Budget. - FY14
• COF Department Support. Survey support to acquire manhole data for future sewer collection
system model continues
• Annual Utility Contract. - Annual utilities contract awarded to TRC Construction by City Council
th
on August 6
• Federal Funding
o Water Projects - Meter Replacement Project
• City Council to approved final loan application to l\Jew Mexico Finance Authority
(NMFA) - loan documents completed in January 2013.
o Wastewater Projects - submitting for funding in 2014
• WWTP - MRAS Basin, Final Clarifier, Solids Handling Facility & UV Disinfection
NMED funding source is the Clean Water State Revolving Loan Fund (CWSRF)
Program - Project approved by NMED, on Nov 5 City Council approved
permission to draft ordinance as required by NMED for loan . Michael Groshek
with Sherman and Howard is drafting ordinance for the proposed project.
, !
.• PROJECTS IINITrATIVES REQUIRING INTER-D!VISIONAL COORDINATION
• Farmington Reach - Navajo Municipal Pipeline.
o Working with Bureau of Reclamation and Navajo Tribe for agreements to transfer title to
the City for the tank and pipeline project along with an Operation, Maintenance and
Replacement (OM&R) agreement as required by Federal law - March 2009.
• WWTP NPDES PERMIT - EPA. City has received the EPA final permit. New permit went into
effect on November 1,2010, permit expires October 31,2015. - City staff and OMI are reviewing
the permit regarding Total Dissolved Solids (TDS) limits 400mg/1 requirement. On July 19,2013
the City received an Administrative Order (AO) from EPA Region 6 which specifies the activities
the City is to accomplish along with due dates for each activity, these tasks and due dates
correspond to those proposed in the City's letter to EPA. After each task is completed as outlined
in the AO a written report for that completed task is due to EPA Region 6.
• Snowpack - Water Year 2013 - BOR reporting site down
• Animas River Basin - 110%
• San River basin - 96%
ATTACHMENTS
WATER FUND (602) - RENEWAL & REPLACEMENT
WASTEWATER FUND (603) - RENEWAL & REPLACEMENT
GRAPH WATER REVENUE FY 10 - FY14
-2.1
WATER
•Renewal & Replacement
Water Fund - 602
FY10 FY11 FY12 FY13 FY14 FY14
REVENUES Actual Actual Actual Actual Y-T-D Budget
I I Renewal/Replacement Fee $1,733,666 $1,943,342 $2,018,436 $2,037,806 $868,126 $2, 082,909
I I ---- -------- ----- ------ -------- ----
STATE GRANT - $825,000
REVENUE TODATE • $11,525,254
PROJECTED REVENUE FY07 - FY14 $13,608,163
FY10 FY11 FY12 FY13 FY14 FY14
Actual Actual Actual Actual Y-T-D Budget
EXPENDITURES
1602-5543 RENEWAL/REPLACEMENT
1651.70-60 Construction $1,375,293 $1 ,51 8,581 $1,706,469 $2,278,859 $1 ,139,438 $2,750,000
I ---------- - ---- -.------ --------. ------- --------
$9,770,965
Largo & ' Main PRV estimated $150,000
20th St - Red Lobster PRV estimated $150,000
Knollcrest Dr - Windsor to Klngsway estimated $200,000
Holiday Dr - Windsor to Kingsway estimated $150,000
Troy King - Piedras south to US 64 estimated $500,000
20th St - Municipal to Sunset estimated $700,000
Behrend - Apache to Commanche estimated $80,000.
Coyote Drive - LaPlata Hwy to end estimated $70,000
Blake St - Main to Apache estimated $100,000
Foothills Dr - Hili & Dale to Main St estimated $700,000
N Court Av - Apache to Shiprock estimated $250,000
Schwartz - Broadway to Animas estimated $95,000
Northwood estimated $100,000
'Polyllne ' Servlce Replacement estimated $100,000
Fire Hydrant 1950 Replacement estimated $100,000
$3,445,000
PROJECTED EXPENDITURES FY07 - FY14 $13,215,965
WATER RENEWAL & REPLACEMENT
$2,500,000
$2,000,000
en $1,500,000
c:: .Revenue
«
...I
...I $1,000,000
o Expenditures
0
c
$500,000
$0
Actual Actual Actual Actual Y-T-D
FY10 FY11 FY12 FY13 FY14
FISCAL YEAR
-2.2
WASTEWATER
; Renewal & Replacement
. Wastewater Fund - 603
FY10 FY11 FY12 FY13 FY14 FY14
REVENUES Actual Actual Actual Actual Y·T·D Budget
Charges for Utility Services
I I Renewal IReplacement Fee $1 ,229,258 $1,385,827 $1,436,494 $1,441,591 $605,145 $1 ,494,391
I I ------- -------- --------- ------ -------- -------
,.
REVENUE TODATE
PROJECTED REVENUE FY07 • FY14 $8,970,954
FY10 FY11 FY12 FY13 FY14 FY14
Actual Actual Actual Actual Y·T·D Budget
EXPENDITURES
603-5543 RENEWALIREPLACEMENT
751.70-60 Construction $592,933 $1,152,988 $501 ,814 $685,848 $698,507 $1,257,531
-----._---- ----------- -------- ------~- ------ - --------
Subtotal Capital $592,933 $1 ,152,988 $501 ,814 $685,848 $698,507 $1,257,531
Projects FY07· FY13 $4,364,995
Lift Station #5 Rehab $915,000
MRAS Basin $1,000,000
Lift Station # 3 Rehab $800,000
Sewer Rehab $750,000
Scrubber Rehab $250,000
Manhole Rehab $150,000
Mainline Rehab $300,000
PROJECTED EXPENDITURES FY07· FY14 $8,811,624
OFY1Q
F Y11
Total Water Revenue Per Month
FY12
FY10 - FY14
. F Y 13
_ F Y 14
2,000,000
1,800,000
1,600,000
1,400,000
1,200,000
1 ,000,000
800 ,000
600,000
400,000
200,000
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
,-----------------------------------------------------------------------------~
-2.3
BUDGET TO ACTUAL COMPARISON PER MONTH
FY 2010" FY 2011 FY 2012 FY 2013- FY 2014
Budget Actual Budget Actual Budget · Actual Budget Actual Budget Actual
JUL 1,067,568 1,322,552 1,107,254 1,485,229 1,176,228 1,630,402 1,165,141 [ 1,696,293 1,196,227 1,657,429
AUG 1,067,568 1,420,178 1,107,254 1,303,558 1,176,228 1,588,665 1,165,141 1,725,060 1,196,227 1,495,029
SEP 1,067,568 1,290,632 1,107,254 1,330,247 1,176,228 1,410,448 1,165,141 1,362,607 1,196,227 1,349,906
OCT 1,067,568 1,010,908 1,107,254 1,110,501 1,176,228 1,1 84,374 1,165,141 1,338,557 1,196,227 1,123,250
NOV 1,067,568 735,252 1,107,254 886,031 1,176,228 887,002 1:165,141 936,091 1,196,227 805,566
DEC 1:067,568 791,478 1,107,254 810,541 1,176,228 832,980 1,165,141 839,767 1,196,227
JAN 1,067,568 760,713 1,107,254 835,520 1,176,228 851,299 1,165,141 851,542 1,196,227
FEB 1,067,568 740,561 1,107,254 838,187 1,176,228 813,970 1,165,141 401,518 1,196,227
MAR 1,067,568 727,418 1,107,254 824 ,263 1,176,228 823,706 1,165,141 788,759 1,196,227
APR 1,067,568 889,702 1, 107,254 951,749 1,176,228 i,028,028 1,165,141 958,767 1,196,227
MAY 1,067,568 1,099,110 1, 107,254 1,116,639 1:176,228 1,317,793 1,165,141 1,194,193 1,196,227
JUN 1,067,568 I 1,521,671 1, 107,254 ! 1,425,556 1,176,228 1,570,209 1,165,141 . 1,520,186 1, 196,22'1
..
TOTAL: I 12,310,175 1 12,918,021 1 13,938,876 I 13,613,340 " . I 6,431,180
REVENUE PER CLASS/CUSTOMERS
FY 2010 FY 2011 FY 2012 FY 2013 FY 2014
Budget i Actual Budget Actual Budget Actual Budget Actual Budget Actual
R 5,901,722 5,742,019 6,338,837 5,962,727 6,275,000 6,509,749 6,481,728 6,464,202 6,676,180 3,019,262
GS 3.400,119 2,923,899 3.294,004 3,081,024 3,458,704 3,441,527 3",447,238 3,107,129 3,550,655 1,720,157
CU 1,247,750 994,443 1,062,666 1,118,738 1,117,925 1,096,582 1,129,104 1,123,093 1,151,686 465,905
REG 212,000 205,146 227,751 217,349 210,000 264,281 225,000 264,196 250,000 130,720
FH 92,225 80,933 96,793 . 89,526 125,000 112,642 118,750 76,419 118,750 48,763
R&R 1,419,550 1,733,666 1,744,954 . 1,943,342 1,910,000 2,018,437 2,055,322 2,037,805 2,08i,909 868,127
GRANTS 10,821,688 5,814 ,967 3,226,226 1,292,048 500,000 284, ni8 2,510
OTHER 537,453 . 630,069 1,740,218 1.720,237 1:018:114 747,207 524,552 . 2,595,398 524,552 178,246
TOTAL: 23,632,507 18,125,142 " 17,731,449 . 15,424,991 14,614,743 14,475,213 13,981,694 15,670,752 14,354,7321 6,431 ,180
SCHEDULE OF CUSTOMERS
R Residential
GS General Service,
Single (commerlcal
CU Contract Users (bulk water users)
REC Recreational/Raw
WaterWater Users
(city facilities and
FH Fire Hydrants
R&R Renewal & Replacement
OTHER Miscellaneous
-2.4
CH2N1HILL
OMI
Monthly Activity Report
December 2013
Prepared for
City of Farmington, Public Utility Commission
-3
ADMINSTRATION OPERATIONS
Safety Training and Incidences as of 12-30-13
TAILGATE TOPICS DEC 2013 YTD
Total Safety Training Hours 258.5 2294.65
I ncidences/ accide nts 0 4
I\.t1 otor Vehicle Incidences/accidents 0 2
DELIVERABLES FOR DISTRIBUTION & COLLECTION SYSTEM
DeJiverables as of 12-27 -13
TASK TARGET YTD % COMPLETED
Pressure Regulator Inspection 57 60 105%
Valve Exercise 4895 4762 97%
Storm Drain Cleaning 678 900 133%
Dead End Main Flushing 492 492 100%
Sewer Main Cleaning 6" - 24" 307560 290182 94%
Sewer Main Cleaning 24" - UP 9800 10965 112%
Sewer Main Video Inspection 184800 163087 88%
Fire Hydrant Inspection 2565 2600 101%
Air Relief Valve Inspection 147 149 101%
Permaloggers 100 100 100%
Water breaks as of12-27-13
DEC 2013 YEAR-TO-DATE
Main line breaks 18 Main line breaks 62
Service line breaks 23 Service line breaks *177
Total 41 Total 239
*YTD totals adjusted to reflect remaining November totals. Two additional water service lines
added for November 2013.
Estimated water loss for December => 87,250 (gallons)
New Meters as of 12-27 -13. *Total for the Sewer Tap has not been finalized.
-3.1
WATER TREATMENT OPERATIONS
Farmington Lake Elevations - Monthly Average Comparison for 2012 to 2013
563800
E 5636.00 =:-..
~ .........
I ......
'-.. - ~/ ~
e
v 5632.00
5634.00
"- ~
j
i
If"
'\
A
/ . I 2013 I
,~,
a
5630.00 '- / ''/ /'II
t
5628.00 ' +~~ / 2012 I
o
5626.00
n
5624.00
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
I 2012 5630.95 5628.25 5628.85 5631.63 5634.98 5635.69 5633.96 5630.78 5628.70 5628.71 5633.28 5635.56
1-2013 5634.68 5633.63 5634.58 5634.77 5635.02 5635.46 5634.28 5633.85 5634.88 5635.92 5635.96 5634.48
Water Treatment Plants - Total Effluent to System Comparison for 2012 to 2013
700
600
!... - ---,
~/ / ' ~~
Vi'
c:
.2
500
400
, /1 / ~
'" 0 0
~
'f"
Vl
c: 300
..Q
~
ro
200
~
- .... " '"' ' d 2012 I--
..............
-
I 2013 I
100
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1
2012 242.566 234.059 269.349 375.305 510.642 598.929 578.981 557.870 451.947 364.366 253.024 236.803
1
2013 257.025 218.347 258.694 329.580 414.543 531.199 573.921 495.340 375.268 291.420 231.239 244.408
-3.2
WASTEWATER TREATMENT OPERATIONS
FLOW
6.00
5.50
~ ~ ~ ~
~ ~ ~
5.00
~ ~ ~ ~ ~ ~ ~ ~
4.50 ~
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
4.00
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~
~ ~ ~
3.50
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
~ ~ ~
3.00
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
2.50
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
2.00
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
1.50
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
1.00
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
0.50
~ ~ ~ ~ ~~ ~~ ~~
0.00 ~ ~ ~ ~ ~
...., ~ ~ ~ ~
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
_INF 5.38 5.28 5.19 5.52 5.53 5.69 5.69 5.62 0.00 5.22 5.12 5.19
ts:SJ EFF 4.82 4.73 4.68 5.01 4.97 5.18 5.31 5.42 5.46 4.89 4.64 4.87
-LIMIT 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67 6.67
Final Effluent Total Flow [MG] 87.71
Final Effluent Average Flow [MG] 4.87
Total Number Septic Trucks 379
Total Gallons Septic Trucks 433320
-3.3
DMR lOS NET INCREASE I
550.00
500.00
~
'"
E
.I»oo-/f- \--jf--- - - -\--/- - 'I/- -\- - j' - -\I - - - - - -----'''''''''''·"'''''W''''.
35000
300.00
11 1 1m 21 12 JJS 31;(6 ~ / 16 '!:n 928 €J 18 7(9 7130 3110 9110 IOJ I HJI12 11,,2 1213 1212"
D.te ( 1/11201 3 tD 12131/201 3 )
, DM R ros :ET r ICREJt. Y
PRETREATMENT ACTIVITES
• Completed 100% of grease trap inspections - a total of 172.
• Completed 100% sand, oil, grease trap inspections - a total of 84.
• Completed Industrial Pretreatment Program annual sampling and inspections for all six discharge
permittees.
• Completed follow up on triennial industrial survey. The survey list was provided by the City of
Farmington (based on a list of City of Farmington business licenses). This started out as a 3,000 item
list. After initial review, a total of 977 surveys were sent out, 383 surveys were returned. An
internet search and telephone interviews were conducted on the remaining surveys and most were
found to be either out of business or temporary businesses (Le. festival licenses). 26 businesses
were then inspected and six of these were identified as having either grease traps or sand
interceptors.
• Completed monthly TBLL sampling and data entry.
-3.4
Acronyms and Abbreviations
CM Corrective Maintenance
CMMS Computerized Maintenance Management System
gpd Gallons per day
gpm Gallons per minute
hp Horsepower
mg millions of gallons
mg/L Milligrams per liter
mgd Million gallons per day
NMED New Mexico Environment Department
NPDES National Pollutant Discharge Elimination System
O&M Operation and Maintenance
OMI Operations Management International
OOS Out of Service
PdM Predictive Maintenance
PM Preventive Maintenance
ppm Parts per Million
PRV Pressure Reducing Valves
PRVs Pressure Reduced Valves
QA/QC Quality Assurance/Quality Control
SCADA Supervisory Control and Data Acquisition
SMP Standard Maintenance Plan
SOP Standard Operating Procedure
TTHMs Trihalomethanes
-3.5
USEPA u.s. Environmental Protection Agency
WEP Work Execution Plan
WWTP Wastewater Treatment Plant
-3. 6
PUC Presentation Electric Utility Newsletter January 8,2014
1 Page 2 Page 4 Page
Double Sided Double Sided Double Sided
2 pages of 4 pages of 8 pages of Email Marketing
Options content content content Campaign
Quantity 35,000 35,000 35,000 Unlimited
Printing Price -$2,660 -$4,630 -$10,458 N/A
Paper Weight 20#, Plain 70#, Matte 70#, Matte N/A
Saddle Bound I
Fold N/A 1/2 Folded 2 Staples N/A
Bill Stuffer
(no cost for postage) YES YES NO N/A
Postage $12,950 $12,950 $21,000 N/A
$2951 month
$3,0091 year (15%
Service Cost discount)
Annual Cost Comparison of Monthly Mailed Publication
In-house Labor $ 8,496 $ 16,992 $ 33,983
Printing Cost 31,920 55,560 125,496
Postage 155,400 155,400 252,000
Total Annual Cost $ 195,816 $ 227,952 $ 411,479
Annual Cost per Customer $ 5.59 $ 6.51 1$ 11.76
Annual Cost Comparison of Quarterly Mailed Publication
In-house Labor $ 2,124 $ 4,248 $ 8,496
Printing Cost 10,640 18,520 41,832
Postage 51,800 51,800 84,000
Total Annual Cost $ 64,564 $ 74,568 $ 134,328
Annual Cost per Customer $ 1.84 $ 2.13 $ 3.84
Annual Cost Comparison of Semi-Annual Mailed Publication
In-house Labor $ 1,416 $ 2,832 $ 5,664
Printing Cost 5,320 9,260 20,916
Postage 25,900 25,900 42,000
Total Annual Cost $ 32,636 $ 37,992 $ 68,580
Annual Cost per Customer $ 0.93 $ 1.09 $ 1.96
Annual Cost Comparison of Bill Stuffer Publication
Publication Frequency Monthy Quarterly
In-house Labor $ 8,496 $ 4,248
Printing Cost 31,920 18,520
Total Annual Cost $ 40,416 $ 22,768
Annual Cost per Customer $ 1.151 $ 0.65