Attendees: Airport Commissioners: Chairman John Naylor, Vice Chairman Peter Kettle, Secretary
Clayton Raymond, Richard Liberatore, Airport Manager Scott Ellis,
Others in attendants include: Assistant Solicitor Christine Tree, Nicholas Ippolito, P.E. of Gale
Associates, Inc
1. Meeting Protocol Meeting called to order
Chair Naylor introduced the commission members in attendance.
Chair Naylor motioned request to record audio (granted) and approved
Commissioner Raymond and Comm. Kettle request to record audio.
Chair Naylor Request to bypass the public opportunity to speak Motioned
to bypass Chair Naylor 2nd Comm. Liberatore 18-05-01 Vote 4-0
2. Previous month’s minutes to include special meeting minutes as required
Motion to accept previous month’s minutes as amended, motion Comm. Kettle
to accept 2nd Comm. Liberatore 18-05-02 Vote 4-0
3. Correspondence to the Commission None to report
4. Project Review-Gale Associates,Inc Nicholas Ippolito,P.E.
There are four (4) projects that Gale Associates, Inc. (Gale) is administering on
behalf of the Fitchburg Airport Commission. They are:
Runway 14 End Obstruction Removal and Aeronautical Survey (Off Airport
Property) AIP No. 3-25-0018-25-2015
Project Description: This project is an obstruction removal project to clear
obstructions identified on nine (9) off-airport properties in the Runway 14
approach surface, and to complete an Aeronautical Survey.
Project Cost: FAA Share: $ 675,000.00 (90.0%)
State Share: $ 37,500.00 ( 5.0%)
Local Share: $ 37,500.00 ( 5.0%)
Total Cost: $ 750,000.00 (100%)
Project Status:
The Aeronautical Study is ongoing. Gale has coordinated with Col-East,
the sub-contractor performing the Aeronautical Survey to determine the
current status of the aeronautical study. At last month’s meeting, it was
reported that the Profile data has been uploaded to the AGIS system.
This was apparently incorrectly reported. Gale has finalized the Runway
grading plans and will be preparing CAD files to transmit to Col-East so
that they can upload the information into the FAA AGIS System.
Night operations have been restored to Runway 14. The Airport
Commission has requested that Gale look into removing the VASI NOTAM
and restoring the VASI Approach Angle to it’s original angle. This work
should be coordinated through Charles Beaton, P.E.
(Charles.Beaton@faa.gov) via his email or by phone at (603) 881-1306.
Upon the final upload into AGIS, this project should be ready for final
reimbursement and close-out procedures. Action Item Nick Ippolito will
research alternative ways to pay for the restoring of the VASI approach
angle to its original angle, possibly getting the funding to be included in
the runway project.
Actions Required by the Airport this Month:
None.
Runway 32 End Obstruction Removal (Off Airport Property) AIP No. 3-25-
0018-26-2017
Project Description: This project is an obstruction removal project to clear
obstructions identified on up to twenty-seven (27) off-airport properties in the
Runway 32 approach surface in the City of Leominster. One (1) property is
partially in the City of Fitchburg.
Estimated Project Cost: FAA Share: $ 1,156,500.00 (90.0%)
State Share: $ 64,250.00 ( 5.0%)
Local Share: $ 64,250.00 ( 5.0%)
Total Cost: $ 1,285,000.00 (100%)
Project Status:
Tree work has been completed. There are still several punchlist items
that must be coordinated. Specifically stumps at the Murphy, Dutting,
Arsenault, and McKenzie properties.
Merril was on site to verify approaches have been cleared in the Runway
32 end. Once the approach surfaces have been verified clear, Gale will
coordinate with Northern Tree on the final punchlist items.
Work to modify the roof of an existing structure is ongoing. The
Contractor has reported that the electrical systems inside the structure
are comprised of knob/tubing type wires and if any part of this system is
modified as part of the Project, that part must be brought up to code.
Gale is working with the Contractor to evaluate what options there may
be to perform the work without updating the entire electrical system.
Action Item Nick will research this issue and get back to the commission
of the status of the electrical upgrade.
MassDOT has received the Contracts between KOBO Utility and the
Airport. Gale has requested a schedule for construction from KOBO. The
anticipated schedule for the work will be provided prior to the next
meeting.
KOBO has requested that the City set up a work order for the new
electrical service with the local power company. This must be set up by
the Airport, as the Airport will ultimately be paying the bill. Once this
work order is in place, the power company can make all service
connections as KOBO Completes the work. Action Nick will look into a
timeframe concerning the pole removal as the poles are now the only
obstruction.
Actions Required by the Airport this Month:
Please contact the local power company to set up a work order for the
proposed work. Once open, provide Gale with the information.
Runway 14-32 and Parallel Taxiway Permitting and Preliminary Design – AIP
No. 3-25-0018-XXX-2018 (Pending)
Project Description: This project is to collect survey and soil information, conduct
preliminary design efforts, and obtain local permits for the Runway 14-32 and
Parallel Taxiway reconstruction.
Estimated Project Cost: FAA Share: $ 589,500.00 (90.0%)
State Share: $ 32,750.00 (5.0%)
Local Share: $ 32,750.00 (5.0%)
Total Cost: $ 655,000.00 (100%)
Project Status:
A follow-up scoping meeting was held on Friday, March 2, 2018 at 10:00
A.M. The FY 2018 project will shift to a permitting and preliminary design
effort, to include the survey and soil information collected to date.
A finalized Scope of work and fee has been approved by the Airport. Gale
will be preparing Contracts for signatures this week.
A Record of Negotiations letter has been prepared by Gale and will
accompany the Contracts when sent to the Airport for signatures. This
letter will need to be signed by Scott Ellis and sent to MassDOT along with
the Contracts.
Gale has prepared preliminary design and permitting plans for the
Runway project. Once these plans are put through Gale’s internal QC/QA
process they will be ready to present to the Conservation Commission.
th
Gale is coordinating with GZA to determine whether the June 26
Conservation Commission meeting is still feasible. Any update on this
deadline will be relayed to the Commission as soon as possible. Comm.
Raymond noted the commission has requested additional conduit to be
installed under the runway for the proposed solar farm. Curious to
know if the conduit is currently in the preliminary design Action Nick
will check preliminary design to see if the conduit is accounted for.
Actions Required by the Airport this Month:
Please sign and forward the finalized Contracts to MassDOT upon receipt.
Please sign and forward the Record of Negotiations Letter to MassDOT
along with the Contracts.
Purchase Compact Track Loader and Attachments – ASMP No. TBD
Project Description: This project is to purchase a new compact track loader
(Bobcat T770, or equivalent) and various attachments for use around the Airport.
This equipment was offered to the Airport at an 80% MassDOT funding level.
Equipment will be purchased using the FAC88 State Contract, which requires only
minimal specifications, and a minimum of three (3) quotes from pre-approved
vendors. The equipment must be delivered to the Airport no later than June 30,
2018 as a condition of the MassDOT grant.
Estimated Project Cost: FAA Share: $ 0.00 (0.0%)
State Share: $ 103,200.00 (80.0%)
Local Share: $ 25,800.00 (20.0%)
Total Cost: $ 129,000.00 (100%)
Project Status:
A MassDOT pre-application was prepared and submitted to MassDOT.
Gale prepared the quote solicitation notice, and sent to the Purchasing
Department for review and comment. The solicitation was sent to five (5)
vendors on June 26, 2018.
The selected vendor has provided a quote in the amount of $121,515.00
for the preferred machine to be acquired. This quote includes all
attachments that have been requested by the Airport. Upon
A purchase order will be prepared upon Scott’s final recommendation and
Commission approval.
Actions Required by the Airport this Month:
Please make a motion to accept the Schmidt Equipment Proposal for VMP
Equipment based on the quoted price of $121,515.00 and issue a
Purchase Order based on this price.
Other Items:
None at this time.
5. New Business
A. Airport Access-Rules and regulations No action on
this item subject is tabled
B. Mass DOT-A Pavement survey
Scott Ellis explained to the commission the use of a
high tech drone to film the runway to compare before
and after pictures for the runway project.
C. Mass DOT-A updated economic impact study Scott
Ellis stated a new study is underway and the
completion of the study may be available early next
year.
6. Old Business
A. Self serve fuel facility Airport Manager Scott Ellis Is hopeful for an
80/20 grant through ASMP.
B. Panema Productions Rodeo 2-018 No action taken Rodeo is still on
schedule for July 29 2018
C. EMS Drone Use discussed earlier in Mass Dot Pavements survey
D. Proposed Airport Events regulations. No action subject tabled Action
has been taken at previous meeting to be removed from agenda
E. Paper Airplane event June 12 2018 Event is on schedule with some
minor changes the airplane will not be towed to simulate flight It has
been changed to an airplane sculpture as it was determined the model
was too heavy for lift.
F. Autumn Air Update and payments Arrears are accumulating the
commission asked Scott Ellis to try to collect arrears Action Item Scott
will try to collect arrears Scott will draft a letter to be sent to any tenant
who is 30 days overdue in an effort to stimulate payment. A 14 day notice
to quit should be considered for circumstances where rents are over 120
days overdue. It is suggested by Attorney Tree that Scott Ellis draft a
payment plan for arrears owed to the airport.
G. Twin City Airmotive update and Payments Scott Ellis is going to draft
a 30 Day letter to try to stimulate payment for overdue rent.
7. Financial Review FY2019 Budget Commission to review matter will be
discussed next month
8. Sub-Committee Report Fact lease status:
a) Item out of order approved by Chair Naylor. Kurt Hoffman is
pleased with all progress to this point. Kurt would like to point out
one issue concerning the snowplowing agreement for fiscal year
2017-2018 season. In the fall of 2017 it was agreed upon by the
commission to charge $9,000.00 for the snow plowing for the
2017, 2018 season while the lease was still being negotiated
throughout the winter. This creates an issue with the terms of the
newly proposed lease agreement as it has a retroactive component
in the amended lease. The dollar amount shortfall to the Airport is
$1,250.00. Attorney Tree suggests a compromise to avoid a
modification to the renegotiation of the amended lease as it was
agreed upon by the city council. Chair Naylor motion to accept
weed control services for the month of June to be performed by
FACT to make up the difference 2nd Comm. Raymond 18-05-03
Vote 3-0 Comm. Kettle recuse himself from the vote
b) FCA Lease proposal Chair Naylor will approach Jim Powell, Co
owner of FCA to try to negotiate a monetary value to the shortfall
created by the lease space inadequacies
9. Managers operation report
Scott Ellis: Stated Summer hours start Sunday
Scott Ellis: The state will be funding 100% of some remaining tree work at
the airport
Scott Ellis is attending a meeting with Monty Tech on the subject of the
school considering an aviation management program
GPS Coordinates were marked at the airport free of charge at two locations
at the airport
10. Next Regular Airport Meting June 27, 2018
11. Executive session Not required None
12. Motion to adjourn Comm. Early seconded Comm. Liberatore 18-05-04vote
4-0
Executive session No:
Conclusion 19:30
Recording secretary Clayton Raymond
Agenda
Fitchburg Municipal Airport
May 30th, 2018-Airport Commission Meeting 18:00 Hours
Airport Terminal, 567 Crawford Street, Fitchburg, Ma. 01420
Please notify the commission chair to record the proceedings (Audio, video)
1. Meeting Protocol
Meeting called to order and recognize commissioners in attendance
Monthly approvals are year-month-sequence
Opportunities for the public to speak during a Commission Meeting
The public forum occurs immediately after the meeting is called to order
and the roll is called. The Chairman or designee will ask if anyone in the
Audience wishes to speak on any matter appearing on the agenda. If you
do wish to address the commission, please stand and be recognized and
follow these rules before speaking:
*Please stand, so you can be clearly seen by others in attendance.
*State your name and address.
*You may speak only on the items on the agenda for a period of time
In which the chair feels that you have explained your purpose.
If you are in attendance for a specific item on the agenda,
You may speak at that time only to the purpose of the agenda item.
2. Previous Months minutes-including special meeting minutes.
3. Correspondence to the commission
4. Project Review-Gale
A. Runway 14 end obstruction removal and aeronautical survey.
B. Runway 32 end obstruction removal.
C. Runway 14-32 preliminary design and permitting
D. ASMP equipment purchase
5. New Business
A. Airport Access-Rules and regulations
B. Mass DOT-A Pavement survey
C. Mass DOT-A updated Economic impact study
6. Old Business
A. Self-serve fuel facility and fuel supplier.
B. Panema Productions, Rodeo 2018
C. EMS Drone use
D. Proposed Airport events regulations
E. Paper Airplane event- June 12th
F. Autumn Air Update and payments
G. Twin City Airmotive update and payments
7. Financial Review-
a. FY 2019 Budget
8. Sub Committee Reports
a. FACT lease- subcommittee.
b. FCA lease report.
9. Managers Operation Report
a. Summer hours
10. Date and time of next regular meeting:
11. Executive Session (If required) by Roll Call
a. FCA lease negotiation status.
It should be noted that after the regular meeting, the commission will go
into Executive Session (If required) and will not come back into open
session.
12.Regular Meeting adjourned at :
13. Executive Session began at; and adjourned at:
The Chairman or designee may take out of order any agenda
items with the majority vote of the commission.
Get email alerts for Fitchburg
A daily email when new agendas and minutes are posted.