1. Open Meeting, Introductions, and Announcements
Chairman G. Corbosiero called the meeting to order at 7:01 p.m. Chairman G. Corbosiero stated in
accordance with Governor Baker’s Covid-19 Executive Order regarding the Open Meeting Law and
remote participation, votes will be taken through Roll Call.
2. MRPC Minutes – January 5, 2023- Approval of Commissioners Requested
Having no objections to the January 5, 2023 minutes, P. Cunningham moved to accept
the minutes as written. The motion was seconded.
Roll Call vote followed:
G. Tillotson- yes
P. Cunningham- yes
S. Donahue- yes
J. DeRoy- yes
G. Corbosiero- yes
M. Bohart- abstain
K. Nartowicz- yes
A. Reid- yes
L. Shifrin- yes
3. Cash Schedule – January 2023 – Acceptance of Commissioners Requested
L. Quinlivan presented the cash schedule. The opening balance for January was $722,381.63, total
receipts and transfers for the month were $181,167.07, total cash on hand before this warrant was
$903,548.70, less the amount of this warrant of $269,302.72, left a balance after the warrant of
$634,245.98.
1
L. Shifrin asked that we look into interest rates for CDs (Certificates of Deposit) so we could be earning a
higher interest rate. G. Eaton stated he didn’t believe governments are allowed to do this, but we would
look into this.
Having no objections to the cash schedule, L. Shifrin moved to accept the cash schedule
as presented subject to audit. The motion was seconded.
Roll call vote followed:
A. Reid- yes
G. Tillotson- yes
G. Corbosiero- yes
J. DeRoy- yes
K. Nartowicz- yes
L. Shifrin- yes
M. Bohart- yes
P. Cunningham- yes
R. Hoyt- yes
S. Donahue- yes
4. Guest Announcements and Questions
No announcements or questions were presented.
5. Administrative Matters
5.1 FY23 Budget Update and FY24 Budget “First Look” – Information Only
FY23 Budget – June 2022 – Adopted
Projected Revenue $1,503,848
Projected Expenses $1,810,479
Projected Surplus/(Deficit) (16.9%)
Projected Overhead Rate 132.59%
FY23 Budget – February 2023 –Working Budget
Subject to Approving Amendments in March,
April, May, and/or June 2023
Projected Revenue $1,765,591
Projected Expenses $1,751,754
Projected Surplus/(Deficit) 0.08%
Projected Overhead Rate 131.55%
FY24 Budget – To be Adopted June 2023
2
Projected Revenue $2,333,091
Projected Expenses $2,449,746
Projected Surplus/(Deficit) (5%)
Projected Overhead Rate $130.00%
5.2 MRPC and MEC, Inc. Records Preservation: Digitization of Documents – Information
Only
MRPC’s Administrative Manager and Executive Director met with representatives from Ricoh
to build a budget for the digitization (scanning) of approximately 40+/- bankers’ boxes full of
plans completed by the agency (back to the 1970s), financial reports, and related documents.
The budget is about $22,032.75. By this spring, MRPC will seek quotes from additional firms
to complete this project in phases or in whole. Please watch this space for updates.
5.3 Nashoba Valley Chamber of Commerce Executive Roundtable Program – Information Only
The CEOs Roundtable Program met on January 25th. We discussed the difficulty of hiring
workers and retaining talented employees in a very tight labor market.
The next meeting will be hosted by the MRPC’s Executive Director on Wednesday, February
22nd.
5.4 Status of Request for Proposals for Grant Writing Consultant – Information and Possible
Action Requested
REPORT
A Request for Proposals and Quotes (RFP/Q) was published on December 12, 2022, in the MA
Secretary of State’s Goods and Services (G&S) Bulletin, with an initial deadline of January 16,
2023, which was later extended to February 6, 2023.
One proposal was received from Dexterity Management. The firm’s qualifications are
superior. Personnel from Dexterity Management will deliver grant proposal research, writing,
and submission services from $75 to $150 per hour. The firm’s average hourly rate is
$115/hour. Please see the detailed quote on the following page.
This space left intentionally blank.
3
4
The Executive Director recommends the:
1. Hiring of Dexterity Management as the MRPC’s grant writing consulting firm to
augment MRPC’s services to its communities; and,
2. Use of up to $50,000 in cash appropriated from the MA Municipal Depository Trust
(MMDT) account and/or the District Local Technical Assistance-Augmentation funds,
as needed, for grant proposal preparation services.
The Executive Director recommends the hiring of Dexterity Management through June 30,
2023, as advertised.
It is possible that the MRPC will need grant writing assistance from an outside firm(s) in FY24.
If so, staff will issue a second RFP/Q in the spring or summer 2023.
RESOLUTION
BE IT RESOLVED that the Montachusett Regional Planning Commission
Accepts the Executive Director’s recommendation to hire the firm of Dexterity Management
to deliver grant proposal application and submission services to MRPC and its communities
through June 30, 2023, and that the funding sources above will be used to pay this consulting
firm.
G. Corbosiero asked if this firm would also be able to look for available grants for member
communities while working with us. G. Eaton stated yes, there is a line item on the proposal
stating they would do research for us as well.
P. Cunningham moved to accept the resolution as presented. Motion was seconded.
Roll call vote followed:
A. Reid- yes
G. Tillotson- yes
G. Corbosiero- yes
J. DeRoy- yes
K. Nartowicz- yes
L. Shifrin- yes
M. Bohart- yes
P. Cunningham- yes
R. Hoyt- yes
S. Donahue- yes
5.5 Election of Officers- Information Only
1. March of Each Year: Call for Participation on the Nominating Committee.
5
a. The Chairman shall call for nominations to the Nominating Committee
at the March MRPC meeting.
2. April of Each Year: Nominating Committee.
a. A Nominating Committee shall be elected by the full Commission in the
month of April.
3. May of Each Year: Other Candidates May be Considered.
a. The Nominating Committee shall present a slate of proposed members of
the Executive Committee. Other delegates may be added to this slate as
candidates for the various Commission offices and at-large positions by
nominations from the floor of the May meeting of the Planning
Commission.
4. June of Each Year: Vote for the Slate of officers and at-large members who will
then serve as the members of the Executive Committee for the following fiscal
year.
5.6 Other Administrative Matters
5.6.1 The State of Emergency Accommodations for the Open Meeting Law is scheduled to
expire on 3/31/23 – Information Only
Please be advised that the next regular Commissioners’ meeting will be held on March 9,
2023, and will be held remotely.
Commissioners and staff should be prepared to return to meet in person for the
Commissioners’ meeting to take place on April 6, 2023 at 7:00 p.m. (unless the State
Legislature and Governor agree to pending legislation to allow the continuance of 100%
remote meetings, which may be unlikely). MRPC will be able to offer a “hybrid” meeting to its
Commissioners.
5.6.2 Audit Review scheduled for 3/23/23 – Information Only
A special meeting of the Commissioners will be held on the evening of March 23, 2023, at
7:00 p.m. This will be for the sole purpose of hearing, reviewing, and accepting the FY22
Audit Report from Roland Lambalot, CPA.
5.6.3 New Contracts – Information Only
K. Chapman shared information on new contracts that MRPC has begun working on. These
contracts include a contract with Leominster to help with their MBTA communities, DLTA16,
DLTA Augmentation Funds, Mass Housing Partnership, Groton and Harvard.
G. Eaton stated the Transportation department is also working on the SS4A grant (Safe
Streets For All) which is to create an action plan to reduce the fatalities in the transportation
system.
6
6. Department Updates
6.1 Geographic Information Systems (GIS)
No new information at this time.
6.2 Planning & Development
6.2.1 ECONOMIC DEVELOPMENT ADMINISTRATION (EDA) ECONOMIC ADJUSTMENT
ASSISTANCE (EEA) GRANT PROGRAM FILLTERR - (Future Industrial Lands for Long Term
Economic Recovery and Resiliency) - Action Item - Report and Resolution for
Commissioners’ Consideration on Feb. 9, 2023, for Matching Funds for the EDA EAA Grant
Proposal
REPORT
MRPC is in the process of preparing a competitive, Economic Adjustment Assistance (EAA)
grant application to be submitted to the US Department of Commerce (DOC), Economic
Development Administration (EDA). The proposal is entitled Future Industrial Lands for Long
Term Economic Recovery and Resiliency (FILLTERR).
The purpose of the grant will be to fund a multidisciplined analysis of lands most suitable for
business development throughout the entire region, leading to the retention and creation of
jobs for inhabitants of the entire region, thus benefitting all communities. For example,
industrial lands will not be developed in all communities throughout the region. This is more
likely to occur in the more urbanized and some suburban communities rather than in our
rural towns. However, the companies that will locate in the more urbanized sections of the
region will provide jobs to inhabitants throughout the entire region.
This proposal is intended to include a 15-month grant term, ideally from April 2023 through
June 2024.
EDA requires a dollar-for-dollar match to receive this competitive planning grant. MRPC’s
Executive Director recommends the use of the following, existing State contract dollars plus a
portion of the in-kind salary of the Planning and Development Director which totals $170,814
and is broken down as follows:
• Up to $54,692 from two State contracts (Planning Assistance Grant [PAG]
program) providing relevant planning assistance in Ashburnham, Hubbardston,
Phillipston, Townsend, Lunenburg, and Shirley;
• Up to $48,955 from the existing contract between MRPC and the Massachusetts
Department of Transportation (MassDOT, where only a portion of the 20% in State
matching funds will be used as matching funds for the completion of transit and
transportation planning projects related to moving the workforce and goods and
services through the region supporting the regional economy);
7
• Up to $50,000 in existing DLTA program funds from the FY23 MRPC’s Budget
(DLTA Program Year 16) for $25,000 and an additional $25,000 from the FY24 Budget
(DLTA Program Year 17) for projects that complement this proposal (i.e. planning
assistance to the “MBTA communities,” downtown zoning, economic development
planning in one of our rural communities, and transportation circulation planning);
and,
• Up to $17,167 of in-kind funding for a portion of the Planning and Development
Director’s time to manage this planning project.
Matching dollars from the Planning Assistance Grants (PAGs) (contracts between
Massachusetts Executive Office of Energy and Environmental Affairs), MassDOT-MRPC
contract, and Massachusetts Department of Housing and Community Development for the
District Local Technical Assistance contracts will be available during the entire period of
performance of the EDA planning grant, and the funds are not conditioned or encumbered in
any way that may preclude their use consistent with the requirements of EDA investment
assistance. (These are requirements of the EDA and MRPC is in full compliance.)
The use of LTA funds as matching funds for the FILLTERR grant is not recommended at this
point. Using these funds would contribute to a small increase in the agency’s overhead rate.
As a total of $170,814 can be raised by the MRPC in matching funds, the total amount of the
grant proposal will be equal to this amount, so the total project cost would be $341,628.
RESOLUTION
BE IT RESOLVED that the Montachusett Regional Planning Commission approves of the
Executive Director’s request to use the funds, as detailed above, as matching funds against
the agency’s FILLTERR grant proposal to the US EDA.
P. Cunningham moved to accept the resolution as presented, motion was seconded.
Roll call vote followed:
A. Reid- yes
G. Tillotson- yes
G. Corbosiero- yes
J. DeRoy- yes
K. Nartowicz- yes
L. Shifrin- yes
M. Bohart- yes
P. Cunningham- yes
R. Hoyt- yes
S. Donahue- yes
8
6.2.2 Presentation of grant opportunities
See the grant opportunity monthly spreadsheet which shows a list of grants that are available
to our communities. This spreadsheet can be found in the meeting folder. We are also
working on a master calendar to help communities to better plan ahead.
6.2.3 DLTA and DLTA-A – Action Item
DLTA Program Year 16 (Jan-Dec 2023): $207,474.
We have a resolution to approve community projects. The second-round deadline is March
7th for the next Commission Meeting.
REPORT:
In response to a first solicitation, issued December 15, 2022, a total of eight (8) proposals
were received for use of District Local Technical Assistance (DLTA) resources to provide a
variety of services. The proposals received are as follows:
1. Groton: Assistance evaluating the economic, transportation, and related impacts
of the Groton Hill Music Center.
2. Hubbardston: Assistance developing zoning bylaws and/or districts to promote
agricultural uses and agritourism.
3. Hubbardston: Assistance compiling completed chapters of the Master Plan and
planning for implementation.
4. Shirley: Assistance complying with the new Chapter 40A, Section 3A for MBTA
Communities in conjunction with a 40R District evaluation.
5. Sterling: Assistance complying with the new Chapter 40A, Section 3A for MBTA
Communities.
6. Townsend: Assistance complying with the new Chapter 40A, Section 3A for MBTA
Communities.
7. Townsend: Assistance evaluating the town’s bylaws and recommending changes
in order for the town to become a Housing Choice community.
8. Westminster: Assistance complying with the new Chapter 40A, Section 3A for
MBTA Communities.
RESOLUTION:
BE IT RESOLVED that the Montachusett Regional Planning Commission recommends that #1
through #8 of the above-named project requests for District Local Technical Assistance
(DLTA), if eligible, be conditionally awarded based upon further
communication/clarification/negotiation with the applying communities and approval from
the Massachusetts Department of Housing and Community Development (DHCD). Moreover,
all activities in some applications may not be awardable under the DLTA program: MRPC staff
reserves the right to negotiate an awardable detailed scope of services and budget amount.
9
MRPC also reserves the right to work with the Towns of Shirley, Sterling, Townsend, and
Westminster to help them obtain funding from other available resources to complete MBTA
3A/TA planning tasks in place of or after the DLTA Program.
Those requests conditionally awarded (#1 through #8) are subject to the conditions listed
below.
1. The services to be delivered to the communities will be completed commencing
no earlier than a fully executed Memorandum of Understanding (MOU) between
the subject (lead) community and the MRPC.
2. Services will be delivered to the subject community(ies) during the
implementation of the District Local Technical Assistance (DLTA) program year
(2023).
3. The award of services from the MRPC is subject to the:
a. Funding available to the MRPC during the program year (2023);
b. Successful negotiation of a detailed scope of services, schedule for the
completion of the tasks identified in the scope of services, and budget
utilizing DLTA and other funds, if available and eligible for the
aforementioned project;
c. Execution of a Memorandum of Understanding (MOU) between the
MRPC and the community(ies); and,
d. The MRPC’s receipt of a letter from the Chief Elected Official (CEO) of
all of the affected communities indicating agreement to this proposal
and willingness to participate in this analysis. [Communities may agree
to participate in this analysis after the full execution of the MOU
between the subject (lead) community and the MRPC but must agree
to participate in order to receive the results of the report.]
4. Where and when possible the MRPC will deliver the tasks related to “analysis,
preparation and presentation … report(s) …” as indicated above. The MRPC and
the community requesting services will “outsource” consulting services only when
absolutely deemed to be necessary by both the lead community and the MRPC.
5. This is an award of services from the MRPC to the applicable community(ies). This
is not a cash award.
6. If at any time DHCD determines that the project is ineligible, the award of services
will be null and void.
7. The municipality and all municipal departments shall provide MRPC with
cooperation/access/assistance to public data applicable to the DLTA project
including the provision of such materials. Related costs associated with this (data
collection, photocopying, etc.) will be at the expense of the municipality(s).
L. Shifrin moved to accept the resolution as presented, the motion was seconded.
Roll call vote followed:
A. Reid- yes
G. Tillotson- yes
10
G. Corbosiero- yes
J. DeRoy- yes
K. Nartowicz- yes
L. Shifrin- yes
M. Bohart- yes
P. Cunningham- yes
R. Hoyt- yes
S. Donahue- yes
DLTA-Augmentation (Jan 2023-June 2024): These are extra funds ($138,316) awarded to each
RPA to spend on assisting our communities with project prioritization and grant applications.
A solicitation to our communities will be sent out next week, with proposals due March 7th
for the first round and April 4th for the second round. Commissioners will vote at their
meetings on March 9th and April 6th to approve projects. DTLA Augmentation activities and
projects may include, but are not limited to, the following:
• identification and understanding of top project priorities;
• research, assessment, and identification of federal, state and other funding
opportunities;
• review of grant application guidelines and preparation of applications and/or
identification of specialty skills needed (e.g. specialized technical assessment,
engineering, cost benefit analysis);
• provision of needed procurement services; and
• assessment of municipal grant reporting capacity and determination if assistance is
needed by the RPA.
6.2.4 MBTA Communities Technical Assistance
MRPC is currently working with Leominster under a One Stop Planning Grant, with Lunenburg
under an EEA Planning Assistance Grant, with Ashburnham, Groton, and Harvard under an
MHP 3A/TA grant, and if awarded tonight, Shirley, Sterling, Townsend, and Westminster
under DLTA. Ashby is applying for 3A/TA in June. Options for those with no current technical
assistance (Ayer, Fitchburg, Lancaster) are:
• Apply for funds in the One Stop Program: Expressions of interest open until March 17,
2023. Applications now available. Full application submittal opens May 2023 and ends June
2, 2023. These grants last 18 months – two years. MRPC can assist with applications available
here: https://www.mass.gov/guides/community-one-stop-for-growth#-how-to-apply
• Apply for a Planning Assistance Grant: RFR due out in March 2023, application due in May
2023. MRPC can apply on community’s behalf. These grants last 18 months – 2 years.
https://www.mass.gov/service-details/planning-assistance-grants
• MHP 3A/TA: Mass Housing Partnership is offering grants to complete tasks towards
compliance. Will open another round of applications in the summer. Three to four month
11
contracts.
• DLTA: First round due Feb. 7th, second round due March 7th. Contract through December
2023.
6.2.5 Mass Broadband Institute (MBI) Digital Equity
MRPC is an authorized contractor of MBI to provide Digital Equity planning for our
communities. The goal of the Municipal Digital Equity Planning Program is to enable
municipalities to engage in planning activities related to digital equity and bridging the digital
divide. These planning activities will result in strategic documents designed to identify the
community's needs, interest, and key assets and provide a framework that will guide future
municipal decision-making and potential investments and activities that will increase access
and usage of the internet for the populations most impacted by the COVID-19 pandemic. The
three key areas to be studied in each community and regionally are Internet Availability and
Affordability, Device Access, and Digital Skills. The applications are open now and are
available here: https://broadband.masstech.org/municipal Royalston and Phillipston have
already applied as part of a regional plan and MRPC encourages communities to apply as part
of this regional plan, or individually if the community prefers.
6.2.6 CPTC Conference March 18, 2023
The Citizen Planner Training Collaborative Spring Conference is back in person at Holy Cross
in Worcester on Saturday, March 18, 2023. There will be the traditional CPTC training
modules for new board members, as well as timely topics such as MBTA Communities, Digital
Equity Planning, Climate Resiliency, Housing, etc.
6.2.7 Planning Assistance Grants
RFR due out in March 2023, with the application due in May 2023. MRPC can apply on a
community’s behalf. These grants last 18 months – 2 years. These grants are good for Open
Space and Recreation Plans, Housing Production Plans, Master Plan chapters, corridor
studies, zoning bylaw reviews, etc. The maximum grant per community is $50,000. Go to the
website to see past projects that were funded. https://www.mass.gov/service-
details/planning-assistance-grants
6.2.8 New Contracts
12
6.3 Transit & Transportation
No new information at this time.
7. New Business
This time is reserved for topics that the chair did not reasonably anticipate would be discussed.
8. Adjournment
There being no further business to discuss, P. Cunningham moved to adjourn the meeting. The motion was
seconded.
Roll call vote followed:
A. Reid- yes
G. Tillotson- yes
G. Corbosiero- yes
J. DeRoy- yes
K. Nartowicz- yes
L. Shifrin- yes
M. Bohart- yes
P. Cunningham- yes
R. Hoyt- yes
S. Donahue- yes
The meeting adjourned at 8:27 pm.
This meeting will be recorded by the GoToMeeting app and will be made available for viewing at
https://www.youtube.com/user/MontachusettRegion/videos.
This notice is subject to change with reasonable notice provided to all.
========================================================================
Meeting Registration Link: February 9, 2023, MRPC Meeting Registration
QR Code, below:
=======================================================================
MRPC Meeting Materials: February 9, 2023, MRPC Meeting Material
13
Agenda
FITCHBURG CITY CLERK
Feb 06 2023 1:11 pm
MONTACHUSETT REGIONAL PLANNING COMMISSION (MRPC)
THURSDAY, FEBRUARY 9, 2023
7:00 PM
REMOTE MEETING
AGENDA
7:00 PM 1. Open Meeting, Introductions, and Announcements
7:05 PM 2. MRPC Minutes – January 5, 2023- Approval of Commissioners Requested
7:10 PM 3. Cash Schedule – January 2023 – Acceptance of Commissioners Requested
7:15 PM 4. Guest Announcements and Questions
7:20 PM 5. Administrative Matters
5.1 FY23 Budget Update and FY24 Budget “First Look” – Information Only
5.2 MRPC and MEC, Inc. Records Preservation: Digitization of Documents –
Information Only
5.3 Nashoba Valley Chamber of Commerce Executive Roundtable Program –
Information Only
5.4 Status of Request for Proposals for Grant Writing Consultant – Information
And Possible Action Requested
5.5 Election of Officers- Information Only
1. March of Each Year: Call for Participation on the Nominating Committee.
a. The Chairman shall call for nominations to the Nominating Committee at the March
MRPC meeting.
2. April of Each Year: Nominating Committee.
1
a. A Nominating Committee shall be elected by the full Commission in the month of
April.
3. May of Each Year: Other Candidates May be Considered.
a. The Nominating Committee shall present a slate of proposed members of the
Executive Committee. Other delegates may be added to this slate as candidates for
the various Commission offices and at-large positions by nominations from the floor
of the May meeting of the Planning Commission.
4. June of Each Year: Vote for the Slate of officers and at-large members who will then serve as
the members of the Executive Committee for the following fiscal year.
5.6 Other Administrative Matters
5.6.1 The State of Emergency Accommodations for the Open Meeting Law is
scheduled to expire on 3/31/23 – Information Only
5.6.2 Audit Review scheduled for 3/23/23 – Information Only
7:30 PM 6. Department Updates
6.1 Geographic Information Systems (GIS)
6.2 Planning & Development
6.2.1 EDA EEA FILLTERR (Future Industrial Lands for Long Term Economic Recovery and
Resiliency) - Action Item
6.2.2 Presentation of Grant Opportunities
6.2.3 DLTA and DLTA-A - Action Item
6.2.4 MBTA Communities Technical Assistance
6.2.5 MBI Digital Equity
6.2.6 CPTC Conference March 18, 2023
6.2.7 Planning Assistance Grants
6.3 Transit & Transportation
8:00 PM 7. New Business
This time is reserved for topics that the chair did not reasonably anticipate would be discussed.
8:15 PM 8. Adjournment
This meeting will be recorded by the GoToMeeting app and will be made available for viewing at
https://www.youtube.com/user/MontachusettRegion/videos.
This notice is subject to change with reasonable notice provided to all.
========================================================================
2
Meeting Registration Link: February 9, 2023 MRPC Meeting Registration
QR Code, below:
=======================================================================
MRPC Meeting Materials: February 9, 2023 MRPC Meeting Material
3