Water & Wastewater Commission
Regular MeetingFitchburg, MA · May 29, 2013
Minutes
COMMISSION MINUTES
May 29, 2013
A meeting of the City of Fitchburg Water / Wastewater Commission was held on May 29, 2013
at the JA Provincial Building, 1200 Rindge Rd, Fitchburg, MA.
The meeting commenced at 4:45 p.m.
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
Ronald Lubianez
Michael McLaughlin
Members Absent: George Siener
Carol Brown
Others present: Denis Meunier, Deputy Commissioner Water
Joseph Jordan, Deputy Commissioner W.W.
Mary Jane Franklin, Clerk
ITEM # 1: Approval of last meetings minutes:
The minutes for the March 13, 2013 meeting were approved by unanimous vote.
(Please Note: the commission did not meet in April 2013 due to lack of a quorum.)
ITEM # 2: Public Forum:
No one from the public attended.
ITEM # 3: Water Division:
End of fiscal year review:
Mr. Meunier reported that during FY 2013 two water mains have been replaced under the
Kimball St Bridge and the River St Bridge with 12 inch main. A section of water main under
Wallace Ave was also replaced in conjunction with the bridge project. The new section of
main will allow for the abandonment (cut and capped in place) of a section of very old main
that runs under the railroad track in this area. The water main on Almount Terrace, a cul-de-
sac, with a history of discolored water, was replaced with approximately 220 ft. of 4 in. pipe
and 300 ft. of 1 in. pipe. In addition, to the above capital projects, a loan order to replace
9,000 linear feet of water main during FY14 and 15, in conjunction with next sewer
separation project, was approved and appropriated.
Review and recommend FY 2014 budget:
Mr. Meunier noted that the Water Division currently has two open positions, created by
retirements, he would like to see these positions filled in the next fiscal year. Filling these
positions would allow the Water Department to do more work in house, such as water main
work, hydrant flushing, watershed maintenance, etc. rather than having the expense of
contracting the work out.
The Commission discussed future capital needs and the need to, on an ongoing basis, fund
water main replacement as an important part of the budget process.
It was noted that the FY 14 budget included as increase for reimbursement to the City in the
amount of $50,000. There was some discussion about the calculation of this expense,
specifically regarding how the health insurance for retirees is being allocated.
A motion to recommend the FY14 budget was made by Mr. McLaughlin and seconded by
Mr. Laakso. It was approved by unanimous vote.
ITEM # 4: Wastewater Division:
End of fiscal year review:
Mr. Jordan reported $2.5M in retained earnings, which is ahead of the amount projected,
mostly as a result of the rate increase. Additionally, the payments on the 2 large consent
decree loans won’t start until next year because of principle forgiveness, resulting in only
a small increase in debt service in FY14.
Several consent decree projects have been completed. A ground water interceptor on
Jeffrey St. has been completed. This removed several thousand gallons of rain water that
was previously going into the sanitary system and now drains into a separate storm drain.
Three homeowners with sump pumps connected to the system were identified and a
shared cost arrangement was made in conjunction with the project to remove and
reconnect the sump pumps to the new drain system. A broken sewer main under the
Nashua River has been repaired. CSS2B and CEPT have also been completed. The
design for the next separation phase is finished with a bid opening on May 30, 2013.
CSS3C will be completed in June.
Mr. Jordan reported a dramatic decrease in permit violations at the plant as a result of the
ongoing improvements in both the collection system and the treatment plant.
Review and recommend FY 2014 budget:
There will be an approximately $3M increase in debt service in FY15 and FY16 as a result
of the payments on new loans. For FY 14 short term debt will increase modestly. Starting
in FY15, $700,000- $800,000 per year will be used from accumulated retained earnings to
pay for the increased debt service. The Division will be retiring a number of small loans in
the coming years and as that money becomes available it will be applied to the consent
decree loans. As suggested, by the City Auditor, a new line item, reserved for debt services,
has been added to the Wastewater budget to define the use of retained earnings. This money
will be earmarked to pay off future debt only. Revenues will go down slightly due to shut
down of the sludge incinerator. Personal services will increase due to contractual increases.
Natural gas will go down substantially and electric was also reduced. Sodium hydroxide
decreased and magnesium hydroxide and polymer increased. There will be an increase in
capital expense related to a supplemental environmental project required by the consent
decree.
A motion to recommend the FY14 budget was made by Mr. Laakso and seconded by Dr.
Lubianez. It was approved by unanimous vote.
Discussion: Town of Westminster’s proposed use of the West Wastewater
Treatment Facility:
Mr. Jordan reported having a meeting with the Town of Westminster to discuss the
possibility of the Town taking over the operation of the West Wastewater Treatment Plant to
treat the Town’s wastewater. They are doing due diligence and much more research needs to
be done. A second meeting has been requested by Westminster at a future date.
OTHER BUSINESS:
The next meeting is scheduled for July 10, 2013 at 4:30 pm at the Water Office.
The meeting adjourned at 6:30 pm.
Minutes Prepared by: ________________________________
Mary Jane Franklin
Senior Clerk
Agenda
Water/Wastewater Commission
Meeting of May 29, 2013: 4:30 p.m.
JA Provencial Water Treatment Facility
1200 Rindge Rd
Fitchburg MA 01420
AGENDA
1. Review Meeting Minutes for March 13, 2013.
2. Public Forum
3. Water Division
• Discussion and approval for submitting a Water Supply Protection
Grant Application to the Commonwealth. For the purchase of
sensitive watershed land.
End of fiscal year review.
Review and recommend FY 2014 budget
4. Wastewater Division
End of fiscal year review
Review and recommend FY 2014 Budget
Discussion: Town of Westminster’s proposed use of the West
Wastewater Treatment Facility
5. Other Business
Set next meeting date
Get email alerts for Fitchburg
A daily email when new agendas and minutes are posted.