Water & Wastewater Commission
Regular MeetingFitchburg, MA · September 11, 2013
Minutes
COMMISSION MINUTES
September 11, 2013
A meeting of the City of Fitchburg Water / Wastewater Commission was held on September 11,
2013 at the JA Provincial Building, 1200 Rindge Rd, Fitchburg, MA.
The meeting commenced at 4:35 p.m.
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
George Siener
Michael McLaughlin
Carol Brown
Ron Lubianez
Members Absent: None
Others present:
Denis Meunier, Deputy Commissioner Water
Joseph Jordan, Deputy Commissioner W.W.
ITEM # 1: Approval of last meetings minutes:
The minutes for the July 10, 2013 meeting were approved by unanimous vote.
ITEM # 2: Public Forum:
No forum comments were received.
ITEM # 3: Water Division:
Staffing and On-Call Contract: Mr. Meunier informed the Commission that he had
received approval to fill two vacant distribution positions in the Department. Two
internal candidates that currently work for DPW Streets have been interviewed. At this
time it appears that both candidates will be offered positions. The Water Division will
coordinate with Commissioner Laakso on the timing of the transfers to minimize any
disturbance in work flow within the DPW. Mr. Meunier also reported that two temporary
employees were hired at the end of the summer and will stay on through October doing
watershed maintenance and hydrant maintenance. Mr. Meunier reported that the, long
delayed, contract for an on-call contractor has been finalized. RJ Pacella Co. will provide
on-call distribution system repairs for both planned and emergency work within the
Water Division.
Ashby Compensating Reservoir Dam Repairs: The planned maintenance project to
repair two depressed area on the crest of the Ashby Compensating Reservoir Dam is
underway and will be completed by the end of the week.
Reclassification of Mare Meadow and Bickford Dams: Mr. Meunier reported that the,
State Office of Dam Safety, after reviewing inspection reports and dam hydraulic data
has determined that the classification for both Mare Meadow Reservoir Dam and the
Bickford Reservoir Dam will be upgraded from “significant hazard to “high hazard”.
This change in classification will require that each dam have an “Emergency Action
Plan” prepared detailing the actions that would be taken in the case of a dam failure. In
addition, each structure will require more frequent inspections. This additional effort and
reporting will come with an additional cost for each dam. The Water Division is, at this
time, investigating what those costs will be.
Petition to abandon easement on land abutting Mare Meadow Reservoir: Mr.
Meunier informed the Commission that he had been contacted by a Mr. Duane Winter
regarding a parcel of land that Mr. Winter owns abutting Mare Meadow Reservoir on
Davis Rd in Westminster. Mr. Winter is attempting to sell this parcel. A review of the
deed determined the parcel contains an easement over the land belonging to the City of
Fitchburg. Mr. Winter has petitioned the City to abandon this easement in an effort to
make the parcel more saleable. Mr. Meunier asked the Commission to review the issue
and to recommend a course of action relative to this petition. The Commission vote will
be made known to the City Council at an upcoming Property Committee Meeting to
assist in there deliberation on this matter. After a lengthy discussion on this matter a
motion was made and seconded to support the petition at City Council with the added
stipulation that the Commission would recommend that only one dwelling could be
constructed on the subject parcel. The motion carried by unanimous vote.
Item #4: Wastewater Division:
General Department Update: Mr. Jordan updated the Commission on several ongoing
projects as follows:
1. Chemically Enhanced Primary Treatment (CEPT) upgrade at the East
WW Treatment Facility is up and running. Plant personnel are working to
fine tune the process and optimize chemical feed.
2. CSS-3 Project in the Water Street area nearly complete. All pipes in the
ground contractor working on manhole rehab. and miscellaneous pipe
lining. Result of the separation project appears to be a nearly 1.0 million
gallon per day reduction in flow at the plant. City collection crew sealed
up open manhole and pipe in the Nashua River near Kimball St. Bridge
further reducing extraneous flow to the plant.
3. Completing final design of second stage aeration and clarifier system at
the East Plant. When completed all of the major operating systems at the
plant will have been rebuilt.
4. CSS-4, Summer St. /Boutelle St corridor, construction contract issued to
Revoli Construction. Work to start before the end of September.
Discussion regarding parameters for winter work. If all goes as planned
CSS-4 will be last major sewers separation project required to meet
consent order limits.
5. Brief discussion regarding plans for East Plant Incinerator and building
space. Mr. Jordan would like to demo the incinerator and convert space to
offices, record keeping, and meeting space.
Status of Anaerobic Digestion at West Wastewater Treatment Facility: Mr. Jordan
update the Commission on status of efforts to study the feasibility of converting the West
Plant to an anaerobic digestion treatment facility. The process would digest and treat
Fitchburg sludge and sludge form other communities. The study is being conducted using
a $60,000 grant from the, MA Clean Energy Commission, and will be completed in two
phases. The first phase will investigate the feasibility and potential for business of the
project. If the feasibility study is positive a conceptual design would be completed. As
part of the study public outreach meetings will be conducted with City Commissions and
Boards as well as an open meeting for the public to solicit comments and reactions.
Other Business:
Mr. Jordan updated the Commission on the status of the, Supplemental Environmental
Project, required by Consent Order, to stabilize stream banks along Baker Brook in the
vicinity of Coolidge Park and the Civic Center.
Mr. Meunier passed out copies of a report submitted by Ms. Ashley Howard that studied
the relative affordability of water and sewer rates in Fitchburg and the potential for
alternative sources of revenue for the Enterprise Funds. Ms. Howard conducted this study
as a project towards a graduate degree at Clark University in Worcester. The Commission
will discuss the report at a later date.
The next meeting is scheduled for October 9, 2013 at 4:30 pm at the Water Office.
The meeting adjourned at 6:00 PM
Minutes Prepared by: ________________________________
Denis Meunier
Agenda
COMMISSION MINUTES
September 11, 2013
A meeting of the City of Fitchburg Water / Wastewater Commission was held on September 11,
2013 at the JA Provincial Building, 1200 Rindge Rd, Fitchburg, MA.
The meeting commenced at 4:35 p.m.
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
George Siener
Michael McLaughlin
Carol Brown
Ron Lubianez
Members Absent: None
Others present:
Denis Meunier, Deputy Commissioner Water
Joseph Jordan, Deputy Commissioner W.W.
ITEM # 1: Approval of last meetings minutes:
The minutes for the July 10, 2013 meeting were approved by unanimous vote.
ITEM # 2: Public Forum:
No forum comments were received.
ITEM # 3: Water Division:
Staffing and On-Call Contract: Mr. Meunier informed the Commission that he had
received approval to fill two vacant distribution positions in the Department. Two
internal candidates that currently work for DPW Streets have been interviewed. At this
time it appears that both candidates will be offered positions. The Water Division will
coordinate with Commissioner Laakso on the timing of the transfers to minimize any
disturbance in work flow within the DPW. Mr. Meunier also reported that two temporary
employees were hired at the end of the summer and will stay on through October doing
watershed maintenance and hydrant maintenance. Mr. Meunier reported that the, long
delayed, contract for an on-call contractor has been finalized. RJ Pacella Co. will provide
on-call distribution system repairs for both planned and emergency work within the
Water Division.
Ashby Compensating Reservoir Dam Repairs: The planned maintenance project to
repair two depressed area on the crest of the Ashby Compensating Reservoir Dam is
underway and will be completed by the end of the week.
Reclassification of Mare Meadow and Bickford Dams: Mr. Meunier reported that the,
State Office of Dam Safety, after reviewing inspection reports and dam hydraulic data
has determined that the classification for both Mare Meadow Reservoir Dam and the
Bickford Reservoir Dam will be upgraded from “significant hazard to “high hazard”.
This change in classification will require that each dam have an “Emergency Action
Plan” prepared detailing the actions that would be taken in the case of a dam failure. In
addition, each structure will require more frequent inspections. This additional effort and
reporting will come with an additional cost for each dam. The Water Division is, at this
time, investigating what those costs will be.
Petition to abandon easement on land abutting Mare Meadow Reservoir: Mr.
Meunier informed the Commission that he had been contacted by a Mr. Duane Winter
regarding a parcel of land that Mr. Winter owns abutting Mare Meadow Reservoir on
Davis Rd in Westminster. Mr. Winter is attempting to sell this parcel. A review of the
deed determined the parcel contains an easement over the land belonging to the City of
Fitchburg. Mr. Winter has petitioned the City to abandon this easement in an effort to
make the parcel more saleable. Mr. Meunier asked the Commission to review the issue
and to recommend a course of action relative to this petition. The Commission vote will
be made known to the City Council at an upcoming Property Committee Meeting to
assist in there deliberation on this matter. After a lengthy discussion on this matter a
motion was made and seconded to support the petition at City Council with the added
stipulation that the Commission would recommend that only one dwelling could be
constructed on the subject parcel. The motion carried by unanimous vote.
Item #4: Wastewater Division:
General Department Update: Mr. Jordan updated the Commission on several ongoing
projects as follows:
1. Chemically Enhanced Primary Treatment (CEPT) upgrade at the East
WW Treatment Facility is up and running. Plant personnel are working to
fine tune the process and optimize chemical feed.
2. CSS-3 Project in the Water Street area nearly complete. All pipes in the
ground contractor working on manhole rehab. and miscellaneous pipe
lining. Result of the separation project appears to be a nearly 1.0 million
gallon per day reduction in flow at the plant. City collection crew sealed
up open manhole and pipe in the Nashua River near Kimball St. Bridge
further reducing extraneous flow to the plant.
3. Completing final design of second stage aeration and clarifier system at
the East Plant. When completed all of the major operating systems at the
plant will have been rebuilt.
4. CSS-4, Summer St. /Boutelle St corridor, construction contract issued to
Revoli Construction. Work to start before the end of September.
Discussion regarding parameters for winter work. If all goes as planned
CSS-4 will be last major sewers separation project required to meet
consent order limits.
5. Brief discussion regarding plans for East Plant Incinerator and building
space. Mr. Jordan would like to demo the incinerator and convert space to
offices, record keeping, and meeting space.
Status of Anaerobic Digestion at West Wastewater Treatment Facility: Mr. Jordan
update the Commission on status of efforts to study the feasibility of converting the West
Plant to an anaerobic digestion treatment facility. The process would digest and treat
Fitchburg sludge and sludge form other communities. The study is being conducted using
a $60,000 grant from the, MA Clean Energy Commission, and will be completed in two
phases. The first phase will investigate the feasibility and potential for business of the
project. If the feasibility study is positive a conceptual design would be completed. As
part of the study public outreach meetings will be conducted with City Commissions and
Boards as well as an open meeting for the public to solicit comments and reactions.
Other Business:
Mr. Jordan updated the Commission on the status of the, Supplemental Environmental
Project, required by Consent Order, to stabilize stream banks along Baker Brook in the
vicinity of Coolidge Park and the Civic Center.
Mr. Meunier passed out copies of a report submitted by Ms. Ashley Howard that studied
the relative affordability of water and sewer rates in Fitchburg and the potential for
alternative sources of revenue for the Enterprise Funds. Ms. Howard conducted this study
as a project towards a graduate degree at Clark University in Worcester. The Commission
will discuss the report at a later date.
The next meeting is scheduled for October 9, 2013 at 4:30 pm at the Water Office.
The meeting adjourned at 6:00 PM
Minutes Prepared by: ________________________________
Denis Meunier