Water & Wastewater Commission
Regular MeetingFitchburg, MA · June 10, 2015
Minutes
WATER/WASTEWATER FACILITIES COMMISSION
COMMISSION MINUTES
June 10, 2015
A meeting of the City of Fitchburg Water / Wastewater Commission was held on May 6, 2015
at the JA Provincial Building, 1200 Rindge Rd, Fitchburg, MA.
The meeting commenced at 4:45 P.M.
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
Michael McLaughlin
George Siener
Carol Brown
Members Absent: Ron Lubianez
Others present: Jeff Murawski, Deputy Commissioner Wastewater
John Deline, Deputy Commissioner of Water
Mary Jane Franklin
ITEM # 1: Approval of last meetings minutes:
The minutes for the May 6, 2015 meeting were approved by unanimous vote.
ITEM # 2: Public forum:
No public forum comments were received.
ITEM # 3: Janet Morrison/Watershed Land Protection projects:
Ms. Morrison from North County Land Trust updated the Commission on the Southern
watershed projects. Ms. Morrison has been in communication with Bob O’Connor, the Director
of Land Programs for the state. Mr. O’Connor was a strong proponent for the Northern
watershed. She reported the State may be interested in purchasing a Conservation Restriction in
this area. After reviewing maps and GIS she believes 2,532 acres of land are available, which is
more than the Northern watershed.
She also updated the Commission on four projects in the Quabbin to Wachusett Forestry Legacy
project. Zins has been completed and three others are ongoing and are expected to be completed
within a year.
Ms. Morrison reminded the Commission that the Kirby project, which was 163 acres in Ashby
and Ashburnham on the Fitchburg town line, has concluded.
ITEM # 4: Water Rate Study – Michael Schrader, Tighe & Bond:
Mr. Deline introduced Michael Schrader from Tighe & Bond. Mr. Schrader explained he needs
additional information to complete the rate study that the billing software, MUNIS, may not be
able to provide.
ITEM # 5: Water Street – repair of water main in bridge over Nashua River:
Mr. Deline reported Pacella, the on call contractor, performed work on the 12 inch main on
Water Street.
It was discovered that the main was tuberculated down to 4 inches on one side. Mr. Deline
decided to replace the 12 inch main with an 8 inch main making it significantly easier to install,
and because of the tuberculation , will improve improve the flow.
After the work had begun, and the main was revealed, the contractor found that it was cracked
(due to a valve being closed several years ago causing freezing and cracking and the
tuberculation).This will be remedied by using the 12 inch main as a conduit and “pushing” the 8
inch main thru the 12 inch.
ITEM # 6: Brief update on sewer infrastructure damage in the Nashua River (near First
Street and Railroad Street), and update on funding:
Mr. Murawski explained the large surplus in electricity that was going to be used to pay for this
project was unavailable. Mr. Murawski had a meeting with Joe Jordan (former Wastewater
Commissioner) who didn’t believe the surplus amount was accurate. As a result of this, Mr.
Murawski began investigating this and discovered Direct Energy hadn’t billed a particular
account, the East Plant, for FY 15 in the amount of approximately $500,000.
ITEM # 7: Updated DRAFT FY-16 Wastewater Budget Request (Include Attachment):
At the Finance Committee meeting, a transfer of funds was approved to cover the cost of the
engineering services for design and permitting for the Beech St and Hazel St project and the
combination manholes, which will be prepared as a publicly bid document.
Mr. Murawski explained a modification to the budget was made to account for the electrical cost
at the east Plant.
Mr. Murawski reported the Finance Committee would like an update on the Wastewater
Enterprise funds specifically regarding retained earnings which will be scheduled for Council’s
June 16th meeting. There was a discussion about the “time line” associated with the previous rate
increase.
ITEM # 8: Projecting “Revenues” (billing):
The residential billing for May is currently being completed and the Paper Mills billing has been
issued and payment received for sewer usage. Capital billing has been issued and one out of the
three mills has paid. The projected revenue was $462,000 and it appears the actual revenue will
be slightly less at $380,000 mostly due to less usage and capital expenditures on an annual basis
from all three mills.
Sewer use and connection permits are both higher than the projected revenues.
ITEM # 9: SSU Project:
Mr. Murawski reported the study by Wright Pierce is advancing regarding the letter of map
revision associated with the 100 year flood at the East Plant and at this point appears to be
favorable.
ITEM # 10 Update on Construction Phase Engineering Services RFP Status.
Mr. Murawski reminded the Commission that that because of some sub trades this should have
been a Chapter 149 project and Wright Pierce’s contact prohibits Chapter 149 work. Mr.
Murawski, Nancy Wilson (Chief Procurement Officer) and John Barrett (City Solicitor) had a
meeting regarding the contract amendment.
ITEM # 11: West Plant Anaerobic Digestion, DRAFT Feasibility Report RECEIVED &
MADE AVAILABLE, & “next steps”:
Mr. Murawski stated that it appears, at this initial stage a private operation - design build operate
- procurement model would be the most effective.
ITEM # 12: Fats, Oils & Grease: Code, Permitting, Regulating, Etc.
Questions from MIIA (Fitchburg’s insurance company) arose regarding the practice and
monitoring of oils and grease in the sewer system. Mr. Murawski explained this is prohibited but
there are no mechanisms to police it. He is working jointly with Board of Health and the
Building Department to find solutions.
The next meeting is scheduled for July 8, 2015 at 4:30 P.M. at the JA Provincial Building, 1200
Rindge Rd., Fitchburg, MA. (The July 8, Meeting was cancelled and rescheduled for July 23)
The meeting adjourned at 7:30 P.M.
Minutes Prepared by_________________
Mary Jane Franklin
Agenda
Water/Wastewater Commission
Meeting of Wednesday
June 10, 2015
4:30 p.m.
JA Provincial Building
1200 Rindge Rd
Fitchburg MA 01420
AGENDA
1. Review Meeting Minutes for May 6, 2014
2. Public Forum
3. Water Division
Janet Morrison/Watershed Land Protection projects
Water Rate Study – Michael Schrader, Tighe & Bond
Water Street – repair of water main in bridge over Nashua River
4. Wastewater Division
Brief update on sewer infrastructure damage in the Nashua River (near First Street and
Railroad Street), and update on funding.
Updated DRAFT FY-16 Wastewater Budget Request (Include Attachment)
Projecting “Revenues” (billing)
Paper Mills Billing …. Billing has been issued for both sewer usage & capital
SSU Project
Update on OPM contract progress.
Update on Construction Phase Engineering Services RFP Status.
Brief CSS-4D Project Update
West Plant Anaerobic Digestion, DRAFT Feasibility Report RECEIVED & MADE
AVAILABLE, & “next steps”
Fats, Oils & Grease: Code, Permitting, Regulating, Etc.
Status Update on Wastewater Enterprise, has been requested by Council. Scheduled for
Council’s June 16th meeting.
5. Other Business
Set next meeting date and location
Adjourn