Water & Wastewater Commission
Regular MeetingFitchburg, MA · September 9, 2015
Minutes
WATER/WASTEWATER FACILITIES COMMISSION
COMMISSION MINUTES
September 9, 2015
A meeting of the City of Fitchburg Water / Wastewater Commission was held on September 9,
2015 at the JA Provincial Building, 1200 Rindge Rd, Fitchburg, MA.
The meeting commenced at 4:40 P.M.
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
Michael McLaughlin
George Siener
Ron Lubianez
Members Absent: None
Others present: Jeff Murawski, Deputy Commissioner Wastewater
John Deline, Deputy Commissioner of Water
Mary Jane Franklin
ITEM # 1: Approval of last meetings minutes:
The minutes for the July 23, 2015 meeting were approved by unanimous vote.
ITEM # 2: Public forum:
No public forum comments were received.
ITEM # 3: Water Rate Study - next steps:
There was a discussion about when to present the information from Tighe & Bond to City
Council. It was decided to wait until after the elections, although Mr. Laakso will have a
preliminary discussion about this with Steve Hay, City Council President.
ITEM # 4: Regional Water Plant - SCADA issues and future upgrades:
Mr. Deline stated there are critical issues with the current software and he would like to initiate
upgrades that would allow outside access and communication between the plants specifically. He
believes it will be approximately $300-400 thousand for a more “open” system which would
allow upgrades to happen.
ITEM # 5: Hydrant flushing:
The hydrant flushing has begun but needed to be postponed. See Other Business.
ITEM # 6: Damage (sewer collapse) in Westminster Street Sewer (Saturday – June 20th),
Emergency:
MASS DOT contacted Mr. Murawski on June 20, 2015 regarding the sewer collapse (which
occurred during a paving project done by MASS DOT). Spot repairs will be done and then CIPP
(Cured-In-Place Pipe).
ITEM # 7: Brief update on sewer infrastructure damage in the Nashua River:
The repair has been completed.
ITEM # 8: West Plant Anaerobic Digestion, DRAFT Feasibility Report. Meeting held at
Great Wolf Lodge on August 19.
Mr. Murawski reported there was a lot of interest and support at the meeting held at Great Wolf
and although there was a minor issue with the audio, it went well. Weston & Sampson are
recommending different ways to approach this, DBB (design build bid) and DBO (design build
operate). It appears, at this point, that DBO would be the best direction to proceed.
ITEM # 9: Site visit and tour to the Greater Lawrence Sanitary District’s WWTF
scheduled for September 25th along with a tour of the digestate drying and pelletizing
operation (operated by a third party):
Mr. Murawski has obtained the fire Department bus for transportation to the Lawrence WWTF
tour.
ITEM # 10: SSU Project:
Mr. Murawski reminded the Commission that that because of some sub trades this should have
been a Chapter 149 project and Wright Pierce’s contact prohibits Chapter 149 work. There has
been a reversal by Purchasing regarding the RFP and Wright Pierce’s contact will be amended
and that an OPM contract needed for the Airport will be used as a format template for
Wastewater SSU project.
ITEM # 11: Brief CSS-4D Project Update:
The infrastructure is installed and Mr. Murawski is expecting a paving schedule soon.
ITEM # 12: Fats, Oils & Grease: Code, Permitting, Regulating, Etc. (PENDING … Still
need to investigate procedures of neighboring communities):
Mr. Murawski will follow up with this.
ITEM #13: “Policy” on Sewer Billing Abatements:
Mr. Murawski stated no sewer abatements should be allowed for general leaks, maintenance,
filling swimming pools or watering lawns. He would like the policies to be posted to the website
as an educational outreach. A motion to amend the abatement policy was made by Dr. Lubianez
and seconded by Mr. Siener. It was approved by unanimous vote.
ITEM # 14: Sewer Emergency Notification Procedure (excerpted from the ERP), uploaded
to the City website:
Mr. Murawski stated the sewer emergency procedure, which was excerpted from the Emergency
Response Plan, was publicized to the City website.
ITEM # 15: Discussion with Westminster concerning the need to review & revise the
Fitchburg/Westminster IMA. Provision in Agreement stipulates 3-year frequency for
review & updating (if required). PENDING….No further discussion as of yet with
Westminster):
Mr. Murawski will be contacting Westminster to begin discussions about the IMA.
Other Business:
Mr. Deline reported that several unrelated water incidents occurred simultaneously: A leak on
Rindge Rd, a leak on Boulder Dr. – with several smaller leaks – and a fire. In addition to that,
several gate valves were corroded and broke.
Ms. Brown resigned her position on the Commission as of September 2, 2015. Mr. Laakso
reminded the Commission that, with Ms. Brown’s resignation, there were two vacant positions
that needed to be filled. He explained that Nina Nazarian (Town Manager of Princeton)
approached Nate LaRose (Mayor Wong’s assistant) about becoming a Water/Wastewater
Commissioner.
There was a discussion about beginning the meetings at 5:00 P.M. (with the understanding that
they would end at 6:30 P.M.). The next meeting is scheduled for September 9, 2015 at 4:30 P.M.
at the JA Provincial Building, 1200 Rindge Rd., Fitchburg, MA.
The meeting adjourned at 5:45 P.M.
Minutes Prepared by_________________
Mary Jane Franklin
Agenda
Water/Wastewater Commission
Meeting of Wednesday
September 9, 2015
4:30 p.m.
JA Provincial Building
1200 Rindge Rd
Fitchburg MA 01420
AGENDA
1. Review Meeting Minutes for July 23, 2015
2. Public Forum
3. Water Division
Water Rate Study - next steps?
Regional Water Plant - SCADA issues and future upgrades
Hydrant flushing
4. Wastewater Division
Damage (sewer collapse) in Westminster Street Sewer (Saturday – June 20th), Emergency
Response & Stabilization, Repairs, and CCTV inspection work. Spot repairs & scheduling for the
repairs work is pending.
Brief update on sewer infrastructure damage in the Nashua River.
West Plant Anaerobic Digestion, DRAFT Feasibility Report. Meeting held at Great Wolf Lodge
on August 19. Site visit and tour to the Greater Lawrence Sanitary District’s WWTF scheduled
for September 25th along with a tour of the digestate drying and pelletizing operation (operated by
a third party)
SSU Project
1. Update on OPM contract progress.
2. Update on Construction Phase Engineering Services RFP Status.
Brief CSS-4D Project Update
Fats, Oils & Grease: Code, Permitting, Regulating, Etc. (PENDING … Still need to investigate
procedures of neighboring communities).
Wastewater Industrial Use Permits (PENDING … Still need to investigate procedures of
neighboring communities).
“Policy” on Sewer Billing Abatements.
Sewer Emergency Notification Procedure (excerpted from the ERP), uploaded to the City
website.
Discussion with Westminster concerning the need to review & revise the Fitchburg/Westminster
IMA. Provision in Agreement stipulates 3-year frequency for review & updating (if
required).(PENDING….No further discussion as of yet with Westminster)
5. Other Business
Set next meeting date and location
Adjourn