FITCHBURG WATER & WASTEWATER
COMMISSION MINUTES
March 9, 2016
A meeting for the City of Fitchburg Water/Wastewater Commission was held on March 9, 2016
at the J.A. Provencial Water Treatment Facility Building 1200 Rindge Rd, Fitchburg MA, 01420.
The meeting commenced at 5:08 PM
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
Ron Lubianez
George Siener
Others present: John Deline Jr., Deputy Commissioner of Water
Jeff Murawski, Deputy Commissioner of Wastewater
Janet Morrison, Member of North County Land Trust
Ralph Baker, Director of Nashua River Watershed Association
Mayor Stephen Dinatale
Jennifer Lambert
Members absent: Michael Mclaughlin
Item #1
Approval of last meetings minutes: Motion to approve minutes from February 10, 2016 meeting
was granted by unanimous vote.
Item #2
Public Forum: No public forum comments were received.
Item #3
Water Division:
Janet Morris of the North County Land Trust discussed with the commission land
purchases/conservation restrictions. She stated that she is working with appraisers and still
trying to get in touch with land owners. The city still has plenty of time to work with land
Ralph Baker, director of the Nashua River Watershed Association conducted a
presentation on Forestry and Climate Change. He explained the importance of
protecting our forests and how Fitchburg is in a great position by owning a lot of
forestry land. He recommended changing the practice of harvesting 50% of standing
biomass with each harvest and also to work with Foresters to achieve future goals of
water and forestry protection. He also proposed creating a Forest Reserve in
Management Area South that he and his wife will make a $50K charitable gift to offset
the Water Enterprise Funds loss of income.
Mr. Deline informed the commission that he is still working on and will be presenting
FY17 budget to Mayor Dinatale sometime next week.
Mr. Deline also discussed the term ICE PIGGING, which helps with the cleaning of
tuberculation buildup in water mains. The Ice Pig is a semi-solid that is pumped like a liquid and
flows through changes in diameter, bends and fits without blockage. The ice pig is simply
pumped into and recovered from a hydrant at each end of the pipe section without excavation
or modification to the hydrant. Looking to hire a contractor to do this work around the 3rd week
of April for the Shea street problem and other areas as well.
Item #4
Wastewater Division:
Mr. Murawski updated the commission on the SSU Project. Informed us that the OPM services
agreement w/ CDM Smith should be finalized by the end of this month. Hoping to execute the
bid phase, construction phase & post construction phase engineering services which are in the
preliminary stages. Waiting on procurement. Wright Pierce is under contract already to provide
us some assistance in the development of the RFP document.
The FEMA LOMR (letter of map revision) will be jointly advertised for both Fitchburg &
Leominster. This public advertisement describes the Flood Hazard revisions that are located
between the former Wheelwright Dam in Leominster and the Duck Mill Dam in Fitchburg.
Mr. Murawski also gave an update on the SEP Project. This project has successfully been
completed and the completion reports have been sent to the DEP and EPA. The CSS-4D Project
wrapped up and the final payment requisition was given to the contractor. No finality on the
engineering services as of yet.
The commission was also informed by Mr. Murawski that the mill-business sale of
FiberMark/Crocker Tech to Neenah Paper has fallen through.
Mr. Murawski talked about the proposals that he had in hand for solicitation of services for both
professional/engineering. He recommended a motion to award contracts to both Tighe & Bond
and Wright-Pierce before funding approval. Motion to approve was granted.
Handouts were given out to the commission members regarding FY-17 Wastewater Services &
Needs, FY-17 DPW-Wastewater Draft Budget & the Organics-to Energy Feasibility Study report
from Weston and Sampson on the Fitchburg West Plant.
Mr. Murawski discussed with the commission his meeting on the preliminary budget with Mayor
Dinatale on March 1, 2016. There was heavy talk about the estimated high costs of the
Engineering/Professional services especially the Sewer Rate Study, and the Affordability Study
that he is budgeting for.
Item #5
Other Business:
The commission members were given copies of resumes for the two applicants that would like
to become commission members.
The next meeting is scheduled for April 13th, 2016 at 5:00 P.M. at the J.A. Provencial Building,
1200 Rindge Rd., Fitchburg, MA.
Meeting adjourned at 6:27 P.M.