Water & Wastewater Commission
Regular MeetingFitchburg, MA · December 14, 2016
Minutes
FITCHBURG WATER & WASTEWATER
COMMISSION MINUTES
December 14, 2016
J.A. Provencial Building
1200 Rindge Rd. Fitchburg, MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday
December 14, 2016 at the J.A. Provencial Water Treatment Facility Building 1200 Rindge Rd,
Fitchburg MA, 01420.
The meeting commenced at 5:06 PM
Members present: Lenny Laakso, Commissioner DPW
Rick Healy
George Siener
Joshua Champagne
Others present: John Deline Jr., Deputy Commissioner of Water
Jeff Murawski, Deputy Commissioner of Wastewater
Janet Morrison
Jennifer Lambert Principal Clerk Water Office
Members absent: Mike Mclaughlin
Nina Nazarian
Item #1
Approval of last meetings minutes: Motion to approve minutes from October 20, 2016 meeting
was granted by unanimous vote.
Item #2
Public Forum: No public forum comments were received.
Item #3
Water Division:
Janet Morrison our Land Conservation Consultant spoke to the commission about The
FY2017 -2018 Drinking Water Supply grant application. There are 4 tracts of land in the
Northern Watershed totaling approximately 90 ½ acres that are included in this
application. A motion to authorize the application was granted by the Commission in
unanimous vote. She also discussed with the commission the Wilen property in the
Southern Watershed of Westminster. Landowner is willing to sell approximately two
acres of land in Zone A to Mare Meadow Reservoir for land conservation. Land in Zone A
is highly sought after, may work with the owner to potentially offer more. Ms. Morrison
also spoke about Conservation restriction monitoring. The Forest Legacy Program
requires this be done and a yearly basis. The city will work with a professor at Fitchburg
State and monitoring will be done by Fitchburg State interns who actively have an
interest in GIS mapping and land conservation.
Mr. Deline spoke about the city’s state regarding this year’s drought. Even though we
have had rain the past two months the city’s reservoir levels are at about 80%. We are
definitely better than where we were, and since the summer months have passed
people are not using as much water, but restrictions do remain in place.
The water quality issue has come up again in the area of Shea St. We have received a
few calls that the water is cloudy and dirty. The section of water main on which the ice
pigging was completed to temporarily relieve residents of this issue ultimately didn’t
work, but was worth a try. We have a hydrant running and also a bleeder in place. This
section of water main is first on our list of mains to be replaced.
John updated us on the Hydraulic Study that Weston and Sampson did on our Narrows
Road Pressure Reducing Station. We talked about moving it out of Westminster and
down the road a bit and making two sub-stations. This will eliminate the Lacava Hotel
pump station and also the Montachusett Industrial Park pump station. The pressure
reducing station does need some rehabbing and also will cost to relocate, but the end
result is we will be saving on maintenance and pumping costs.
Regarding our meter upgrade program, John informed the commission that he recently met
with three different meter companies for presentations along with Missy (Water Operations
Coordinator), Nelson (Business Manager), Nick (City Engineer) and Trevor (IT Manager). We will
go through the pros and cons of each company and will move forward in making a decision on
which company’s services best fit the city’s needs. We would like to stick with cellular reading,
which is how we read the meters we have currently. Will most likely have company do the
entire change out themselves, and would like to have everything completed in about a year to
15 months.
Lastly, we have good news regarding the outsourcing of water/sewer bills. Starting with the
December billing, Global Direct out of Millbury Ma will be printing and mailing out the monthly
bills. This is a great cost savings for the water/wastewater divisions.
Item #4
Wastewater Division
Mr. Murawski updated the Commission on the status of Construction Projects that are in the
works. The bids for the SSU project were received by the general contractors on Nov 16, 2016.
Bid award is planned for January 11th, 2017. Construction has commenced regarding the Beech
St/Hazel St project with work in progress on Pratt Rd @ Rollstone St. The CMHs Separations
Project contract has been awarded to Blue Diamond Equipment and a preconstruction
conference was held. Blue Diamond Equipment has done CMH’s separations before for the city.
Regarding the Sewer Rate Study, Jeff updated us that it has been stalled because we have not
been able to gather all of the data for Tighe & Bond to move forward. Work is still in progress
though.
Mr. Murawski also informed the commission that he is still currently working with Vincent
Pusateri , City Solicitor to develop provisions regarding City Code/Rules & Regs on “Infiltration &
Inflow”.
Kick off meeting was held with Westminster regarding the Fitchburg/Westminster IMA.
Westminster is looking to expand their allotted capacity of flow. There are two points of entry
from Westminster to the Fitchburg sewer system. In order for us to evaluate what they are
asking for we will need to do Hydraulic model runs, we will be submitting them by the end of
this month.
Item #5
Other Business:
Mr. Laakso informed the Commission that member Nina Nazarian has resigned due to State
Ethics Policy. Nina is Town Administrator for the Town of Princeton Ma, as well as a member of
our Water/Wastewater Commission. The State Ethics Policy states that it is a conflict of interest
because the city owns land in Princeton. We are now down two commission members. We will
reach out to the Mayor’s Office and let them know to put the word out.
Next Water/Wastewater Commission Meeting scheduled for Wednesday January 11, 2017 at
4:30pm.
Meeting adjourned at 6:28 P.M.
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – December 14, 2016
5:00 p.m.
J.A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
1. Review minutes from October 20th, 2016 Commission Meeting
2. Public Forum : None
3. Water Division
Drought
Shea St.
Hydraulic Study-Narrows Rd. PRV Station
SCADA System Upgrades
Water Main Replacement Project-Summer 2017
Meter Upgrade Program
Outsourcing of Bills
4. Wastewater Division
Construction Projects :
o SSU Project
1. Bids shall be received from GCs on November 16th, at 2:00 PM.
2. Award tentatively planned for January 11th, 2017.
o Beech Street/Hazel Street
Construction commences Monday – November 7, 2016, in Pratt Road (at Rollstone
Street).
o CMHs Separation Project
Contract awarded & executed. Preconstruction conference was held on Oct. 25th.
Contractor awarded the project is Blue Diamond Equipment.
Construction schedule (start date, locations, etc.) is anticipated to be received on
Nov. 7, 2016.
Sewer Rate Study (in progress)
City Code Chapter 147 & “Rules and Regulations” (working with City Solicitor – in
progress)
“Infiltration & Inflow” – Develop provisions for City Code/Rules & Regs in order to
effectively administer and to comply with NPDES, State Regulation (314 CMR 12), and
Consent Decree. …….. (working with City Solicitor in progress)
Westminster/Fitchburg IMA
1. Letter response (from Fitchburg W/WW) has been acknowledged by Westminster DPW
Director Josh Hall; Josh Hall indicated the general preferences for days of the week
Westminster would like the meeting to be scheduled.
2. Meeting to be scheduled.
5. Other Business
Set next meeting date and location
Adjourn
Get email alerts for Fitchburg
A daily email when new agendas and minutes are posted.