Water & Wastewater Commission
Regular MeetingFitchburg, MA · May 10, 2017
Minutes
FITCHBURG WATER & WASTEWATER
COMMISSION MINUTES
May 10th, 2017
J.A. Provencial Building
1200 Rindge Rd. Fitchburg, MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday May 10,
2017 at the J.A. Provencial Water Treatment Facility Building 1200 Rindge Rd, Fitchburg MA, 01420.
The meeting commenced at 4:37 pm
Members present: Lenny Laakso, Commissioner DPW
Rick Healey
George Siener
Mike Mclaughlin
Others present: John Deline Jr., Deputy Commissioner of Water
Jeff Murawski, Deputy Commissioner of Wastewater
Jennifer Lambert Principal Clerk Water Office
Janet Morrison, Land Conservation Consultant
Members absent: Joshua Champagne
Item #1
Approval of last meetings minutes: Motion to approve minutes from last month’s April 12th, 2017
meeting was granted by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division:
Janet Morrison first presented the Commission with the approx. 31.4 acre Conservation Restriction
on the Krashes property in the Town of Princeton that we are getting ready to close on. Motion to
approve the Conservation Restriction was granted and accepted by unanimous vote.
Motion was raised to accept the $162,500 MA Drinking Water Supply Protection Grant that the City
was awarded. That also was granted and accepted by unanimous vote.
The 2017 Water Main Improvement Project bid went out this week. Approx. 10 contractors have
already taken out plans and seem interested in the project. We are hoping to get at least seven to
eight bids on it. Bid date is May 25th. We hope to start the construction phase of the project
sometime in July.
John gave an update on the list of items we are still working on and working with MA DEP regarding
the Sanitary Survey. We have been going back and forth with them to try and avoid a Consent
Order. We are trying to get list down as much as possible, but a few of the items are larger and will
take a little longer to fix. MA DEP will I assume, want some type of list with specific dates as to when
they will be finished. Still waiting to hear back from MA DEP.
Engineers Weston and Sampson have been conducting a Water Audit through a MA DEP grant. This
Audit will go through everything including the use of fire hydrants by the fire dept., no charge
accounts, general billing, and the meters themselves to help keep track of our unaccounted for
water. We are hoping to have a report from them sometime in June.
Hydrant flushing is still ongoing, we are near complete on the low system with just a few hydrants
left in that section. It’s a slow process as we are only flushing two to three hydrants per day. We
would like to flush 7 or eight a day but it pushes the plant to the limit. We hope to start flushing the
high system sometime around the first or second week of June.
Item #4
Wastewater Division:
Updates on the current Construction Projects were given to the Commission, most notably the
Beech/Hazel St Project. We are anticipating the final closure of the Laurel St. CSO regulator by the
end of May. This was one of the main drivers behind this project, being that we were not able to
close it previously. A look ahead schedule was passed out on both the SSU Project and the
Beech/Hazel St. Project. No schedule on the CMH’s Separation Project, but it looks like they will be
working in the area of Westminster St. at Princeton Rd starting sometime next week or the week
after.
The Westminster/Fitchburg IMA is still in progress, pending the CWMP & Hydraulic Model. After
reviewing the proposals received, Jeff recommended “subject to budget appropriation” that the
Commission approves and awards the assignment to Tighe & Bond for a service fee of $181,000. Mr.
Healey suggested waiting until budget approval since the Commission has already approved the
Wastewater Division’s FY18 budget with this appropriation included and recommended it to City
Council. The only problem will be if City Council does not approve the budget, then we will deal with
it then.
Work with the City Solicitor on the City Code Chapter 147 & “Rules and Regulations”, along with
“Infiltration & Inflow” provisions are still in progress and are ongoing at this point.
The “On-Call Wastewater Collection Engineering Services” Contract expired on May 4, 2017.
Purchasing has issued and RFQ for a new 5 yr. on-call contract. Six firms submitted responses. Of the
six, four firms were short listed and were interviewed on Monday May 1, 2017. References are still
being checked on the four firms that were interviewed.
Item #5
Other Business:
Jeff gave a final update on the issue of the Sewer Services Repayment Agreement between the City
and the residents that reside at 111 Highview St. Mr. & Mrs. Aldrich. They have signed and agreed to
pay 8 monthly installments, the last which will be in Dec of 2017 to avoid interest and penalties.
Also, Jeff passed out a draft for review on a new policy regarding the repayment of past due sewer
service charges. John agreed to look over the draft and see if it is something in which the water
division will follow also.
Lenny Laakso, DPW Commissioner informed the Commission of the e-mail that was received by the
Mayor’s Office regarding the resignation of Joshua Champagne from the Water/Wastewater
Commission. Unfortunately, Mr. Champagne is stepping down as a commission member due to
personal reasons.
Next Water/Wastewater Commission Meeting scheduled for Wednesday June 14th, 2017 at 4:30pm.
Meeting adjourned at 5:36 P.M.
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – May 10th, 2017
4:30 p.m.
J.A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
1. Review minutes from April 12th, 2017 Commission Meeting
2. Public Forum :
Update on: Mr. & Mrs. Aldrich (#111 Highview Street, Fitchburg, MA).
Repayment Agreement has been signed by both Mr. & Mrs. Aldrich, and by
Wastewater; the term for repayment in the agreement is 8 monthly payment periods.
First of eight payments has been received on time from the customer.
3. Water Division
Krashes Property Conservation Restriction-Janet Morrison
MA Drinking Water Supply Protection Grant Award
2017 Water Main Improvement Project-Update
MA DEP Sanitary Survey and possible ACO – Update
Water Audit being completed through MA DEP grant
Flushing of hydrants/water system
4. Wastewater Division
Construction Projects (Updates):
o SSU Project
o Beech Street/Hazel Street
o CMHs Separation Project
Westminster/Fitchburg IMA
o Drafting IMA in progress (pending….CWMP & Hydraulic Model).
o After review of all CWMP proposals received (from Wright-Pierce ($232,500),
Tighe & Bond, and Arcadis ($334,404)) it is recommended that the most
advantageous proposal received is that from Tighe & Bond, for the service fee
sum of $181,000.
o Subject to budget appropriation, Wastewater requests that the Commission
approves award of the service task assignment to Tighe & Bond.
Working with City Solicitor – in progress/ongoing :
o City Code Chapter 147 & “Rules and Regulations” (pending)
o “Infiltration & Inflow” – Develop provisions for City Code/Rules & Regs in order
to effectively administer and to comply with NPDES, State Regulation (314 CMR
12), and Consent Decree (pending).
Wright-Pierce’s “On-Call Wastewater Collection Engineering Services” Contract
expired on May 4, 2017
o Purchasing issued an RFQ for a new 5-year on-call contract. Six firms submitted
quals responses. Four of the six firms were “short-listed”, including Wright-
Pierce, CDM-Smith, Weston & Sampson Engineers, and ARCADIS.
o Short-listed firms were interviewed on Monday – May 1st. As of the preparation
of the Commission Meeting Agenda, references were still being checked for the
short-list firms, subsequent to the interviews.
5. Other Business
Set next meeting date and location
Adjourn