Water & Wastewater Commission
Regular MeetingFitchburg, MA · September 11, 2019
Minutes
Water/Wastewater Commission
Meeting Minutes
September 11th, 2019
J.A. Provencial Building
1200 Rindge Rd, Fitchburg MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday September
11th, 2019 at the J.A. Provencial Building, 1200 Rindge Rd, Fitchburg MA, 01420.
The meeting commenced at 5:05 pm
Members present: Rick Healey, Chairman
Nicolas Bosonetto, Commissioner of Public Works
George Siener, Commission Member
Joshua Bedarian, Commission Member
Steven Bodurtha, Commission Member
Michael McLaughlin, Commission Member
Others present: John M. Deline., Deputy Commissioner of Water
Jeff Murawski., Deputy Commissioner of Wastewater
Jennifer Lambert, Head Clerk Water Office
Janet Morrison, Land Conservation Consultant
Absentees: None
Item #1
Approval of last meetings minutes: Motion to approve minutes from June 12, 2019 meeting was granted
by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division:
Janet Morrison, Land Consultant spoke to the Commission about a potential sale of
Conservation Restriction on the City’s Southern Watershed properties to MA Division of
Fisheries and Wildlife. This CR would open land to non-motorized outdoor recreational activities
such as hiking, nature study, snowshoeing, cross-country skiing, hunting, fishing, wildlife
observation, mountain biking, etc., etc. She also updated the Commission as to the Jewell Hill
Conservation Project. We will be applying for two Land protection grants and one Drinking
Water Supply protection grant for approx. 318 acres of pristine Land.
Update given on the City-wide Water Meter Replacement. We have installed approx... 240-250
new meters ourselves. We are waiting on the last two gateways (Phillip’s park, Oak Hill) to be up
and running. New meters have been installed at Great Wolf. Also installed meters on Rte. 31 up
to the Ashby line, and Narrows Rd in Westminster to see if readings would come in and they
have.
Falulah transmission main, which is basically the main from this plant down to the storage tanks
is a 16” main. We will need to upgrade this main to a 24” pipeline, that way if either plant
(Falulah/Regional) goes down we can distribute water to all residents via the other plant.
MA DEP will begin its Sanitary Survey week of September 16th they will only have time for the
Regional Plant, and the Falulah plant will be completed at a later date.
Water Division and IT personnel held meeting with Arcadis representatives to review
the Basis of Design Report (BODR) for the design of the SCADA system upgrades for the
two treatment plants and 13 monitored stations (pump and prv stations).
Item #4
Wastewater Division:
Sewer Ordinance, and Sewer Use Rules & Regulations ordinance have finally been approved and
signed by the Mayor. Question was raised as to how these new rules and regulations would
affect the regular customer/business. Jeff will look into this a bit further with more discussion to
follow at next Commission Meeting.
WWMP- We have not heard back from DEP or EPA. We have already sent out the first
submission on the WWMP this past May. Weston and Sampson along with Tighe & Bond to
develop the best case scenario to put off tertiary treatment. Separating has far more benefits
than treatment itself.
East WWTF’s Lab & Control Room upgrade-RFQ has been sent out and Contractor CDM Smith
was chosen.
CMH’s Separation Project- Weston and Sampson are moving along with this. We have a
scheduled completion date for the end of the calendar year.
SSU Project- the SSU project is 97% to substantial completion, 91% to final completion and 95%
of the contract price through the end of August 2019. For work completed over the last month
or planned work for the month ahead please see attachment.
Combined Sewer Separation Project-Application has been sent in to DEP for the SRF funding
program. Loan authorization will be put forth to the finance committee next week in the
amount of 8.2 million. This is the combined area between Water St. and South St. to stay in line
with MASS DOT work.
SSES, Phase 4 – Project is moving along very well.
Misc. updates – Rain Barrels Program year 2. Is completed. We distributed 50 barrels, including
one donated to the McKay Arts Academy. We also have scheduled a presentation by Mr. David
Vallee NOAA/NWS Hydrologist in charge out of the Northeast River Forecast Center on Weather,
Climate trends in Mass to the FPS 8th grade students. This is tentatively scheduled for STEM
Week 2019 (week of October 21-25, 2019)
Item #5
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on October 9, 2019 at the J.A.
Provencial Building, 1200 Rindge Rd. Fitchburg MA, 01420.
Meeting adjourned at 6:02 P.M.
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – September 11th, 2019
5:00 p.m.
J. A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
1. Review minutes from June 12th, 2019 Commission Meeting. Our July 10, 2019 meeting
was cancelled due to lack of quorum.
2. Public Forum: None
3. Water Division
Potential sale of Conservation Restriction on the City’s southern watershed
properties to MA Division of Fish and Game (DFG)
Drinking Water Supply Protection grant application – Porter & Crocker properties
City-wide Water Meter Replacement Project – update
Falulah Transmission Main
MA DEP Sanitary Survey
Upgrade of SCADA System at treatment plants and stations
4. Wastewater Division
Status Update Items:
o Sewer Ordinance, and Sewer Use Rules & Regulations … (Arcadis) Update.
o WWMP (Consent Decree)…. (Weston & Sampson) Update.
o East WWTF’s Lab & Control Room Upgrades Project (RFQ) …. Update
o CMHs Separation Project …. (Weston & Sampson) Update.
Construction Projects (Updates):
o SSU Project
Completion: 97% to “Substantial Completion”, & 91% to “Final
Completion”; and Price: 95% of Contract Price (thru end of August 2019)
Work completed over previous two months included: (See Attachment).
Planned work over next month includes: (See Attachment).
Next Combined Sewer Separation Project (“CSO 039, 048 and Clarendon Street
Project”) Status (Weston & Sampson).
SSES, Phase 4 – Interceptor Sewer Evaluation (Weston & Sampson): Update.
Miscellaneous Updates:
Rain Barrels Program, Year #2 Completed (50 rain barrels distributed, including a
“donated” rain barrel to the McKay Arts Academy).
Coordinating w./FPS and F-Con-Comm for a presentation by Mr. David Vallee,
NOAA/NWS Hydrologist-in-Charge, out of the Northeast River Forecast Center, for
presentation to FPS 8th Grade Students, on “Weather, Climate, Climate Trends in
Massachusetts, and Climate Change Impacts on River Flood Behavior”.
Tentatively scheduled for Massachusetts’ STEM Week 2019 (week of October
21 - 25, 2019).
JUST THIS MORNING….(Sept. 11th)…..Gave “Fitchburg Easterly Wastewater
Treatment Facility – Recent Upgrades” presentation at the Massachusetts Water
Pollution Control Association’s (MWPCA) Quarterly Meeting, in Princeton MA
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
October 9, 2019 at the J.A. Provencial Building, 1200 Rindge Rd. Fitchburg, MA
01420.
Adjourn
Get email alerts for Fitchburg
A daily email when new agendas and minutes are posted.