Water & Wastewater Commission
Regular MeetingFitchburg, MA · December 12, 2019
Minutes
Water/Wastewater Commission
Meeting Minutes
December 12th, 2019
J.A. Provencial Building
1200 Rindge Rd, Fitchburg MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday December
12th, 2019 at the J.A. Provencial Building, 1200 Rindge Rd, Fitchburg MA, 01420.
The meeting commenced at 5:12 pm
Members present: Rick Healey, Chairman
Nicolas Bosonetto, Commissioner of Public Works
Steven Bodurtha, Commission Member
Michael McLaughlin, Commission Member
Others present: John M. Deline., Deputy Commissioner of Water
Jeff Murawski., Deputy Commissioner of Wastewater
Jennifer Lambert, Head Clerk Water Division
Janet Morrison, Land Consultant
Absentees: Joshua Bedarian, Commission Member
George Seiner, Commission Member
Item #1
Approval of meeting minutes: Motion to approve minutes from October 9th, 2019 meeting was granted
by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division:
Janet Morrison our Land Consultant updated the Commission on the Jewell Hill/Crocker Farm
Land Preservation Project. Crocker Farm is comprised of over 500 acres within a landscape of
historic farms and conserved watershed land. Its most prominent features are Jewell Hill, whose
summit affords a view of the Boston skyline, over 120 acres of agricultural fields and scenic
views in all directions. Motion was made to approve the DWSP (drinking water supply
protection) Grant, and was granted unanimously.
The Commission was also updated on the progress of the meter upgrade project. Approx. 1400
meters already installed. Baystate now has a 5 man crew working 6 days a week. They each are
installing about 10 meters a day, and have approx. 1200 more scheduled. By mid-January we
should have about 2500 meters installed. We have had a few problems with old services that
are iron pipe, some we can shut at street, and others we cannot so we will deal with them in the
spring.
Sanitary Survey from MA DEP-update: Draft copy of the results received. Nothing to be majorly
concerned about. It was mostly comprised of additional paperwork that MA DEP is now
requiring. Example being daily logs sent in, rather than monthly.
ACO-update: Deadline for the Bickford and Mare Meadow pump station roof projects were to
be completed by the end of 2019. MA DEP was notified that we would not have these done.
Letter to go out to MA DEP requesting extension. There was some issues with purchasing
regarding the bidding process, and we will need to go out to bid again.
Item #4
Wastewater Division:
Sewer Ordinance, and Sewer Use Rules & Regulations was passed and signed by the Mayor in
May of 2019. There are at least 13 locations where it makes reference to “rules & regs”, but the
“rules & regs” don’t exist. We will continue working on so the two documents go hand in hand.
SSU Project- SSU Project- the SSU project is 100% to substantial completion, 92% to final
completion and 98.5% of the contract price through the end of November 2019. For work
completed over the last month or planned work for the month ahead please see attachment.
Next Combined Sewer Separation Project: Weston and Sampson provided preliminary design
report. Storm drainage is substandard, and will be an additional $750,000 roughly. Separation of
storm water cannot be paid by rate payers because “storm drainage” is not part of the
enterprise fund. We will be meeting with Weston and Sampson to talk about this in further
detail.
SSES, Phase 4-Interceptor Sewer Evaluation: Vendors doing CCTC inspections, work is
continuing. Weston and Sampson is putting together a sewer evaluation report.
Combination Manhole Separation Project: Weston and Sampson are also working on a design
project for combination manhole separation. This will allow us to separate approx. 150
combination manholes. This will have to be done in a phased approach.
Siphon Cleaning Design & Bid, and Inspection Services Project: This project has been previously
budgeted and will go out to bid over the winter.
Miscellaneous updates: Industrial Pre-treatment Program Permittees briefing meeting was held
on November 13th regarding Local Limits. EPA will be “public noticing” the local limits in the
Federal Register, which will open a public comment period on local limits. Once finalized after
the public comments, the new local limits will have to be incorporated into ordinance (City
Codes).
Coordinated presentations by David Vallee, NOAA/NWS Hydrologist-in-charge out of the
Northeast River Forecast Center, for presentation to the FPS 8th Students.
Item #5
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on January 8, 2020 at the J.A.
Provencial Building, 1200 Rindge Rd. Fitchburg MA, 01420.
Meeting adjourned at 6:24 P.M.
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – December 12th, 2019
5:00 p.m.
J. A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
1. Review minutes from October 9th, 2019 Commission Meeting.
2. Public Forum: None
3. Water Division
Jewell Hill/Crocker Farm Land Preservation Project
Drinking Water Supply Protection Grant
Meter upgrade Project – Update
MA DEP Sanitary Survey
ACO - update
4. Wastewater Division
Status Update Items:
o Sewer Ordinance, and Sewer Use Rules & Regulations … (Arcadis) Update.
Construction Projects (Updates):
o SSU Project
Completion: 100% to “Substantial Completion”, & 92% to “Final
Completion”; and Price: 98.5% of Contract Price (thru end of November 2019).
Work completed over previous two months included: (See Attachment).
Planned work over next month includes: (See Attachment).
Next Combined Sewer Separation Project (“CSO 039, 048 and Clarendon Street
Project”) (Weston & Sampson): Update.
SSES, Phase 4 – Interceptor Sewer Evaluation (Weston & Sampson): Update.
Combination Manhole Separation Project (Weston & Sampson): Update.
Siphon Cleaning Design & Bid, and Inspection Services Project (Weston &
Sampson): Update.
Miscellaneous Updates:
o Held a “briefing meeting” (Wed. – Nov. 13th, 2019) for current Industrial
Pretreatment Program Permittees on the forthcoming Local Limits update. EPA
will soon be “public noticing” the local limits in the Federal Register, which opens
a public comment period on the local limits. Once “final” (after the conclusion of
the public comment period), the new local limits will have to be incorporated into
ordinance (City Codes).
USEPA published the “Public Notice” of the proposed revised local limits in
the Friday – Dec. 6th, 2019 Sentinel & Enterprise……commencing the 30-day
public comment period.
o Coordinated presentations by Mr. David Vallee, NOAA/NWS Hydrologist-in-
Charge, out of the Northeast River Forecast Center, for presentation to FPS 8th
Grade Students, on “Weather, Climate, Climate Trends in Massachusetts, and
Climate Change Impacts on River Flood Behavior” (for Massachusetts’ STEM
Week 2019, on Friday – October 25th).
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
January 8, 2020 at the J.A. Provencial Building, 1200 Rindge Rd. Fitchburg, MA
01420.
Adjourn