Water & Wastewater Commission
Regular MeetingFitchburg, MA · July 8, 2020
Minutes
Water/Wastewater Commission
Meeting Minutes
July 8th, 2020
J.A. Provencial Building
1200 Rindge Rd, Fitchburg MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday July 8th,
2020 via Zoom and FATV.
The meeting commenced at 5:12 pm
Members present: Rick Healey, Chairman
Steven Bodurtha, Commission Member
George Seiner, Commission Member
Joshua Bedarian, Commission Member
Others present: John M. Deline., Deputy Commissioner of Water
Jeff Murawski., Deputy Commissioner of Wastewater
Jennifer Lambert, Head Clerk Water Division
Nathan Glenny, FATV
Absentees: Nicolas Bosonetto, Commissioner of Public Works
Michael Mclaughlin, Commission Member
Item #1
Approval of meeting minutes: Motion to approve minutes from May 13th, 2020 meeting was granted
by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division:
Meter upgrade Project- The meter project has been put on hold since the pandemic of Covid 19
started. Conference meeting set up with Weston & Sampson along with Baystate Winsupply our
installation contractor this week to discuss when we can resume this project. Because we have
changed from Badger meters to Neptune meters, we no longer have software support on the
old meters. With our older badger meters dying out, we need to wrap this project up by the end
of this calendar year.
Cross Connection Control Program-The testing of backflow devices which is mandated by the
state was also put on hold due to the pandemic. We currently have one technician testing
devices because our Head Water Service Inspector left in February to take another job. We have
had no luck in hiring anyone new, and internal candidates are not qualified. We need someone
with expertise in this field and unfortunately there are not a lot of people with qualifications.
We may need to sub out to meet state regulations and requirements. The State has said that
there is no requirement to test low hazard properties such as residential, but will need to test
the high hazard areas such as commercial properties.
Water Rate Revenues- Handout given to Commission Members of our monthly commitments for
the past few years. These are the amounts the Water Division “bills out” for water rate revenue
each month. We will be working on additional analyses going forward. It will be interesting to
see what the impacts of the pandemic will have on our revenues compared to previous years.
Water use Restrictions and Drought- On June 2nd, the Water Division implemented a seasonal
restriction on nonessential outdoor water use. This is based upon the flow of the North Nashua
River between the periods of May 1, to September 30th as measured at the USGS stream flow
gage located near the Fifth Street Bridge here in Fitchburg. The restrictions imposed by this
order are related to stream flows that have been determined to protect aquatic habitat. They
are not at this time related to Fitchburg’s reservoir levels or the ability to provide water to the
City’s Water Division Customers. While we don’t strictly enforce this, we do ask those customers
that have sprinkler systems to water before 9am and after 5pm, and not run them when it’s
raining. This includes City owned property.
Item #4
Wastewater Division:
Status update items- Sewer Ordinance, need the following changes. (1) Amending 147-10.D., to
re-incorporate the Sewer Connection Permit Fees back into the Ordinance and (2) Amending
147-18, to incorporate the USEPA approved Local Limits that were approved on January 7, 2020.
Motion was made to incorporate both amendments to the Ordinance. Motion was granted by
unanimous vote.
SSU Project- This project is winding down. Contractor had to make some repairs to the
secondary clarifier tanks while the work was still under warranty. Final completion date will be
the end of July.
Next Combined Sewer Separation Project- Our next separation project should be going out to
bid sometime this month. Most likely will receive bids this coming August. We are a little behind
with this project because of Covid. We should have this project under contract this year if
everything goes to plan.
SSES, Phase 4-Interceptor Sewer Evaluation-Report has been submitted to us by Weston &
Sampson. We just have to finish up our comments and get the report back to them so they can
finish up the Phase 4 report to be submitted to EPA and DEP for review and approval.
Combination Manhole Separation Project-Weston & Sampson is working on a bidding document
for this project. The intention of this document will be a phased approach for these types of
combination manhole separations, where we can do separate smaller projects.
Siphon Cleaning Design & Bid, and Inspection Services Project-Recent investigative work (by Ted
Berry) has identified an urgent structural problem with a 350 foot stretch of critical trunk sewer
infrastructure between Hartwell St. & Oliver St. This is a combined sewer (installed in 1885)
which is a brick, egg shaped 39” high by 26” upper diameter sewer which transmits 3-MGD in
dry weather and 32-MGD in wet weather. Our estimated construction cost to do this repair is
$450K (as an “open-cut” repair). We will also be getting estimate cost for trenchless repair costs.
Misc. updates- Our 2020 Rain Barrels Program was a terrific success with 176 rain barrels sold.
This is our third year doing this and we surpassed years 1 & 2 combined. The On-Call
Construction Contract has been executed (Contractor: Blue Diamond Equipment) and the “River
Bank Stabilization Project” will be commencing soon. Also under the “On-Call Construction
Contract”, this summer we will be commencing the Highview Street Sewer Replacement Project
construction.
Item #5
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on September 9, 2020 at the J.A.
Provencial Building, 1200 Rindge Rd. Fitchburg MA, 01420.
Meeting adjourned at 5:49 pm