Water & Wastewater Commission
Regular MeetingFitchburg, MA · December 9, 2020
Minutes
Water/Wastewater Commission
Meeting Minutes
December 9th, 2020
J.A. Provencial Building
1200 Rindge Rd, Fitchburg MA 01420
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday December
9th, 2020 via Zoom and FATV.
The meeting commenced at 5:01 pm
Members present: Rick Healey, Chairman
Steven Bodurtha, Commission Member
George Seiner, Commission Member
Nicolas Bosonetto, Commissioner of Public Works
Others present: Jeff Murawski., Deputy Commissioner of Wastewater
Jennifer Lambert, Head Clerk Water Division
Nathan Glenny, FATV
Absentees: Michael Mclaughlin, Commission Member
Item #1
Approval of meeting minutes: Motion to approve minutes from November 4th, 2020 meeting was
granted by unanimous vote.
Item #2
Public Forum: None
Item #4
Water Division:
Narrows Rd Hydroturbine Project – Hydroturbine has been installed and should be started
within the next week. Very happy with how it turned out. We had minor adjustments to be
made, including replacing some couplings. Hopefully this will generate some revenue for us.
Also made some significant improvements with the facility in terms of piping and removing un-
needed piping. New roof also.
Meter upgrade Project – Bit of a slowdown given the holidays and Covid ramping up, people are
just not making appointments. Once the holidays are over we will send out more letters. We
have 7836 meters have been replaced so far, so we have approx... 25 percent left to go. We do
have the Water Smart portal open to our customers. A flyer was sent out last month with the
water/sewer bills. We are hoping people sign up and use this tool. Once signed up they will be
able to monitor their usage, get leak alerts and high usage alerts. There are lots of great tips
such as how to check for leaks and conserving water. Jennifer and Missy are informing
customer’s also when they call the office. This will be great for businesses and landlords as well.
MA DEP Administrative Consent Order – Submitted to have a revised schedule for completion
dates on some of the items within the consent order. This was approved by MA DEP, and the
Mayor, both have signed with their approval.
Cross Connection Control Program – Talked with MA DEP recently about our Cross Connection
Program. Our head person left last February and we haven’t been able to fill this position. We
have advertised a few times and got very few applicants. One was in house and two were
outside. The two from outside the City had no water experience at all or any construction
experience. One from in house made efforts to get the licensees required but still doesn’t have
enough experience. This has fallen on Steve, Missy and Jen and we have fallen behind. Our only
employee in the meter room is out on FMLA for an extended period. We usually have two
people full time in the meter room. We may have to look at hiring an outside consultant to
assist us with getting caught up. Ma DEP has suggested that we do this until we get a qualified
person in-house with sufficient experience and licensure.
Item #3
Wastewater Division:
Sewer Ordinance, (City Code Chapter 14) - Waiting on review feedback from City Solicitor
Vincent Pusateri for comments, questions or suggestions. The Water/Wastewater Commissions
January 2021 meeting we will review and approve the revised DRAFT “Sewer Rules &
Regulations” On Saturday November 28th, 2020 the City Clerk posted the public notice ad in the
Sentinel and Enterprise pf the pending Ordinance change. City Council will hold the final vote on
changes to the City Code, Ch. 147 at the December 15th 2020 City Council Meeting.
CSS Project, Separation/Rehabilitation – Work commenced on November 24th with the
contractor addressing a failing sewer on lower South St. They installed approx... 80 linear feet of
replacement sewer. Work will continue into the winter months with spot excavation work and
with trenchless rehabilitation portions of the work. Contractor Blue Diamond Equipment has
completed the Highview St. open cut excavation work and is preparing for the trenchless
rehabilitation portion of the work,
SSES, Phase 4 Interceptor Sewer Evaluation – Engineers Weston and Sampson will be submitting
report pertaining to the sewer evaluation to MA DEP and EPA by the end of December 2020.
Siphon Cleaning Design & Bid Project – This project has been concluded. We removed approx...
200 cubic yards of grit and sludge that limited flow capacity.
Wastewater Management Plan, Consent Decree – Submission #2 is being prepared by Weston &
Sampson to be submitted to MA DEP and EPA by December 31, 2020. Wastewater will receive
shortly a draft review document for the submission. We will provide feedback comments,
questions and or revisions prior to submission to MA DEP and EPA.
Item #4
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on January 13, 2021 at the J.A.
Provencial Building, 1200 Rindge Rd. Fitchburg MA, 01420.
Meeting adjourned at 5:33 pm
Agenda
Water/Wastewater Commission
Meeting AGENDA
Wednesday – December 9th, 2020
5:00 p.m.
J. A. Provencial Building
1200 Rindge Rd.
Fitchburg, MA 01420
DUE TO THE RESTRICTIONS REGARDING COVID-19, THIS MEETING WILL TAKE
PLACE VIRTUALLY WITH THE ASSISTANCE OF FATV & ZOOM.
The public is invited to participate in the Zoom webinar of December 9, 2020 5:00 PM
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
https://us02web.zoom.us/webinar/register/WN_OhmZyfpIQOGKrocgkgTLAQ
After registering, you will receive a confirmation email containing information about logging in to join
the webinar.
_____________________________________________________________________________________
1. Review minutes from November 4th, 2020 Commission Meeting.
2. Public Forum: None
3. Water Division
Narrows Road Hydroturbine Project
Meter Upgrade Project – status update
MA DEP – Revised schedule for ACO (Administrative Consent Order) items
Cross Connection Control Program - update
4. Wastewater Division
Status Update Items:
o Sewer Ordinance, (City Code Chapter 147):
Saturday – November 28th, 2020: City Clerk posted “Public Notice”
advertisement in the Sentinel & Enterprise, notifying the public of the pending
Ordinance Change;
City Council will hold the final vote on Petition 204-20 (‘Changes to City
Code, Ch. 147) at the December 15th, 2020 City Council Meeting.
o Continue to the W/WW January 2021 Meeting: Review & Approve the Revised
DRAFT “Sewer Rules & Regulations” (update of previous DRAFT “Sewer Rules
& Regulations” provided by Arcadis {consulting engineer}), provided to the
W/WW Commission at the Sept. 9th, 2020 Commission Meeting.
As of the writing of the agenda for the W/WW Dec. 9th, 2020 Meeting, the City
Solicitor has not yet provided review feedback
comments/questions/suggestions.
Construction Project (Update):
o CSS Project: “CSO 007, 011, 039, 048 Separation/Rehabilitation Project”.
Contractor, J.A. Polito & Sons, Inc.; and Engineer, Weston & Sampson Engineers.
1. Contractor commenced work on Tues. – Nov. 24th, first addressing a failing
sewer on lower South Street, and installed approximately 80 linear feet of
replacement sewer. Work will occur into the winter, with “spot” excavation
work, and with “trenchless rehabilitation” portions of the work.
o “On-Call Construction Contract” Work (Contractor: Blue Diamond
Equipment): Blue Diamond has completed the Highview Street open cut
excavation work portion of the “Highview Street Sewer Rehab./Replacement
Project”, and is preparing for the trenchless rehabilitation portion of the work.
SSES, Phase 4 – Interceptor Sewer Evaluation (Weston & Sampson): Update.
Siphon Cleaning Design & Bid, and Inspection Services Project (Weston &
Sampson): Update.
Wastewater Management Plan, Consent Decree Submission #2: Being prepared by
Weston & Sampson for submission to EPA & MassDEP by December 31, 2020.
Wastewater will shortly receive DRAFT review document for the WWMP #2
submission, to provide feedback comments/questions/revisions to Weston & Sampson,
prior to submission to EPA & MassDEP.
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
January 13, 2020 at the J.A. Provencial Building, 1200 Rindge Rd. Fitchburg, MA
01420.
Adjourn