A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday September
8th, 2021 via Zoom and FATV.
The meeting commenced at 5:02 PM
Members present: Rick Healey, Chairman
Steven Bodurtha, Commission Member
George Seiner, Commission Member
Michael Mclaughlin, Commission Member
Nicholas Erickson, Interim Commissioner of Public Works & City Engineer
Others present: Jeff Murawski., Deputy Commissioner of Wastewater
John Deline., Deputy Commissioner of Water
Jennifer Lambert, Head Clerk Water Division
Nathan Glenny, FATV
Kasia Allen, Constituent
Mark Piermarini, Prospective Commission Member
Absentees: None
Item #1
Approval of meeting minutes: Motion to approve minutes from May 12, 2021 meeting was granted by
unanimous vote.
Item #2
Public Forum: Mrs. Kasia Allen from 68 Bilotta Way spoke to the Commission about appealing the
wastewater department’s denial of a sewer abatement. Commission raised a motion to gather more
information regarding her irrigation system. Motion passed unanimously.
Item #4
Water Division:
245 River St. / Meter issue – Topic postponed due to conflicting schedule with City Solicitor
Vincent Pusateri. Discussion at next Commission Meeting 10/13/21
Meter upgrade project – The project is approx... 94% complete. There are around 670 meters
left to change out. Of the ones that are left to change, half of them we just have had no
response from the homeowners. The others have issues with either there service line or
plumbing needs. We have started sending shut-off letters to the non-responsive properties with
certified as well as regular letters being sent to the homeowners. The Board of Health along with
the Mayor are all notified when letters are sent. We have gotten a great response this way.
Falulah Transmission Main Project – This is the replacement of the 16” main to a 24” main.
Contract is taking a little bit longer, but the contractor has informed us that the 24” pipe is
currently hard to come by. Project will most likely start early winter. We have notified DEP that
we will need an extension on this item.
SCADA upgrade project – Fall River Electrical is updating/fabricating the electrical boxes and
software is being programmed.
2022 Projects / Oak Hill Tank Replacement & Meetinghouse Gatehouse Rehab – These are both
major projects coming up. We have applied for SRF funding for both projects. This will greatly
advance our infrastructure.
Item #3
Wastewater Division
Both the towns of Westminster and Lunenburg are working on incorporation of Fitchburg’s
Ordinance updates into their own Town Bylaws. Westminster voted to amend Bylaw Chapter
161, Sewers, to mirror the updated changes of Fitchburg City Code, Chapter 147, Sewers. In June
of 2021, we received the Lunenburg Sewer Commission’s DRAFT Town Sewer Regulations
update for review which is still ongoing.
Council Petition No. 134-21 – Discussion about the possibility of transporting sludge, in-house
rather than outsourcing this task. Primary and secondary sludge gets dewatered and then
transported to the West Plant. This material is hazardous to a sense that there are still
pathogens in it. We are in year two of a three year contract with W.L. French who is our current
vendor for this service. Unfortunately, because there was no competitive bidding and we only
received this vendors bid. If wastewater were to haul sludge ourselves, we would need a new
hauling truck (we currently do not have one) which would cost between $150,000 to $240,000
and purchase bins, and hire new staff. This type of service is something that has to be done,
holidays included which would mean overtime costs at time and a half and sometimes double
overtime. Concerns would also be the landfill we currently use could be at full capacity and
could close within the next 3yrs according to Health Director Steve Curry. Regulatory
requirements are also a big concern. Further discussion and cost report at our next
Water/Wastewater Commission Meeting to be held on Wednesday October 13, 2021.
Construction Projects – CSS Project work started beginning of July. This part of the project
proved to be challenging and also disruptive with just over 300 ft. of work being done on Water
St. between First St. & Walnut St. It was decided that Water St. would be closed to vehicular
traffic and a detour was set up to go around the closure.
“On Call Construction Contract” - Contractor Blue Diamond Equipment, and subcontractor
completed the trenchless rehabilitation work in mid-May on the Highview Street Sewer
Replacement and Rehab project. The project is substantially complete, and Blue Diamond
Equipment is working on punch list items.
Miscellaneous – Wastewater staffing (plant and sewer system crew) - attended a joint webinar
on June 22nd on Innovative Approaches as to where our new operators will come from? A grant
proposal application was sent to provide internship opportunities to women who complete the
“NEIWPCC online Women’s Water Workforce” wastewater training. A new senior operator was
hired at the plant and started in June. We also hired a general foreman, working foreman and a
sewer collection operator. This is a six person crew and is staffed at 5 crewman. We will seek to
fill the sixth spot in the fall of 2021. We have partnered with “X-Cel Conservation Corps. A spring
time graduate may join wastewater as a “Wastewater Operations Intern”. Program participants
take the Massachusetts Grade 3 operator licensure examination. Continuing networking
connections with Technical Vocational Trade Schools for “maintenance workers” staffing. Our
4th year rain barrel program sold 155 rain barrels. To date the total number of rain barrels sold
are 500. Our semi-annual report for the Consent Decree on Remedial Measures was sent
electronically on August 27th, and by USPS on August 30th.
Item #4
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on October 13, 2021 at the
Legislative Building, City Hall Campus 700 Main St. Fitchburg MA, 01420.
Meeting adjourned at 6:28 pm
Agenda
FITCHBURG CITY CLERK
Sep 01 2021 2:30 pm
Water/Wastewater Commission
Meeting AGENDA
Wednesday – September 8th, 2021
5:00 p.m.
Legislative Building, City Hall Campus
700 Main St.
Fitchburg, MA 01420
Please note that the Legislative Building will be open to the public for this meeting. For any member
of the public that might not be ready to return to a public setting, they are invited to participate in the
meeting via the Zoom webinar of September 8, 2021 at 5 PM Eastern Time .
Topic: Water/Wastewater Commission Meeting
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
https://us02web.zoom.us/webinar/register/WN_Be6khA8LSbqwP9F-hUwmZA
After registering, you will receive a confirmation email containing information about logging in to
join the webinar.
_____________________________________________________________________________________
1. Review minutes from May 12th, 2021 Commission Meeting.
2. Public Forum: Hearing Appeal to ‘Sewer Billing Abatement Request’, regarding private
Irrigation System water usage.
3. Water Division
• 245 River St. – meter issues
• City-wide water meter upgrade project
• Falulah Transmission Main Project – update
• SCADA upgrade project - update
• 2022 Projects – Oak Hill Tank Replacement & Meetinghouse Gatehouse rehab
4. Wastewater Division
• Status Update Items:
o Sewer Ordinance, (City Code Chapter 147):
Both the Town of Westminster and the Town of Lunenburg are working on
incorporation of Fitchburg’s Ordinance updates into their own Town Bylaws.
Wastewater provided Westminster with review feedback on the Feb. 26th
received DR AFT Town Bylaw Update (Chapter 161 – Sewers). Westminster’s
Town Meeting was on April 27th.
Westminster voted to amend Bylaw Chapter 161, Sewers, to mirror the
updated changes of Fitchburg City Code, Chapter 147, Sewers.
For Lunenburg, in the month of June 2021, we received (and review is
ongoing) the Lunenburg Sewer Commission’s DRAFT Town Sewer
Regulations Update.
• Council Petition No. 134-21:
o Councilors Paul Beauchemin and Samantha Squailia, to petition the City to conduct a study
to investigate the possibility of transporting sludge, in-house, by the Wastewater
Department, instead of outsourcing this task.
o Sludge & Grit Hauling Service Contract Prices:
2016/2017: $126,270 (Charles George)
2017/2018: $129,820 (Charles George)
2018/2019: $133,370 (Charles George)
2019/2020: $133,367 (W.L. French)
2020/2021: $301,150 (W.L. French)
2021/2022: $311,300 (W.L. French)
2022/2023: $321,450 (W.L. French)
• Construction Projects (Update):
o CSS Project: “CSO 007, 011, 039, 048 Separation/Rehabilitation Project”.
Contractor, J.A. Polito & Sons, Inc.; and Engineer, Weston & Sampson Engineers.
Early July marked the beginning of a challenging and publicly disruptive
portion of the project….Water Street work, between First Street & Walnut
Street…..a length of just over 300 feet. (See “Drawing C103”)
We decided to close Water Street to vehicular thru traffic, and detour around
the closure. (See 2-pg. “Construction Notification”)
See most recent “Look Ahead” Construction Schedule
o “On-Call Construction Contract” Work (Contractor: Blue Diamond
Equipment): Highview Street Sewer Replacement/Rehabilitation Project” -
BDE’s cured-in-place-pipe installation subcontractor (Insituform Technologies,
Inc.) completed the trenchless rehabilitation work in mid-May; the Project is
“substantially complete” and BDE is working on punch list items.
• Miscellaneous:
1. Wastewater Staffing (Plant & Sewer System Crew).
a. MAWEA/NEIWPCC Joint Webinar, (6/22): “Workforce Webinar: Where
Will Our New Operators Come From? …. Innovative Approaches”
b. Fitchburg Wastewater Support of NEIWPCC’s “Women in Apprenticeships
and Non-Traditional Occupations” Grant Proposal Application: to provide
internship opportunities to women who complete the “NEIWPCC Online
Women’s Water Workforce” wastewater training.
c. New Senior Operator was hired at the Plant, and started in June;
d. The Sewer Collection Crew, Wastewater hired a General Foreman (previously
unfilled) and Working Foreman, and a Sewer Collection Operator and a
replacement “Flex” Sewer/Storm water Operator. The 6-person crew is staffed
at 5 crewmen. Wastewater will seek to staff the 6th crew spot in fall 2021.
e. New collaboration partner, “X-Cel Conservation Corps”. A Spring-time
graduate of the Boston-based “X-Cel Conservation Corps” may join
Wastewater as a “Wastewater Operations Intern”. Program participants take
the Massachusetts Grade-3 Wastewater Operator licensure examination.
f. Networking connections with Technical Vocational Trade Schools for
“Maintenance Workers” staffing, including: Monty Tech; Leominster Center
for Technical Education Innovation (CTEI); Minuteman (Lexington);
Worcester Technical H.S.; Bay Path (Charlton); Blackstone Valley (Upton).
2. 2021 Rain Barrels Program (a form of “Green Infrastructure”).
a. In the Program’s 4th Year, we sold 155 rain barrels. To date, the total number
of rain barrels sold are 500.
3. Consent Decree Semi-Annual Report on ‘Remedial Measures’ Activities sent
(electronically on 8/27; and USPS on 8/30).
5. Other Business
• The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
October 13, 2021 at the Legislative Building, City Hall Campus 700 Main St.
Fitchburg Ma.
• Adjourn
07/08/2020
#18
ET #1
93
A STRE
#213
#2
NASHU
03
WATER STREET
#212 #196
#2
40
Drain Remaining
To Be Completed,
as of Sept. 1, 2021
(~73 L.F.) #202 Sewer Remaining
#184
To Be Completed,
as of Sept. 1, 2021
(~123 L.F.)
Digitally signed by Frank
Occhipinti
DN: C=US,
Sewer Remaining E=occhipif@wseinc.com,
O=Weston & Sampson
Engineers, CN=Frank
Occhipinti
To Be Completed, Reason: I have reviewed
this document.
Date: 2020.07.08
09:46:09-04'00'
as of Sept. 1, 2021
Drain Remaining
To Be Completed,
as of Sept. 1, 2021
CONSTRUCTION SCHEDULE
CSO 007, 011, 039, 048 Separation/Rehabilitation
City of Fitchburg
Contract No.: 21-004-C
CWSRF No.: 4624
Contractor: J.A. Polito Sons, Inc.
Consultant: Weston Sampson
Week Ending 27-Aug 3-Sep-21 10-Sep-21 17-Sep-21 24-Sep-21
26-Aug-21 27-Aug-21 30-Aug-21 31-Aug-21 10-Sep-21 13-Sep-21 14-Sep-21 15-Sep-21 16-Sep-21 17-Sep-21 20-Sep-21 21-Sep-21 22-Sep-21 23-Sep-21 24-Sep-21
Duration
1-Sep-21 2-Sep-21 3-Sep-21 6-Sep-21 7-Sep-21 8-Sep-21 9-Sep-21
(Calendar
Project/ Activity Start End Days) CREW Status
SEWER AND DRAINS
Clarendon Street from Pratt Road to Legros Street 31-Aug-21 08-Oct-21 39 Polito Crew #2 Pending
Water Street from Nashua Street to Walnut Street 23-Aug-21 24-Sep-21 33 Polito Crew #1 Pending
HOLIDAY
First Street Drain from Middle Street to Water Street 23-Aug-21 30-Aug-21 8 Polito Crew #2 Pending
TRENCHLESS REHABILITATION
Various Streets -Green Mountain-Intermittent Construction 07-Sep-21 03-Jun-22 270 GMPS Crew #1 Pending
Page 1 of 1
CITY OF LEOMINSTER, MASSACHUSETTS
JOB DESCRIPTION
W-4 Grade 1 Heavy Motor Equipment Driver
(LEOMINSTER DPW CDL TRUCK DRIVER POSITION)
Duties include all those listed under ‘LABORER’ and the following:
• Performs the operation of all trucks, automatic sanders, Vactor truck, clamshell catch basin
cleaning truck, big snow blowers (Snow-Go), sweepers, sign painter and a six-ton roller.
• Evaluates, maintains and performs minor repairs to water distribution machinery, such as
pumps, motors, engines, valves, piping and other equipment involved in wastewater
pumping, distribution system; oils, and greases equipment and performs other related
duties.
• Is assigned to the Sanitary Sewer Working Foreman. The applicant must have the ability to
mark sewer mains, assist with the Vactor truck and catch basin cleaning truck, must have the
skills necessary to learn the City of Leominster wastewater system and infrastructure.
• The applicant will be assigned to any other department when needed and must have the
ability to use Microsoft spreadsheets and track a daily truck log.
Qualifications:
• CDL Class-B License required, with Air Brakes Endorsement; and
• Two years working in a municipal wastewater collection system.
In the "Massachusetts Laborers' District Council/Local 39" Union,Wastewater's
"Collection System Operator" & "Sewer/Stormwater System Operator"
positions both have the necessary CDL (Class B, with Airbrakes Endorsement)
and the "two years working in a municipal wastewater collection system"
experience requirement ...... where either of these positions are "qualified" for
the role of "CDL Truck Driver" for the duty of sludge hauling from the East
Plant to an end disposition site.
In the most current Local 39 CBA (FY-20), the range of hourly payrates ranges
from $20.44/hour to $26.65/hour.
For comparison, the Leominster CBA (FY-21), for this position's range of hourly
payrates ranges from $21.84/hour to $25.25/hour.