A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday February
9th, 2022 at the Legislative Building, City Hall Campus, 700 Main St. Fitchburg, MA 01420
The meeting commenced at 5:03 PM
Members present: Nicholas Erickson, Commissioner of Public Works & City Engineer
George Seiner, Commission Member
Mark Piermarini, Commission Member
Rick Healey, Chairman Water/Wastewater Commission
Stephen Bodurtha, Commission Member
Michael Mclaughlin, Commission Member
Others present: John Deline, Deputy Commissioner of Water
Jennifer Lambert, Head Clerk Water Division
Nathan Glenny, FATV
Mark McNamara, Interim Deputy Commissioner Wastewater Division
Absent: None
Item #1
Approval of meeting minutes: Motion to approve minutes from January 12, 2022 meeting was granted
by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division:
Staffing Levels – We recently had another two people leave and take other jobs. We usually
have people in our Distribution Crew, we are down to 5. We have completed a few interviews
these last two weeks and are hoping a couple of them work out. Problem is our working
foreman in Distribution was one of the employees who recently left. He held a D3 Distribution
license, so he served as a primary operator within our Distribution system. We currently do not
have a primary operator, so Steve Neal (Distribution Manager) and I are acting as primary
operators. We have notified DEP of this so they are aware. Our Treatment side as 6 operators
and one chief operator. Our Chief operator has recently retired, and we have two primary
operators retiring in March. We have two secondary operators who will be moving up to
primaries, but they do not have their T4 treatment licenses. We are a T4 plant so this is needed.
The downside to not having enough staff on the distribution side is that we are going to have to
hire out more work. We had a significant water main break on Electric Ave last week and had to
hire a contractor to do the job. This not something that we normally do. We will do the best we
can with what we have.
Falulah Water Transmission Main – Contractor KJS LLC has hit a lot of ledge in the last couple of
weeks but has managed to complete approx. 1000 ft. of pipe installed out of 2200 ft. of 24”
main. Project is moving along and they are getting pretty close to where they will cross the
stream at the Falulah Dam. We’ve lowered the lower reservoir. Once they get to the dam the
plant will be shut down.
SCADA upgrade project – This project is behind due to supply shortages, along with labor and
material shortages. It is moving along but has been delayed.
Item #4
Wastewater Division
Westminster/Lunenburg IMA – Lunenburg’s Sewer Commission reviewed and updated their
“Sewer Use Regulations” to reflect Fitchburg’s. A minor change was requested in an article
pertaining to discharge permits for SIU’s (referring back to the City for permits). Westminster is
requesting a short term extension to the IMA for 2-3 yrs. because dialogue is needed from MA
DEP in allocating additional flow. They are also requesting a transfer of 50,000 GPD from Rte. 31
to Rte. 2A.
Consent Decree – This item is being compiled and is approx... 85% complete. Should be
completed by next week and then sent out to MA DEP.
Hazardous Communication Plan – Weston and Sampson is currently working with the East Plant
staff on this item and has requested an extension with the Dept. of labor safety.
Polito has shut down operations because of the weather. We are hoping to start back up in early
spring.
FY23 Wastewater Division Budget – We are currently in the process of compiling the
Wastewater Divisions budget for FY23. We do not see any major changes so far between this
year’s budget, but again we are in the early stages.
Staffing Levels- Wastewater Division currently has 1 vacant operator due to a retirement.
Interviews are being done for this position. We have another operator retiring on March 4th. We
have a pool of candidates that have applied to the job posting. We also have 1 senior operator
retiring as soon as the latest CBA is reached. This is a critical position and presently no
candidates have applied. Lastly, we have a chemist that will be retiring on March 18th.
Interviews for this position will begin soon.
Item #5
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm. on March 16, 2022 at the
Legislative Building, City Hall Campus 700 Main St. Fitchburg MA, 01420.
Meeting adjourned at 5:36 pm
Agenda
FITCHBURG CITY CLERK
Feb 07 2022 8:29 am
Water/Wastewater Commission
Meeting AGENDA
Wednesday – February 9th, 2022
5:00 p.m.
Legislative Building, City Hall Campus
700 Main St.
Fitchburg, MA 01420
Please note that the Legislative Building will be open to the public for this meeting. For any member
of the public that might not be ready to return to a public setting, they are invited to participate in the
meeting via the Zoom webinar of February 9, 2022 at 5 PM Eastern Time .
Topic: Water/Wastewater Commission Meeting
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
https://us02web.zoom.us/webinar/register/WN_E6i626UdS06V7GOfVhG5VA
After registering, you will receive a confirmation email containing information about logging in to
join the webinar.
_____________________________________________________________________________________
1. Review minutes from January 12th, 2022 Commission Meeting.
2. Public Forum: None
3. Water Division
Staffing Levels – update
Falulah Water Transmission Main – update
SCADA upgrade project – progress update
4. Wastewater Division
Lunenburg Sewer Commission reviewed and updated their Sewer Use Regulations
to reflect Fitchburg’s. A slight change was requested in an article pertaining to
discharge permits for SIU’s (referring back to the City for permits)
Town of Westminster is requesting a short term extension to the IMA for 2-3 yrs.
Reason: Dialogue is needed from MA DEP in allocating additional flow.
Westminster is also requesting a transfer of 50,000 GPD from Route 31 to Route
2A.
Consent Decree is being compiled.
Weston & Sampson is working with East Plant staff on a Hazardous
communication plan.
CCTV Police Station Drainage for proposed PD station parking lot upgrade
Polito is shutting down operations effective 2/1 until weather is more favorable.
FY23 budget is being developed.
Staff vacancies/retirements: 1 operator presently vacant from a retirement
(interviews being done) 1 operator retiring on March 4th (a pool of candidates have
applied to the posting) 1 senior operator retiring as soon as the latest CBA is
reached. Critical position and presently no candidates have applied. Chemist
retiring on March 18th (interviews to begin soon)
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday March