Water & Wastewater Commission
Regular MeetingFitchburg, MA · September 21, 2022
Minutes
Water/Wastewater Commission
Meeting Minutes
September 21st, 2022
Legislative Building, City Hall Campus
700 Main St, Fitchburg MA 01420
______________________________________________________________________________
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday September
21st, 2022 at the Legislative Building, City Hall Campus, 700 Main St. Fitchburg, MA 01420
The meeting commenced at 5:03 PM
Members present: Nicholas Erickson, Commissioner of Public Works & City Engineer
George Seiner, Commission Member
Michael McLaughlin, Commission Member
Mark Piermarini, Commission Member
Rick Healey, Chairman
Others present: John Deline Jr, Deputy Commissioner Water Division
Mark McNamara, Deputy Commissioner Wastewater Division
Absent: Stephen Bodurtha, Commission Member
Colby O’Brien, Commission Member
Item #1
Approval of meeting minutes: Motion to approve minutes from July 20, 2022 meeting was granted by
unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division
DWSP Grant, Kerlinger Property Ashburnham MA – We have been approved to receive the DWS
Protection Grant. So this is great news. This will be a conservation restriction on the property.
This will give us an additional 50 acres of watershed land that will be protected.
Oak Hill Storage Tank Replacement – This project is being delayed due to material costs and the
schedule and worker shortage of the company doing the work. Instead of being finished this
winter it looks more likely that work will be completed in June/July of 2023. Engineering work
on the new tank will be done as well. Tank will need to be drained completely to do the 3D
model of the inside of the tank. Maintenance on some of our other tanks will need to be done as
well. They will try and get this part of the project done before the end of the calendar year.
Meetinghouse Gatehouse & Mare Meadow pump Stations, SRF Funding – Primary water supply
sources for the regional Water Treatment Plant in Westminster, MA are Bickford Pond, Mare
Meadow Reservoir and the Meetinghouse Pond. Meetinghouse gatehouse is on the list that DEP
wants us to rehabilitate.
Boulder Dr. Water Main Replacement/Upgrade Project – This project is being funded with ARPA
funds. Weston & Sampson is working on the engineering. Looks like this will be going out to bid
this winter and will begin next year. Some borings and stuff have been done. The water main is
in sections on Boulder Dr. we are looking into how to facilitate not having two mains. This may
be tricky work because some buildings are on the high system and some are on the low system.
It also may incur other work that will need to be done on Main St. down the road.
Water St. Bridge Projects MA DOT – This project will entail quite a bit of work. Two water mains
run under the railroad tracks and will need to be relocated. Bridge abutments are lying right
across where our mains are located. We will also be replacing the two mains between the
bridges. This will be a tremendous plus for the downtown infrastructure once completed.
Regional Plant, upgrades/NPDES Permit Renewal – Regional plants is now over 20 yrs. old. We
do some maintenance work, but cannot keep up. Bigger projects will need to be done, so we are
having Weston and Sampson look at this. We will also have to look at our discharge from the
backwash on the filters and clarifiers. A new NPDES permit will be coming out so all these
aspects of the Regional Plant will need to be looked at. Lots of things need to be upgraded or
replaced all together. Example being that we are seeing higher organic carbon in the reservoir
water. We will have to start treating this so that it doesn’t create disinfection byproducts. We
also have PFAS in the meeting house reservoir. Very low detection, a couple parts per trillion.
Being that it has been detected in rain water, there is not a body of water in the State of MA
that hasn’t detected some PFAS. If there is something we can do to remove this down the road,
we will. EPA may become stricter with the limits. If we are going to do some work in the plant
we want be able to add the filters that are needed to remove PFAS altogether.
Item #4
Wastewater Division
Staffing update – Two qualified in-house candidates were interviewed for the Plant
Superintendent Job. Looks like we will be selecting one of these candidates and offering the
position to them. We are just waiting on HR to finish the selection process. We still have
numerous vacancies within wastewater division that still need to be filled.
West Plant Repurposing Project – Project is still ongoing. City met yesterday for final evaluation.
We will next meet to discuss pricing proposal.
CSO 039, 048 and Clarendon St. Sewer Separation – Completed construction from July 22, 2022
through September 9, 2022 is as follows: Trench Construction on South St., Payson St., William
St., Franklin Rd. at Reingold Ave., Franklin Rd. at Fredette St., Clarendon St. at Alden St., Beech
St. at Franklin Rd., Pine St. from Rollstone St. to Walton St., and Hazel St. till ongoing. Short Line
installation was done on Chester St., Legros St., Spruce St., and Walnut St. Cleaning, Inspection,
Testing and Sealing of Sewer Mains and Laterals were done on Henry St, Marion St, Chester St,
Legros St, Woodland St, Spruce St, Charles St, Payson St, Main St, Blossom St, Walnut St,
Clarendon St, and Water St. Our Projected Construction Schedule began beginning of this
month. This includes trench construction on Hazel St, Milk St, Birch St. Passway, and Drepanos
Dr.
CSO 010, 032, 045, 083 Separation/Rehabilitation Project – This project consists of the down
town area, and was just voted on by the City for the 30,000,000 Mil loan order. SRF application
is being prepared by Weston & Sampson and will be submitted to DEP by October 14, 2022. The
City plans to phase this project to complete the CSO 10 area in 2023, with the remaining area
CSO 032, 045 and 083 to begin construction in 2024. Once these areas are completed it will
drastically improve the treatment plant as this is the area in which we see the most infiltration
coming through.
Water/Sewer Rate Study – City is actively gathering information for Weston & Sampson for the
rate study.
The City’s Easterly Wastewater Treatment Plant was selected by the USEPA and MADEP for a
PFAS in Wastewater Study. This will test the influent and effluent sludge to see what the impact
of PFAS is coming into a treatment plant and how it is handled inside the treatment plant. This
testing was supposed to start in September, but it is looking more like October and will run for
approx. 6 months.
Item #5
Other Business:
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday October 19, 2022
at the Legislative Building, City Hall Campus 700 Main St. Fitchburg, MA.
Meeting adjourned at 5:22 pm
Agenda
FITCHBURG CITY CLERK
Sep 16 2022 2:00 pm
Water/Wastewater Commission
Meeting AGENDA
Wednesday – September 21st, 2022
5:00 p.m.
Legislative Building, City Hall Campus
700 Main St.
Fitchburg, MA 01420
Please note that the Legislative Building will be open to the public for this meeting. For any member
of the public that might not be ready to return to a public setting, they are invited to participate in the
meeting via the Zoom webinar of September 21, 2022 at 5 PM Eastern Time .
Topic: Water/Wastewater Commission Meeting
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
https://us02web.zoom.us/webinar/register/WN_3qQqZH1_R22KwUiyuONTDw
After registering, you will receive a confirmation email containing information about logging in to
join the webinar.
_____________________________________________________________________________________
1. Review minutes from July 20th, 2022 Commission Meeting.
2. Public Forum: None
3. Water Division
• Kerlinger Property, Ashburnham MA – DWSP Grant
• Oak Hill Storage Tank – update/schedule
• Meetinghouse Gatehouse & Mare Meadow pump station – SRF Application
• Boulder Dr. Water Main Replacement/Upgrade Project
• Water St. MA DOT Bridge Projects – Related water system improvements
• Regional Plant – Future Plant Upgrades, NPDES Permit Renewal
4. Wastewater Division
• Staffing update
• West Plant Repurposing Project
• CSO 039, 048, & Clarendon St. Sewer Separation – update
• CSO 010, 032, 045, 083 Separation/Rehabilitation Project- updates
• Sewer/Water Rate Study
• Treatment Plant selected by USEPA and MA DEP for a PFAS in wastewater
study.
5. Other Business
• The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday
October 19, 2022 at the Legislative Building, City Hall Campus 700 Main St.
Fitchburg Ma.
• Adjourn