Water & Wastewater Commission
Regular MeetingFitchburg, MA · October 19, 2022
Minutes
Water/Wastewater Commission
Meeting Minutes
October 19th, 2022
Legislative Building, City Hall Campus
700 Main St, Fitchburg MA 01420
______________________________________________________________________________
A meeting for the City of Fitchburg Water/Wastewater Commission was held on Wednesday October
19th, 2022 at the Legislative Building, City Hall Campus, 700 Main St. Fitchburg, MA 01420
The meeting commenced at 5:15 PM
Members present: George Seiner, Commission Member
Michael McLaughlin, Commission Member
Mark Piermarini, Commission Member
Rick Healey, Chairman
Others present: John Deline Jr, Deputy Commissioner Water Division
Mark McNamara, Deputy Commissioner Wastewater Division
Absent: Stephen Bodurtha, Commission Member
Colby O’Brien, Commission Member
Nicholas Erickson, Commissioner of Public Works & City Engineer
Item #1
Approval of meeting minutes: Motion to approve minutes from September 21, 2022 meeting was
granted by unanimous vote.
Item #2
Public Forum: None
Item #3
Water Division
Staffing – Water Division personnel usually includes around 25 people. This includes myself,
treatment personnel, engineering and administration. Our distribution crew typically has a crew
of 9 people. We are down to just 3. We have advertised, and we are just not attracting qualified
workers due to pay scale. Every day is a challenge to say the least. Only doing emergency work
when necessary. On top of this, we have 2 current employees that are out long term for various
reasons and another who is having surgery mid-November and will return in December.
DCAMM Emergency Waiver, on call services support – Purchasing has reached out to the state
and we were given a waiver to hire on-call personnel in case of emergency situations. We have
also reached out to a few companies on pricing. We may have to request another waiver for
treatment personnel if assistance is needed.
Treatment Plants/ Raw water quality variability & charges - We are having an issue at the
treatment plant regarding seasonal turnover. With the fall turnover happening, we have been
seeing a high level of manganese in the water which unfortunately is passing through our filters.
This is not a health hazard, but we are seeing little flecks in the water and also some
discoloration. Hopefully after the seasonal turn over things start to settle down. We will be
doing some flushing tomorrow in the areas that are seeing this. MA DEP is aware of the
situation.
Item #4
Wastewater Division
CSO 007, 011, 039, 048 Separation/Rehabilitation: Polito – Crew 1, Trench excavation work
(sewer spot repairs) were completed on Drepanos Dr. Inland Waters – Crew 1, Pre-cleaning and
inspection for upcoming CIPP installation on Laurel St., Payson St., Crown St., Nashua St., Main
St., Clarendon St., Delisle St., Cross St., South St., Drepanos Dr., and Franklin Rd. Sewer and drain
construction was completed in September on Milk St., Birch St. Passway and Drepanos Dr.
Cleaning, Inspection, Testing and Sealing of Sewer Mains and Laterals has been completed as
well on Charles St., Clarendon St., First St., Middle St., Water St., Walnut St., Blossom St., Main
St., Henry St., and Marion St. Pre-CCTV Inspection for Lining has also been completed on Laurel
St., Payson St., Crown St., Nashua St., Franklin Rd., Main St., Clarendon St., Delisle St., Cross St.,
Drepanos Dr., and South St.
CSO 010, 032, 045, 083 Separation/Rehabilitation Design Phase: Work completed in the month
of September include: Task 4 - Completed geotechnical report. Task 6 - Developed proposed
conditions based on hydraulic model results. Task 7 – Continued developing sewer design for
CSO 010 area based on hydraulic model, flow meter data and existing conditions. Task 8 –
Continued developing drain design for CSO 010 area based on hydraulic model, flow meter data
and existing conditions. Task 9 – Attended Fitchburg Conservation Commission Hearing for
Project and received negative determination. Task 11 – Began developing contract specifications
and design plans for MassDEP SRF submittal on October 14, 2022. Task 12 – Began Developing
SRF application for MassDEP submittal on October 14, 2022. Upcoming work for this month
includes: Task 6 – Modify proposed conditions based on hydraulic model results and
recommended storm water improvements from the MVP Grant. Task 7 – Continue developing
sewer design for CSO 010 area based on hydraulic model, flow meter data and existing
conditions. Task 8 – Continue developing drain design for CSO 010 area based on hydraulic
model, flow meter data and existing conditions. Task 9 – Attend Fitchburg Conservation
Commission Hearing for Project (negative determination of applicability received at September
7th meeting. Task 11 – Finalize draft contract specifications and design plans for MassDEP SRF
submittal on October 14, 2022. Task 12 – Submit SRF Application for MassDEP submittal on
October 14, 2022.
Staff update- New plant Superintendent (Ryan Burns) former Sr. Operator has assumed the
duties on October 17, 2022. We are going to be advertising for a Gr. 6 Sr. Operator for his
vacancy. We also have two vacancies in the maintenance department.
EPA/MassDEP – An inspection of the Wastewater Treatment Facility on July 20, 2022 and we
received their report on September 20, 2022. It was a favorable report, and didn’t list any issues
or problems that needed to be addressed.
Item #5
Other Business:
Chemical prices have increased significantly. This is affecting the budget this year and we will
have to address this before it becomes an issue. For example, chlorine (sodium hypochlorite)
has increased 117% since last year. The northeast chemical consortium released a statement
today costs for all chemicals, production, labor, fuel, energy and raw materials have all
increased and will continue to do so. There is talk of looking at prices this year for chemicals
instead of waiting until next year.
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday November 16,
2022 at the Legislative Building, City Hall Campus 700 Main St. Fitchburg, MA.
Meeting adjourned at 5:39 pm
Agenda
FITCHBURG CITY CLERK
Oct 12 2022 2:25 pm
Water/Wastewater Commission
Meeting AGENDA
Wednesday – October 19th, 2022
5:00 p.m.
Legislative Building, City Hall Campus
700 Main St.
Fitchburg, MA 01420
Please note that the Legislative Building will be open to the public for this meeting. For any member
of the public that might not be ready to return to a public setting, they are invited to participate in the
meeting via the Zoom webinar of October 19, 2022 at 5 PM Eastern Time .
Topic: Water/Wastewater Commission Meeting
https://us02web.zoom.us/webinar/register/WN_1ykqJxCYR_6qYXHMvHq-sA
Register in advance for the Public Comment/Hearing portion of the Agenda by going to:
After registering, you will receive a confirmation email containing information about logging in to
join the webinar.
_____________________________________________________________________________________
1. Review minutes from September 21st, 2022 Commission Meeting.
2. Public Forum: None
3. Water Division
Staffing – Update
DCAMM Emergency Waiver – on call services support
Treatment Plants – raw water quality variability and charges
4. Wastewater Division
CSO 007, 011, 039, 048 Separation/Rehabilitation: Polito – Crew 1, Trench excavation work
(sewer spot repairs) were completed on Drepanos Dr. Inland Waters – Crew 1, Pre-cleaning
and inspection for upcoming CIPP installation on Laurel St., Payson St., Crown St., Nashua
St., Main St., Clarendon St., Delisle St., Cross St., South St., Drepanos Dr., and Franklin Rd.
Sewer and drain construction was completed in September on Milk St., Birch St. Passway and
Drepanos Dr. Cleaning, Inspection, Testing and Sealing of Sewer Mains and Laterals has been
completed as well on Charles St., Clarendon St., First St., Middle St., Water St., Walnut St.,
Blossom St., Main St., Henry St., and Marion St. Pre-CCTV Inspection for Lining has also
been completed on Laurel St., Payson St., Crown St., Nashua St., Franklin Rd., Main St.,
Clarendon St., Delisle St., Cross St., Drepanos Dr., and South St.
CSO 010, 032, 045, 083 Separation/Rehabilitation Design Phase: Work completed in the
month of September include: Task 4 - Completed geotechnical report. Task 6 - Developed
proposed conditions based on hydraulic model results. Task 7 – Continued developing sewer
design for CSO 010 area based on hydraulic model, flow meter data and existing conditions.
Task 8 – Continued developing drain design for CSO 010 area based on hydraulic model, flow
meter data and existing conditions. Task 9 – Attended Fitchburg Conservation Commission
Hearing for Project and received negative determination. Task 11 – Began developing contract
specifications and design plans for MassDEP SRF submittal on October 14, 2022. Task 12 –
Began Developing SRF application for MassDEP submittal on October 14, 2022. Upcoming
work for this month includes: Task 6 – Modify proposed conditions based on hydraulic model
results and recommended stormwater improvements from the MVP Grant. Task 7 – Continue
developing sewer design for CSO 010 area based on hydraulic model, flow meter data and
existing conditions. Task 8 – Continue developing drain design for CSO 010 area based on
hydraulic model, flow meter data and existing conditions. Task 9 – Attend Fitchburg
Conservation Commission Hearing for Project (negative determination of applicability
received at September 7th meeting. Task 11 – Finalize draft contract specifications and design
plans for MassDEP SRF submittal on October 14, 2022. Task 12 – Submit SRF Application
for MassDEP submittal on October 14, 2022.
Staff update- New plant Superintendent (Ryan Burns) assumed the duties on October 17,
2022. We are going to be advertising for a Gr. 6 Sr. Operator for his vacancy.
EPA/MassDEP – An inspection of the Wastewater Treatment Facility on July 20, 2022 and we
received their report on September 20, 2022. It was a favorable report, and didn’t list any
issues or problems that needed to be addressed.
5. Other Business
The Water/Wastewater Commission will next meet at 5:00 pm on Wednesday November 16,
2022 at the Legislative Building, City Hall Campus 700 Main St. Fitchburg Ma.
Adjourn
Get email alerts for Fitchburg
A daily email when new agendas and minutes are posted.