Public Cultural & Entertainment Facilities Cooperative District
Regular MeetingFoley, AL · May 13, 2016
Minutes
The City of Foley Public
City of Foley, AL Cultural & Entertainment
Facilities Cooperative
District
407 East Laurel Avenue
Meeting Minutes - Final Foley, AL 36535
Public Cultural & Entertainment Facilities Cooperative District
Friday, May 13, 2016 1:30 PM Conference Room
Special Called
Call to Order
Chairman Davis called the meeting to order at 1:30 p.m.
Roll Call
All members were present. Others present were Assistant City Clerk Katy
Taylor, and Matt Denaburg was also present.
Present: 4 - Floyd A. Davis,Keith Newton,Charles Ebert III and J Koniar
Present: 4 - Floyd A. Davis,Keith Newton,Charles Ebert III and J Koniar
Approval of the Minutes
16-0224 04-05-2016 PCEFCD MINUTES
Attachments: 04-05-2016 PCEFCD MINUTES DRAFT.pdf
A motion was made by Member J Koniar, seconded by Secretary/Treasurer
Charles Ebert, III, that this Minutes be approved. The motion carried by an
unanimous vote.
Ordinances, Resolutions and Other Business
16-0291 Award bid for Construction of foundation and metal building (Event
Center)
Attachments: 05-13-2016 LOI Event Center Package 1 - Dunn Building (2).pdf
Mr. Denaburg reported there is an initial budget in the packet; page 2 is the
running estimate of the project broken out into each package into their dollar
value limits for the 90,565 sf building. Site/Civil Work $1,714,255; PEMB &
Concrete Package (Metal Building) $2.5 million; General Trades Package $42.56
million; Mechanical Package $1.4 million; Electrical Package $1.6 million for a
total Multi-Prime of $11.16 million. Architectural/Engineering fees, soft costs
and other owner items broken out are still hitting the budget number. They
still have $150,000 in design contingency and still have $500,000 in the
construction contingency bucket. Everything looks good.
City of Foley, AL Page 1
Public Cultural & Entertainment Meeting Minutes - Final May 13, 2016
Facilities Cooperative District
Page 3 is the Bid Package 1 results bid tab. There were five bid requests sent
out and four returned; they did not receive a bid from Bayshore Construction.
The lowest responsible bidder was from Dunn Building Company who are
based in Mobile. HPM have worked with them in the past and they specialize in
metal buildings. Their base bid was $3,897,000 and included two alternate
bids. The first alternate bid was for insulated wall panels for $135,000 and the
second alternate was insulated roof panels for $103,000. At this time there is
no available funding for the alternates so HPM is not recommending them. Mr.
Denaburg reported at the time they turned the bids in they also asked for value
engineering. Dunn submitted a list the Value Engineering options, which were
reviewed by HPM and the architect. Some were minor in detail and some had
some aesthetics implementations. HPM made recommendations as to accept
or decline the value engineering based on the architects' recommendations.
They have four items pending and $97,000 worth of value engineering. They
hope to increase that as time goes on and that is how they came up with the
$3,897,000 changed to $3.8 million.
Originally they had 10' high pre-cast panels starting at the bottom and working
its way up. It requires a lot of extra structural design and backing to support
the pre-cast panels. Dunn Building in their B option listed an alternate for the
metal panel that simulates pre-cast. He brought samples of each. The
architects believe that it is a good viable option if the District members want to
take that route. Mike, Jeff and Don have seen it and like it. Mr. Koniar asked if
the alternate would have an affect on the wind loads and Mr. Denaburg
reported there would be no effect. It does have a higher rating. He will need to
get some more information on the backing. They will be doing more research
on it and that is why it is in the pending status. There will be a change order if
they decide to take it. They would like a warranty higher than ten years. Mr.
Ebert is very apprehensive about it because of the EFIS (Exterior Finish
Insulation System) in the industry.
Mr. Denaburg reported the Limited Letter of Intent will tell Dunn that they are
beginning the negotiations for the contract in an amount up to $3.8 million. In
looking at the foundation changes they hope to get a little bit closer to $7
million. The letter will release them to go to work on procuring the insurance
bonds, preparing their submittals, getting any long lead items they need, and
eccentually releasing them for costs incurred up to $250,000 over the course of
the next week or two until we can finalize their contract.
A motion was made by Member John Koniar, seconded by Secretary/Treasurer
Charles Ebert, III, they move forward with a letter of intent and the resolution
be adopted. The motion carried by an unanimous vote.
Enactment No: 16-0026-PCEFCD
16-0292 Authorize PCEFCD Chairman to enter into an agreement with Martin
Construction and CEIDA for dirt removal.
Mr. Denaburg reported CIEDA and Martin Construction have agreed to take up
to 50,000 cubic yards of dirt of the City's site, which is approximately the
amount that needs to be removed in excess dirt. They are willing to do that for
$3.00 per cubic yard, which normally runs approximately $7-$8 per cubic yard.
Martin sent their proposal to HPM this morning and they are recommending
that the City approve moving forward. They will issue a purchase order so
City of Foley, AL Page 2
Public Cultural & Entertainment Meeting Minutes - Final May 13, 2016
Facilities Cooperative District
they can begin placing the dirt on CIEDA's property at their use and leisure.
They will use the dirt the City doesn't need for building pads; otherwise, the
City would pay $7-$8 per cubic yard just to haul it off.
Mayor Koniar asked how long the ground would be exposed (dust). Mr.
Denaburg reported they are working on getting the parking lot laid out to get
some base laid down and not have any issues. They have their water truck
working and he will be on site. The site improvements begins in September.
The general trades packages will be bid around the same time around
September and will start work around September/October. They will continue
on through May until they are completed.
Mayor Koniar asked what the next step was. Mr. Denaburg reported over the
course of next week they will be working deligently to finalize an agreement. At
that point they will bring it back to the Chairman, Skip Davis, to sign if it is
under the $3.8 million. After that HPM will give them a Notice to Proceed and
they will let them go to work. Before they go to work, they will have all their
bonds, insurance and other documentation in place.
Mr. Ebert made a motion to approve this item and Mr. Koniar seconded the
motion. The vote passed unanimously.
Enactment No: 16-0027-PCEFCD
Visitor Comments
There were no visitor comments to report.
Adjourn
A motion was made by Member Mark Welytok, seconded by
Secretary/Treasurer Charles Ebert, III, that this meeting be adjourned. The
motion carried by an unanimous vote and adjourned 1:58 p.m.
City of Foley, AL Page 3
Agenda
The City of Foley Public
City of Foley, AL Cultural & Entertainment
Facilities Cooperative
District
407 East Laurel Avenue
Meeting Agenda - Final Foley, AL 36535
Public Cultural & Entertainment Facilities Cooperative District
Friday, May 13, 2016 1:30 PM Conference Room
Call to Order
Roll Call
Approval of the Minutes
16-0224 04-05-2016 PCEFCD MINUTES
Attachments: 04-05-2016 PCEFCD MINUTES DRAFT.pdf
Ordinances, Resolutions and Other Business
16-0291 Award bid for Construction of foundation and metal building (Event
Center)
Attachments: 05-13-2016 LOI Event Center Package 1 - Dunn Building (2).pdf
16-0292 Authorize PCEFCD Chairman to enter into an agreement with Martin
Construction and CEIDA for dirt removal.
Visitor Comments
Adjourn