Chair Bruce Hunchard called the above-captioned meeting held in the Town Council Chambers, second
floor of the Franklin Municipal Building, 355 E. Central Street, and online via the Zoom platform to order
this date at 7:30 PM. Members in attendance: Bruce Hunchard, Chair; Robert Acevedo, Vice Chair;
Ginelle Lang, Clerk; Meghan Whitmore, Associate; Joseph Halligan, Associate. Members absent: Also in
attendance: Casey Thayer, Administrative Assistant.
This meeting is being recorded and televised and is being conducted as an in person and as a remote
access Zoom virtual meeting. The Zoom meeting link and the Zoom meeting call-in number are provided
on the agenda.
33 Elm Street - G. David Iverson, Trustee
Abutters: None.
7:30 p.m. Applicant is seeking to construct a single-family home that has 123.92’ of frontage where 200’
is required and with right side yard setback of 26.5’ where 40’ is required. The building permit is denied
without a Variance from the ZBA. Applicants present: Attorney Edward Cannon (via Zoom) on behalf of
the applicant.
Chair Hunchard read aloud a letter received from the applicant’s attorney Edward Cannon which
indicated they came to terms with completing the engineering work concerning drainage that the Zoning
Board of Appeals requested at the last meeting about three months ago, but now the engineer has to
complete the work; they would like to continue to October 23, 2025.
Attorney Cannon said what Chair Hunchard read sums it up perfectly. The applicant is working to get the
information the ZBA would like and would like this item to be continued to October 23, 2025.
Motion made by Ginelle Lang to continue the public hearing to October 23, 2025, at 7:30 PM. Motion
seconded by Robert Acevedo. Vote: Unanimous by the Board.
Parcels 270-28, 038 and 39 West Central Street and Panther Way
Abutters: Mr. Joseph Roy, 16 Schofield Drive; Ms. Cindy Stucchi, 10 Applewood Lane.
7:35 p.m. Applicant is seeking to conduct earth removal in excess of 1,000 cubic yards. The building
permit is denied without a Special Permit from the ZBA. Applicants present: Mr. Rick Goodreau of
United Consultants and Mr. Brad Chaffee, applicant Camford Property Group.
Mr. Goodreau said they have been working with the other land use boards particularly Conservation
Commission and the Planning Board on details relative to project design such as stormwater issues that
were raised by the peer review consultant. He said those have been rectified, and the Conservation
1
Tel: (508) 553-4856 Fax: (508) 520-4906
Commission has issued an order of conditions, and the Planning Board has issued and approval for the
project. They will give the Zoning Board of Appeals (ZBA) an update as to some of the changes that have
occurred. He said changes were made on stormwater, tree planting, parking layouts, and location of
certain site features. He said the project has proposed a reduction from 49 units to 44 units. There is a
driveway that was eliminated. He said they relocated some of the housing units in the back to allow for
some additional space for parking within the driveway for visitors. The original application requested
earth removal of about 104,500 cu. yd. They have reduced that to 98,882 cu. yd. due to variance changes
reflected in the revised site plans submitted.
Mr. Chaffee confirmed hours of operation are 7 AM to 5 PM, Monday through Saturday, but they mostly
work Monday through Friday. He said they are not planning to do any crushing at this time. Chair
Hunchard responded to an audience member’s question and said the applicant will be building a Senior
Village. Mr. Goodreau confirmed the clear-cutting areas and said the clearing limits have not really
changed. The cul de sac is in the same spot. Chair Hunchard said if they decide they want to do crushing
they will have to come back to the ZBA. Mr. Goodreau provided Chair Hunchard with copies of the
approved decisions from Conservations Commission and Planning Board for the record.
Building Commissioner Gus Brown confirmed the applicant needs a building permit before they start, and
they need to give him reports weekly from the engineer. He asked the applicant if they will be pulling the
building permits before the earth removal or during. Mr. Chaffee said typically they would do the site
work first to get everything set up. Chair Hunchard recommended getting the building permits. Mr.
Goodreau said there will be a construction apron at the entrance of the project. If necessary, sweeping the
road would be one of the conditions.
Mr. Acevedo asked about dust mitigation. Chair Hunchard said this is where the crushing comes in. He
said another project did crushing, and it made dust on the neighborhood. He said there is only so much
you can do with dust. Mr. Goodreau said they will spray the road. Mr. Chaffee said typically they will
have a water truck there and probably do it every other day depending on the weather. Mr. Goodreau said
they have the detention basin located and explained the location of the erosion control sock.
Ms. Lang asked if there were any requirements in the approvals by the Planning Board and Conservation
Commission that were not reflected in the plans and documents the ZBA has. Mr. Goodreau said the
Conservation Commission put in some standard conditions of approval; the Planning Board put some
general conditions which he noted. Ms. Lang asked about the potential for blasting and the concern about
monitoring if blasting is done. Mr. Chaffee said if they do blast there are state regulations that they have
to abide by. Ms. Lang noted some concerns from abutters that were less on the foundations but more on
the utilities that were an issue on a past project. Mr. Chaffee confirmed they did some blasting on the first
project, and there were no complaints. Chair Hunchard noted the problems must have occurred from a
different project. Mr. Brown said the amount of distance that you have to ask people if they want a survey
is 300 ft.; however, people within 500 ft. up to .5 mile feel it, and we get phone calls. He said he would
like to be able to call Mr. Chaffee right away if they get any calls. He said it does get people riled up a
little bit. He said whatever you can do to help with that.
Mr. Acevedo asked if there was any concern about shutting down Panther Way regarding school in the
morning and in the afternoon. Mr. Chaffee said they are aware of the morning and afternoon for schools
and do try to make a conscious effort to let the students go for those times.
Mr. Joseph Roy, 16 Schofield Drive, asked about water supply as that seems to be a big concern to people
with a new development. He said they are losing a lot of pressure in the water, and water taxes are going
higher. He said it seems like they are having a problem with water supply and asked is building 44 more
units going to affect us.
2
Tel: (508) 553-4856 Fax: (508) 520-4906
Water and Sewer Superintendent Doug Martin (via Zoom) said we are currently in a water ban as every
year we have the conservation restriction per our water management act permit. It does not mean that we
do not have enough water. We do. He said he has given presentations before and explained how much
water they are allowed to take out and what they do take out. He said recently, due to the drought
conditions and two major sources are offline due to repairs, our tanks did drop a little which may be why
people saw some lower pressure, but we were able to recover. He said everything should be back to
normal. Every time a development comes through, we evaluate it and determine if we can serve it and
will it be a drain on the existing system.
Mr. Roy said he is hearing that there is a pressure problem and asked about supply. Mr. Martin said they
have rebounded, and there is no pressure issue. Chair Hunchard said the only problem he would see for
this project on Panther Way is to pump the water for fire as the main is down at the street, and it has to go
to the top of the hill. Mr. Martin said everything in that area including the condo project has a pump at the
bottom which is privately owned to pump all that up the hill for the units. He said this development will
be on that cusp; he has not looked at these plans regarding what they are doing to maintain pressure. Mr.
Halligan confirmed it is true that Franklin uses about 1 million gallons a day less than we did five years
ago even with all the development. Mr. Martin said yes that is correct.
Ms. Cindy Stucchi, 10 Applewood Lane in Chestnut Ridge, said she moved in a few years ago and taxes,
water bills, everything has skyrocketed. She has noticed a huge difference with all of that. She is against
Stobbart’s for a lot of reasons such as traffic and water. She noted everyone’s taxes are going to go up
because of all this. She said she was talking about water in general. She said that does not seem logical
with more people and less water usage.
Motion made by Ginelle Lang to close the public hearing. Motion seconded by Robert Acevedo. Vote:
Unanimous by the Board.
Motion made by Robert Acevedo to grant a Special Permit to construct earth removal in excess of
1,000 cubic yards, for Parcels 270-28, 038 and 39 West Central Street and Panther Way, not to exceed
99,000 cubic yards, with the conditions that the hours be set for 7 AM to 5 PM, Monday through
Saturday, the construction trucks/traffic make right-hand turns only onto Panther Way towards West
Central Street, no rock crushing on site, weekly reports to the building commissioner with the amounts
removed if there is any activity during the week, and a building permit before the start of any
excavation, as shown on the drawing titled “Site Plan Panther Way” prepared by United Consultants
Inc., dated December 13, 2024, last revised with revision number 2 on August 8, 2025. Seconded by
Ginelle Lang. Roll Call Vote: Unanimous by the Board.
444 East Central Street – TAG Central LLC
Abutters: All abutters’ names/addresses are listed within the meeting minutes below.
Mr. Halligan recused himself.
7:40 p.m. Applicant is seeking a building permit to construct a 264-unit multi-family development. The
building permit is denied without a Comprehensive Permit from the ZBA. Applicants present: Mr. A.J.
Alevizos of TAG Central LLC; Mr. Peter Alevizos of TAG Central LLC; Mr. Carlton Quinn, Civil
Engineer of Allen & Major Associates; and Mr. Braden Drypolcher of Dry Landscape Architecture (via
Zoom).
Mr. Peter Alevizos provided each ZBA member with documents.
3
Tel: (508) 553-4856 Fax: (508) 520-4906
Chair Hunchard noted the applicant is going over the new site plan tonight, and there will not be a lot of
discussion on engineering because we just got some renderings today. He said a balloon test was done
yesterday. He explained the balloon test process to determine the height of the building. He noted a traffic
engineer attended a past hearing. Audience member asked if there was a paper copy of the rendering. Mr.
Alevizos said he had three or four extra copies. Ms. Thayer confirmed it was already posted to the zoning
webpage.
Mr. Alevizos said he would give a brief overview of the alternative site plan that they submitted this
morning. He said they made some major concessions in this new plan including both height and unit
reductions to increase the buffer area on the east side and minimize impacts for our residential abutters to
the east. He said in total they now have 254 units which is 10 units less than the original proposal of 264.
He said they maintain parking at 1.57 spaces per unit. The west side of the property has remained
unchanged. He showed the new site plan on the screen and reviewed changes. Building 4 has changed
from four stories to three stories. They maintained the flat roof design which also limits the height of the
building. They also increased the buffer area at the eastern edge. He said they took a unit cut to minimize
the footprint of the building, and they added a costly retaining wall. He said they saved 30 linear feet and
valuable mature vegetation. He said from the balloon study yesterday, they are proposing to plant a
healthy program of vegetation buffer species to fill in the gaps of the area.
Mr. Drypolcher discussed the enhanced vegetation buffer and what minimizing that limit of work does to
the proposed buffer on the eastern border. He showed some slides and reviewed the plans. He said they
will maximize the existing buffer. He said they will talk about the existing vegetation and canopy that
they are going to preserve with minimizing the limit of work. He said the strategy depends on the
retaining wall and to stay out of the portion to the east that goes up to the abutters on Red Gate. He said
they will enhance the existing screening and are looking to fill canopy gaps where views and sight lines
open up towards the abutters in layering in plantings within the already pre-productive screening. He said
the outcome is privacy for abutters, strengthening the ecological continuity of the site, and providing
more naturalistic and resilient visual appealing buffers. He showed a plan on how that would look. He
pointed out the retaining wall on the plan. He said they are still providing a 6 ft. vinyl fence that snakes
through the existing site. He pointed out on the plans the old and new limit of work. He showed the vinyl
screen fence image on the slide.
Mr. Alevizos said he has proposed a plan in coordination with the ZBA that presents the least number of
units of any of the alternatives, the shortest building height, the largest buffer, and the least impact to
abutters.
Mr. Acevedo said in looking at the new plan, they have the parking behind building 4 where the parking
garages are and asked is that where the field is. Mr. Alevizos said that is where the field is in that corner.
Ms. Lang said on the tree buffer, is it intended to be a year-round green lush wall. Mr. Alevizos said
mostly deciduous trees are there now. Mr. Drypolcher said they are proposing 27 evergreen/conifer trees
which will be strategically placed in the canopy gaps. He showed his plan and explained the survey
markers Allen & Major put out. He showed portions that will have more evergreen plantings to block
views and fill in. He reiterated the 6 ft. fence along the property line. Ms. Lang said the applicant said that
this scheme shows major concessions to the application. She noted that after lots of months, this is what
she would consider a starting point because the reviews by the Planning Board and Town Council when
they originally gave support to this project, were with the understanding that there would be three stories
and a significant buffer, and that is now what we are seeing. This is a starting point in terms of site layout.
Ms. Whitmore said she likes the new changes to this plan.
4
Tel: (508) 553-4856 Fax: (508) 520-4906
Mr. Richard Neal, 43 Indian Lane, said his children benefitted from the public schools. He praised the fire
and police departments. He noted he votes in confidence that those elected will lead and serve in the best
interest of the community and citizens. The town has grown. He noted increases in tax revenue and the
decrease in required resources have not resulted in reductions in property taxes. He said this is an
acceptable reality of town governance. He has tried to follow the debate on 444 East Central Street. He
assumes there will continue to be increases in building and population and added stresses to
infrastructure. He said what is compelling to him is that multiple waivers and variances of town codes and
standards must be approved for this development. If that is true, it feels that this project is flawed from the
outset. He said should these standards now be obsolete; they should not be spontaneously set aside in this
ad hoc manner. They should be reviewed and revised and discarded by a formal town prescribed process.
It seems to be a matter of principle that this project cannot be approved under the current codes that were
designed to promote and protect the town and the citizens.
Mr. Stephen Malloy, 19 Russet Hill Road, said on the balloon test, did any of the neighbors know about
it. Chair Hunchard said some neighbors were there. Mr. Malloy said at 254 units the project is still too
big. He noted the traffic and said it will diminish the quality of life for all those who live and access East
Central Street. The size and scope should be reconsidered.
Mr. Gene Grella, 36 Red Gate Lane (via Zoom), noted the balloon test. He said he agrees with Ms. Lang’s
comments that we have finally got there with the three stories and buffer. He asked Mr. Martin about
water from the last public hearing. He said we keep talking that we have plenty of water, but the state
prohibits us from using the water and why this is. Mr. Martin explained the history of why the state limits
the amount of water we can use. He explained the town has both registered water and permitted water.
Registered is ours and permitted is what changes and is in the water management act. He said they are in
the last five years of the town’s current 20-year permit. The state dictates what towns have to do for
conservation restrictions. He said Franklin has one of the stricter ones, but all towns are heading in that
direction. He talked about if there were no restrictions he thinks we do have enough water, but he
explained not for all the lawn irrigation that happens. Mr. Grella said we have plenty of water because we
conserve, and we need to continue to conserve to maintain that.
Mr. Larry Shluger, 9 Applewood Lane, said at the last meeting the Town Council chair spoke and said
since this project has drastically changed from what they approved, they would have unanimously not
approved it. He said why has this not been referred back to the Town Council since the project is
substantially different. He asked about water and said he finds it hard to believe that 264 units are going
to use less water than if they were single-family homes. He would like that proved as a fact.
Chair Hunchard said the last few big projects requested 1.74 parking spaces per unit. The only way the
applicant could have done that is to raise the buildings up another floor and reconfigure them to get close
to the 1.75. Now they have come back to the original submittal with a three-story building on the easterly
side. He said regarding water, Mr. Martin is a professional who works for the town. Chair Hunchard
explained that there was a piece of land on Grove Street, and they approved 330 units last year. It was
proposed because it was an industrial piece of land, 32 acres; it looked beautiful with apple orchards. The
land was for sale for 25 years and did not sell because you could not use it for industrial use because it
had some wetland fingers that ran through it. So, people who want to build 40Bs look for these types of
properties and see how many units they can get on it. He said this property is zoned commercial, and it is
the most environmentally sensitive site the ZBA has ever had to deal with. It is still under Conservation
Commission. He said this is the next best use for it according to these applicants; everyone has a right to
propose a development. He said if the ZBA turns it down flat, it can be appealed, and 9 out of 10 times,
the housing court agrees with the developer. He said the ZBA is trying to do the best they can. He said the
ZBA has not made a decision. He said all the projects get waivers which is why they are here.
5
Tel: (508) 553-4856 Fax: (508) 520-4906
Ms. Carrie Landry, 18 Moore Avenue, said the traffic problem on Rt. 140 is a big problem. She said it is
the best town she has lived in. Over the past few years, the building of apartments has greatly driven up
the traffic on Rt. 140 so badly. She said people are using Moore Avenue as a cut through now, and it is
literally a speedway. She said you are killing the vibe in Franklin with all the building you have approved
over the past few years.
Ms. Cindy Stucchi, 10 Applewood Lane, said they are already worried as there is a cut through, and their
road is private. She asked who is going to watch that for them regarding their private road. She said who
is going to have to pay for their private road. She said taxes are going up because there are going to be a
lot of school children over there, and we already voted no on the override. She said all the traffic is going
to be horrendous. Chair Hunchard said they could put a gate. Ms. Stucchi said they should not have to put
a gate. Audience member said they have inquired and the fire department does not really want that. Mr.
Grella said they are all asking for the ZBA to say no, and if it goes through appeal, they will deal with it
then.
Mr. John Johnson Jr., 23 Northern Spy Road, asked what Mr. Grella’s questions are. Mr. Johnson said the
traffic on Rt. 140 is like getting off of the cape. He said he moved here to have a great experience in
Franklin.
Mr. Gene Grella, 36 Red Gate Lane (via Zoom), said when this started, Chair Hunchard sent him the ZBA
handbook on 40Bs. It says in the handbook that the HAC will not overturn local denial of a
comprehensive permit if the city or town meets one of the statutory minimums or another safe harbor
under the chapter 40B regulations. He said based on this, we can deny this permit, and it will not be
overturned. He said there were 30 waivers and asked for an updated list of waivers. Chair Hunchard said
we have not talked about the waivers yet.
Mr. Grella asked about the letter that was published dealing with the storage tank. In the letter in says in
the town bylaw that we are not supposed to have storage tanks in zone 2 unless it meets certain criteria.
He said storage tank is self-defined. Mr. Quinn said the letter was issued to Joe who would review it and
say if he agrees with it or not. Mr. Grella asked if the Conservation Commission would look at that also.
Mr. Quinn provided an explanation of what the state regulation refers to. Mr. Grella asked the ZBA to
review the bylaw. Mr. Alevizos said the holding tank is not required to mitigate the impacts; they have
other options.
Resident who lives off of Jordan Road said he has been a resident for 28 years. He said they have seen
developments over the past years. He said he questions the rapidness of how fast Franklin is growing
especially around the traffic. He said he knows a traffic study was done, but getting onto Rt. 140 from
Jordan Road is almost impossible. He does not see how this project makes it any better. He noted school
buses stop on Rt. 140 as well. He asked the ZBA to take a look at that again. He said with all the building
being done, what are the stresses on our public safety. He asked what is built into the designs of these
projects for public safety. He noted the failed override. He said as you look at these projects, take into
account the totality of the impact to the town.
Ms. Catherine Villano, 1 Crestwood Drive, said she moved there 10 years ago, and it was a much quieter
corner then than now. She discussed the location and said people use it as a cut through already. She said
if any of the ZBA members who are overly supportive of this project lived in close proximity to this, they
may not be in favor of it either. She said it is not going to help home values. She said she understands
growth, but it has to be in the guidance of sensibility and if there are so many variances, it makes you
wonder. She asked is this the right step for Franklin at this time. She said in good conscience we cannot
say that it is.
6
Tel: (508) 553-4856 Fax: (508) 520-4906
Ms. Lori Macaskill, 56 Stewart Street, said she wrote to Representative Jeff Roy about this project and
asked him for help. His answer was thank you for your note. At this juncture, given that Franklin is above
the 10 percent of the 40Bs, the state will not have any input whether the project moves forward. It is a
Friendly 40B which leaves the negotiations entirely in the hands of the town. Should anything change in
that regard, I will weigh in on any involved state agencies.
In response to Chair Hunchard, Town Administrator Jamie Hellen (via Zoom) said he mentioned at the
last Town Council meeting new growth was a preliminary figure for this year’s fiscal year; new growth
was short of the benchmark that was approved in the budget. He said they are two months away from the
tax rate hearing in December. He announced that the preliminary assessment is about $271,000 less in
new growth than was budgeted. If that number of $1.1 million which was in the budget for this fiscal year
is not met, then we might have to make some other budget adjustments or cuts down the line. He said he
has mentioned at budget meetings many times we had record breaking new growth numbers three to
seven years ago, and we have lost probably about $.75 million in tax base because that new growth
number has declined over the last couple of years. He noted some of the factors for this. He noted that not
all growth comes from just new construction. Mr. Grella said Mr. Hellen had said you either have to grow
or pass overrides. Mr. Hellen said that is correct.
Person who did not identify themselves said she wanted to put a spotlight on Ms. Lang when she said this
is just a start as that really resonated with her. She said they have been talking about the project for a long
time. She was happy to see the project has been amended, but it is really back to the original plan, and
many residents did not like it then either. She said removing 10 units is nice, but it is still way too big.
She said she recommends to TAG LLC condos or low rent apartments with an option to buy, so we can
have people invest in the community. Her preference is not apartments. She said in Westwood she saw an
advertisement that the TAG buildings across the way are advertising a lottery for low-income apartments.
She asked if the lottery can just be open to Franklin residents. Chair Hunchard said he does not think so.
Mr. John Macaskill, 56 Stewart Street, said we understand the town went through an override and denied
it twice. He asked how much income is going to be generated from the town from the tax rates from these
buildings going up versus what it is going to cost us for police, fire, schools. He said he wants to know
what it is going to cost the town beyond the what is generated from this project.
Mr. Domenick Dileo, 5 High Ridge Circle, said he appreciates the balloon test. He asked for a 3D model
for this. He asked has the project met the similar soils provision mandated by the State of Mass DEP. Mr.
Quinn said he did not know what this is, and he has worked on dozens of 40Bs.
Mr. Brown said regarding single-family homes over the past five years, there are 67 houses. For multi
units there were 532 units in five years; that is anything over a two-family home. He said he only gets the
information when they are applying for permits. Chair Hunchard noted there are 60 units on Pleasant
Street which is a truly affordable project and 50 units approved behind the high school for senior housing.
Mr. Brown said Dean Avenue was in 2019, and it was approximately 275 units. Chair Hunchard said
there are 104 units across the street which is 100 percent occupied. There are 14 condos on the corner of
Lewis Street. The other building has 32. The one on Lincoln Street was approved 20 years ago.
Mr. Stephen Huston, 10 Wampanoag Drive, asked about the process from here to a final vote. Chair
Hunchard said the applicant just came up with a new design. It is basically back to the original design.
They are still in Conservation Commission. Chair Hunchard explained the Conservation Commission
process. He said he is curious about how the applicant will get through Conservation Commission without
getting the waivers from the ZBA first. He noted that the ZBA cannot consider what it is going to cost for
schools; that cannot be put in the decision.
7
Tel: (508) 553-4856 Fax: (508) 520-4906
Audience member reiterated Representative Jeff Roy said the state does not have any voice in this.
Mr. Grella commented about new growth. Franklin is not against new growth. He said like former Town
Administrator Jeff Nutting stated when he spoke, we have had enough now. That is what the people of
Franklin are saying now; we have had enough for now, and let’s stop this. This Friendly 40B process is
not needed now as we are above limits, and that is what you are hearing from the people.
Person who did not identify themselves said if this is going to be continued to October 23, how is the
ZBA going to keep the residents informed about what is going on so we know how to fight back. Chair
Hunchard said we are still waiting for the applicant to go through Conservation Commission, and we have
not had a discussion on the waivers yet. He explained there is a time limit of 180 days from when we have
the first public hearing. He said these things can carry on.
Mr. Brown said all information we receive is put on the website as soon as possible.
Motion made by Ginelle Lang to continue the public hearing to October 23, 2025, at 7:40 PM. Motion
seconded by Robert Acevedo. Vote: Unanimous by the Board.
General Business
Meeting Minutes: August 28, 2025
Motion made by Robert Acevedo to approve the Meeting Minutes as presented for August 28, 2025.
Motion seconded by Ginelle Lang. Vote: Unanimous by the Board.
Motion made by Ginelle Lang to adjourn the In-Person/Remote Access Zoom Virtual Meeting. Motion
seconded by Robert Acevedo. Vote: Unanimous by the Board.
Meeting adjourned at 9:25 PM.
Respectfully submitted,
Judith Lizardi
Recording Secretary
Signature: _______________________________Date: ____________________________
8
Agenda
Town of Franklin
Zoning Board of Appeals
355 East Central Street, Franklin MA 02038
508-553-4856
NOTICE IS HEREBY GIVEN
AGENDA FRANKLIN ZONING BOARD OF APPEALS
Meeting Held in the Town Council Chambers Second Floor of the
September 25, 2025 Franklin Municipal Building, 355 E. Central Street and
online via ZOOM platform
Bruce Hunchard–Chairman, Robert Acevedo–V Chairman, Ginelle M
7:30 PM
Lang-Clerk, Meghan Whitmore–Associate, Joesph F Halligan-Associate
Meeting called by: Bruce Hunchard, Chairman Zoning Board of Appeals Hearings
Type of meeting: This meeting is being recorded and televised. “The listing of
matters are those reasonably anticipated by the Chair which may
be discussed at the meeting. Not all items listed may in fact be
discussed and other items not listed may also be brought up for
discussion to the extent permitted by law”. This meeting will be
held via ZOOM platform. Please log in at
https://zoom.us/j/95769299521
You may also join the meeting on your smart phone by calling 1-
929-205-6099
For those looking to view the meeting, it can be viewed live at this
time on Comcast 9 or Verizon 29. It is also streaming directly from
Franklin-tv's website. Visit Franklin - dot - tv and just click on the
“Town Hall TV” channel
Agenda Topics
7:30pm 33 Elm Street- G. David Iverson, Trustee Public Hearing- New-
Cont.
Applicant is seeking to construct a single
family home that has 123.92’ of frontage Filed-2/13/25
where 200’ is required and with right side Hearing- $200.00
yard setback of 26.5’ where 40’ is required. Mailing - $261.60
The building permit is denied without a
Variance from the ZBA.
7:35pm Parcels 270-28, 038 and 39 West Central Public Hearing- New-
Street and Panther Way CONT
Applicant is seeking to conduct earth Filed-12/26/24
removal in excess of 1,000 cubic yards. The Hearing- $350.00
building permit is denied without a Special Mailing - $3,557.76
Permit from the ZBA. Advertising- $145.14
7:40pm 444 East Central Street – TAG Central Public Hearing- New-
LLC Cont.
Applicant is seeking a building permit to Filed-2/28/25
construct a 264 unit multi-family Hearing- $27,400.00
development. The building permit is denied Mailing - $287.76
without a Comprehensive Permit from the
ZBA.
August 28 Meeting Minutes