CAPITAL
IMPROVEMENT
PLAN
199
This page left intentionally blank
200
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
MEMORANDUM
TO: Honorable Mayor and Members of City Council
FROM: Timothy J. Baroody, City Manager
RE: Recommended Capital Improvement Plan for FY 2025
DATE: March 12, 2024
Capital Improvement Plan
During each budget cycle, the City of Fredericksburg is asked to review its Capital Improvement Plan
(CIP) and update the projects anticipated to begin over the next five fiscal years. Throughout this
process, projects may be added or removed as new needs arise and resources are shifted. This plan is
meant to be a roadmap for the anticipated needs that will assist City staff in accomplishing the desired
future state described by City Council throughout Council Priorities. While the CIP provides a glimpse
into what the future will look like for the City of Fredericksburg, it is important to keep in mind the
projects that have recently been completed as well as those that are ongoing to grasp the full scope of
all that the City has accomplished over the last year.
Recently Completed Projects
NextGen 911
In January 2023, the Information Technology and Fredericksburg Police Departments debuted NextGen
911 (NG911). NG911 improves the speed and efficiency of emergency response and gives citizens more
options for accessing help in an emergency; citizens can send text messages to 911 operators, which can
be especially useful in situations where it is unsafe to make a voice call. They can also send photos or
videos that may help identify the location or nature of the emergency. In addition, NG911 can
automatically provide the operator with the caller's location, which can be very useful in emergencies
where the caller may not know their exact location or may not be able to provide it. NG911 uses geo-
location technology to determine the caller's location based on their phone's GPS signal, which will help
emergency responders find the caller more quickly and efficiently.
Snowden Pump Station and Force Main Improvements
The Snowden pump station and force main was installed in the early 1990s by Mary Washington Hospital
and deeded to the City. The pump station receives sewage from the Hospital and buildings on Sam Perry
Boulevard, Hospital Drive and Care Way. It is located approximately 1200 feet from the Route 1 and Mary
201
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
Washington Boulevard intersection. In FY 2023, staff completed the replacement of the lower portion of
the force main and installed air and pressure relief valves.
Executive Plaza Center
Over the last two fiscal years, Public Facilities completed the renovation of the fourth floor for the
Community Planning and Building Department and moved that department to the Executive Plaza from
the second floor of City Hall. In addition, staff also managed the replacement of the heating, ventilation,
and air conditioning systems for the second, third, fourth, fifth, sixth and seventh floors and replaced
the main electrical distribution panels for the entire building.
Public Safety
Through a FY 2024 mid-year appropriation, City Council approved the purchase of five replacement
patrol hybrid vehicles, three for the Police Department and two for the Sheriff’s Department. Both
departments have replacement schedules for their vehicles and this appropriation would maintain the
current fleet, given existing supply chain delays. The departments are finding it difficult to have existing
orders fulfilled and are currently exploring other environmentally-friendly vehicle options.
The Fire Department currently provides service from two (2) fire stations strategically located within the
City limits. Fire Station 1 is located downtown on Princess Anne Street and Fire Station 2 is on Altoona
Drive adjacent to Route 3. Due to increased development, a third fire station is necessary for the City.
This station will produce better response times to locations that are furthest from the existing stations,
providing enhanced and complete coverage as part of an overall Fire / EMS delivery system. Fire Station
3 will be constructed on City-owned land at Fall Hill Avenue and Wicklow Drive. Since FY 2022, funding
has been budgeted for architectural and engineering services; construction is now planned for FY 2027.
Purchases for new fire suppression apparatus to equip the new station are planned for FY 2026.
Ongoing Projects
Wastewater Treatment Plant Upgrade
On January 18, 2023, the City of Fredericksburg entered into an interim agreement with Ulliman Schutte
Construction, LLC to set the City on course for a planned wastewater treatment facility expansion to
accommodate future residential, commercial, and industrial growth. The current project is projected to
cost $158.5 million and will expand the current plant’s capacity from 4.5 million gallons per day (mgd) to
6.0 mgd. Of the projected cost, approximately $100 million dollars is comprised of grant funding
procured by City staff. This figure includes $27 million via State budget allocation, $54.02 million via the
Water Quality Improvement Fund (WQIF), $3.9 million in City ARPA funds, and $13.58 million in State
Enhanced Nutrient Removal Certainty, Pound and Petersburg (ENRCPP) Program. These grants coupled
with the recent approval of the City’s application for Virginia Clean Water Revolving Loan Fund
(VCWRLF), which is a low interest financing vehicle, further reduced ratepayers projected burden. The
project is at the 60% design phase with 85% design expected in May 2024. Comprehensive Agreement
and negotiation is expected in May 2024 and construction anticipated summer 2025.
202
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
New Middle School Project
The adopted FY 2023 budget included a new middle school currently planned to be an 1100 student
middle-school serving all Grades 6-8 in the City. This would replace the current Walker-Grant Middle
School which was built in 1988. On November 8, 2022, City Council approved the comprehensive
agreement between the School Board and First Choice for the design and construction of the new
middle school project. The gross total value of the comprehensive agreement is $75.58 million. Of this
amount, the City and Schools anticipate $8.57 million in State grant opportunities to help offset some of
the impacts to tax payers.
The new middle school and the upgraded wastewater treatment plant represent the largest capital
projects, in terms of funding, in the City’s history. These projects have been and will continue to be
major projects for city staff over the next few of years.
Riverfront Park Improvements
Since May 2022, residents and visitors have enjoyed the river views, open play areas, the interactive
water features and more at Riverfront Park. In February 2024, the new restroom building was installed
and opened to the public.
In February 2024, through Resolution 24-10, City Council approved the purchase of a mobile stage for
Riverfront Park. Originally, staff had planned for the $1.2 million Riverfront Park grant received from the
U.S. Economic Development Administration (EDA) to fund a permanent covered stage, but the one bid
received was substantially more than the allotted funds. The mobility of the stage would allow for the
center of Riverfront Park to be used for other activities and the ability to remove the stage also leaves
unobstructed views of the river when events are not occurring.
Water and Sewer Master Plan
The Public Works Department and Procurement Officer issued a Request for Proposals for the Water
and Sewer Master Plan in FY 2024 and proposals have been received. Staff anticipates awarding a
contract in May or June 2024 and expects a final Master Plan to be delivered within eighteen (18)
months.
Executive Plaza Visitor Center
In August 2022, through Ordinance 22-15, City Council authorized the sale of 706 Caroline to the
Economic Development Authority (EDA) in order to establish a larger, more modern and accessible
Visitor Center at the City’s Executive Plaza Building at 601 Caroline Street. In December 2022, the City
sold 706 Caroline to the EDA and leased the building back from the EDA until the Executive Plaza
Building renovation is complete. The Fiscal Year 2023 Capital Improvement Plan included $1,000,000 for
this project; in December 2023 the project budget was adjusted to $1,441,374. Paddox Construction of
Leesburg, VA was awarded the contract for the renovation and in February 2024 the vendor began
demolition work.
203
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
Capital Carryovers
The projects mentioned above are just a few of the ongoing improvements happening currently in the
City. At the end of each fiscal year, budget staff will analyze all budgeted projects to conclude if they
have been completed or need to have funds appropriated in the next fiscal year. This process is called
the “Capital Carryover Process” and results in a resolution brought before City Council to approve said
appropriation1.
FY 2025 Adopted Budget Capital Improvement Plan
The recommended capital budget for FY 2025 is presented in this transmittal letter. The new capital
improvement plan spans FY 2025 – FY 2029, with future fiscal years considered planning years.
This capital improvement plan includes projects needed to accommodate the City’s continued growth
and infrastructure improvement needs. There are a number of key transportation and infrastructure
repair projects that bolster the Public Works portion of the CIP. Outside of these items, there are three
projects that have been included in the recent 2022(A) G.O. issuance occurring in FY 2023: upgrading
the Computer Aided Dispatch (CAD) System, engineering and design of a new fire station, and pump
station and force main improvements to the pump station at Routes 2 and 17. In addition, the CIP
includes improvements to the City Shop, Rolling Stock Replacements, Fiber Network Expansion and the
Asphalt & Concrete Program.
Project highlights from each fund are presented in the following sections.
Fredericksburg City Public Schools
Bus and Maintenance Facility
In their FY 2024, Fredericksburg City Public Schools has included preliminary engineering and design
costs for their new Bus and Maintenance Facility. This facility will include a garage for bus maintenance
and repair as well as space for bus parking to fit all school buses. Construction is anticipated to begin in
2027 and the accompanying construction estimate is subject to change once engineering and design are
complete.
James Monroe High School Expansion
Based on enrollment projections, an expansion of James Monroe High School is necessary. The
proposed expansion project included ten (10) new classrooms, including lab spaces for the Career and
Technical Education program. This latest estimate has increased since the FY 2024 CIP and now includes
construction costs, site work, permitting/inspections, contingency, furniture and equipment.
Public Works
Asphalt & Concrete Program
Each year the City completes an Asphalt Reconstruction and Repaving Program. The City maximizes
funding available each year to address the streets in the greatest need of repair. The maintenance of the
1
See Supplemental Section for FY 2024 Capital Carryover Cover Memo and Resolution 23-71
204
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
City’s street system is essential to the transportation network, and supports the Comprehensive Plan’s
goals in providing good transportation in the community.
Pavement Condition Study
The study, proposed for FY 2026 and FY 2027, will involve an inspection and evaluation of the existing
pavement conditions of City-maintained streets. The purpose of this assessment is to assign a Pavement
Condition Index (PCI) value to each street. This value will be used to identify streets for consideration in
the City’s annual Asphalt & Concrete Repair Program.
Sidewalk & Access Ramp Replacement & Upgrade Program
This program, proposed annually, is intended to identify and replace long segments of sidewalk
throughout the City that have deteriorated, are displaced or are non-ADA compliant. The intent is to
replace or upgrade approximately 1,800 linear feet of sidewalk per fiscal year.
Public Facilities
Dorothy Hart Community Center Improvements
Staff proposes contracting out for a concept plan in FY 2025 and then implementing the suggestions
from that plan in FY 2026 and FY 2027. In addition, in FY 2025 staff proposes the addition of an
auditorium dehumidification system and bathroom and carpet renovations. In FY 2026, the ADA Ramp
project would involve the replacement of the main entrance ADA access ramp and stairs.
Computer Aided Dispatch (CAD) System
The Police Department's current Public Safety System is in need of replacement. The system was
installed in 1998 and is in need of a major overhaul. This upgrade is viewed as critical as the public
safety system supports E911 Dispatch, Incident Reporting, Evidence, Citations/Summons, Accident
Reporting, Warrants, Case Management, Mug Shot Imaging, Pawn Shop Watch, Alarm and Parking
Permitting and Parking Tickets programs. This project was part of the 2022(A) debt issuance and the IT
department has begun assessing the options for this project.
Public Safety
New Fire Station
The Fire Department currently provides service from two stations strategically located within the city
limits. Due to economic growth in development, fire suppression services will be challenged to meet
National Fire Protection Association guidelines for response times which could negatively impact the
City’s Insurance Services Office rating without adding another fully staffed facility. Unfortunately, these
services must be planned for before the demand as construction and apparatus acquisition will take a
substantial amount of time. All of the above combined with the increase in call volume, the historic
district, and new construction materials which burn at a faster rate than older materials necessitate the
need to focus on response times, personnel and equipment. The funding in the capital budget allows
for the accomplishment of all the phases necessary to complete and occupy the proposed fire station
per the findings from the Manitou Study of 2018. Architectural and Engineering services as well as site
work are scheduled for FY 2024.
205
Transmittal Letter | FY 2025 Recommended |Capital Improvement Plan
Conclusion
The FY 2025 CIP represents a continued investment in the maintenance and expansion of critical
community resources.
206
COMMUNITY
PLANNING &
BUILDING
295
This page left intentionally blank
296
FY 2025 Capital Improvements Plan
BANKSIDE TRAIL
Department Community Planning & Building Est. Year of Completion 2028
City Council Vision Building Community Through Cultural Vibrancy
Comprehensive Plan 3 - Transportation
Project Type Multi-Year
FY2025 FY2026 FY2027 FY2028 FY2029 Total
Uses $ 325,000 $ - $ - $ 1,725,000 $ - $ 2,050,000
Construction $ - $ - $ - $ 1,725,000 $ - $ 1,725,000
Design/Engineering $ 325,000 $ - $ - $ - $ - $ 325,000
Sources $ 325,000 $ - $ - $ 1,725,000 $ - $ 2,050,000
CRP & CMAQ thru FAMPO $ 325,000 $ - $ - $ - $ - $ 325,000
VDOT Smartscale Funds $ - $ - $ - $ 1,725,000 $ - $ 1,725,000
Operating Impacts $ - $ - $ - $ - $ - $ -
Operating Impact - Debt $ - $ - $ - $ - $ - $ -
Operating Impact - Operations $ - $ - $ - $ - $ - $ -
Operating Impact - Personnel $ - $ - $ - $ - $ - $ -
Operating Impact - Savings $ - $ - $ - $ - $ - $ -
Project Description:
The Area 7 Downtown Small Area Plan includes a Bankside Trail that is proposed to extend from just north of Amelia
Street all the way to Frederick Street along the Rappahannock River. All Right-of-Way acquisitions, funded in the FY 2023
CIP by a Virginia Outdoors Foundation Grant, and carried over to FY 2024, have been completed.
In FY 2028, the Bankside Trail construction will begin and will extend from just north of Amelia Street to the Riverfront
Park.
The FY 2025 Engineering work is funded with $325,000 in Carbon Reduction Program (CRP) and Congestion Mitigation
and Air Quality Funds (CMAQ) through FAMPO. The City was awarded funding through VDOT's SmartScale program for
construction in FY 2028.
Operating Impact:
Once Phase I is complete, the Parks, Recreation and Events department will maintain the Bankside Trail.
297
FY 2025 Capital Improvements Plan
CANAL STREET WHARF
Department Community Planning & Building Est. Year of Completion 2028
City Council Vision Building Community Through Cultural Vibrancy
Comprehensive Plan 4 - Public Services, Facilities/Preserved Open Space
Project Type Multi-Year
FY2025 FY2026 FY2027 FY2028 FY2029 Total
Uses $ - $ - $ - $ 200,000 $ - $ 200,000
Engineering/Construction $ - $ - $ - $ 200,000 $ - $ 200,000
Sources $ - $ - $ - $ 200,000 $ - $ 200,000
Transfer from the General Fund $ - $ - $ - $ 110,000 $ - $ 110,000
VDOT TAP $ - $ - $ - $ 90,000 $ - $ 90,000
Operating Impacts $ - $ - $ - $ - $ - $ -
Operating Impact - Debt $ - $ - $ - $ - $ - $ -
Operating Impact - Operations $ - $ - $ - $ - $ - $ -
Operating Impact - Personnel $ - $ - $ - $ - $ - $ -
Operating Impact - Savings $ - $ - $ - $ - $ - $ -
Project Description:
The Canal Street Right-of-Way extending from Caroline Street to the Rappahannock River was the site of the historic
DeBaptiste Wharf. The Area 7 Downtown Small Area Plan identified this area as an access way to the river. In FY 2028
staff proposes to install wayside panels, construct stone walkways, add fencing and develop water access while
pursuing partnerships with Friends of the Rappahannock, the Boy Scouts and other organizations. Construction will
include a trailhead with public art and historical interpretation in conjunction with the implementation of the Bicycle
Boulevard connecting the Bankside Trail to the Heritage Trail. Staff will address stormwater issues and utilize
transportation funding through VDOT Transportation Alternatives Program (TAP) as well as through the Virginia
Outdoors Foundation and other outside funding sources. The FY 2025 CIP shifts funding from FY 2027 (as the project
appeared in the FY 2024 CIP) to FY 2028.
Operating Impact:
N/A
298
FY 2025 Capital Improvements Plan
DOWNMAN HOUSE
Department Community Planning & Building Est. Year of Completion 2027
City Council Vision Building Community Through Cultural Vibrancy
Comprehensive Plan 8 - Historic Preservation
Project Type Multi-Year
FY2025 FY2026 FY2027 FY2028 FY2029 Total
Uses $ - $ 150,000 $ 150,000 $ - $ - $ 300,000
Stabilization $ - $ 150,000 $ - $ - $ - $ 150,000
Restoration & Interpretation $ - $ - $ 150,000 $ - $ - $ 150,000
Sources $ - $ 150,000 $ 150,000 $ - $ - $ 300,000
Transfer from the General Fund $ - $ 150,000 $ 150,000 $ - $ - $ 300,000
Operating Impacts $ - $ - $ - $ - $ - $ -
Operating Impact - Debt $ - $ - $ - $ - $ - $ -
Operating Impact - Operations $ - $ - $ - $ - $ - $ -
Operating Impact - Personnel $ - $ - $ - $ - $ - $ -
Operating Impact - Savings $ - $ - $ - $ - $ - $ -
Project Description:
The Area 3 Plank Road / Route 3 Small Area Plan included a concept to stabilize the ruins and enhance the grounds of
the historic Downman House, located in the Idlewild Subdivision near the construction of the new middle school. In
FY 2022, the department contracted for archaeological testing and assessment for three historic outbuildings on the
property. In FY 2023, staff obtained a draft design and generalized site plan. The FY 2024 CIP included $100,000 to
stabilize one of the buildings (the dairy/laundry) in the near term. The Community Planning & Building Department
has also cleared vegetation, added new temporary fencing for safety and security, and adjusted the site boundary.
The Community Planning & Building Department proposes in FY 2026 to perform additional stabilization, complete
design documents for the structures, provide for safe and decorative fencing for the site, and connect the grounds
into the existing trail system.
In FY 2027, through grant funding and other sources, the Community Planning and Building Department proposes to
complete the restoration of the Smokehouse (using "ghost" structures to reset the roof and stabilize the remaining
walls), the restoration of the Dairy building (removing unstable walls and replacing them with "ghost" structures and
stabilizing the roof and remainder of the building) and the restoration of the Quarters building by removing interior
finishes added in modern times. Interpretation of the site will be completed. It is possible that this project may need
to be moved to future fiscal years due to availability of staffing resources.
Operating Impact:
Once complete, the Parks, Recreation and Events department will maintain the trails and the Downman House site.
299
FY 2025 Capital Improvements Plan
PLANNING AREA UPDATE
Department Community Planning & Building Est. Year of Completion 2026
City Council Vision Distinct and Linked Neighborhoods
Comprehensive Plan 4 - Public Services, Facilities/Preserved Open Space
Project Type Periodic
FY2025 FY2026 FY2027 FY2028 FY2029 Total
Uses $ - $ 100,000 $ - $ - $ - $ 100,000
Area 9 Braehead/National Park $ - $ 100,000 $ - $ - $ - $ 100,000
Sources $ - $ 100,000 $ - $ - $ - $ 100,000
Transfer from the General Fund $ - $ 100,000 $ - $ - $ - $ 100,000
Operating Impacts $ - $ - $ - $ - $ - $ -
Operating Impact - Debt $ - $ - $ - $ - $ - $ -
Operating Impact - Operations $ - $ - $ - $ - $ - $ -
Operating Impact - Personnel $ - $ - $ - $ - $ - $ -
Operating Impact - Savings $ - $ - $ - $ - $ - $ -
Project Description:
The 2015 Comprehensive Plan provides for 10 Small Area Plans. These plans identify the strengths and weaknesses in
planning policy and land use regulation for each planning area. The new small area plans will incrementally establish a
new General Land Use Plan Map. The small area plans will result in revised land use regulations based on 21st century
planning concepts, including form-based codes, and will foster all areas of the City to become walkable urban places
with "complete streets" accommodating multiple forms of transportation.
Five Small Area Plans (Areas 3 Plank Road / Route 3, Area 6 Princess Anne Street / Route 1 North, Area 7 Downtown,
Area 2 Fall Hill, and Area 1 Celebrate Virginia / Central Park) have been adopted into the Comprehensive Plan. The Area
10 Lafayette Boulevard Small Area Plan is entering the public hearing phase and the Area 5 University / Route 1 plan is
now underway and will be competed in FY 2024. The Area 8 Dixon Street / Mayfield was anticipated in FY 2024 but
funds will be carried over in the capital carryover process and the project will be completed in FY 2025. Remaining
expenditures for these Area Plans will include traffic studies and other engineering necessary to implement planning
level concepts in the plans.
The next round of Small Area Plan work will focus on Area 4 Hospital / Cowan Boulevard (to be rolled over from FY 2024
to FY 2026 to allow time for a general update to the Comprehensive Plan) and Area 9 Braehead / National Park (focused
on the Belman Road Industrial Park) was previously scheduled for FY 2025 and is proposed to be shifted to FY 2026, as
well. The bulk of the proposed funds will be used for consultant services that will include public outreach involving
potential site specific charrettes or other public meetings; tailored market information for each planning area; and
identification of the economic potential for residential, commercial, and / or industrial uses in each planning area. The
consultants will also provide urban design / land use analysis to develop policies resulting in form based codes or other
land use regulations as well as an identification of necessary infrastructure or other capital improvements needed to
implement the Small Area Plans.
Operating Impacts:
N/A
300
FY 2025 Capital Improvements Plan
TRAIN STATION INFRASTRUCTURE PLAN
Department Community Planning & Building Est. Year of Completion 2028
City Council Vision Public Services—The Backbone Of Our Community
Comprehensive Plan 3 - Transportation
Project Type Multi-Year
FY2025 FY2026 FY2027 FY2028 FY2029 Total
Uses $ - $ - $ - $ 75,000 $ - $ 75,000
Train Station Planning $ - $ - $ - $ 75,000 $ - $ 75,000
Sources $ - $ - $ - $ 75,000 $ - $ 75,000
State Grant $ - $ - $ - $ 75,000 $ - $ 75,000
Operating Impacts $ - $ - $ - $ - $ - $ -
Operating Impact - Debt $ - $ - $ - $ - $ - $ -
Operating Impact - Operations $ - $ - $ - $ - $ - $ -
Operating Impact - Personnel $ - $ - $ - $ - $ - $ -
Operating Impact - Savings $ - $ - $ - $ - $ - $ -
Project Description:
The Area 7 Downtown Small Area Plan identified the need for a Train Station Infrastructure Plan, which would be created
in consultation with the Fredericksburg Area Metropolitan Planning Organization (FAMPO), Virginia Department of Rail
and Public Transportation (VDRPT), Virginia Railway Express, Amtrak, and other regional entities. The Plan should provide
planning level concepts and cost estimates for an expanded train station, updated multi-modal access points and links
into the City's broader transit network. The infrastructure plan should also focus on train station parking -- both short
and long term -- as well as appropriate signage, wayfinding and ticket sales operations to maximize the station's
navigability for tourists and visitors.
The Train Station Infrastructure Plan is needed to begin preparing improvements, budgets and any construction
documents needed to be in place in conjunction with the design of the proposed third track through the City and should
be in place prior to the track's construction.
Operating Impact:
N/A
301
This page left intentionally blank
302
Comprehensive Plan:
Small Area 10
Items:
Planning Commission
March 13, 2024
Bailey Thompson
Community Development Planner II
Summary
• Identify Area 10
• Plan Overview
• Focus on updates since Feb 14:
• Proposed modifications to the Small Area Plan included in packet
• Recommendation
Where in the City are we?
Plan Timeline
Community P.C. Discussion
Project Kickoff P.C. Discussion P.C. Discussion P.C. Discussion
Meeting #1 September 14,
June 6, 2022 June 22, 2022 July 13, 2022 October 12, 2022
July 21, 2022 2022
Community
City Council
Community P.C. Discussion Meeting #3 / P.C. P.C. Completes
P.C. Discussion Transmittal
Meeting #2 November 9, Public Hearing Comment
January 11, 2023 February 28,
October 15, 2022 2022 December 14, January 25, 2023
2023
2022
Area 10 Report City Council P.C. Public
City Council Work P.C. Discussion P.C. Public
converted to Initiation Hearing
Session November 8, Hearing
Small Area 10 December 12, February 14,
Plan October 24, 2023 2023 January 10, 2024
2023 2024
P.C. Public
Hearing
March 13, 2024
Transect Map
T-5M
T-4
T-3
Civic
T-3E Civic
T-1 T-4
T-1
T-3E T-4 T-3E
T-5C
T-3
T-3E
T-1
T-4 T-3E
T-4
T-5M
T-4 T-3 T-3
Civic
T-5C
T-4
Zoning Map Amendments
Zoning Map Amendments
Zoning Map Amendments
Residential Areas
Mobility – Lafayette Blvd.
Mobility – Route 1
Courtland Drive Extended
Green Infrastructure
Updates since Feb. 14 Meeting
• Residential-4 to Residential-2 Rezoning
• Infill Development / Neighborhood Policies
• Green Infrastructure / Stormwater
Residential-4 to Residential-2 Rezoning
Non-Proposed Proposed 41 Twin Lake 18 Fox Run
38 Braehead 76 Braehead Parcels Parcels
Woods parcels Woods parcels
(shown in cyan) (shown in yellow)
Subdivision 1 12 38 13
capable within lot
R-4 Standards
Subdivision 0 5 9 0
capable within lot
R-2 Standards
Non-Conforming Non-Proposed Proposed 41 Twin Lake 18 Fox Run
Lots 38 Braehead 76 Braehead Parcels Parcels
Based on Lot Woods parcels Woods parcels
Dimensions
(shown in cyan) (shown in yellow)
Non-Conforming 0 1 2 0
under existing R-4
Standards
Non-Conforming 17 lots 13 lots 3 lots 2 lots
with R-2 Standards (45% of total) (17% of total) (7% of total) (11% of total)
(4 are vacant
lots)
Setback Information
Minimum Setback R-4 Zoning District R-2 Zoning District
(Conventional
Development)
Front Neighborhood Pattern Neighborhood Pattern
Side 6 12
Rear 24 30
180 ft.
Non-Conforming 38 Braehead Woods 76 Braehead Woods
Lots parcels parcels
Based on Setback Non-Proposed Proposed
(shown in cyan) (shown in yellow)
Existing Non- 6 4
Conforming (16% of total) (5% of total)
with R-4 standards
New Non-Conforming 8 16 100 ft.
with R-2 standards (total of 14 structures or 37%) (total of 20 structures or 26%)
Legal Elements of a Downzoning
• A downzoning is a major legislative decision
• Legal Justification:
• Neighborhood plan conducted to increase sustainability
• Substantial change in conditions
• Previous zoning action was done in error
Area 10 Downzoning
• Purpose of Area 10 Downzoning:
• Preserve large-lot neighborhood
character
• Effect of Area 10 Downzoning:
• reduce future subdivisions
• increase non-conformities
• limit buildable area on existing lots
• Recommendation
Neighborhood Conservation
Pattern Book: Conservation District: Historic District:
• Planning design guidelines • Zoning Overlay District • Zoning Overlay District
• Encourage consistency in • Government oversight of • Architectural Review
neighborhood design certain alterations Board
• No requirement for • Can be implemented • Highest level of regulation
homeowners outside of historic district
status
Stormwater
• Existing issues reported regarding “valleys”
• Modern stormwater regulations require no degradation of
downstream channels.
• What options are available to address existing issues?
• Prioritize stormwater infiltration at the top of the watershed;
• Identify channel improvements for private property (step pools,
culvert replacement, and culvert maintenance); and
• Evaluate opportunities to restore sinuosity in the stream channel.
Stormwater - Infiltration
Stormwater – Conveyance Improvements
Stormwater – Opportunity for Sinuosity
Staff Recommendation
• Tonight – Conclude public hearing process & recommend approval
• 7A: Comprehensive Plan Amendment: Small Area 10 Plan
• 7B: R-4 to R-2 rezoning of 124 Acres
• 7C: I-1 & I-2 to Creative Maker rezoning of 7 Acres
• 7D: Adopt T5-C F.B.C. for 12.58 Acres in Route 1 Commercial Center
• Once recommendation has been made, return to City Council for
public hearings
• Potential final result:
• Comprehensive Plan Amended
• Parcels Rezoned
• Form-Based Code Standards Applied
• VA Code 15.2-2204 E
• Adoption or amendment prior to July 1,
1996 shall not be declared invalid by
reason of a failure to advertise or give
notice
Updates since Jan. 10 Meeting
• Residential-4 to Residential-2 Rezoning
• Infill Development / Neighborhood Policies
• T-4V Village Center Transect / Walkable Urban Places
• Sidewalk Network
• Stormwater Considerations
• Transportation Improvements within Chapter 3
• Implementation Update
Residential-4 to Residential-2 Rezoning
• Additional analysis on the Braehead parcels not included in
the proposed rezoning (west of Dominion Energy Power Line
Easement – shown in cyan on the map)
• Currently: 1 out of the 38 parcels would be capable of
subdivision under R-4 regulations
• 17 of the parcels would become non-conforming if rezoned
to R-2 based on lot size, lot width, and public frontage
requirements
Required Lot Dimensions
• Rectangular Lot Width: measured parallel to the front lot line
at minimum front setback line
• Front setback in R-2 & R-4 is the calculated median front
setback from existing homes along the same block face
• Irregular or Curvilinear Front Lot Width: measured between
lot’s narrowest dimensions through center of
proposed/located building
• Corner Lot Requirement: minimum lot width and frontage
must be met on both street fronts
• Public Frontage Requirement: no less than 80% of required lot
width
• R-4 Zoning
• Lot Width: 60 ft. Interior Lot / 75 ft. Corner Lot
• Public Frontage: 48 ft. Interior Lot / 60 ft. Corner Lot
• R-2 Zoning
• Lot Width: 100 ft. Interior Lot / 125 ft. Corner Lot Figure 72-82.3A(1) Lot Area Measurement
• Public Frontage: 80 ft. Interior Lot / 100 ft. Corner Lot
• 72-51.3 Lots & 72-82.3 Lots & 72-82.4 Required Yards
Cluster Development
• Only for single-family detached residential
development in R-2 and R-4 Zoning Districts
(cluster subdivision can not exceed base zoning
district maximum density)
• Minimum of 2 acres in area with no less than 5
lots
• 25% of total area committed to permanent
private open space
• 60% of open space shall be configured as one
parcel
• Lots located to minimize need for grading and Figure 72-51.4 Example Cluster Subdivision
removal of existing vegetation
• 72-51.4 Cluster Subdivision
7 Devonshire Dr. – R-2
Devonshire Drive Example Lot size: 37,418 sq. ft.
Lot Width: 120 ft.
Conforming?
YES
Public Frontage: 87 ft.
Public Frontage: 87 ft.
Lot Width: 120 ft.
Case Study: Kinloch Circle
• Public Comment “If 3 Kinloch Cir, 112 Kinloch Dr. and 2
Kinloch Circle would form an LLC, we would have
enough frontage space to put 5 to 8 tiny homes
between our properties.”
• Proposed lot lines drawn under R-4 regulations
• Total assessed value of all three parcels: $835,200
• Would require teardown of 1, possibly 2 existing homes
• Possibility to convert 3 lots into 4 lots
Case Study Drawing – Not Drawn to Scale
• New lots would require Modern Development Buildable Area
New Lots
Standards for stormwater management
Limitations of Down Zoning:
• One portion of Braehead has the area,
ownership pattern (acreages shown on
right are under individual ownership at
this time), and lot geometry whereby
further subdivision is possible.
• This area is within the proposed
downzoning area from R4 to R2.
• **Under proposed R2 Zoning**, the lots
containing five homes could be
consolidated and subdivided into 13 new
single family lots.
Additional protections envisioned in the Area 10 Plan:
• Areas designated as “single family detached infill” and
“Low Density Area” are recommended for additional
design controls such as Pattern Books or
Neighborhood Conservation Districts.
• A Pattern Book is a resource tool developed with
consensus from the community to guide additions or
reconstruction of existing homes based on existing
patterns of architectural character.
• A Neighborhood Conservation District is a regulatory
overlay that requires special approval of additions or
demolition similar to (but less intense than) the
architectural review board’s oversight of the
Downtown Historic District.
• These tools are recommended in the plan, which if
approved would establish their viability. Developing
and activating these plans requires neighborhood
consensus as a next step – they will not be “imposed”
on a neighborhood by unilateral City action!
Infill Development – Post Agenda Addition (Based
on Public Comment)
• Adjusting Development Standards to Calibrate Desirable Infill – Page 11(10)-5
• “Infill development is not desired if by the means of teardown of existing housing, unless to
be determined as blight.”
• Expanding the Pattern Book & Neighborhood Conservation District Area - Page 11(10)-5
T-4V Village Center Transect / Walkable Urban Places
T-5M
• T-4V transect areas replaced with T-4
transect and Walkable Urban Places T-4
T-3
designation to reduce over-calibration
T-3E Civic
T-4
• Similar to concept adopted in Area 7-
T-1
Downtown plan T-4 T-3E
• Create a strong pedestrian network T-5C
• Reorienting or consolidating vehicular T-3E
T-1
access patterns T-3E
• Improve pedestrian crossings T-4
• Incorporate on-street parking T-4
Civic T-3 T-3
• Upgrade place making elements
T-4
Sidewalk Network & Stormwater Considerations
• Sidewalk network adjusted based on presence of
existing curb and gutter
• Residential traffic calming in Area 2 (without curb and
gutter) Area
• Construction of speed tables in place of new 1
sidewalks, curb / gutter, road widening, etc.
• Pedestrian network still provides connections for
existing neighborhoods to Citywide pedestrian network
Area
• Increased clarity on stormwater BMPS and strategies 2
• Street-side ditches, upper elevation infiltration,
conveyance improvements, step-pool sequencing,
and culvert maintenance and upgrades
Chapter 3 - Transportation
• Updates to the Pathway System & Road
Improvement Projects
• Lafayette Blvd. Corridor Improvements
• Route 1/ Route 3 Interchange Improvements
• Route 1 Shared Use Path
• Courtland Drive Connector & Trail
• Kind Street Connector
Recommendation
• Tonight – Conclude public hearing process & recommend approval (WITH
PROPOSED MODIFICATIONS BASED ON PUBLIC COMMENT)
• 7A: Small Area Plan for Planning Area 10
• 7B: R-4 to R2 rezoning of 124 Acres
• 7C: I-1 & I-2 to Creative Maker rezoning of 7 Acres
• 7D: Adopt FBC to 12.58 Acres in Route 1 Commercial Center
• Once recommendation has been made, return to City Council for public
hearings
• Potential final result:
• Comprehensive Plan Amended
• Parcels Rezoned
• Form-Based Code Standards Applied
Questions?
Small Area Plan
Boundary Changes
Land Use Focus
• Residential Neighborhoods:
• Right sizing the zoning districts and standards
• Conservation Districts and Pattern Books
• Neighborhood Commercial Overlay District
• Activation of Village Centers:
• Updating zoning districts and standards (eg. temporary use of parking lots)
• Conceptual infill
• FBC considerations – Frontage, formal open space, access patterns
• Enhanced Pedestrian Connections
T-5M
Transect Map
T-4
T-3
CIVIC
T-3E
Civic
T-1
T-4
T-1 T-3E
T-4 T-3E
T-5C T-3
T-3E
T-1 T-4
T-3E
T-4 T-5M
T-4 T-3 T-3
Civic T-5C
T-4
Zoning Map
R2 Discussion
To R2
New
District
To CM
To CH
w/FBC
R2 Discussion
Details on Frontage Type E next
• Parallel on-street parking
• 5-foot sidewalk
• 5-foot utility strip
• Street trees
• Pedestrian-scaled street lights
• Curb extensions (bulb-outs) at
intersections
Mobility – Lafayette
Blvd.
Neighborhood
Sidewalk
Discussion
• Area 1 streets already have curb,
gutter, and closed drainage systems
(shown as blue lines on the map Area
above) 1
• Adding sidewalks into this area is
possible without impacting existing
street geometries
• Area 2 is characterized by narrow
street widths with shoulder parking Area
and open ditches 2
Mobility – Route 1
Mobility -
Courtland Dr.
Green
Infrastructure
Plan
Utility Infrastructure
• Response to City Council Discussion
• Discussion with Public Works Department
• Smith Run, Upper Hazel, and Lower Hazel Run are the Area 10 interceptors to
the Wastewater Treatment Plant (improvements planned in CIP)
• Specific areas within Small Area 10 are highlighted for I & I rehabilitation
(annually programed in CIP)
• Area 10 plan elements will be incorporated in the future Utility Master Plan
• No anticipation of sewer/water issues with proposed future land use
growth projections.
Regulation & Infrastructure Implementation
• Pursue funding for engineering / design of transportation and
stormwater improvements
• Advance City initiated rezonings
• Create a Pattern Book for pre-approved building plans for
existing/infill residential development
Next Steps
• Tonight – Conclude Public Hearing Process & Recommend Approval
• 8A: Small Area Plan for Planning Area 10
• 8B: R-4 to R2 rezoning of 124 Acres
• 8C: I-1 & I-2 to Creative Maker rezoning of 7 Acres
• 8D: Adopt FBC to 12.58 Acres in Route 1 Commercial Center
• Once recommendation has been made, return to City Council for
Public Hearings
• Potential Final Result:
• Comprehensive Plan Amended
• Parcels Rezoned
• Form-Based Code Standards Applied
Get email alerts for Fredericksburg