Planning Commission
Regular MeetingFredericksburg, VA · January 22, 2025
Minutes
John Walker
5509 River Road
Fredericksburg, VA
January 22, 2025
For Distribution:
Comments to City of Fredericksburg Timothy J. Baroody, City Manager; Josh Summits, Director of
Economic Development and Tourism; Mike Craig, Director of Community Planning & Building; and
members of the Fredericksburg City Council for the January 22, 2025, Public Input Session On The
Proposed Technology Overlay District with the City Council to the draft ordinance, Subject: Establishing
the Technology Overlay District to encourage data center campuses and related uses in large assemblages
of properties; amending generally applicable data center provisions in the Unified Development
Ordinance; and zoning map amendment to designate part of Area 1 to Technology Overlay District
As previously stated in my submitted written comments of January 17, 2025, I am a homeowner in this
area of the city surrounded by an area that is, or was, designated T-1 Preserved Open Space and T-2 Rural.
My home is part of a small cluster of homes that include 5509, 5511, 5513, 5515, and 5517 River Road, I
do not think the Zoning maps shown provide an adequate view of the amount of old growth forest that
exists on these properties and or property perimeters which add to the rural nature of this area. My own
property contains approximately 4 to 4 ½ acres of old growth forest in addition to the trees planted on the
rest of the property.
I am again repeating some of my previously submitted written comments of January 17, 2025 for
consideration by the City Council and the City Planning Commission.
I do believe the City Council is trying to find new commercial sources of revenue to lessen the tax burden
on its citizens and find better uses for the undeveloped areas originally planned for Celebrate Virginia
South. Although I am not against data centers per se, I suggest City leadership slow down and carefully
consider all of the impacts this will have. Perhaps the sudden speed at which the City Council and
Planning Commission members are proceeding is driven by recently introduced 2025 Virginia state
legislation, House Bill No. 1984, to restrict data centers from being developed within a quarter mile of
parks, schools, and residential areas. During the January 14, 2025, City Council meeting it was mentioned
several times the need for additional revenue to fix the City of Fredericksburg schools and the connection
between data center development and city schools. I think issues with City of Fredericksburg schools are
larger than a new source of revenue and would separate those issues from those of data center
development.
I understand the members of the City Council and Planning Commission have traveled to Prince William
County to see their data centers, I highly recommend the same travel to Loudoun County to visit the data
centers along and in the vicinity of Waxpool Road and Route 28. In particular, visiting areas where these
data centers meet existing residential areas to include Ashby Ponds, a retirement community and others.
The average data center height in Loudoun County, a major data center area in the state, is 35 feet.
In addition to the current area under consideration for data centers, I believe other areas should be
considered including: the Belman Road area and the small area west of I95 and south of Route 3.
What is the end of life of a data center and happens at the end of life? How will the city be impacted?
Have these and other questions been considered?
Paragraph 1. Comprehensive Plan Amendment – “may justify the future vacation of portions of Gordon
W. Shelton Boulevard to consolidate and maximize land use development potential.” This seems to be
counter to FAMPO desire for a new river crossing. Therefore, I suggest the City stop any further waste of
Page 1 of 3
John Walker
5509 River Road
Fredericksburg, VA
January 22, 2025
taxpayer dollars on the expenses and efforts on a new river crossing until the City can figure out exactly
what they will have left for roads in this area.
1. Draft Ordinance Paragraph 1 C Permitted Uses. Sub paragraph (8) (c) “Sewage treatment plant,
publicly or privately owned;” Please carefully consider the possible impacts and define how the
City can manage outflows and spills from this in the future.
2. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (11) Building height.
“The maximum height shall be no more than ninety (90) feet. The height limitation shall not
apply to parapets, screening, spires, belfries, cupolas, roof-mounted antennas or communications
towers, air cooling ventilation equipment, ventilators, or other appurtenances usually required to
be placed on the roof level and not intended for human occupancy, which shall be subject to the
exception stated in §72-82.6(B)(1).” A height of 90 feet, plus the additional allowed for air-
conditioning equipment equates to a minimum of a 10 story building. This is grossly excessive,
especially against existing residential housing near the stadium and other areas. This excessive
building height seems to negate other requirements. I suggest a reduced building height the closer
buildings are constructed to existing residential building. As stated previously, the average data
center height in Loudoun County is 35 feet. Some of these Loudoun data centers are close to /
abutting existing residential properties. I believe this to be a more reasonable height against the
existing residential properties.
3. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (1) “Rappahannock River
viewshed. Principal buildings within the TOD shall not be visible to the naked eye from the
Rappahannock River frontage regardless of season.” Buildings discussed may not be visible from
the building’s property river frontage, due to the existing topography of that area, but I think it
will be hard to not see a 10-story building from anywhere along the river frontage.
4. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (2) Minimum setback
requirements. (a) “Adjacent to residential zoning districts: minimum setbacks shall be 200 feet.” I
consider this insufficient given a planned allowed building height of 10 stories and suggest 300
feet minimum. Again, I believe the maximum height against residential properties should be 35
feet.
5. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (2) Minimum setback
requirements. (e) “Adjacent to residential uses: no building, parking, outdoor storage areas for
collection of refuse, or loading area shall be within 150 feet of any adjacent property with
existing or planned residential development or residential units within mixed use development at
the time of site plan submittal.” I disagree with allowing, trash sheds etc. to be closer to
residential areas and seems in conflict with the setback requirements.
6. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (4) “Buffers associated
with each phase or incremental expansion of a campus must be shown on a landscaping plan
submitted with each individual site plan. Vegetation that will remain on and is within a
landscaping buffer provided on an easement on adjacent property may be used to satisfy the
requirements of this subpart.” Adjacent Property is not defined and requires / allows for adjacent
property owners, including residential, to provide their own landscaping buffer. This should not
be allowed. The only way adjacent property buffer should be considered is if the adjacent
property owner agrees in writing and it is recorded. As worded, the city is responsible for
providing the buffer for river walk.
Page 2 of 3
John Walker
5509 River Road
Fredericksburg, VA
January 22, 2025
7. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (6) Noise “Any noise
which emanates from operation or other activity associated with any data center or research,
development, or light manufacturing facility, or their accessory uses will be limited to a
maximum volume in A-weighted decibels of 60 dBA during the day (7:00 a.m. until 12:00
midnight) and 55 dBA night (12:00 midnight through 7:00 a.m.). Such levels may be measured at
the campus boundary. Notwithstanding the foregoing, the following activities and operations are
exempt from the restrictions stated in this subpart:” as I discussed previously 60 dBA is
sometimes described as a conversation. Left out of this description is that this is at a distance of 3
feet. As described in the above this noise is louder and at the perimeter of the Data Center
properties.
8. Draft Ordinance Paragraph 1 D Development standards. Sub paragraph (6) Noise (c) “Generator
testing conducted between 7:00 a.m. until 12:00 midnight unless testing at a time outside of this
range is required by the Department of Environmental Quality.” Having run an emergency diesel
generator in my long ago past, I see no reason to operate this type of machinery at midnight or
outside of normal working times for testing. The times should be modified to 8:00 AM to 7:00
PM. Sometimes, operators may be required to burn off old diesel fuel oil, in which case it can be
planned, agreed to by the City, and residents notified ahead of time.
9. As I previously stated, there should be consideration to provide current residents of the area
connecting trail or trails to the River Walk. This needs to be defined first.
10. “Prohibition of the use of potable water for permanent industrial cooling.” This does not prohibit
use of well water. Please add well water as a prohibition. For those of us who depend on well
water, industrial use of well water so close to our properties would likely force us off our
properties.
John Walker
Page 3 of 3
RAPPAHANNOCK HP LLC
January 22, 2025
BY EMAIL TO:
Tonya B. Lacey, Clerk of Council - For Distribution to Council
tlacey@fredericksburgva.gov
Planning Commission
PlanningCommissionMembers@fredericksburgva.gov
Dear Madam Mayor, Members of City Council and Members of the Planning Commission:
As the owner of a third of the proposed Technology Overlay District (TOD), we are an important
stakeholder in the ongoing discussions about the proposed TOD ordinance. We previously
provided comments to you in our January 7, 2025 letter, which was included in the Staff Report
for City Council’s January 14, 2025 Regular Session meeting (20467). We want to offer some
additional input this evening.
First, we agree with Staff’s recommendation that 75 acres should be the minimum acreage for a
data center campus in the TOD. We understand that Council’s vision for the TOD is to have an
interconnected data center campus. We are on board with the City’s vision, and the 75-acre
minimum will achieve that.
Seventy-five acres will accommodate a multi-building data center campus with a substation. As
you know, the City approved EDA funding for the Dominion power study for the TOD, and the
EDA’s written authorization to Dominion includes our property. Thus, the City has already
deemed our site to be an important part of the City’s vision for the TOD. Any minimum acreage
greater than 75 takes our parcel out of the mix, which would be directly at odds with that vision.
Once Dominion provides more details about the routing of power to the TOD, that will help inform
all parties how the TOD could be built-out in a campus-like atmosphere.
Second, we note that our engineering firm, which has substantial data center experience in
Northern Virginia, has prepared conceptual layouts showing that on our property, we can build
approximately 1.3 million square feet of data center and a substation. Based on the fiscal impact
analysis presented by the City, our property would generate approximately $25 million in annual
tax revenue to the City.
We urge you to accept Staff’s reasonable recommendation of a 75-acre minimum. If you enact a
minimum greater than that, one-third of the land within the TOD would not meet the minimum
requirement. Good zoning practice requires a generally applicable, evenly applied, and fair
ordinance that serves the stated purpose of promoting data center development in the TOD.
1
2 Righter Parkway, Suite 301, Wilmington, DE 19803 ~ Phone: 302.479.8314 ~ Fax: 302.488.0882
Thank you for the opportunity to continue to provide input. We appreciate your consideration.
Sincerely,
James H. Oeste, Jr., CSM
Vice President of Real Estate
Rappahannock HP LLC c/o Allied Properties
cc: Timothy J. Baroody, City Manager
tjbaroody@fredericksburgva.gov
Michael J. Craig, Planning Director, Community Planning & Building
mjcraig@fredericksburgva.gov
Joshua A. Summits, Director, Economic Development & Tourism
jasummits@fredericksburgva.gov
Karen Cohen, Gentry Locke
cohen@gentrylocke.com
John Yannacone, Manager, Rappahannock HP LLC c/o Allied Properties
johnyannacone@aol.com
2
2 Righter Parkway, Suite 301, Wilmington, DE 19803 ~ Phone: 302.479.8314 ~ Fax: 302.488.0882
From: Spencer Hanemann
To: Planning
Subject: [EXTERNAL] Renaming of Forrest Avenue
Date: Saturday, January 11, 2025 7:51:45 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
To whom it may concern,
I feel like the process of this name change has been in violation of the city addressing policy,
and should therefore not move forward.
As per your December 9th notification, this change was “formally requested” by the Memorial
Advisory Commission. As per city code 10-292 this request is not within the roles and
responsibilities of this commission and therefore the request should be considered a private
request under the cities addressing policy. The city is however treating it as a city initiated
readdressing which I feel is in violation of the addressing policy and city code. Since the
Memorials Advisory Commission has not met the required burden of the private address
request change, this should not proceed.
If the intention of the city is to proceed with this change despite the violation, I would like to
propose multiple name change options outside of the Forest Avenue name.
R. Kirkland Avenue- Named for the “Angel of Marye’s Heights” Sgt. Kirkland is already
memorialized on the battlefield park and deserves recognition from the city for his heroic act
of service during the battle of Fredericksburg.
Chickadee Avenue- in recognition of one of the great natural creatures that we have here in
our city, these birds are constantly present in our neighborhood and invoke not sentiment of
racism.
John Paul Jones Avenue- Named for the Revolutionary “Father of the Navy” that once called
Fredericksburg home.
Thank you very much for consideration of my concerns and the name change options that are
more in line with what the Memorial Advisory Commission should have offered in the first
place.
Respectfully,
Spencer Hanemann
122 Forrest Avenue, Fredericksburg 22401
Sent from Yahoo Mail for iPhone
Planning Commission and
City Council Joint Work Session
January 22, 2025
Technology Overlay District
Presentation Summary
• Timeline of Data Center Discussion in the City of Fredericksburg
• Technology Overlay Zoning District: January 14, 2025 Talking Points
and Staff Ordinance Update Recommendations
• Implementation Steps
• Potential Implementation Schedule
Timeline of Data Center Development in the
City of Fredericksburg
• After discussion at prior meeting, on October 23, 2018 Council unanimously adopted zoning amendments to
allow for Data Center development with performance standards by special use permit in all commercial,
mixed-use, and industrial districts (except by-right in industrial if not using potable water for cooling).
• City Council unanimously passed an ordinance establishing a regional tax rate for “all computer equipment
and peripherals used in data centers” to a rate of $1.25 cents per every $100 of assessed value.
• In July 2024 City Council directed City staff to (a) pursue advanced due diligence studies on the potential for
Data Center development and (b) draft potential Zoning Ordinance provisions to provide for by-right Data
Center development within the parcels generally known as Celebrate Virginia South.
• On November 12, 2024 City Council adopted a resolution further supporting and acknowledging the
continued support the study of Data Center development within the City.
• On December 10, 2024 a Council Work Session was held to review the initial framework and tentative
project schedule for implementing the proposed Technology District Overlay.
• On January 14, 2025 a joint City Council and Planning Commission Work Session was held to review and
discuss the proposed Technology District Overlay Ordinance.
Technology Overlay District (TOD)
District Purpose, Intent, and Siting
• Purpose: promoting the development of technology centers in areas of the City where existing
or new infrastructure could adequately support uses described herein. By their nature, these
uses may require sizeable acreage, often operating, designed, and built-out in a campus-like
atmosphere, typically with adequate buffering or mitigation consistent with City standards.
• Intent and Siting: the TOD furthers the City’s efforts to diversify its economic tax-base, attract
high-paying jobs, and advance high-tech industrial development while limiting the impacts on
the immediate community. The TOD may be designated by the City Council as an overlay in
whole or in part of existing zoning districts, regardless of classification.
Technology Overlay Zoning District
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Minimum Campus Size
• What is the appropriate minimum size for a technology campus? In
its initiating resolution, the City Council set a 150-foot minimum
campus size as a starting point for discussion.
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Noise
• Data centers site planning includes the siting of emergency generators. Should
generators be located on the sides of buildings opposite existing residential and/or
potential residential development? Are there other ways to provide noise mitigation
from emergency generators?
• Emergency generator operations were listed in the draft ordinance as an exemption to
maximum noise limits. Testing of emergency generators was also limited to between the
hours of 7 AM and midnight. The evening hours were included in response to potential
requirements from DEQ related to the daily air quality cycle. Should the proposed
provisions related to emergency generators be refined?
• The noise limitations focus on A-weighted decibels and some discussion occurred about
other low frequency noise.
Technology Overlay District (TOD)
Staff Recommendations further addressing noise:
• Set noise standards as 60 dBA during the day (7:00 a.m. until 9:00 p.m.) and 55
dBA night (9:00 p.m. through 7:00 a.m.).
• Refine place of measurement: Such levels will may be measured at the campus
boundary on which such noise is generated, or at any point within the receiving
property affected by the noise.
• Remove exemption for noise standard for generator testing (exemption for
emergency generator operations will remain)
• Enhance screening and siting mitigation: Generators shall be screened separated
from residential uses by either a/the principal building or an engineered sound
wall of like materials as detailed within 72-41.2. Any generator shall additionally
be enclosed and muffled for mitigating sound.
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Water
• The use of potable water for industrial cooling is prohibited by the
draft ordinance other than for temporary bridging as a site is built
out. Should the ordinance instead specify that reuse water is the only
permitted means for industrial cooling? Would additional
prohibitions on using well water and / or direct withdrawal from the
Rappahannock River be appropriate?
Technology Overlay District (TOD)
Staff Recommendations refining water and discharge provisions:
• Water-based cooling systems used by permitted or accessory uses
described under this TOD shall utilize industrial reuse water for permanent
industrial cooling through a Water Service Agreement as approved by the
City Council.
• Cooling shall not depend on groundwater wells or surface water intake
from the Rappahannock River.
• City Code Sections 72-41.2(4) and 74-73 (which address potable water for
industrial cooling) shall not apply.
• Effluent water from cooling must be discharged to the City’s water
treatment plant, with discharge and any pretreatment requirements as
required by state and federal laws and regulations.
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Water
• Are Water and Sewage Treatment Plants an appropriate accessory
use? What would their role be on-site – are they part of a treatment
and distribution network associated with reuse water from the
existing public utility network or would they be used in conjunction
with independent water attainment / discharge sources?
Technology Overlay District (TOD)
Staff Recommendation as to accessory uses:
• Water treatment plant, publicly or privately owned if requested by
the Department of Public Works and incorporated into a/the Water
Services Agreement
• Sewage treatment plant, publicly or privately owned if requested by
the Department of Public Works and incorporated into a/the Water
Services Agreement
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Buildings
• Setbacks to residential districts are 200 feet but there are existing
residential uses within the adjacent Planned Development district where
the setback would be 150 feet. Should the setback to residential uses be
uniform across any zoning district?
• Maximum building height was proposed to be 90 feet to match the existing
Planned Development – Commercial maximum height limit. Should a step
in maximum height from 90 to 60 feet be considered around residential
uses?
• Are setbacks between buildings necessary?
Technology Overlay District (TOD)
Review of January 14, 2025 Joint Work Session Discussion Items
Other
• Data centers in the UDO are considered institutional uses and other
localities consider them industrial. What types of uses are data
centers comparable to?
• How would the development of a Technology Campus impact other
agreements such as the Celebrate Virginia South Agreement from
2005?
Implementation Steps
• Comprehensive Plan Amendment to Small Area 1 “North End”;
• Property owner initiated rezoning / proffer amendment for “Neon” project
parcels;
• Development of Technology Overlay Zoning District UDOTA; and
• Review and approval of UDOTA and Zoning Map Amendment to apply the
Technology Overlay Zoning District.
• These steps may occur concurrently.
Potential Overlay Implementation Schedule
January 22 – Joint Work Session with the Planning Commission
February 12 – Planning Commission Public Hearing
February 25 – City Council Public Hearing (requires pre-advertisement
prior to Planning Commission Public Hearing)
Area 5
Small Area Plan
Planning Commission
January 22, 2025
Bailey Thompson – Community Development Planner II
Summary
• Identify Area 5
• Review Process
• Discuss Proposed Changes
• Next Steps
Where in the City are we?
Plan Timeline
Community Meeting Community Meeting
Project Kickoff P.C. Discussion P.C. Discussion
#1 #2
June 7, 2023 September 13, 2023 November 8, 2023
September 20, 2023 November 16, 2023
P.C. Completes City Council Work
P.C. Discussion P.C. Discussion Community Meeting Comment Session Transmittal
January 10, 2024 February 14, 2024 #3 February 24, 2024
April 10, 2024 May 28, 2024
Area 5 Report Architectural Review P.C. Concept Architectural Review
Board Discussion Discussion P.C. Discussion
Converted to Small Board Discussion
October 23, 2024
Area 5 Plan September 23, 2024 September 25, 2024 October 14, 2024
City Council Architectural Review
Initiation P.C. Public Hearing P.C. Discussion
Board Discussion
December 11, 2024 January 22, 2025
November 12, 2024 November 12, 2024
Transect Map
T-4
T-5C
Civic
T-4
T-1 Preserved Open Space
Civic
T-3E Sub-Urban Edge T-3E
T-3
T-3 Sub-Urban T-4
T-4 T-4
Civic
T-3
T-4 General Urban
T-5C Core Corridor Civic Civic
T-3E
T-4
T-1
Proposed Text Changes
Emphasis on College Avenue’s pedestrian traffic and
neighborhood commercial opportunity on p. 11(5)-2
Less defining symbol for “Potential Neighborhood
Conservation Area” on p. 11(5)-5
Text changes about Neighborhood Conservation Districts
to provide further clarity on p. 11(5)-6
• Actions subject to review
• Emphasize on benefit of naturally occurring
affordable housing
• Allow for context-based unit type/count
Proposed Text Changes
Area switched from T-5C to T-4 also transitioned from the “Brain
Power District” to the “Village Transition Area” on p. 11(5)-7 & 11(5)-8
Two new implementation steps on p. 11(5)-15
• Neighborhood Commercial Overlay
• Commercial Corridors Revitalization Study
Next Steps
• Planning Commission Discussion – Tonight
• Provide feedback on proposed changes to prepare final draft for continued
public hearing
• Small Area 5 Plan
• Zoning Map Amendment
• Planning Commission Continued Public Hearing– Feb. 12
Zoning Map
Future Land Use Map
Form-Based Code
Focus primarily on the “form”
• Relationship of the buildings to
each other and the public realm
• Form and mass of buildings
• Scale and type of streets
Where in the City?
• “T-5C Core-Corridor” designations
within the Commercial-Highway
Zoning District
• “T-4M & T-5M” designations
within the Creative Maker Zoning
District
• Planned Development Zoning
Districts
Form-Based Code
Primary Components:
A) Public Component
• Between the street center line and the public right-of-way
line
B) Private Component
• Yards, building placement tools, and parking lot placement
tools on private property
C) Building Type Permitted
• Identify building types and frontages
• Setbacks, building orientation, transparency, mass,
scale, and building façade activation
T5-C Core Corridor Transect
Focus to retrofit and redevelopment of auto-oriented
shopping centers into mixed-use nodes with human-scaled
urban streets
Applies with redevelopment incorporating residential or
mixed-use
Legal Application:
Zoning Map Amendment to Apply T-5C transect on
Commercial Highway Zoning District parcels
For Small Area 5:
• Rezoning from Commercial Shopping Center to Commercial
Highway
• Activation of T5-C Core-Corridor Transect
T5-C Core Corridor Transect
Small Area
T5-C Transect 6
Activation
Small Area
3
Small Area
10
Zoning Map
Commercial Shopping Center (CSC)
Small Area
rezoning to 6
Commercial Highway (CH)
Small Area
3
T5-C Core Corridor Transect – Area 3
• Required 4 parcels to be rezoned CSC to CH
• Recommended in Small Area 3 Comprehensive
Plan Amendment
• Approved as amendment to the Unified
Development Ordinance
• Approved July 19, 2019
T5-C Core Corridor Transect – Area 6
• Required 5 parcels be rezoned from CSC to CH
• Recommended in Small Area 6 Comprehensive Plan Amendment
• Approved as amendment to the Unified Development Ordinance
• Approved July 9, 2019
T5-C Core Corridor Transect – Area 10
• Existing CH zoning
• Application of the T5-C Transect
• Approved alongside Small Area 10
Comp. Plan Amendment
• Approved Sep. 10, 2024
Neighborhood Focus
Neighborhood Conservation Districts:
• Building Width Averaging
• Building Scale
• Minimum Façade Transparency
• Required Façade Features
• Context-Based Housing Arrangement
• Review of Demolition
Pattern Books and Design Guidelines
Vacating Old Right-of-Way Stubs for Pedestrian
Connections and Open Space
Work with Civic Uses to Reduce Parking Demand and
Increase Safety on Adjacent Streets
Village Transition Area
Potential for Walkable Commercial, Entertainment, Dining, and
Service Uses
Character Structure Designations (more detail to come)
• Period of significance of 1946 (completion of the Route 1 Bypass)
through 1974 (1973 oil embargo/general decline in new
construction in vicinity).
Future Form Based Code potential:
• Focus on Frontages
• Shared Access and Rear Loaded Parking
• Transitional Zones (Height steps, Mass, Buffer, Alley)
Evaluate “Pre-Approved Plans” for Historic Housing Types Built within
the Existing Lot Pattern
“Brain Power District”
Unique Economic Development Opportunity at the Confluence of the
City’s Two Major Institutional Partners (UMW and MWH) and the
Power Substation
Short-term Property Improvements to Encourage Façade and
Landscaping Upgrades
Form Based Code Approach to Major Redevelopment:
• Re-establish Historic Block Pattern
• Focus on Frontages and Building Orientation
• Shared Access and Rear Loaded Parking
• Focus on Formal Open Spaces Including the Repurpose of the
Antiquated Service Road
Area 5 Historic Foundation
Older Neighborhoods with an Established Form and
Pattern
Older (Typically) Non-Residential Buildings that May
Now be Considered Historic
Eligible National Register District Centered on the
University of Mary Washington
Character Structures
24 designated buildings as Character Structures
in the Local Inventory of Historic Structures
• Architectural Review Board Action on Nov. 12, 2024
Benefits of Character Structure Designation
• Qualification for exemptions in the International Existing
Buildings Code (IEBC) and Unified Development Ordinance
(UDO) such as parking requirements and interior modifications.
• Priority given to adaptive reuse where form-based code
applies. Flexibility in site development standards.
• Policy language and documentation of resources provides
support for preservation in entitlement processes.
Vehicular Mobility
College Avenue / US Route 1 / Eagle
Village Drive Intersection
Eagle Village Road Network
Augustine Avenue Access / Crossing
Route 3 E to US Route 1 N Ramp Rebuild
(SmartScale Round 4)
Beverly Drive Access Management
Downtown Connector
Bike / Pedestrian Mobility and Safety
Sidewalk Infill:
• Westmont
• Greenbrier
• Olde William
William Street Corridor:
• Reinstitute On-Street Parking
• Traffic Calming (1200 – 1300 Blocks)
• Enhanced Pedestrian Corridor (to Downtown)
Downtown Connector
Beverly Drive Connector
Neighborhood Traffic Calming:
• Stafford Avenue
• College Avenue
• Keeneland Road
• Hanover Street
Linking the Uplands Open Space
Marye’s Heights to the Battleground
Athletic Complex Connections
UMW Performing Arts Center
Rowe Street / Cornell Street Bicycle
Boulevard (The Heslep Amphitheatre
Connection)
Olde William Street Pedestrian Connection
Expanding Alum Spring Park and
Connecting Via Downtown Connector and
William Street
Campus Walk
Zoning Map Amendment
• Rezone Commercial Shopping Center to Commercial Highway
• Adopt Form-Based Regulations
• Public frontage (below) – complete
street with pedestrian orientation.
• Private frontage – consistent building
envelope and parking / service located
behind the buildings.
Zoning Map
Future Land Use Map
Get email alerts for Fredericksburg
A daily email when new agendas and minutes are posted.