Planning Commission
Regular MeetingFredericksburg, VA · April 23, 2025
Minutes
PLANNING COMMISSION
MINUTES
April 23, 2025
6:30 PM
Supplementary Meeting
You may view and listen to the meeting in its entirety by going to the Planning Commission
page on the City’s website: https://www.regionalwebtv.com/fredpc
The agenda, staff report and associated documents are also available on the Planning
Commission page: https://www.fredericksburgva.gov/241/Planning-Commission
MEMBERS CITY STAFF
David Durham , Chair Mike Craig, Director
Carey Whitehead, Vice-Chair Josh Crump, Principal Planner
Dugan Caswell, Secretary Kelly Machen, Zoning Administrator
Thomas Johnson Tanagra Cafferky, Administrative Assistant
Mary-Margaret Marshall
Jane McDonald
Joseph Winterer
1. CALL TO ORDER [00:00:24]
Chairman Durham called the meeting to order at 6:30 p.m. in Council Chambers and explained
meeting procedures for the public. Members of the public were invited to attend or access this
meeting by public access television Cox Channel 84, Verizon Channel 42, or online at
https://www.regionalwebtv.com/fredpc.
2. PLEDGE OF ALLEGIANCE
3. DETERMINATION OF A QUORUM [00:03:15]
There were seven members in attendance of the meeting at the call to order.
4. APPROVAL OF AGENDA [00:03:33]
There were no changes to the agenda. Ms. Whitehead moved to approve the agenda, Ms.
McDonald seconded. Motion passed 7-0.
5. DISCUSSION OF POTENTIAL POLICIES, ORDINANCES, OR APPLICATIONS
6. DECLARATION OF CONFLICTS OF INTEREST OR DISCLOSURES OF CONTACT [00:03:57]
Audio lost 00:04:27 – 00:08:44
Planning Commissioner Dugan Caswell submitted a “Disclosure of Personal Interest in a
Transaction” in relation to Agenda Public Hearing item 8. A. SUP2500-0010 Mis Ojos 1600
Princess Anne Street. After the disclosure was noted, Mr. Caswell excused himself from the
Dais for the public hearing portion of the meeting. (Attachment)
7. OLD BUSINESS
8. PUBLIC HEARING – New [00:08:45] (Attachment)
A. Special Use Permit SUP2503-0010 – Mis Ojos Restaurante requests a Special Use
Permit to permit alcohol sales at 1600 Princess Anne Street
Kelly Machen presented. Ms. Machen explained that the previous tenant, Haley’s Honey
Meadery, had a SUP for a winery. The new tenant, Mis Ojos Restaurante, has requested a
change to the SUP to allow for general alcohol sales.
Staff recommended approval with conditions of the SUP for alcohol sales:
Hours of operation are limited to the hours of 11:00 am to 10:00 pm.
Outdoor food and beverage service shall be limited to the hours of 11:00 am to 9:00 pm
Sunday through Thursday, and 11:00 am-10:00 pm on Friday and Saturday.
Outdoor live music shall not have amplified sound.
Elimary Perez Bonilla presented for the applicants, Maritza Bonilla and Orssy Hernandez. The
name of the restaurant is in honor of Ms. Bonilla’s grandmother. The menu would be a fusion
of Dominican & Italian cuisine with an offering of mixed cocktail drinks, beer, and wine.
Mr. Durham opened the floor to the Dais for questions.
Topics of discussion were hours of operation, employee street parking, and possible uses of the
upper floor of the restaurant.
Mr. Durham opened the floor for public comment.
No in-person comments were made.
Mr. Durham requested that the public comment letters be read into the record (Attachment):
Staff read into the record electronically received letters.
Timothy Bornholtz, 303 Canal Street, Fbg, VA 22401 is directly adjacent to the property and
wrote in favor of the SUP submission.
Mr. Durham declared public hearing closed and asked the Dais if there were any questions for
staff. There were none.
Mr. Durham entertained a motion on the proposed SUP. Ms. Marshall motioned to
recommend to City Council approval of the SUP to permit alcohol sales at 1600 Princess Anne
Street subject to the proposed conditions. Ms. Whitehead seconded. Mr. Durham polled the
Dais. The motion passed 6-0.
Mr. Caswell rejoined the Dais for the rest of the meeting.
9. OTHER BUSINESS [00:22:41]
A. FXBG Forward! Comprehensive Plan Update and Discussion (Attachment)
Mr. Durham noted that the FXBG Forward! Comprehensive Plan Update and Discussion is work
session and not a public hearing item.
Josh Crump noted that this is the third work session of the Comprehensive Plan.
The consultant representatives from the firms of Stantec and Summit Design presented the
changes to the Comprehensive Plan Update. The changes made are in an effort to unify the
framework that binds the neighborhoods and communities together through transportation,
open space, public facilities, and walkable centers. Some change highlights to the plan are:
Adding community centers and bike/pedestrian corridors to the Walkable Centers Map
Adding language that links walkability and housing with community health access by
prioritizing bicycle and pedestrian considerations in the regulation development
process.
Adding language to incentivize desired housing types.
New strategies for Economic Development
Linking natural systems maps to the T-1 Transects in the Small Area Plans to better
integrate stormwater plans.
New strategies for interactions between rail, industrial, and residential areas.
The next scheduled public hearing on this item will be held on May 28, 2025.
The consultants concluded their presentation.
Mr. Durham opened the floor to the Dais for questions.
Ms. Whitehead and Mr. Craig discussed the housing definition of the term “Missing Middle”
used in certain sections of the document.
Mr. Caswell thanked the consultants for their work on the Comprehensive Plan Update.
Ms. McDonald appreciated the additional language for aging populations to be able to house in
place and the new strategies of the rail corridors.
Ms. Whitehead requested that the concept of Community Health point be integrated into
essential services.
Mr. Durham and the consultant team discussed aspects of the process of how this plan was put
together through small area plans, community input, expansion of concepts, and interactive
story maps.
Ms. Whitehead and Mr. Craig discussed refining some of the attributes of the story maps to
include side-by-side comparisons.
Mr. Craig said the process timeline is:
Planning Commission City Council
Discussion Public Hearing Public Hearing & Adoption Public Hearing & Adoption
23-Apr-25 14-May-25 28-May-25 Late June/ Early July
Mr. Durham and Mr. Craig discussed changes to the plan including changes to the Gateway
Boulevard Trail, cell tower locations, a potential river crossing, and better use of database
technology.
Mr. Durham closed the Planning Commission question period.
10. GENERAL PUBLIC COMMENT [00:53:34]
Mr. Durham opened the floor for the General Public Comment period.
Dennis Lister, 1108 Rappahannock Avenue, Fbg, VA 22401, spoke in opposition to the
Neighborhood Commercial Overlay District as it relates to the College Heights neighborhood.
Sue Sargeant, 1318 William Street, Fbg, VA 22401, represents the College Heights Civic
Association. Ms. Sargeant spoke in opposition to the Neighborhood Commercial Overlay
District as it relates to the College Heights neighborhood and the ongoing problems in the area.
Anne Little, 726 William Street, Fbg, VA 22401, spoke about the negative effects on the College
Heights neighborhood due to the neighborhood’s proximity to commercial sites.
Mr. Durham requested that the public comment letters be read into the record (Attachment):
Staff read into the record electronically received letters.
Rebecca Eaton, 811 Weedon Street, Fbg, VA 22401, wrote in opposition to the Commercial
Overlay District in the Area 5 Comp Plan.
Matthew Kelly, 1309 Hanover Street, Fbg, VA 22401, wrote in opposition to the Commercial
Overlay District in the Area 5 Comp Plan.
Rachel Sargeant, 812 Daniel Street, Fbg, VA 22401, wrote in opposition to the Commercial
Overlay District in the Area 5 Comp Plan.
Mr. Durham closed the General Public Comment period.
11. ADOPTION OF MINUTES [01:14:04] (Attachment)
A. Minutes - January 22, 2025 Joint Planning Commission Meeting with City Council
Mr. Durham asked if any commissioner had comments that would preclude the minutes being
adopted. None responded. Mr. Durham declared the minutes adopted.
12. PLANNING COMMISSIONERS COMMENTS [01:14:32]
A. Chairman Comments
Mr. Durham noted that the Comprehensive Plan Area 5 Plan is with the City Council for action.
The next Planning Commission Public Hearing on the new Comprehensive Plan is scheduled for
May 14, 2025.
Mr. Durham explained that the Planning Commission meets on the second and/or fourth
Wednesday of each month. Tonight’s meeting is called a Supplementary Meeting.
Supplementary Meetings are scheduled when the Planning Commission has additional
business.
Mr. Durham noted that the previous Planning Commission Public Hearing on the Area 5 Plan
was attended by the public and televised as part of the public record.
B. Commissioner Comments
Mr. Caswell noted that the actual wording in the Comprehensive Plan is “Commercial Outlook”.
The “Neighborhood Commercial Overlay District” occurs earlier in the document. The future
land use plans for College Avenue do not contain an overlay district.
Mr. Craig and the Dais discussed the attributes of a “Neighborhood Commercial Overlay
District” and the processes involved in implementing an Overlay District.
Mr. Craig reviewed the areas of the city that currently have Overlay Districts.
Ms. Whitehead, Mr. Durham, and Mr. Craig discussed what the term “determine
appropriateness” means in the Planning Commission’s reviewing and recommendation
processes. The term is not meant as a requirement step, rather, it is meant to reflect the
considerations of current issues that are before the Planning Commission and City Council at
the time.
13. PLANNING DIRECTOR COMMENTS [01:29:29]
Mr. Craig noted:
Tanagra S. Cafferky
From: Tim Bornholtz <tim@bornholtz.com>
Sent: Friday, April 11, 2025 2:10 PM
To: Planning
Subject: [EXTERNAL] Mis Ojos - April 23, 2025
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hello, My name is Timothy Bornholtz and I live at 303 Canal St, Fredericksburg, VA 22401. My property is
directly adjacent to the planned restaurant at 1600 Princess Anne St.
I fully support their application for an ABC license and look forward to having them in our neighborhood.
Thank you.
1
Tanagra S. Cafferky
From: Rebekah Eaton <rsarg09@gmail.com>
Sent: Wednesday, April 23, 2025 1:41 PM
To: Planning
Subject: [EXTERNAL] Commercial Overlay District
Good Evening.
My name is Rebekah Eaton. I live at 811 Weedon St. 22401.
Please remove the Neighborhood COMMERCIAL Overlay District from the Area 5/Comp Plan. College
Heights is a healthy neighborhood. It does not need a COMMERCIAL Overlay District. Thank you for this
consideration.
Rebekah
1
Tanagra S. Cafferky
From: Matthew Kelly <kelly058@verizon.net>
Sent: Wednesday, April 23, 2025 1:00 PM
To: Planning
Subject: [EXTERNAL] REMARKS--General Public Comment Planning Commission Meeting 4/23
Please read the following during Public Comments:
Matthew Kelly, 1309 Hanover Street.
I have received several calls regarding the Area 5 plan allowing commercial operations within College
Heights. An issue that has not been directly discussed during the public engagement process to date. If this is
the case, it is a discussion that needs to take place with the residents of College Heights before any action is
taken. A few points in this regard:
1. College Heights is already close to, and impacted by, commercial development.
2. College Heights is already dealing with the impacts from traffic, parking, and other issues related to UMW
and some of the larger churches in the area that have operations that go beyond just Sunday services.
3. Allowing commercial operations in College Heights was NOT a proposal that came from the neighborhood.
Before any action is taken, an explanation needs to be made on how this proposal came forward and what it is
trying to achieve as it relates to College Heights. An explanation that needs to be made directly to the residents
of College Heights in a setting where they can participate in the discussion.
I have read the staff report on the Area 5 Plan for tonight's supplementary meeting, which is unclear and makes
little sense to anyone not directly involved in the points referenced, i.e., city residents. This and the fact that this
discussion is taking place outside the normal meeting schedule are concerning.
My apologies if the information I have received is in any way inaccurate, but as noted, the presentation of
materials does not paint a clear picture. That in itself calls for a more robust effort to inform the public before
action is taken.
Matt Kelly
1309 Hanover Street
Fredericksburg, VA
540-455-7122
1
Tanagra S. Cafferky
From: Rachel Sargeant <rmns08@yahoo.com>
Sent: Wednesday, April 23, 2025 2:08 PM
To: Planning
Subject: [EXTERNAL] Public Comment at the 4-23-25 Planning Commission meeting
Please read as a public comment at the 4-23-25 Planning Commission meeting.
My name is Rachel Sargeant. I live at 812 Daniel St. 22401.
I am writing about the Neighborhood COMMERCIAL Overlay District that is in the Small Area
5/Comprehensive Plan.
It says, 'College Ave is a highly utilized pedestrian corridor and creates the opportunity for
neighborhood-serving commercial uses through the conversation of residential buildings to
COMMERCIAL uses".
Please remove this statement out of the Plan. College Heights residents do NOT agree with it.
1. College Heights is a healthy, vibrant neighborhood. Neighborhood COMMERCIAL Overlay District
is for neighborhoods that need revitalization.
2. This is a Top down decision. This statement did not come from College Heights members.
3. This statement was not verbally 'highlighted' in public presentations at Planning Commission or
Council meetings. It is in small font at the bottom of a page. It is definitely controversial and affects
entire neighborhoods in the city.
4. College Heights has a diversity of housing options: duplex, triplex, apts and a diversity of people,
18-24 yrs old UMW students. Protect our housing. Not sacrifice it to 'retail'.
5. College Heights has 'workforce housing'. College Ave must remain residences for teachers,
firefighters, police, rescue, local govt employees, and our students and neighbors
6. City's crumbling Water/sewer pipes under College Ave can't support a commercial kitchen or toilets
in the business
7. We College Heights residents won't sacrifice the essence of our community for the sake of the
city's need for retail income.
8. Small 'retail' is struggling to make ends meet. Many are closing because they can't find the
workers. Don't replace our homes with 'retail'.
1
9.This is not 'low impact' on our neighborhood. It opens the door to destruction of our neighborhood,
by developers who will pick us apart with 'encroachment', making a 'killing' in their COMMERCIAL
spaces.
10. Please Remove Neighborhood COMMERCIAL OVERLAY District from the Area 5 and Comp
Plan. College Ave is not up for commercialization.
Thank you for your consideration.
Rachel Sargeant
2
1600 Princess Anne Street
Special Use Permit
Planning Commission
Regular Meeting
April 23, 2025
Overview
• Issue
• Shall Planning Commission recommend approval of the Special Use Permit (SUP) for
alcohol sales at 1600 Princess Anne Street?
• Applicant is Mis Ojos Restaurante
• SUP for alcohol sales granted in 2011 to Haley’s Honey Meadery
• Existing SUP limited to sales under a Farm Winery license
• Request would modify existing SUP to permit sales under a general Virginia
Alcoholic Beverage Control Authority license
• No changes to the site proposed
• Applicant working on interior renovations to expand food options
Location
General Development Plan
Comprehensive Plan / Zoning District
• Area 7 Downtown Plan (T-4M
Transect: General-Urban-Maker)
• Promotes small-medium scale
businesses and adaptive reuse
of existing structures.
• C-M District
• Purpose: reduce barriers to
small scale entrepreneurs and
expand businesses along
commercial corridors
Land Use
• Surrounding uses
include:
• Single Family
Detached
• Canal Quarter Arts
Studio
• Office Space
• Duplex/Quadplex
Special Use Permit Considerations
• Parking
• 3 spaces required (1st 1500 sqft exempt + 1 per 180 sqft required)
• 13 Spaces Provided (9 Spaces on site + 4 on-street spaces)
• Noise
• Outdoor speakers installed by previous tenant
• Carry existing SUP condition forward prohibiting amplified live music outdoors
• Need to remain in compliance with City noise ordinance
• Hours of Operation
• Keep existing SUP Conditions on Hours of operation
• Condition permits 1 more hour of inside service then proposed (9 to 10 PM)
• Anticipates 5-6 employees
Conclusion & Recommendation
• Approval with conditions of the SUP for alcohol sales:
1. Hours of operation are limited to the hours of 11:00 am to 10:00 pm.
2. Outdoor food and beverage service shall be limited to the hours of 11:00
am to 9:00 pm Sunday through Thursday, and 11:00 am-10:00 pm on Friday
and Saturday.
3. Outdoor live music shall not have amplified sound.
1600 Princess Anne Street
Special Use Permit
Planning Commission
Regular Meeting
April 23, 2025
Welcome to
Mis Ojos
Restaurante
Co-Owners: Maritza Bonilla and
Orssy Hernandez
Background
Mis Ojos Restaurante is a cozy and inviting restaurant
blending the bold, vibrant flavors of Dominican cuisine
with some influences of Italian cooking. The restaurant
is named after Maritza’s grandmother, who raised her
and taught her everything she knows about cooking.
She comes from a family of restaurant owners so it’s
something that she grew up with and is passionate
about.
Business Name Section 2
M
E
N
U
Why are we requesting a Special Use Permit?
~We would like to sell mixed beverages,
beer, wine etc.
~It would help bring in more clientele,
especially during the warmer weather
when we are able to seat people outside
on the patio.
~We have two trained bartenders that will
curate a cocktail menu based of
Dominican and Italian influences as well as
common cocktails.
~It would help us in our mission to bring in
a different culture into the community
through food and drinks.
Thank you for
your time. We
hope to see you
soon at
Mis Ojos Restaurante
FXBG FORWARD
COMPREHENSIVE PLAN
UPDATE
PLANNING COMMISSION
MEETING
APRIL 23, 2025
Walkable Centers Map Update
• Two new Community/City centers were added: Alum Springs Maker
District and Canal Quarter Maker District (see page 17 of map and
pages 20-23 of text).
• The representation of the Downtown and Celebrate Virginia South
Regional centers was adjusted.
• The two main independent bike-ped corridors (Motts Run to Dixon
Park, and VCR Trail) were added to illustrate connections and
relationship between Walkable Centers, corridors, and open space
networks (see additional text added on page 16).
Walkable Centers Map Update
Community Health Integration
• Language was added to incorporate considerations for essential
services and community health outcomes linked to walkability and
housing access (see page 8, 16 and strategy 5.f on page 71).
Mobility Updates
• A new strategy was added to review development regulations around
Walkable Centers to prioritize pedestrian/bicycle connectivity and safety
(see strategy 2.b on page 28).
• Language was modified to clarify that all travel modes should be balanced
city-wide but non-automobile modes (pedestrians, bikes, transit) should be
prioritized within designated Walkable Centers and connecting corridors
(see strategy 1.g on page 42).
• The strategy to prioritize proactive traffic calming implementation in
specific locations like Walkable Centers, Corridors, and near schools/parks
was expanded (see strategy 2.b on page 42).
• A new strategy was included to integrate traffic calming projects into the
CIP, budget, and maintenance schedules to ensure implementation (see
strategy 2.e on page 43).
Housing Updates
• Language regarding incentivizing desired housing types (e.g., smaller
units, condos) and removing regulatory barriers was strengthened
(see strategy 1.d & 3.a on pages 70-71).
• General language encouraging the exploration of innovative housing
strategies such as land trusts/banks, was included (see strategy 3.c on
page 71).
• A new policy and strategies were added for monitoring housing
production based on Housing Advisory Committee input (see Policy 6
and strategies 6.a,6.b,6.c on page 71)
Adobe Stock
Economic Development
• Language was added about the recently adopted Technology Overlay
District was added to the context section as well as the Economic
Development area map (see page 95 & 97).
• A new strategy to review existing industrial zones as part of the Small
Area Plan process was included (see strategy 4.d on page 99).
• A new strategy to engage major employers about workforce housing
needs was developed (see strategy 9.e on page 100).
• A policy and strategy to facilitate targeted redevelopment efforts in
the city, including exploring a community-based development
corporation or similar entity for the long-term vision for Central
Square was
(7) FXBG Forward included (see policy 11 and strategy 11.a on page 100).
pg.53
Environment
• New context language was developed in a paragraph called "Physical
Constraints to Development" linking natural systems maps 14 and 15
to the T-1 Transect designation process in the small area plans as well
as City Code requirements (see page 109)
• A new strategy regarding mitigation of conflicts between rail
corridors, industrial uses, and residential areas was added (see
strategy 8.d on page 120).
Future Plan Timeline
Planning Commission
Planning Commission Public Hearing and City Council Public
Public Hearing Adoption Hearing & Adoption
May 14, 2025 May 28, 2025 Late June/Early July
Final Thoughts
MAY 6, 2025- 4:00PM
FY2026-2031 Six-Year Improvement Program- Public Comment
• The public is invited to share feedback on transportation projects that have been
recommended for funding by submitting comments through the online form, by
email or posted mail by May 21, 2025.
• Online comment form: https://arcg.is/1y1vue2
• For roads and highways:
Six-YearProgram@VDOT.Virginia.gov or
Infrastructure Investment Director
Virginia Department of Transportation
1401 East Broad Street, Richmond, VA 23219.
• For transit and rail:
DRPTPR@drpt.virginia.gov or
Public Information Office
Virginia Department of Rail and Public Transportation
600 East Main Street, Suite 2102, Richmond VA, 23219.
TRANSPORTATION PROJECTS DATABASE
Bridges, Interstate, New Streets
ID Project_Type Name Origin Destination Project_Description Next Step Cost Est Timeframe
B1 Bridge VCR Trail Bridge - Hazel Run Over Hazel Run Bridge over Hazel Run Engineering / Construction $2,606,000.00 TBD
B2 Bridge - Bicycle Quarry Trail Bridge Drainage Way Drainage Way New bike / ped bridge over natural drainage Concept Development TBD TBD
B3 Bridge - Bicycle VCR Trail Bridge over Blue & Gray Pkwy Intersection Intersection Grade Separated bike/ped crossing over Route 3 Pursue Funding $8,000,000.00 TBD
B4 Bridge - Bicycle VCR Trail Bridge over US Route 1 Intersection Intersection Grade Separated bike/ped crossing over Route 1 Pursue Funding $9,500,000.00 TBD
B5 Bridge Transit, bicycle, ped bridge bw Carl D and Gateway Blvd Carl D Silver Pkwy Gateway Blvd A transit, bicycle, and pedestrian bridge over I-95 connecting Carl D Silver Pkwy and Gateway Blvd Private Development TBD During Development
B6 Bridge US Route 1 - Falmouth Bridge Replacement Rappahannock River Bridge replacement over Rappahannock River Engineering / Construction $86,200,000.00 TBD
B7 Bridge US Route 1 Hazel Run Bridge Replacement Hazel Run Bridge replacement over Hazel Run Engineering / Construction $25,000,000 2030
B8 Bridge New River Crossing Carl D Silver Parkway Stafford County New bridge across the Rappahannock to include bike and pedestrian infrastructure Complete FAMPO Study TBD TBD
B9 Bridge Route 1 Bridge over the Canal Replacement Canal Canal Bridge replacement over the canal Engineering / Construction $21,400,000.00 2026
IN 1 Interstate VCR Tunnel Under I-95 VCR Trail Spotsylvania County A tunnel underneath I-95 for the VCR Trail to cross Pursue Funding $20,000,000 TBD
IN 2 Interstate Central Park Slip Ramp Interstate 95 Commerce St A slip ramp from the Exit 130 South Ramp directly to Commerce Street Concept Development $50,000.00
S1 New Street Gateway Boulevard (Middle) Route 3 Cowan Blvd A new four lane divided street between Route 3 and Cowan Private Development Private Development During Development
S2 New Street Gateway Boulevard (Upper) Cowan Blvd Fall Hill Ave A new four lane divided street between Cowan and Fall Hill Planning Concept TBD TBD
S3 New Street Collector, extending Gordon W Shelton Blvd to Cowan Blvd Cowan Blvd Fall Hill Ave A new four lane divide street between Cowan and Fall Hill Private Development Private Development During Development
S4 New Street Collector, extending Carl D Silver Pkwy to Gordon W Shelton Carl D Silver Pkwy Gordon W Shelton Extending Carl D Silver Pkwy to th enorth to connect to Gordon W Shelton Blvd Private Development Private Development During Development
S5 New Street Roffman Road Extension Wicklow Dr Roffman Road Extension of Roffman Road to Wicklow Drive Private Development Private Development During Development
S6 New Street Downtown Connector Idlewild Blvd Olde William Street A new connection to improve safety, capacity, and mobility around the US Route 1 / Route 3 interchange Planning Concept TBD TBD 2030
S7 New Street Courtland Drive Connector Hillcrest Drive US Route 1 A new connection to provide a safe route to school and enhance local mobility in the southern portion of the City Planning Concept TBD TBD 2028
S8 New Street Area 1 - North Grid Haven Terrace New Development A new connection to be made as development occurs Private Development Private Development During Development
S9 New Street Area 1 - North Grid Gordon W Shelton Blvd New Development A new connection to be made as development occurs Private Development Private Development During Development
S 10 New Street Area 1 - North Grid Gordon W Shelton Blvd New Development A new connection to be made as development occurs Private Development Private Development During Development
S 11 New Street Area 1 - North Grid Gordon W Shelton Blvd New Development A new connection to be made as development occurs Private Development Private Development During Development
S 12 New Street Area 1 - North Grid Carl D Silver Pkwy New Development A new connection to be made as development occurs Private Development Private Development During Development
S 13 New Street Area 1 - North Grid Haven Terrace New Development A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 14 New Street Area 1 - North Grid Fall Hill Ave New Development A new connection to be made as development occurs Private Development Private Development During Development
S 15 New Street Area 1 - Central Grid Fall Hill Ave Carl D Silver Pkwy A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 17 New Street Area 1 - Central Grid Carl D Silver Pkwy Central Park Blvd A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 18 New Street Area 1 - Central Grid Shadmoor Drive Carl D Silver Pkwy A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 19 New Street Area 1 - Central Grid Islip Lane Carl D Silver Pkwy A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 19 New Street Area 1 - Central Grid Islip Lane Extended Shadmoor Drive Extended A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 20 New Street Area 1 - Central Grid Carl D Silver Parkway Redevelopment A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 21 New Street Area 1 - South Grid Central Square Central Square A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 22 New Street Area 1 - South Grid Central Square Central Square A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 23 New Street Area 1 - South Grid New Development Mall Ring Road A new connection to be made as redevelopment occurs Private Development Private Development During Development
S 24 New Street Area 1 - South Grid Route 3 Mall Ring Road Extending Mall Court to connect Route 3 and the Mall Private Development Private Development During Development
S 25 New Street Area 1 - South Grid New Development New Development A new connection to be made as redevelopment occurs Private Development Private Development During Development
TRANSPORTATION PROJECTS DATABASE
Intersection Analysis and Street Improvements
ID Project_Type Name Origin Destination Project_Description Next Step Cost Est Timeframe
I1 Intersection Improvements Route 1 / Princess Anne / Hanson Intersection Improvements Intersection Intersection Safety Upgrades at Princess Anne / Route 1 / Hanson Intersection Engineering / Construction $1,600,000.00 2026
I2 Intersection Improvements Route 1 / Fall Hill Ave Intersection Improvements Intersection Intersection Capacity Upgrades at Fall Hill Ave / Route 1 Construction $7,400,000.00 2026
I3 Intersection Improvements Dixon Street / Landsdowne Road Intersection Improvements Intersection Intersection Safety Upgrades at Dixon Street / Landsdowne Road Construction $2,400,000.00 TBD
I4 Intersection Improvements Augustine Ave / Route 1 Intesection Improvements Intersection Intersection Access management and safety upgrades at Augustine Ave / Route 1 Engineering / Construction $4,700,000.00 2028
I5 Intersection Improvements Lafayette / Charles / Kenmore Intersection Improvements Intersection Intersection Intersection Improvements at Kenmore and at Charles St Engineering / Construction $7,170,000.00 TBD
I6 Intersection Improvements Route 3 Off-Ramp / Spostsylvania Ave Improvements Route 3 Spotsylvania Ave Capacity Upgrades on Route 3 west to Route 1 north off-ramp Engineering / Construction $11,500,000.00 2028
I7 Intersection Improvements Old Mill Park Entrance Improvements Intersection Intersection Reconfiugre culvert, provide pedestrian access Alum Springs Parks Masterplan TBD TBD
I8 Intersection Improvements Gateway Crossing Intersection Intersection Grade Separated bike/ped crossing over Route 3 at Gateway Blvd extended Develop Concept TBD TBD
I9 Intersection Improvements Battlefield Park Connector Intersection Intersection Crosswalk at Willis Street, across Lafayette Blvd Planning Study Underway TBD TBD
I 10 Intersection Improvements George Stree Walk - Traffic Calming (Hanover, Kenmore, Littlepage Intersections) George Street Littlepage St Provide traffic calming, pedestrian improvements, and reduce asphalt widths at three intersections along Hanover Pursue Funding $750,000 TBD
I 11 Intersection Improvements St. Paul Street Pedestrian Crossing Intersection Intersection Safe pedestrian crossing at the end of proposed Greenway Future Lafayette Boulevard Study TBD TBD
I 12 Intersection Improvements Twin Lakes Pedestrian Crossing and Turning Movement Evaluation Intersection Intersection Safe pedestrian crossing and turning movement evaluation Future Lafayette Boulevard Study TBD TBD
I 13 Intersection Improvements Morningside Pedestrian Crossing and Turning Movement Evaluation Intersection Intersection Safe pedestrian crossing and turning movement evaluation Future Lafayette Boulevard Study TBD TBD
I 14 Intersection Improvements Courtland / Hillcrest intersection alignment for Courtland Drive Connector Intersection Intersection Alignment of intersection as part of the new Courtland Drive Connector project Future Courtland Drive Connector Study TBD TBD
I 15 Intersection Improvements Olde Greenwich Drive Pedestrian Crossing and Turning Movement Evaluation Intersection Intersection Safe pedestrian crossing and turning movement evaluation Future Lafayette Boulevard Study TBD TBD
I 16 Intersection Improvements Twin Lakes Drive Intersection evaluation as part of access management along US Route 1 Intersection Intersection Evaluate intersection as part of access management program along US Route 1 Future US Route 1 South Study TBD TBD
I 17 Intersection Improvements Confederate Drive full intersection evaluation as part of access management along US Route 1 Intersection Intersection Evaluate intersection as part of access management program along US Route 1 Future US Route 1 South Study TBD TBD
I 18 Intersection Improvements Learning Lane Intersection Evaluation for Courtland Drive Connector Intersection Intersection Evaluate level of service and pedestrian safety as part of Courtland Drive Connector project Future Courtland Drive Connector Study TBD TBD
I 19 Intersection Improvements Oakwood Drive / Mahone Street Pedestrian Crossing Evaluation Intersection Intersection Identify appropriate safe crossing of Route 3 and connectivity to it Gateway SUP Re-alignment TBD TBD
I 20 Intersection Improvements Cowan / Gateway Intersection Intersection Intersection Build new intersection as part of Gateway Blvd. extension Private Development TBD During Development
I 21 Intersection Improvements Mall Court Intersection Intersection Evaluate level of service and safety as part of accomodating a connection to the Mall Future VDOT STARS Study TBD TBD
I 22 Intersection Improvements Trade Street Intersection Intersection Evaluate level of service and safety as redevelopment of Central Square occurs Private Development TBD During Development
I 23 Intersection Improvements Central Square Intersection Intersection Evaluate level of service and safety as redevelopment of Central Square occurs Private Development TBD During Development
I 24 Intersection Improvements Cowan / Carl D / Central Park Capacity Improvements Intersection Intersection Add turn lane capacity and extend pedestrian facilities Pursue Funding $1,000,000 TBD
I 25 Intersection Improvements River Road Intersection Intersection Provide a safe pedestrian crossing and evaluate inner-connectivity as redevelopment occurs Concept Development TBD TBD
I 26 Intersection Improvements Carl D / Fall Hill Ave - Safety and Capacity Intersection Intersection Add pedestrian crossings / evaluate capacity as new development is proposed Concept Development TBD TBD
I 27 Intersection Improvements Rappahannock HP / Carl D Intersection Evaluation Intersection Intersection Evaluate capacity, level of service, and safety as new development is proposed Private Development TBD During Development
I 28 Intersection Improvements Gordon W Shelton - Intersection Evaluation Intersection Intersection Evaluate level of service and safety as new development is proposed Private Development TBD During Development
I 29 Intersection Improvements Gordon W Shelton - Intersection Evaluation Intersection Intersection Evaluate level of service and safety as new development is proposed Private Development TBD During Development
I 30 Intersection Improvements Lafayette Blvd and Route 3 Intersection Intersection Expand turn lane capacity and add supplemental turn lane to Summit Street Engineering / Construction $7,726,000.00 TBD
SI 1 Street Improvements Route 3 STARS and I-95 Off-Ramp Improvements Gateway Blvd. Lafayette Blvd. Access management and safety upgrades along Route 3 Engineering / Construction $15,474,000.00 2029
SI 2 Street Improvements Dixon Street Widening SCL Mayfield Ave Widen three lane roadway to four lanes and include pedestrian facilities Engineering / Construction $8,909,000.00 TBD
SI 3 Street Improvements Lafayette Boulevard Reconfiguration St Paul Street SCL Implement boulevard and urban street as recommended in Area 10 Plan Develop Concept TBD TBD
SI 4 Street Improvements Wicklow Drive Reconstruction Fall Hill Avenue End Reconstruction of Wicklow Drive to include curb, gutter, sidewalk, lighting, and SUP Pursue Funding $1,500,000 TBD
SI 5 Street Improvements Downtown Lafayette Corridor Study Willis Street Essex Street Study Lafayette for better ADA Access Concept Development $75,000.00 2025
SI 6 Street Improvements William Street Corridor Study Sunken Road Washington Ave. Study Wiliam Street from Downtown to future Perfomring Arts Center for safety Concept Development $75,000.00 2026
SI 7 Street Improvements Downtown Traffic Engineering Study Varies Varies Study one-way to two-way traffic conversions and on-street bicycle facilities Concept Development $250,000.00 2025
SI 8 Street Improvements US Route 1 Access Management (Area 6) Wellford Street Charles Street Access management and safety upgrades along US Route 1 Pursue Funding $900,000 TBD
SI 9 Street Improvements Neighborhood Traffic Calming Lafayette Blvd. Morningside Drive Traffic calming and stormwater infiltration Concept Development TBD TBD
SI 10 Street Improvements Neighborhood Traffic Calming Lafayette Blvd. Future Greenway Traffic calming and stormwater infiltration Concept Development TBD TBD
SI 11 Street Improvements US Route 1 Access Management Learning Lane Confederate Blvd Access management, lighting, landscaping, and safety upgrades Future US Route 1 South Study TBD TBD
SI 12 Street Improvements US Route 1 Access Management Confederate Blvd Twin Lakes Dr. Access management, lighting, landscaping, and safety upgrades Future US Route 1 South Study TBD TBD
TRANSPORTATION PROJECTS DATABASE
Shared Use Paths, Sidewalks, Nature Trails
ID Project_Type Name Origin Destination Project_Description Next Step Cost Est Timeframe
SUP 1 Shared Use Path Kensington Connector St. Paul St. Twin Lakes Dr. Bike / Ped Facility along West Side of Lafayette Complet Construction $2,370,000.00 2025
SUP 2 Shared Use Path Mary Washington Connector Normandy Ave. Mary Washington Blv Accessibility upgrades to shared use path connection Engineering / Construction $347,000.00 TBD
SUP 3 Shared Use Path Bankside Trail / VCR Multimodal Improvements Chatham Bridge Train Station Shared Use Path along Rappahannock River to connect to the VCR Trail Engineering / Construction $2,267,000.00 2028
SUP 4 Shared Use Path Dixon Park Connector Dixon Park Train Station Shared Use Path / On-street facility from Dixon Park to Downtown Engineering / Construction $9,300,000.00 2029
SUP 5 Shared Use Path Telegraph Hill Connector VCR Trail St. Paul St. 10 foot wide shared use path on the west side of Lafayette Blvd Private Development Private Development 2025
SUP 6 Shared Use Path Idlewild Connector #1 Wright Court VCR Trail Enhanced trail connection from the neighborhood to the VCR Trail Concept Development TBD TBD
SUP 7 Shared Use Path Idlewild Connector #2 Walker Drive VCR Trail Enhanced trail connection from the neighborhood to the VCR Trail Concept Development TBD TBD
SUP 8 Shared Use Path Mayfield Connector Railroad Ave Downtown Shared use path adjacent to railroad tracks to the VRE parking deck accessway Future Study TBD TBD
SUP 9 Shared Use Path Lafayette Boulevard Trail Twin Lakes Dr. SCL 10-foot shared use path along improved roadway, from Twin Lakes Drive to SCL Concept Development TBD TBD
SUP 10 Shared Use Path Gateway Blvd. Trail (Middle) Route 3 Cowan Blvd 10-foot shared use path along new road Private Development Private Development During Development
SUP 11 Shared Use Path Gateway Blvd. Trail (North) Cowan Blvd Fall Hill Ave 10-foot shared use path along new road Concept Development TBD TBD
SUP 13 Shared Use Path William Street Corridor Trail Blue and Gray Pkw Gateway Blvd Shared use path along Route 3 Concept Development TBD TBD
SUP 14 Shared Use Path Downman House Connector Gateway Blvd Sand Circle Shared use path connecting Gateway to Idlewild Downman Project Development TBD 2030
SUP 15 Shared Use Path Hospital Drive Connector Mary Wash Blvd Cowan Blvd 10 foot shared use path on Hospital Drive between Mary Wash and Cowan Concept Development TBD TBD
SUP 16 Shared Use Path Gateway Blvd. Trail (South) (modified) Idlewild Blvd Route 3 Shared use path along the east side of Gateway Blvd Alternative Alignment Identified TBD 2030
SUP 17 Shared Use Path Special Tourism and Events District Shared Use Path Fall Hill Ave Stadium Shared Use Path connecting the Fall Hill Ave Shared Use Path with the Stadium Pursue Funding $1,250,000 TBD
SUP 18 Shared Use Path Carl D. Silver Shared Use Path Fall Hill Ave Route 3 Shared Use Path along west side of Carl D. Silver connecting Central Park into Trail Network Private Development Private Development During Development
SUP 19 Shared Use Path Celebrate Virginia South Connector Gordon W Shelton Carl D Silver Pkwy Shared Use Path connecting Celebrate Virginia South into existing Shared Use Path Network Private Development Private Development During Development
SUP 20 Shared Use Path Wild Riverfront Connector Sunshine Park Riverfront Shared Use Path connecting anticipated development in the north west corner of CVAS South Wild Riverfront Park Masterplan 75000 2030
SUP 21 Shared Use Path Downtown Connector Idlewild Blvd Olde William Street Shared Use Path to connect western neighborhoods to Downtown Planning Concept TBD TBD TBD
SUP 22 Shared Use Path Courtland Drive Connector Learning Lane Hillcrest Drive Shared Use Path to provide safe route to schools Planning Concept TBD TBD TBD
SUP 23 Shared Use Path US Route 1 SUP including the Idlewild Connector SCL Idlewild Blvd Shared Use Path to provide north south connection to VCR Trail Engineering / Construction Regional Project 2030
SUP 24 Shared Use Path Kind St Connector US Route 1 VCR Trail Shared Use Path to provide east / west connection between US Route 1 and VCR Trail Private Development Private Development During Development
SUP 25 Shared Use Path Gordon W Shelton Connector Fall Hill Avenue Cowan Blvd Shared Use Path to provide north / south connection between Fall Hill Ave and Cowan Blvd Private Development Private Development During Development
SUP 26 Shared Use Path Fall Hill Connector Fall Hill Avenue Gordon W Shelton Bl Shared Use Path connection Private Development Private Development During Development
SUP 26 Shared Use Path Fall Hill Connector Fall Hill Avenue Gordon W Shelton Bl Shared Use Path connector Private Development Private Development During Development
SUP 27 Shared Use Path River Accessway Wicklow Drive The Quarry Shared Use Path Future Study - Wild Riverfront Park TBD TBD
SUP 28 Shared Use Path Beverly Drive Connector Beverly Drive Idlewild Blvd 10 foot wide shared use path to connect US Route 1 SUP, VCR SUP, and neighborhoods to the north of Idlewild Concept Development TBD TBD
SW 2 Sidewalk Oakwood Street Corridor Governors Row Route 3 Sidewalk along Oakwood Street Complete Streets Study TBD TBD / FAMPO
SW 3 Sidewalk Walker-Grant School Connector Cowan Blvd Learning Lane Sidewalk on US Route 1 Complete Streets Study TBD TBD / FAMPO
SW 4 Sidewalk Fredericksburg Cemetery Sidewalks Amelia Street William St Provide for modified sidewalk and wall protection along Washington Avenue Complete Streets Study TBD TBD / FAMPO
SW 5 Sidewalk Morningside Connector Lafayette Proposed Greenway Provide neighborhood sidewalks Complete Streets Study TBD TBD / FAMPO
SW 6 Sidewalk Lafayette Sidewalk SCL St Paul Street Provide complete sidewalks to fill in gaps on eastern side of Lafayette Blvd. Pursue Funding $1,000,000 TBD
SW 7 Sidewalk Olde Greenwich Sidewalk Lafayette Proposed Greenway Provide neighborhood sidewalks Complete Streets Study TBD TBD / FAMPO
SW 8 Sidewalk US Route 1 SCL VCR Trail Provide sidewalk on the eastern portion of US Route 1 Future Study TBD TBD
SW 9 Sidewalk Fall Hill Ave Sidewalk Vidalia Carl D Silver Pkwy Provide sidewalk on the eastern side of Fall Hill Ave Complete Streets Study TBD TBD / FAMPO
N 1 Natural Trail River Quarry Trail Fall Hill Ave River Road Natural Trail along the River Non-Profit Partnership TBD TBD
N 2 Natural Trail Motts Run Connector Fall Hill Ave Motts Run Natural Trail along the River Non-Profit Partnership TBD TBD
N 3 Natural Trail Altoona Connector Altoona Semple Court Bike / Ped connection between Altoona and Semple Court Non-Profit Partnership TBD TBD
N 4 Nature Trail Area 10 Greenway Farrell Lane St Paul Street Greenway nature trail Non-Profit Partnership TBD TBD
Public Open Space Database
Facility Name Type Type# Water-Dependent Facilities Additional Information
Triangle EOS 1 N/A Area 7 Small Area Plan
War Memorial EOS 2 N/A Area 7 Small Area Plan
Heritage Trailhead EOS 3 Canal Features Area 6 Small Area Plan
Heritage Trailhead EOS 3 Canal Features Area 6 Small Area Plan
University of Mary Washington EOS 4 N/A Area 5 Small Area Plan
Washington Ave Mall EOS 6 N/A Area 7 Small Area Plan
Trestle Open Space EOS 7 N/A Area 7 Small Area Plan
Masonic Cemetery EOS 8 N/A Area 7 Small Area Plan
Methodist Yard EOS 9 N/A Area 7 Small Area Plan
Wallace Library Yard EOS 10 N/A Area 7 Small Area Plan
Riverside Drive EOS 11 Recreation and River Access Area 6 Small Area Plan
Hurkamp Park EP 1 N/A https://www.fredericksburgva.gov/1552/Hurkamp-Park
Alum Spring Park EP 2 Recreation https://www.fredericksburgva.gov/1127/Alum-Spring-Park
Dixon Park EP 3 Recreation https://www.fredericksburgva.gov/1550/Dixon-Park
Memorial Park EP 4 N/A https://www.fredericksburgva.gov/1554/Memorial-Recreation-Park
Maury Playground EP 5 N/A https://www.fredericksburgva.gov/1553/Maury-Playground
Snowden Park EP 6 N/A https://www.fredericksburgva.gov/1556/Snowden-Park
Old Walker Grant School Park EP 7 Recreation https://www.fredericksburgva.gov/1558/Walker-Grant-Center
WL Harris Playground EP 8 N/A https://www.fredericksburgva.gov/1557/WL-Harris-Playground
City Dock EP 9 Dock and Boat Ramp https://www.fredericksburgva.gov/1126/City-Dock
Old Mill Park EP 10 Recreation and Boat Ramp https://www.fredericksburgva.gov/1602/Old-Mill-Park
Riverfront Park EP 11 Recreation and Dock https://www.fredericksburgva.gov/1262/Riverfront-Park
Cossey Park EP 12 Recreation https://www.fredericksburgva.gov/1549/Cossey-Park
Powhatan Park EP 13 N/A https://www.fredericksburgva.gov/1555/Powhatan-Park
Cobblestone Park EP 14 Recreation https://www.fredericksburgva.gov/1548/Cobblestone-Park
Dorothy Hart Community Center EP 15 N/A https://www.fredericksburgva.gov/1477/Dorothy-Hart-Community-Center
Sunshine Park EP 16 N/A Area 2 Small Area Plan
Fredericksburg Dog Park EP 17 N/A https://www.fredericksburgva.gov/1551/Fredericksburg-Dog-Park
Fredericksburg National Battlefield - NPS EP 18 N/A https://www.nps.gov/frsp/index.htm
Motts Run Reservoir EP 19 Recreation, Boat Ramp, and Docks https://www.fredericksburgva.gov/Facilities/Facility/Details/Motts-Run-Reservoir-Recreation-Area-10
Maury Stadium EP 20 N/A Area 7 Small Area Plan
Battleground Athletic EP 21 N/A Area 5 Small Area Plan
Market Square EP 22 N/A Area 7 Small Area Plan
Vermont Ridge Open Space FOS 1 Recreation Area 3 Small Area Plan
Alum Spring Extended FOS 2 Recreation Area 5 Small Area Plan
Hazel Run Open Space FOS 3 Recreation and Dock Area 7 Small Area Plan
Old Mill Extended FOS 4 Recreation and Dock Area 6 Small Area Plan
Butler-Brayned Open Space FOS 5 Recreation Area 2 Small Area Plan
Wild Riverfront FOS 6 Recreation, Boat Ramp, and Docks Area 1 / 2 Small Area Plans
Wild Riverfront FOS 6 Recreation, Boat Ramp, and Docks Area 1 / 2 Small Area Plans
Lake Areas 2 FOS 7 Recreation and Dock Area 1 Small Area Plan
Lake Areas 1 FOS 8 Recreation and Dock Area 1 Small Area Plan
Downman FOS 9 Recreation Area 3 Small Area Plan
Canal Street Wharf FOS Recreation and Dock Area 7 Small Area Plan
James Monroe High School S1 N/A Area 6 Small Area Plan
Hugh Mercer School S2 N/A Area 3 Small Area Plan
Idlewild School S3 N/A Area 3 Small Area Plan
Learning Lane Schools S4 N/A Area 10 Small Area Plan
Get email alerts for Fredericksburg
A daily email when new agendas and minutes are posted.